HomeMy WebLinkAboutO-1984-1168-A (2)
.
.
ORDINANCE NO. l168-A
AN ORDINANCE AMENDING ORDINANCE NO. 1168, AN ORDINANCE REGULATING
THE DRILLING OF WATER WELLS WITHIN THE CITY~ REGULATING THE USE
AND SALE OF WATER WITHIN THE CITY~ PROVIDING EXCEPTIONS~ PROVIDING
THAT ANY PERSON VIOLATING THE TERMS OF THIS ORDINANCE SHALL BE
DEEMED GUILTY OF A MISDEMEANOR AND UPON CONVICTION SHALL BE
FINED IN ANY SUM NOT MORE THAN TWO HUNDRED DOLLARS ($200.00):
CONTAINING A SEVERABILITY CLAUSE ~ FINDING COMPLIANCE WITH THE
OPEN MEETINGS LAW~ AND PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section L From and after the effective date hereof, it
shall be unlawful for any person to drill a water well to provide
water for human consumption, or for residential or commercial
purposes within the City 9f La Porte.
Section 2. From and after the effective date hereof, it
shall be unlawful for any person to use, sell, barter, give away
or offer for sale, offer to barter, or offer to give away, for
human consumption, or for' residential or commercial purposes,
water originating from any source other than the Water Department
of the City of La Porte, to any other person within the City of
La Porte, except such City.
Section 3. The provisions of this Ordinance shall not be
appJ.icable to the sale of distilled water, or other bottled water
approved for human consumption, by the Texas Department 01; Health.
~n addition, the provisions of this Ordinance shall not be appli-
cable to the collection of rain water for use to water vegetation.
Section 4. This Ordinance shall be effective fourteen (14)
days after its passage and approval. The City Secretary shall
give notice of the passage of this ordinance by causing the
caption hereof to be published in the official newspaper in the
City of La Porte at least twice within ten (10) days after the
passage of this ordinance.
Section 5. If any section, sentence, phrase, clause, or
any part of any section, sentence, phrase, or clause, of this
ordinance shall, for any reason, be held invalid, such invalidity
.
.
Ordinance No. IlG8-A, Page 2.
shall not affect the remaining portions of this Ordinance, and
it is hereby declared to be the intention of this City Commission
to have passed each section, sentence, phrase or clause, or part
thereof, irrespective of the fact that any other section, sen-
tence, phrase or clause, or part thereof, may be declared invalid.
Section 6. Any person, as defined in S~ction 1.07(27),
Texas Penal Code, who shall violate any provision of this ordi-
nance, shall be deemed guilty of a misdemeanor and upon conviction
shall be punished by a fine not to exceed Two Hundred Dollars
($200.00). Each day any violation of this ordinance shall con-
tinue shall constitute a separate violation.
Section 7. The City Council officially finds, determines,
recites and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the public at the City Hall of
the City for the time required by law preceding this meeting, as
required by the Open Meetings Law, Article 6252-17, Texas Revised
Civil Statutes Annotated; and that this meeting has been open to
the pUblic as required by law at all times during which this
ordinance and the subject matt-er' thereof has been discussed,
considered and formally acted upon. The City Council further
ratifies, approves and confirms such written notice and the
contents and posting thereof.
PASSED AND APPROVED this the 18th day of April, 1984.
CITY OF LA PORTE
By
.
.
ordinance No. 11GB-A, Page 3.
ATTEST:
(I~aA/
City Secretary
AP:R~ tI c:;L
Ci~neY
.
--
11/03/03
BUILDING COMMENTS
Proposed Use:
Office Building - Truckin2 Company
Zoning:
SIC# 421 or 423 Allowable Use: Y or N
(Use permitted in U and HI zones)
Certified Site Plan Required?
Yes
(S. 106-141 of City's Code of Ordinances)
Zoning Permit Required?
Yes
(S. 106-142 of City's Code of Ordinances)
Building Permit Required?
Yes
(S. 104.1 of '94 Ed, Standard Bldg. Code)
Trailer must be a state certified "Industrialized Building".
(S. 106-521, Table A - City's Code of Ordinances)
Based on Use (Trucking Company), site to be located on designated "Truck Route".
