Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />The parties understand and agree that all money <br />paid to Boe by La Porte under this section is intended <br />to be used for the construction of an intake stack <br />which, at a minimum, meets the size standards set forth <br />herein. Should Boe receive payment under this section <br />from La Porte and should Boe fail without good cause to <br />construct a stack which at least meets the <br />specifications stated herein wi thin 240 days from the <br />date of payment, La Porte shall have no further <br />obligation hereunder and La Porte shall be released from <br />any liability with respect to methane emissions. Once <br />the stack is constructed, Boe has the duty to properly <br />use, operate and maintain same. <br /> <br />9.S.b. If La Porte selects this remedial action, <br />within 60 days of its selection notice to Boe it shall <br />begin the installation of the landfill gas collection <br />and flaring system constructed and designed in <br />accordance with then current technology and sound <br />engineering practice. Installation of the landfill gas <br />collection and flaring system shall be completed within <br />240 days of La Porte I s selection notice to Boe. When <br />completed, the landfill gas collection and flaring <br />system shall be operated in accordance with sound <br />engineering practice. <br /> <br />7 <br />