Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
ARIZONA STREET DRAINAGE IMPROVEMENTS
BATTLEGROUND ESTATES DRAINAGE IMPROVEMENT PROJECT
BATTLEGROUND ESTATES SUBDIVISION FLOODING (PHASE I)
BAYMUD DRAINAGE PROJECT - PINE BLUFF SUBDIVISION
BAYMUD DRAINAGE PROJECT - SHADY OAKS SUBDIVISION
BROOKGLEN DETENTION PONDS
CANADA ROAD PAVING, DRAINAGE, WATER & SANITARY SEWER IMPROVEMENTS
CITY-WIDE DRAINAGE STUDY (2009)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (1996)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2000)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2001)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2002)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2003)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2005)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2006)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2007)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2008)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2010)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2011)
CITY-WIDE SIDEWALK IMPROVEMENT PROJECT (2013)
CITY-WIDE SIDEWALK INFILL PROJECT (2007)
CITY-WIDE SIDEWALK INFILL PROJECT (2009)
CITY-WIDE SIDEWALK INFILL PROJECT (2010)
CITY-WIDE SIDEWALK RAISING PROJECT (2014)
CITY-WIDE SIDEWALK REPLACEMENT / INFILL PROJECT (2011)
CITY-WIDE SIDEWALK REPLACEMENT PROJECT & FAIRMONT PKWY PED PLAN PHASE II
CITY-WIDE SIDEWALK REPLACEMENT PROJECT (2009)
CONCRETE STREET PROGRAM STUDY (2011)
CREEKMONT SUBDIVISION DRAINAGE IMPROVEMENTS
CROW'S NEST GALLERY DRAINAGE
CULVERT AND TIMBER BULKHEAD AT UNNAMED LATERAL OUTFALLING INTO GALVESTON BAY
DESILTING DITCHES 2010
DRAINAGE & UTILITY PLAN - PINE BLUFF SUBDIVISION
DRAINAGE PROBLEM AT HAPPY HARBOR
DRIFTWOOD DRIVE DRAINAGE IMPROVEMENTS
EAST "E" STREET & DRIFTWOOD DRIVE BIKE PATHS
EAST "E" STREET PEDESTRIAN TRAIL
EAST "G" STREET PAVEMENT INVESTIGATION
EAST MAIN STREET DRAINAGE IMPROVEMENTS
F101 - CHANNEL CONVEYANCE IMPROVEMENTS (F101-06-00 TO N. 'L' ST.
F101 CHANNEL CONVEYANCE IMPROVEMENTS
F101-00-00-E004 CHANNEL CONSTRUCTION
F101-06-00-X002 CHANNEL DESILT
F216 (LCB) LINEAR DETENTION
F216 (LCB) PHASE 2 IMPROVEMENTS
F216 (LCB) WATERSHED
F216 EXTENSION WEST OF SENS ROAD
F216 IMPROVEMENTS - SENS RD TO UPRR
F216 LINEAR DETENTION
F216-00-00 IN-LINE DETENTION BASIN
FAIRMONT OVERPASS AT UPRR
FAIRMONT PARK EAST IMPACT ANALYSIS
FAIRMONT PARKWAY AT GENOA-RED BLUFF RD PATHWAY IMPROVEMENTS
FAIRMONT PARKWAY BICYCLE-PEDESTRIAN PATHWAY
FAIRMONT PEDESTRIAN PARKWAY PROFILE
FAIRMONT PKWY SHARED USE PATH
FLEETWOOD DRIVE STREET & DRAINAGE IMPROVEMENTS
FONDREN STREET DRAINAGE MAINTENANCE PROJECT
GLEN MEADOWS DRAINAGE IMPROVEMENTS
HCFCD A104-10-02-X001 DRAINAGE ENCLOSURE
HCFCD UNIT NO. F101-00-00
HILLRIDGE RD & ROSEBERRY DR INTERSECTION RECONSTRUCTION
JEFFERSON AVENUE & BAYSHORE DRIVE DRAINAGE IMPROVEMENTS
LAKES AT FAIRMONT GREENS PEDESTRIAN BRIDGE OVER TAYLOR BAYOU
LOMAX SCHOOL RD DRAINAGE PROJECT
MAIN ST SIDEWALK & CURB REPLACEMENT AND CORNER WHEELCHAIR ACCESS RAMPS
MORGAN'S POINT SIDEWALK PROJECT ALONG DONALDSON AVE. & WILSON AVE.
