Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />HLP 70 <br /> <br />HIGH VOLTAGE SERVICE - RIDER A <br /> <br />AVAILABILITY - At all points in all Areas on the Company's Overhead System where <br />facilities of adequate capacity and the required phase and suitable voltage are <br />adjacent to the premises to be served. <br /> <br />APPLICATION - To Electrical Service billed under Rate Schedules MGS and LGS when <br />such service is taken directly from feeder lines of 12,500 volts or higher as <br />specified by the Company for the size, character and location of the load to be <br />served, and where the customer owns, operates and maintains all the facilities <br />required for receiving such ~ervice at the voltage of the feeder line. <br /> <br />Not applicable to temporary, breakdown, standby, supplementary or resale <br />service. <br /> <br />All provisions of the applicable Rate Schedule will apply except as modified <br />herein. <br /> <br />HIGH VOLTAGE SERVICE CREDIT - Monthly billing shall be in accordance with the <br />above mentioned Rate Schedules minus a credit as indicated below. <br /> <br />For Electric Service supplied directly from a feeder line of 12,500 volts <br />10~ per kva for the first 3000 kva and <br />5t per kva for all additional kva <br /> <br />For Electric Service supplied directly from feeder lines of 34,500 volts or <br />69,000 volts <br />15~ per kva for the first 3000 kva and <br />10~ per kva for all additional kva <br /> <br />For Electric Service supplied directly from a feeder line of 138,000 volts or <br />higher <br /> <br />25~ per kva for the first 3000 kva and <br />20~ per kva for all additional kva <br /> <br />This credit shall not serve to reduce (1) the minimum stipulated in Schedule <br />LGS or (2) the monthly bill under Schedule MGS to an amount less than the charge <br />for 40 kwh per kva. <br /> <br />HOUSTON LIGHTING & POWER COMPANY <br />