HomeMy WebLinkAboutO-2001-2485
.
.
ORDINANCE NO. 2001-a~<<jl
AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT BETWEEN THE CITY
OF LA PORTE AND JRC CONSTRUCTION, INC., FOR WATERLINE REPLACEMENT
ON PINEY BROOK DRIVE, BELFAST, AND CATLETT LANE AT BIG ISLAND
SLOUGH; APPROPRIATING $212,649.00 PLUS A CONTINGENCY OF $20,000.00,
TO FUND SAID CONTRACT; MAKING VARIOUS FINDINGS AND PROVISIONS
RELATING TO THE SUBJECT; FINDING COMPLIANCE WITH THE OPEN MEETINGS
LAW; PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes
the contract, agreement, or other undertaking described in the
title of this ordinance, in substantially the form as shown in the
document which is attached hereto and incorporated herein by this
reference. The City Manager is hereby authorized to execute such
document and all related documents on behalf of the city of La
Porte. The city Secretary is hereby authorized to attest to all
such signatures and to affix the seal of the City to all such
documents. City Council appropriates the sum of $212,649.00 plus
a contingency of $20,000.00, from Fund 3 to fund said contract.
Section 2.
The City Council Officially finds, determines,
recites, and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the public at the City Hall of the
ci ty for the time required by law preceding this meeting, as
required by the Open Meetings Law, Chapter 551, Texas Government
Code; and that this meeting has been open to the public as required
by law at all times during which this ordinance and the subject
matter thereof has been discussed, considered and formally acted
upon.
The City Council further ratifies, approves and confirms
such written notice and the contents and posting thereof.
e'
e
ORDINANCE NO. 2001-A1~~
PAGE 2
section 3. This Ordinance shall be effective from and after
its passage and approval, and it is so ordered.
PASSED AND APPROVED, this 23rd day of April, 2001.
CITY OF LA PORTE
By:
it.. #/11~/#14-
oman L. Malone
Mayor
ATTEST:
1!J.wJi Iv a. .(J. 111i1
Mar ha A. Gillett
City Secretary
APPROVED:
~t:J
Knox W. Askins
City Attorney
~
~
~
- ..
e ..
CLAUNCH & MILLER, INC.
Engineering Consultants
April 11, 2001
Mr. Steve Gillette
Director of Public Works
City of La Porte
P.O. Box 1115
La Porte, Texas 77572-1115
Re: Engineering Services for Waterline Improvements
on Piney Brook Drive, Belfast Road and Catlett Lane
CM! Job No. 00-058
Dear Mr. Gillette:
On April 10, 2001 bids were received on the above referenced project at the City Hall of La
Porte at 2:00 p.m. Bids were opened and read in public. Three (3) bids were received on th~
proj ect. '
All bids were tabulated and reviewed. The following is a summary of our bid evaluation:
Bidder Bid Amount
Lowest: JRC Construction . $212,649.00
Second: Triple B Construction $228,563.00
Third: ' Troy Construction $383,174.00
The difference between the low bidder and the second low bidder was $15,914.00. A copy ofthe
bid tabulation is attached.
JRe Construction has successfully completed projects for Claunch & Millet, Inc. previously.
.Therefore, JRC COQ.struction appears to Qe a responsible firm that is capable of performing the
specified work in a satisfactory manner. For this reason, we recommend that the City of La
Porte award the Waterline Improvements Project to JRC Construction for the amount of
$212,649.00.
Sincerely,
CLAUNCH & MILLER, INC.
~ z. ~II?Z.
({ames E. Thompson, P.E.
