My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1994-SCU94-004
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1994
>
O-1994-SCU94-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:55 PM
Creation date
7/21/2006 8:31:37 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/17/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning & Zoning Commission <br />Meeting of 11/17/94 <br />SCU94-004 <br />Page 5 of 6 <br /> <br />Conclusion: <br /> <br />- <br /> <br />e <br /> <br />along the west face of the building to be located <br />in the staging area. Plan submittal and planting <br />should take place in accordance. <br /> <br />In summary, staff finds the following: <br /> <br />· The trailer staging area is not needed for operation of <br />the freezer warehouse. <br /> <br />· The operation of the yard by a separate company <br />maintains the property use envisioned by the original <br />SCU Permit. <br /> <br />. Operating the yard as a separate lease would not <br />seriously disrupt interior traffic circulation, nor would it <br />seriously impact traffic on surrounding streets. <br /> <br />. Existing fire protection is adequate. Sanitary sewer and <br />potable water is available in close enough proximity to <br />be readily extended to serve the proposed office <br />building. <br /> <br />. The 12' x 24' office building can be located in a manner <br />that satisfies zoning setback requirements. <br /> <br />· Subject to replanting the landscape buffer and <br />development of additional landscaping in the manner <br />specified, the proposed business can operate in a manner <br />that is compatible with the intent of the original SCU <br />Permit. <br /> <br />· It must be clearly understood that the property owner <br />maintains full responsibility for maintenance of the <br />stormwater detention facility. <br /> <br />Based on the facts and considerations noted above, staff <br />recommends granting SCU94-004 as an amendment to Special <br />Conditional Use Permit #SCU90-002 with the following <br />Amendment Conditions: <br /> <br />1. The original landscape buffer being replanted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.