(S. 70-237 of City's Code of Ordinances)
Utility Issues:
Can a water well be drilled? No (S. 74-2(a) of City 's Code of Ordinances)
(not for human consumption or for residential or commercial purposes)
Solution: Trailer is fitted with water holding tank
Can Alternate Sewer System be utilized?
Yes
(S, 74-3(a) of City's Code of
Ordinances)
(Only if properties are not within 200' of city sewage system)
Solutions: a) Trailer has sewage holding tank; company handles waste
b) Septic system installation complies with State regulations. Texas
Commission on Environmental Quality (TCEQ) (previously TNRCC)
Restrooms Required?
Yes
(S. 407.1 of'94 Ed. StandardPlbg. Code)
Industrial Waste Permit Required? No (S. 74-72 of City's Code of Ordinances)
(Permit required if discharging into the city sewage system)
Fire Protection:
Building use/size would not require a sprinkler system.
Solution: In past, fire department has approved installation/maintenance of an on-site water
tank (city specifies gallons). This would allow water availability for both building and on-site
situations.
S:\CPShare\INSPECTlON DIVISION\Inspcctions\Gray Trucking Co Info.doc
1994 STANDARD FIRE CO&ENDMENTS Cant.
--
PAGE 13 OF 28
EXCEPTIONS:
A When in the opinion of the fire chief and fire marshal a water main and/or
fire hydrant is not necessary due to the existence of built-in fire protection system(s);
or
B. When the Fire Chief and Fire Marshal have been notified in writing that
pending water mains and fire hydrants are being installed in the vicinity, consistent with
the terms of this code.
2. . Commercial and industrial area fire hydrants shall be installed on an a-inch or
larger approved water main and shall be placed so that 110 part of any building is over-
300 feet from a fire hydrant. Distance for hydrant placements shall be measured at curb
line and/or access corridor.
EXCEPTIONS:
A When in the opinion of the fire chief and fire marshal a water main and/or
the fire hydrant is not necessary due to the existence of built-in fire protection,
system(s); or '
B. When the fire chief and fire marshal have been notified in writing that
pending water mains and fire hydrants are being inst~lIed in that, vicinity, consistent
with the terms of this code. . - , -.. '. ,..
(ORn. NO. 98-2222, S 2-9-98)
603.6 Smoke Detectors
Revised to read:
603.6.1 Deleted.
(ORD. NO. 98-2222, S 2-9-98)
603.6.2 Deleted.
(ORD. NO. 98-2222, S 2-9-98)
. 603.6.3 Deleted.
See Section 38-126 et seq of the Code of Ordinances of the City of La Porte.
(ORD. NO. 98-2222, S 2-9-98) .
.
-
City of La Porte Planning Department
INTER-OFFICE MEMORANDUM
November 19,2003
TO:
Nick Finan, Interim Director of Planning
FROM:
Robert A. Cummings, Supervising Engineer
RE:
ACME Trucking
Attached are the cost estimates you requested. I ran the cost estimates f~ur basic ways:
1) The most direct route and city installed. This would require the purchase of
easements and allow for no reimbursement availability.
2) The most direct route installed by a contractor which would require the purchase
of easements and allow for no reimbursement availability.
3) Going down the existing 60 V.E. which would not require easements to be
purchased but would be a longer run, would allow for three other businesses to tie
onto the lines and allow for reimbursement. Cost estimate #3 is based on the City
installing the lines.
4) Going down the existing 60 V.E. which would not require easements to be
purchased but would be a longer run, would allow for three other businesses to tie
onto the lines and allow for reimbursement. Cost estimate #4 is based on a
private contractor installing everything.
All of these were scenarios were run under the assumption that gravity flow could be
achieved. They were subsequently run using a force main and lift station. When boring
under a railroad bed, the railroad requires that a dry bore be used. Dry boring is always
much more expensive than wet boring and will require the use of casing at least 6-inches
in diameter larger than the service pipe. Taking the utilities the long way would be the
best scenario even if it would be the most expensive as that would allow at least three
other businesses to tie on. Given that the City of La Porte has an ordinance against the
use of wells, it is recommended that at least the water line should be taken the long way.
Given the great importance on arresting subsidence in the greater Houston area, there is
no scenario in which I could recommend the allowance of a water well.