NORTH "D" STREET IMPROVEMENTS
NORTH "L" ST ASPHALT PAVEMENT
NORTH "P" STREET - SOUTH SIDE DRAINAGE IMPROVEMENTS
NORTH "P" STREET DRAINAGE IMPROVEMENTS
NORTH 18TH STREET TOPOGRAPHIC PROJECT
NORTH 2ND STREET EXTENSION
NORTH 7TH STREET EXTENSION
OAKHURST DRIVE & WESTVIEW DRIVE DRAINAGE, SAN SEWER & SERVICE RELOCATIONS
PARK AVENUE BRIDGE REPLACEMENT
PARK AVENUE PEDESTRIAN PATHWAY
PECAN PARK PEDESTRIAN PATHWAY
PEDESTRIAN BRIDGE - LAKES AT FAIRMONT GREENS SUBDIVISION @ TAYLOR BAYOU
PINE BLUFF SUBDIVISION - BAYMUD DRAINAGE PROJECT
PORT CROSSING DEVELOPMENT DRAINAGE ANALYSIS
PORT CROSSING DRAINAGE STUDY
PROFILE OF PROPOSED STREETS IN FAIRMONT PARK SECTION 2
PROPOSED EXT OF 13TH STREET FROM W. L TO W. M (PLAN & PROFILE)
RE-ANALYSIS OF DRAINAGE IMPACTS TO B106-02-00 & B106-00-00, DRAINAGE IMPROVS FOR FAIRMONT PARK EAST
SECTOR 23 PAVING, WATER & SEWER IMPROVEMENTS
SENS ROAD BRIDGE OVER HCFCD UNIT NO. F101-00-00
SENS ROAD DRAINAGE IMPROVEMENTS
SENS ROAD PAVING & DRAINAGE IMPROVEMENTS
SHEET FLOW RELIEF STRUCTURES
SHEET FLOW RELIEF STRUCTURES (2)
SIDEWALK CONNECTING FITNESS CENTER TO LCB PEDESTRIAN BRIDGE
SOUTH 13TH STREET CONSTRUCTION
SOUTH 8TH ST. @ WEST MAIN ST DRAINAGE IMPROVEMENTS
SOUTH 8TH STREET DRAINAGE IMPROVEMENTS (PHASE 1)
SOUTH 8TH STREET DRAINAGE IMPROVEMENTS (PHASE 2)
SOUTH 8TH STREET RECONSTRUCTION
SOUTH BROADWAY & SUNRISE DRIVE DRAINAGE IMPROVEMENTS
SPENCER HIGHWAY OVERPASS AT UPRR
SPENCER HIGHWAY RECONSTRUCTION (1 OF 2)
SPENCER HIGHWAY RECONSTRUCTION (2 OF 2)
STATE HIGHWAY IMPROVEMENTS (TXDOT)
STORM SEWER & DRAINAGE DITCH IMPROVEMENTS
STORM SEWER EXT & DETENTION POND EXCAVATION
STRANG YARD BOX CULVERTS AT HCFCD UNIT F101-00-00
STREET PAVING & DRAINAGE IMPROVEMENT PROJECT (1980)
SUMMER WINDS SUBDIVISION DETENTION POND IMPROVEMENTS
SWALE AT CENTRAL PARK
TEXAS AVENUE BEAUTIFICATION PLAN
UTAH STREET DRAINAGE IMPROVEMENTS
UTILITY RELOCATIONS FOR F101 DRAINAGE IMPROVEMENTS
VALLEY VIEW BRIDGE OVER HCFCD UNIT NO. F101-06-00
VALLEYBROOK DRIVE DRAINAGE IMPROVEMENTS
WEST "B" STREET & SOUTH 17TH STREET EXTENSION
WEST "E" STREET EXPANSION
WEST "F" STREET DRAINAGE IMPROVEMENTS
WEST "H" STREET DRAINAGE IMPROVEMENTS
WEST ADAMS STREET & BROWNING LANE DRAINAGE IMPROVEMENTS
WEST MAIN STREET & SOUTH BROADWAY ACQUISITION FROM TXDOT
WEST MAIN STREET & SOUTH BROADWAY RECONSTRUCTION PROJECT (1949)
WEST MAIN STREET DRAINAGE SURVEY