Laserfiche WebLink
<br />Ordinance 1533-A continul <br />Page 23 <br /> <br />e <br /> <br />(3) Base flood elevation data shall be generated for subdivision proposals <br />and other proposed developments including manufactured home parks <br />and subdivisions, which are greater than 50 lots or 5 acres, whichever is <br />lesser, if not otherwise provided pursuant to Article 3, Section B or Article <br />4, Section B(8) of this Ordinance. <br /> <br />(4) All development proposals including manufactured home parks and <br />subdivisions shall have adequate drainage provided to reduce exposure <br />to flood hazards. <br /> <br />(5) All development proposals including manufactured home parks and <br />subdivisions shall have public utilities and facilities such as sewer, gas, <br />electrical and water systems located and constructed to minimize or <br />eliminate flood damage. <br /> <br />Section D. Standards for Areas of Shallow Flooding (AD/AH) Zones <br /> <br />Located within the areas of special flood hazard established in Article 3, Section B, are <br />areas designated as areas of Shallow Flooding. These areas have special flood <br />hazards associated with base flood depths of 1 to 3 feet where a clearly defined <br />channel does not exist and where the path of flooding is characterized by ponding or <br />sheet flow; therefore, the following provisions apply: <br /> <br />(1) All new construction and substantial improvements of residential <br />structures have the lowest floor (including basement) elevated above the <br />highest adjacent grade at least as high as the depth number specified in <br />feet on La Porte's FIRM (at least two feet if no depth number is specified). <br /> <br />(2) All new construction and substantial improvements of nonresidential <br />structures; <br /> <br />(a) have the lowest floor (including basement) elevated above the <br />highest adjacent grade at least as high as the depth number <br />specified in feet on La Porte's FIRM (at least two feet if no depth <br />number is specified), or; <br /> <br />(b) together with attendant utility and sanitary facilities be designed so <br />that below the base flood level the structure is watertight with walls <br />substantially impermeable to the passage of water and with <br />structural components having the capability of resisting hydrostatic <br />and hydrodynamic loads of effects of buoyancy. <br /> <br />(3) A registered professional engineer or architect shall submit a certification <br />to the Floodplain Administrator that the standards of this Section, as <br />proposed in Article 4, Section C (1 )a., are satisfied. <br />