ACME Trucking
Cost Estimate 1
Most direct route - City Installed
Item
8-inch C-900 water line
6-inch SDR26
6-inch dry bore
8-inch dry bore
Fire Hydrant
Easement (PPG) - 16 ft wide
Easement (RR) - 16 ft wide
Easement (HCFCD) - 16 ft wide
Surveyor Costs
Sanitary Sewer Manhole
Trench Safety
.
Quantity
383
449
110
120
1
0.1425
0.0852
0,0705
1
2
602
Unit
LF
LF
LF
LF
EA
AC
AC
AC
LS
EA
LF
$
$
$
$
$
$
$
$
$
$
$
Unit Price
5.00
8.90
114.00
133.00
1,500.00
5,000.00
5,000.00
5,000.00
2,000.00
2,000.00
0.25
.
Total
$ 1,915,00
$ 3,996.10
$13,540.00
$16,960.00
$ 1,500.00
$ 712.50
$ 426.00
$ 352.50
$ 2,000.00
$ 4,000.00
$ 150.50
$ 45,552.60
$ 6,832.89
$ 52,385.49
Gravity Sanitary Sewer flow is assumed. If impossible, 4 inch force main would be needed and total cost
would be: .
subtotal
15% contingency
total
Item Quantity Unit Unit Price Total
8-inch C-900 water line 383 LF $ 5.00 $ 1,915.00
4-inch SDR26 449 LF $ 4.63 $ 2,078.87
4-inch dry bore 110 LF $ 95.00 $11,450.00
8-inch dry bore 120 LF $ 133.00 $16,960.00
Fire Hydrant 1 EA $ 1,500,00 $ 1,500.00
Easement (PPG) -16 ft wide 0.1425 AC $ 5,000.00 $ 712.50
Easement (RR) - 16 ft wide 0.0852 AC $ 5,000.00 $ 426.00
Easement (HCFCD) -16 ft wide 0.0705 AC $ 5,000.00 $ 352.50
Surveyor Costs 1 LS $ 2,000.00 $ 2,000.00
Trench Safety 602 LF $ 0.25 $ 150.50
Lift Station 1 LS $ 30,000.00 $ 30,000.00
subtotal $67,545.37
15% contingency $10,131.81
total $ 77,677.18
-
ACME Trucking
Cost Estimate 2
Most direct route - Privately Installed
Item
8-inch C-900 water line
6-inch SDR26
6-inch dry bore
8-inch dry bore
Fire Hydrant
Easement (PPG) - 16 ft wide
Easement (RR) - 16 ft wide
Easement (HCFCD) - 16 ft wide
Surveyor Costs
Sanitary Sewer Manhole
Trench Safety
Quantity
383
449
110
120
1
0.1425
0.0852
0.0705
1
2
602
Unit
LF $
LF $
LF $
LF $
EA $
AC $
AC $
AC $
LS $
EA $
LF $
Unit Price
10.00
17.80
114.00
133.00
1,500,00
5,000.00
5,000.00
5,000.00
2,000.00
2,000.00
0.25
.
Total
$ 3,830.00
$ 7,992,20
$13,540.00
$16,960.00
$ 1,500.00
$ 712.50
$ 426.00
$ 352.50
$ 2,000.00
$ 4,000,00
$ 150.50
$51,463.70
$ 7,719.56
$ 59,183.26
Gravity Sanitary Sewer flow is assumed. If impossible, 4 inch force main would be needed and total cost
would be:
subtotal
15% contingency
total
Item Quantity Unit Unit Price Total
8-inch C-900 water line 383 LF $ 5.00 $ 1,915.00
4-inch SDR26 449 LF $ 9.26 $ 4,157.74
4-inch dry bore 110 LF $ 95.00 $ 11,450.00
8-inch dry bore 120 LF $ 133.00 $16,960.00
Fire Hydrant 1 EA $ 1,500.00 $ 1,500.00
Easement (PPG) -16 ft wide 0.1425 AC $ 5,000.00 $ 712.50
Easement (RR) - 16 ft wide 0.0852 AC $ 5,000,00 $ 426.00
Easement (HCFCD) -16 ft wide 0.0705 AC $ 5,000.00 $ 352.50
Surveyor Costs 1 LS $ 2,000.00 $ 2,000.00
Trench Safety 602 LF $" 0.25 $ 150.50
Lift Station 1 LS '$ 30,000.00 $ 30,000.00
subtotal $ 69,624.24
15% contingency $10,443.64
total $ 80,067.88
.
