My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-SCU-98-001
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-SCU-98-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:03 PM
Creation date
7/21/2006 8:24:08 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/15/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Texas Import/Export plphase I <br />March IS, 1999 <br />Page 4 of 4 <br /> <br />e <br /> <br />exterior walls shall have brick, exposed aggregate concrete, or glass and that <br />no buildings shall be covered with aluminum, iron, or steel. With regard to <br />landscaping, staff is only requesting that a uniform design theme be utilized <br />throughout this project. This is also the case with signs. Uniform design and <br />application of signage to create a unified campus appearance is the intent. <br />Assistant City Attorney, John Armstrong, has provided comments regarding <br />the Covenants and Restrictions and these are provided for your review at the <br />end of this report. P&Z is recommending the inclusion of these comments <br />when the Covenants and Restrictions are fmalized and recorded with the <br />subdivision plats for each section of this development. <br /> <br />Exhibit "F" Preliminary Detention I Open Space Plan <br /> <br />This exhibit shows cross-sections and some detail of how the trail system, <br />open space areas, and stormwater detention systems will interrelate.. It is <br />anticipated that all these systems will be constructed in phases as each is <br />needed to support the section being developed. The Development <br />Agreement allows for the City to accept the trail and open space systems <br />depending on the final design and function, <br /> <br />Exhibit "G" Traffic Control Plan <br /> <br />The purpose of this exhibit is to insure the efficient flow of traffic to, from <br />and within the project in a manner that will minimize adverse impacts to the <br />existing thoroughfare system of the area. Traffic control features established <br />in this exhibit will be enforced through the Restrictive Covenants with <br />oversight by the City, The Traffic Control Plan will be implemented through <br />site plan design, driveway design, and the placement of esplanade openings. <br />This exhibit also includes guidelines that can be used to assist in designing <br />facilities that will better accommodate truck traffic. <br /> <br />Exhibit "H" Harris County Thoroughfare Design Guidelines <br /> <br />This exhibit is intended to provide design assistance for all the public <br />roadways within this development. These guidelines require additional <br />pavement thickness among other requirements in anticipation of the traffic <br />loading this development will generate, <br /> <br />Conclusion: <br /> <br />Staff and the Developer have worked hard on a development proposal that <br />we feel is in the best interest of the City of La Porte. All applicable <br />elements of the Comprehensive Plan were reviewed and incorporated into <br />this development proposal.. Staff is recommending approval of the Special <br />Conditional Use Permit, General Plan, Development Agreement, and all <br />Exhibits contained therein as presented, <br />
The URL can be used to link to this page
Your browser does not support the video tag.