Loading...
HomeMy WebLinkAboutO-2002-2535 e e ORDINANCE NO. 2002-1-535 AN ORDINANCE APPROVING AND AUTHORIZING AN AGREEMENT BETWEEN THE CITY OF LA PORTE AND TEXAS SOUTHWEST AQUATICS, INC. TO PROVIDE CONTRACTOR SERVICES FOR THE CONSTRUCTION OF SAN JACINTO POOL AND BATHHOUSE RENOVATIONS; APPROPRIATING $477,457.00 TO FUND SAID AGREEMENT; MAKING VARIOUS FINDINGS AND PROVISIONS RELATING TO THE SUBJECT; FINDING COMPLIANCE WITH THE OPEN MEETINGS LAW; AND PROVIDING AN EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE: Section 1. The City Council hereby approves and authorizes the contract, agreement, or other undertaking described in the title of this ordinance, in substantially the form as shown in the document which is attached hereto and incorporated herein by this reference. The City Manager is hereby authorized to execute such document and all related documents on behalf of the City of La Porte. The City Secretary is hereby authorized to attest to all such signatures and to affIx the seal of the City to all such documents. The City Council appropriates the sum not to exceed $477,457.00 for contractor services for the construction of San Jacinto Pool and Bathhouse Renovations, from 1999 General Obligation . Bond Fund 041 and General Obligation Contingency Fund 041 to fund said Agreement. Section 2. The City Council officially finds, determines, recites, and declares that a suffIcient written notice of the date, hour, place and subject of this meeting of the City Council was posted at a place convenient to the public at the City Hall of the City for the time required e e ORDINANCE NO. 2002- 3\5"3 t{ by law preceding this meeting, as required by the Open Meetings Law, Chapter 551, Texas Government Code; and that this meeting has been open to the public as required by law at all times during which this ordinance and the subject matter thereof has been discussed, considered and formally acted upon. The City Council further ratifies, approves and confirms such written notice and the contents and posting thereof. Section 3. This Ordinance shall be effective from and after its passage and approval, and it is so ordered. PASSED AND APPROVED, this 14th day of January, 2002. By: ATTEST: APP~.!D: ~W2 Knox W. Askins, City Attorney e CITY OF LA PORTE e December 12,2001 ~ f::" ((1:, r.::: ---~.._--.----.-.. o i ll? ~:..Li !::'; ;':-v r --.::~, ' " :;: ':i fic:r. I JJ 2001 ; ~ ;; , . ,) 4 :~j PARKS & RECREATION dpr TO: Mayor and City Council Robert T. Herrera, City M , . FROM: John Joerns, Assistant City SUBJECT: Pre-qualification Concerns San Jacinto Pool Project Mr. Barr and Mr. Kneupper have recently updated me on concerns regarding the pre-qualification of contractors (required by City Ordinance for projects> $300,000) for , the San Jacinto Swimming Pool. There are two parts to the pre-qualification process, financial and experience. . Bacwound '. On October 7,2001, pre-qualifications packets were mailed to'21 contractors in Texas with previous pool experience. . Follow up phone calls were made to these contractors. . A common response from several frrms was the reluctance to provide financial statements. . _ The deadline for response was October 22nd. ' . Two (incomplete) responses were received by the October 22nd deadline. Follow Uu Efforts . Staff contacted four additional contractors and forwarded packets to them. . Staff contacted and received information from the two contractors to complete their packets. Currently . We have received and approved (from financial aspects) two contractors. . The Engineer has not approved the work experience of these two contractors, he is currently doing so. Staffhad not yet advertised for bids because of the de.lays and lack of pre-qualified contractors. After reviewing the situation with Stephen Barr and Doug Kneupper, I have asked them to proceed accordingly: e e . Advertise for bids as soon as possible. . Call the two pre-q~alified bidders and insure they have enough time to prepare a bid by approximately January 9th, 2002. " , . Schedule bid opening for approximately January 9th. . _ Meanwhile, try to secure additional pre-qualified bidders (verify with Knox Askins that council can waive requested 30 day submittal bef~re bid opening). . Open bids and present to Council at the January 14th meeting. . Award bid if they are competitive and within budget. . Council may need to waive the.30-day submission requirement. . If bids are not competitive, consider rebidding and possible modifications to the pre- qualification ordinance (we may need to do this anyway). We got an early start on the pre-qualification (October 7th) but seem to have either a lack of interest in bidding or a reluctance to furnish the required pre-qualification materials. Conversely, the Fire Station #4 project has not experienced these problems as they have 12 pre-qualified bidders. ' JJ/ml c: Stephen Barr, Director of Parks and Recreation Doug Kneupper, Director of Planning Knox Askins, City Attorney -~ . -- City of La Potte San Jacinto Pool 22 December 2001 Pool Renovations and Additions: Shallow pool to 2'-6" maximum with zero depth entry; replace filtration and plumbing systems; vinyl liner pool bottom and sides; remove diving boards; play structures; deck drainage Item: Description: Unit Price Quantity Total Price 1 Demolition of old pool floor; $ 6,500,00 1 LS $ 6,500.00 coping; diving board; 2 Pipes and pool plumbing $ 25,000.00 1 LS $ 25,000.00 3 Filters and pumps $ 30,000.00 1 LS $ 30,000.00 4 Pool electrical and lighting $ 13,900.00 1 LS $ 13,900.00 5 Granular fill in pool $ 20,00 500 CY $ 10,000.00 6 New concrete floor/wall in pool $ 5.75 5400 SF $ 31,050,00 7 New poured in place coping $ 20.00 295 LF $ 5,900.00 8 New vinyl liner on pool shell $ 9.00 5880 SF $ 52,920.00 9 Concrete walls on ramp $ 100.00 100 LF $ 10,000.00 10 Tumblebuckets play structure $ 20,000,00 1 LS $ 20,000.00 11 Floatable gator and hippos $ 14,000.00 1 LS $ 14,000.00 12 Gum drop fountains $ 400.00 3EA $ 1,200.00 13 Umbrella fountain $ 10,000.00 1 EA $ 10,000.00 14 Childrens flat bottom slide $ 8,500.00 2EA $ 17,000.00 15 Concrete trench drain in deck $ 15,00 160 LF $ 2,400.00 16 Concrete surge pit/valve vault $ 8,000.00 1 LS $ 8,000.00 Subtotal Pool Renovations $ 257,870.00 Deck Area Modifications: Renovate and improve the deck areas; relocate fencing; expand deck; replace damaged concrete; add two shade structures; add brick pavers in some areas; landscaping Item: Description: Unit Price Quantity Total Price 1 Remove damaged concrete $ 5.00 3035 SF $ 15,175.00 deck and replace 2 Relocate fencing on one side $ 15,00 150 LF $ 2,250.00 Subtotal Deck Area $ 17,425.00 New Dry Deck Spray Station: Install granulated rubber surface; install Raindrop Rainforest structure; connect to plumbing; Item: Description: Unit Price Quantity Total Price . e These estimates represent the engineer's opinions of probable construction cost based on final construction drawings and specifications. Due to fluctuating bidding conditions the costs could vary from the estimates presented above. There also are areas where savings could be realized, improvements deferred, and work performed by force account. Calvin T. Brannon, P.E. Texas PE No. 40450