--
ACME Trucking
Cost Estimate 3
Going down the N P St 60 ft UE as shown on the 1996 TC&B drawing and going to and through the site
City Installed
3 other businesses could tie onto new line
Item Quantity Unit Unit Price Total
8-inch C-900 water line 1540 LF $ 5.00 $ 7,700.00
6-inch SDR26 1740 LF $ 8.90 $ 15,486.00
6-inch dry bore 100 LF $ 114.00 $12,400.00
8-inch dry bore 100 LF $ 133.00 $14,300.00
Fire Hydrant 1 EA $ 1,500.00 $ 1,500.00
Sanitary Sewer Manhole 5 EA $ 2,000.00 $10,000.00
Trench Safety 3080 LF $ .0.25 $ 770.00
subtotal $62,156.00
15% contingency $ 9,323.40
total $ 71,479.40
Gravity Sanitary Sewer flow is assumed. If impossible, 4 inch force main would be needed and total cost
would be:
Item Quantity Unit Unit Price Total
8-inch C-900 water line 1540 LF $ 5.00 $ 7,700.00
4-inch SDR26 1740 LF $ 4.63 $ 8,056.20
4-inch dry bore 110 LF $ 95.00 $11,450.00
8-inch dry bore 120 LF $ 133.00 $ 16,960.00
Fire Hydrant 1 EA $ 1,500.00 $ 1,500.00
Easement (PPG) -16 ft wide 0.1425 AC $ 5,000.00 $ 712.50
Easement (RR) - 16 ft wide 0,0852 AC $ 5,000.00 $ 426.00
Easement (HCFCD) - 16 ft wide 0.0705 AC $ 5,000.00 $ 352.50
Surveyor Costs 1 LS $ 2,000,00 $ 2,000,00
Trench Safety 3080 LF $ 0.25 $ 770.00
Lift Station 1 LS $ 30,000.00 $ 30,000.00
subtotal $ 79,927.20
15% contingency $11,989,08
total $ 91,916.28
.
.
,A,CME Trucking
Cost Estimate 4
Going down the N PSt 60 ft UE as shown on the 1996 TC&B drawing and going to and through the site
Contractor Installed
3 other businesses could tie onto new line
Available reimbursement = $6641.50
Item Quantity Unit Unit Price Total
8-inch C-900 water line 1540 LF $ 10.00 $ 15,400.00
6-inch SDR26 1740 LF $ 17.80 $ 30,972.00
6-inch dry bore 100 LF $ 114.00 $ 12,400.00
8-inch dry bore 100 LF $ 133.00 $ 14,300.00
Fire Hydrant 1 EA $ 1,500.00 $ 1,500.00
Sanitary Sewer Manhole 5 EA $ 2,000,00 $ 10,000.00
Trench Safety 3080 LF $ 0.25 $ 770.00
subtotal $ 84,572.00
15% contingency $ 12,685.80
total $ 97,257.80
Gravity Sanitary Sewer flow is assumed. If impossible, 4 inch force main would be needed and total cost
would be:
Item
8-inch C-900 water line
4-inch SDR26
4-inch dry bore
8-inch dry bore
Fire Hydrant
Easement (PPG) - 16 ft wide
Easement (RR) - 16 ft wide
Easement (HCFCD) -16 ftwide
Surveyor Costs
Trench Safety
Lift Station
Quantity
1540
1740
110
120
1
0.1425
0.0852
0.0705
1
3080
1
Unit
LF
LF
LF
LF
EA
AC
AC
AC
LS
LF
LS
$
$
$
$
$
$
$
$
$
$
$
Unit Price
5.00 $
9.26 $
95.00 $
133.00 $
1,500.00 $
5,000.00 $
5,000.00 $
5,000.00 $
2,000,00 $
0.25 $
30,000.00 $
Total
7,700.00
16,112.40
11,450.00
16,960.00
1,500.00
712.50
426,00
352.50
2,000.00
770.00
30,000.00
subtotal
15% contingency
total
$ 87,983.40
$ 13,197.51
$101,180,91
POSSIBLE UTILITIES
ACME TRUCKING
,
~
~
o
~
%
~
w
W
::J
W
%
~
o
u
~
z
i
u
~
z
w
%
a..
