My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1987-1564
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1980's
>
1987
>
O-1987-1564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:45 PM
Creation date
7/20/2006 3:12:39 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/26/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />The parties understand and agree that all money <br />paid to Boe by La Porte under this section is intended <br />to be used for the construction of an intake stack <br />which, at a minimum, meets the size standards set forth <br />herein. Should Boe receive payment under this section <br />from La Porte and should Boe fail without good cause to <br />construct a stack which at least meets the <br />specifications stated herein wi thin 240 days from the <br />date of payment, La Porte shall have no further <br />obligation hereunder and La Porte shall be released from <br />any liability with respect to methane emissions. Once <br />the stack is constructed, Boe has the duty to properly <br />use, operate and maintain same. <br /> <br />9.S.b. If La Porte selects this remedial action, <br />within 60 days of its selection notice to Boe it shall <br />begin the installation of the landfill gas collection <br />and flaring system constructed and designed in <br />accordance with then current technology and sound <br />engineering practice. Installation of the landfill gas <br />collection and flaring system shall be completed within <br />240 days of La Porte I s selection notice to Boe. When <br />completed, the landfill gas collection and flaring <br />system shall be operated in accordance with sound <br />engineering practice. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.