My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-1501-BB
LaPorte
>
.Ordinances
>
1990's
>
1998
>
O-1998-1501-BB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:00 PM
Creation date
7/21/2006 9:06:16 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/15/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'! <br /> <br /> <br />e <br /> <br />, <br />J <br /> <br />City of La Porte <br />Established 1892 <br /> <br />September 9, 1998 <br /> <br />Mr. Ron Evans, Manager <br />PPG Industries, Inc. <br />P.O. Box 995 <br />La Porte, Texas 77572-0995 <br /> <br />Dear Mr. Evans: <br /> <br />By this letter, PPG Industries, Inc. is hereby authorized to construct a parking lot over the alleys <br />in Blocks 861 and 868 and "H" Street between 15th and 16th Street (see attached Exhibit "A") in <br />accordance with the following terms and conditions: <br /> <br />1) The parking lot will be considered temporary and the term of this authorization shall not <br />exceed three (3) years. <br />2) Extensions to this authorization may be granted at the sole discretion of the City of La Porte, <br />based upon special circumstances. <br />3) The parking lot shall be constructed and maintained to be dust-free. <br />4) Upon termination of this authorization, all material used to construct the parking lot shall be <br />removed from the referenced street and alleys. <br />5) Nothing in this authorization shall limit the ability of the City of La Porte or its franchised <br />utility companies from installing and maintaining utility lines within the street and alleys. <br />6) Construction of the parking lot will require a building permit from the City of La Porte. <br />Issuance of a building permit will be based upon satisfactory compliance with City of La <br />Porte ordinance requirements as demonstrated on the submitted site plan. <br />7) PPG Industries recognizes that these streets and alleys are dedicated public rights-of-way and <br />further acknowledges that temporary permission to occupy the rights-of-way does not grant <br />or convey any expressed or implied interest in the rights-of-way. <br /> <br />The terms and conditions of this authorization are hereby agreed to: <br /> <br />CITY OF LA PORTE <br /> <br />PPG INDUSTRIES, INC. <br /> <br />tl!4:~ <br /> <br />~Manager, EH & S <br /> <br />G?o&J: '1: ~ <br /> <br />City Manager <br /> <br />P.Q.BoxII15. La rone, Texas 77572-1 115 0 (713)471-5020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.