9
w
~
Q
....I
~
In
::J
Q
Z
~
~
ID
-
X
~
-
d.
ESTIMATES 1 AND 2
UJ
'ct
~ SCALE: I" = 200'
:5
u..
0
8
BRUCE ANGEL
2 1728
~ 040-177-000-0027
C>
~ BRUCE ANGEL
ct
t; 1700
040-177-000-0026
/////,."/;.'//
BRUCE ANGEL
12803
040-177-000-0001
PROPOSED SITE
OWNERS: EDDIE V.
Il EDNA M. GRAY
120 L.F.
8'
10'
,
47
MEMORIAL BAPTIST MEN INC
TR 8B-1
040-177-001-0036
10.
:1.0"
"
il
I
UJ
~
o
0-
:5
u..
o
E
u
POSSIBLE UTILITIES
ACME TRUCKING
~
'U
SCALE: 1 R = 200'
.,
<(
::E
~
c5
~
o
~
::E
ti
w
W
::J
W
::E
~
8
"
-
~
z
w
::E
A.
9
w
~
o
~
~
o
z
~
~
III
....
:J:
~
....
ii
180 FT. FRONT FOOTAGE
BRUCE ANGEL
165 FT. FRONT FOOTAGE
BRUCE ANGEL
LL.
FT. FRONT FOOTAGE
BRUCE ANGEL
12803
040-177-000-0001
1728
040-177-000-0027
1700
040-177-000-0026
~
~
~
u.
o
B
2
~
C>
~
DC
t;
PROPOSED SITE
OWNERS: EDDIE V.
&; EDNA M. GRAY
MEMORIAL BAPTIST MEN INC
TR 88-1
040-177-001-0036
10'
0' U.E.
47
10"
10"
"
~
o
0-
~
U.
o
5
1740 L.F. 6" SDR26 GRAVITY
SAN. SWR OR. 4" SAN. FORCE MAIN
ESTIMATES 3 AND 4
81
.
EXHIBIT 2
.
-"
.
.
K:\laportefairmontsignals
AGREEMENT
THE ST ATE OF TEXAS ~
~
COUNTY OF HARRIS ~
This Agreement is made and entered into by and between Harris County, a body corporate
and politic under the laws of the State of Texas, hereinafter called "County," and the City of La
Porte, a body corporate and politic under the laws of the State of Texas, hereinafter called "City";
RECITALS:
1. It is to the mutual benefit of County and City to construct left turn lanes and traffic signal
modifications at the intersections of Fairmont Parkway and Brookwood Drive, Fairmont Parkway
and Farrington Boulevard, and Fairmont Parkway and Wilmont Drive,' hereinafter called the
"Project."
2. The County is willing to contribute up to $200,500 toward 50% of all costs of the Project
and to administer the design and construction of the Project, provided that City will contribute
50% of all costs of the Project up to $200,500. All costs attributable to the cost of the Project,
including costs of engineering, construction and construction support services will sometimes be
called the "Project Costs."
3. No additional right-of-way will be required for the Project.
'i =a. NOW, THEREFORE, for and in consideration of the mutual covenants, agreements and
benefits to the parties herein named, it is agreed as follows:
TERMS:
1. Within ninety (90) days after execution of this Agreement, the County shall endeavor to
prepare, or cause to be prepared, drawings and specifications for the Project and deliver copies of
same to the City for written approval by the Mayor of the City, or his designee.
2. Within sixty (60) days after approval of drawings and specifications for the Project in
accordance with Section 1, the County will advertise for and receive bids for the construction of the
Project in accordance with the approved drawings and specifications in the manner similar to that
of other like County projects.
3 Upon receipt and tabulation of the bids for the Project, County will determine the lowest
responsible bidder for the construction of the Project. The County Engineer shall then estimate the
projected Project Costs.
4. In the event the estimated Project Costs are equal to or less than the sum of $401,000, the
County Engineer shall notify the City of the estimated Project Costs. The City shall transmit to the