Senior Project Manager
3701 Kirby Drive, Suite 860 · Houston, Texas 77098. (713) 524-7113
PINEY BROOK DRIVE, BELFAST ROAD AND CATLETT LANE AT BIG ISLAND SLOUGH WATERLINE REPLACEMENT PROJECT
CITY OF LA PORTE
CMI Job No. 00-058
LOW BIDDER
TOTAl
AMOUNT
TROY CONSTRUCTION
r
UNIT
PRICE,
TOTAl
AMOUNT
I
TRIPLE B SERVICES
UNIT
PRICE
TOTAl
AMOUNT
I
JRC CONSTRUCTION
UNIT
PRICE
r UNIT TaUAN,
ITEM DESCRIPTION
e
$144,433,00
$!3~
$ ,692,00
$19,907.00
$4,85O.00i
$3,306,00
$5,820,00
$2,670,00
$2,430,00
$6,240,00
$360,00
$960,00
$4,488,00
$20,160,00
$2,850,00
$38,558,00
$3,160,ooi
$ I
81,601,001
$357,239.001
$48,50
$46,00
$47.00
$19,907,00
$970,00
$1,102,00
$2,910,00
$2,670,00
$2,430,00
$1,560,00
$360,00
$120,00
$1,122.00
$480,00
$570.00
$6,50
$1,00
$6,50
$58,071,00
$11,960,00
$342,00
$9,000.00
$2,750,00
$1,125,00
$5,500,00
$2,250,00
$2,000,00
$4,800,00
$225.00
$1,200,00
$1,600,00
$14,700,00
$500,00
$29,660,00
$6,320,00
$19.50
$40.00
~
$9,000,00
$550,00
~
$2,750,00
$2,250,00
$2,000,00
$1,200,00
$225,00
$150,00
$400.00
$350,00
$100,00
$5,00
$2,00
$5,00
$59,113,30
$10~
$450,00
$27,085,00
$2,205,00
$966,00
$3,706,00
$1,635,00
$1,308,00
$4,784,00
$70,00
$1,120,00
$2,616,00
$12,726.00
$255,00
$22,126.36
$6,320,00
$43,436,84
$200,238.00
$19,85
$34,50
$12,50
$27,085,00
~
$322,00
$1,853,00
$1,635,00
$1,308,00
$1,196,00
$70,00
$140,00
$654,00
$303,00
$51,00
$3,73
$2.00
$3,46
2,978
299
38
1
5
3
2
1
1
4
1
8
4
42
5
~
3160
12554
L,F,
!:L
L.F.
~
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
S,F"
L.F.
S,F,
BASE UNIT PRICES
Install 8. PVC Co9oo Walerline in open cut
Install 8" PVC Co900 Walerline in auger hole
Install.6' PVC Co900 Waterline in open cut
8' PVC C-9oo waterline ditch crossing within H,C,F,C,D, right of way
8' gate valve and box, all depths
6' gate valve and box
1 Z" X 8" Tapping sleeve and valve
8' X 8' Tapping sleeve and valve
6' X 6" Tapping sleeve and valve
New fire hydrant
Remove ellisting fire hydrant
Remove valve box and bury
8' connection
Service reconnection all sizes, long and short
6' cut and plug
4' concrete driveway removal and replacement
Trench safely system
New sidewalk, includes removal of exislill!l sidewalk
-
$5,000,00
$2,000,00
$900,00
$3,250,00
$3,250,00
$325,00
$1,560,00
$2,400,00
~
$2,000,00
~
$1,250,00
$25,935.00
$50,00
$1,000,00
$45,00
~
$6,50
.$6,50
$1,560,00
$480,00
$1,000,00
$1,~
~
$25,00
$62,770,00
$214,773.00
$1,950.00
$200,00
$190,00
$2,500,00
$2,500,00
~
$1,200,00
$1,750,00
$750,00
$1,100,00
~
$1,000,00
$13,790.00
$19,50
~
$9,50
$5,00
$5,00
~
$1,200,00
$350,00
$375,00
$550,00
$1,985,00
$100,00
$250.00
$1,750,00
$1,865,00
$150,00
$1,196,00
$1,515,00
$644,00
$882,00
$19,85
$50,00
$12,50
$3,50
$3,73
$3,00
$1,196,00
$303,00
$322,00
$441,00
$10,74
$20,00
100
2
20
500
5!!Q.
50
1
5
2
2
1!!2
50
L.F,
EACH
...!:.!:....
S.F.
~
S.Y,
EACH
EACH
EACH
EACH
L.F,
C,Y,
TOTAL BASE BID:
SUPPLEMENTAL ITEMS
Extra 8' PVC C-9oo waterline in open cut
Extra cut and plug existing waler mains
Extra 6' PVC C-9OO waterline In open cut
Extra removal and replacement of sidewalk without 1 Z" earthwork compaction
Extra removal and replacement of 4' concrete driveways
Extra block sodding
Extra fire hydrants
Extra service connections, all sizes
Extra 6' gate valve and box, all depths
Extra 8" gate valve and box
6' curb on existing pavement, including reinforcing
Select backfill. includillQ comoaction
$5,00
$20,00
$1,074,00
$1,000,00
$12,411.00
OF
$383,174.00
Page
$228,563.00
$212,649.00
TOTAl SUPPLEMENTAl ITEMS:
TOTAL BID:
4/10/01
Bid Date: