ORDINANCE NO. l7lQ
AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT BY AND BETWEEN THE
CITY OF LA PORTE AND K.D. CONSTRUCTION, AND AUTHORIZING CHANGE ORDER
NO.1, FOR CONSTRUCTION OF GOLF COURSE RESTROOM AND CART PATH
REPAIRS 1 MAKING VARIOUS FINDINGS AND PROVISIONS RELATING TO THE
SUBJECT1 FINDING COMPLIANCE WITH THE OPEN MEETINGS LAW 1 AND
PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes the
contract, agreement or other undertaking described in the title of
this ordinance, in substantially the form as shown in the document
which is attached hereto and incorporated herein by this reference.
The Mayor is hereby authorized to execute such document and all
related documents on behalf of the City of La Porte. The City
Secretary is hereby authorized to attest to all such signatures and
to affix the seal of the City to all such documents.
Section 2.
The City Council officially finds, determines,
recites and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the public at the City Hall of the
City for the time required by law preceding this meeting, as
required by the Open Meetings Law, Article 6252-17, Texas Revised
Civil Statutes Annotated1 and that this meeting has been open to the
public as required by law at all times during which this ordinance
and the subject matter thereof has been discussed, considered and
formally acted upon. The City Council further ratifies, approves
and confirms such written notice and the contents and posting
thereof.
Section 3. This Ordinance shall be effective from and after
its passage and approval, and it is so ordered.
PASSED AND APPROVED, this 10th day of September, 1990.
ATTEST: ~
c~~aCk
City Secretary
u;:zJ~
Knox W. Askins
City Attorney
e
e
...--
/
//
.'
BID SCHEDULE
LOCA nON: City of La Porte
DESCRIPTION: Bayforest Golf Course
PROJECf NUMBER (S): 90-2205 DATE: 8/27/90
I
J
ITEM DESCRIPTION UNIT ESTIMATED UNIT TOTAL
I NO. QUANTITIES PRICE
I 1. Restroom facility EA 1 Lump Sum
complete in place $22,200.00
) @.L8S 80
per so. ft.
] 2. Remove 4' cart path SF 486
J. complete in place
@ S 3.35 $ 1,567.80
per sq. ft.
I 3. 8' Cart path SF 528
J complete in place
@ S 3.35 $ 1,768.80
per sq. ft.
I
4. 6' Can path SF 180
complete in place
@$ 3 ,0:; $ 603.00
per!';q ft.
LUMP SUM BID: $26,139.60
. ,
e
e
....-
SEP-136-' 913 THU 11: 213 In: ARBZ PR I HTI HG
TEL HO:713-421-48139
**885 P131
KD CONSTRUcnON
KNOCK DOWN CONS'IRlJC1IDN c;o.sn
(713) 421~2211
FAX MESSAGE
DATE: -9-() (, ...qb
PAGE ..Q.L OF OS
ATTENtiON:
Mn. "'SQ~L t::\ l ~tl.~, k..\-
C~MPANY/~t(
\~ oE
FAX NUMBER
or:;') tt:ll-'1 ~8
~
SUBJF.CT:_~e\J\c;.\!:t) Qu~~ l~.\-\.t.<<- Qt'- ~~~ ~--.~~~ _
MESSAGE
\\AC2. . ~ L \012 i,\ "'- -'c- ,
~tt.s ~ ~ L ~~~~ ~~ ~t,- A-~~~~ -~~~_
s~'-(') ..../~ ,,~~ ~ -lM\__ i~~~ J ?{~ ~~
0.. ~ \.l o,..~ Q.~~."-cc._
. .f. . ;"..,:. '.1
.0 or:;" OJ. ,. : .. 0'::' .~\."O '::~."'.1. ~.
THANK YOU.
\
~;1.,-- u.X ls...~
....-
e
e
p--
SEP-B6-'9B THU 11:21 ID:ARBZ PRINTING
TEL NO:713-421-48B9
'*885 PB2
KD CONSTRUcnON
KNOCK DOWN CONSrR(JC71ONCOSlS
013) 421.2211
Sept~er 04, 1990
Mr. Bill Hanning
0/0 City of LaPorte
Community Development Department
604 West Fairmont Parkway
P.O. BOX 1115
laPorte, Texas 77572-1115
RE: CLP Project NO. 90-2205
Bay Forest Golf Course
Letter of Price RedUc~ion
Mr. Manning,
This letter is to qualify the reduction in price for the proposal
referenced above. The following exclusions will pertain to the
reduction:
1. Access will be guaranteed by the city of LaPorte.
2. Extensions of time will be made as a result of
inaooessibili~y to the work site or unfavorable
oonditions at the work site as the determined by
the Olmer.
3. Payment is ~o be a single payment to the oontractor,
after verirfication of completion and a letter
verifying all sub-contractors have been paid.
4. Slab will be poured on top of existing surface, and
additional work to remove sub-surface materials will
be deleted from our Contraot. We will still put a
sand and clay mix on surface before concrete pour.
5. Louver vents in the upper structure area will be
replaced ~itb grid plates. Louver vents in the
side structures will be 12" X 181r instead of 181r
X 24".
6. Fixtures for both men's and women's bathrooms will
be Kobler instead of tljer. They wi1l still meet
t.he "Handicapped" requirements. They will also be
n'1'ank" type waterclosete instead of pressure valve,
to reduce costs.
7. All Payment and Performance Bonds are to be waived.
The only bond required is a Bid Bond that has already
been furnished with quote.
s. cart path repairs and installation are to be excluded
from this price.
9. Re-barb in cinder block walls to be fully concreted at
corners only. Other areas to be concreted to top of
re-barb only.
41., EAST ARCHER
BAVI'OWN. TEXAS 77521
p.o. BOX 1757
MT. BBLVIEU, TEXAS 77S80
p.o. BOX 1419
BAYl'OWN. TEXAS 77'22
e
e
...- -
SEP-06-'90 THU 11:21 ID:ARSZ PRINTING
TEL 1'10:713-421--4809
Jl88S P03
. .
Page 2.
city of LaPorte
Bayforest Golf Course
Bathroom Facility Proposal Revision:
10. Doors to be 6'8" in heiqht: instead of 7'3d with
thresholds are to be delet~d from this propos~l.
11. Roof shingles aro to be "3-Tabll 210## instead of :U5.
12. PlUmbing to be based on stub-out only.
With all of the listed qualificati.ona we have revised our price
per our meeting with you 08-30-90. The new price will be:
TOTAL: $15,700.00
Price does not include any applicable sales tax.
Thank you for the opportunity to revise this proposal to 2Ileet
your budqet requirelnents.
We will offer a discount of 2% ten days on our final invoice.
Thank you,
..-..... ~.
... ~
~~_..
e
e
. .,
NO. 1
CHANGE ORDER
DATE:' 9/4/90
=================================---c---------------=-=-=
OWNER'S Project No. 90 - 2 2 0 5 ENGINEER'S Pr~~; No~ - SAME- - - - - - - - - - - -
PROJECT: BayForestGolf Course Restroom Facility
=========================================================
CONTRACTOR: KD Construction
Contract For: 26 , 130,..6 0
Contract Date:
9/10/90
=========================================================
TO: KD Construction
CONTRACTOR
You are directed to make the changes noted below in the subject Contract:
'.
Citv of La Porte
Owner
BY:
DATE:
.19_
Nature of Change:
See attached letter dated 9/4/90 from KD Construction, re: CLP Project No. 90-2205
Bay Forest Golf Course, Letter.of Price Reduction.
Enclosures:
These changes result in the following adjustment of Contract Price and Contract Time:
Contact Price Prior to this Change order
Net ~ (Decrea..se) Resulting from this Change Order
Current Contract Price Including This Change Order
$ 26,139.'60
$ ( 6',500.00)
-, .
.' ..
",
, .\
I
$ 19,639.6Q
Contract Time Prior to This Change Order
30 Days
Net (Increase)(Decrease) Resulting from TIllS Change Order
(Days or Date)
'0
(Days)
Current Contract Time Including This Change Order 30 Days
(Days or Date)
==========================================================
e
e
'..
The Above Changes he Approved:
William T. Manning, P.E.
ENGINEER
By:
.'
Date: .
.19_
=========================================================
.
The Above Changes are Accepted:
CONTRACTOR
.By:
Date:
.19_