Requested By: S. Gillett
Appropriation
Agenda Date Requested: A
Source of Funds: General Fund elP
Department: Public Works
Account Number: 015-9892-860-1100
Report:
Resolution:
Ordinance:
xx
Amount Budgeted: $100,000
Exhibits:
Ordinance
Amount Requested: $65,872
Exhibits:
En2ineer's Recommendation
Budgeted Item: YES
Exhibits:
Bid Tahulation
SUMMARY & RECOMMENDATION
The Public Works Department has outgrown the original vehicle and equipment storage facilities
at Public Works. An additional equipment storage shed was budgeted in the 2003-2004 General
Fund CIP.
Claunch and Miller has designed the proposed improvements, and sealed bids were received on
March 22, 2004 from two (2) contractors. Low bid was submitted by L & M Contractors in the
amount of $65,872. A total of $1 00,000 was budgeted for this Project.
Low bidder was checked by the Engineer for past work experience, safety experience and
references. L & M Contractors is recommended by the Engineer for bid award in the amount of
$65,872. A contingency of $3,294 is also recommended.
Action Required bv Council: Approve an ordinance authorizing the City Manager to execute a
contract with L & M Contractors in the amount of $65,872, with a contingency of $3,294.
4~-of
Date
ORDINANCE NO. 2004-.2'/lJU
AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT BETWEEN THE CITY
OF LA PORTE AND L &: M CONTRACTORS, FOR THE CONSTRUCTION OF AN
EQUIPMENT STORAGE SHED, APPROPRIATING $ 6 5, 872 .00 PLUS A CONTINGENCY
OF $3,294.00, TO FUND SAID CONTRACT, MAKING VARIOUS FINDINGS AND
PROVISIONS RELATING TO THE SUBJECT, FINDING COMPLIANCE WITH THE
OPEN MEETINGS LAW, PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes
the contract, agreement, or other undertaking described in the
title of this ordinance, a copy of which is on file in the office
of the city Secretary. The city Manager is hereby authorized to
execute such document and all related documents on behalf of the
City of La Porte.
The City secretary is hereby authorized to
attest to all such signatures and to affix the seal of the City to
all such documents.
city Council appropriates the sum of
$65,872.00 plus a contingency of $3,294.00, from Fund 015 to fund
said contract.
Section 2. The City Council officially finds, determines,
recites, and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the pUblic at the City Hall of the
City for the time required by law preceding this meeting, as
required by the Open Meetings Law, Chapter 551, Texas Government
Code; and that this meeting has been open to the public as required
by law at all times during which this ordinance and the subject
matter thereof has been discussed, considered and formally acted
upon.
The City Council further ratifies, approves and confirms
such written notice and the contents and posting thereof.
section 3. This Ordinance shall be effective from and after
its passage and approval, and it is so ordered.
PASSED AND APPROVED, this 12th day of April, 2004.
CITY OF LA PORTE
~
Mayor
ATTEST:
V1ut,~ nL \.JftUu'LLV ~}
Martha A. Gillett
City Secretary
11
APPROVED: /
~tJa~
Knox W. Askins
City Attorney
2
~
CLAUNCH & MILLER, INC.
Engineering Consultants
April 2, 2004
City of La Porte
P. O. Box 1115
La Porte, Texas 77572-1115
Attention: Mr. Steve Gillett
Director of Public Works
Re: Public Work's Metal Building
City of La Porte
CMI Job No. 03-093
Dear Mr. Gillett:
On March 22,2004, two (2) bids were received on the above referenced project. The
following is a summary of the bids and our evaluation of the bidder to be considered for
this project.
Bid Tabulation Sheet - Two (2) construction firms participated in the bidding process.
The bids for the total project are as follows:
Lowest Bidder
Second Lowest Bidder
Contractor
L &M Contractors, Inc.
Stone Building Systems, Inc.
Total Bid
$65,872.00
$98,700.00
A copy of the bid tabulation is attached for you to review.
Each bid was checked for mathematical errors and/or bid irregularities. No errors were
found in any of the bids.
Review of Lowest Bidder - L & M Contractors, Inc.
The lowest Bidder was L & M Contractors, Inc. L & M Contractors, Inc. is a newly
formed company with no previous job record. This project will be the first project that
will be preformed by L & M Contractors, Inc. L & M Contractors, Inc. did provided
resumes of the current officers of the company along with three letters of
recommendations from clientele from their previous place of employment. The officers
have many years of experience building more detailed and complex structures than the
building that will be erected.
4635 Southwest Freeway, Suite 1000 · Houston, Texas 77027-7169 · 713-622-9264 · Fax 713-622-9265
Another issue that has risen concerns the lack of available steel on the market. L & M
Contractors, Inc. attached a letter to their bid documents notifying the City that it will
need additional time to have the building fabricated from the supplier. Due to current
steel supply problems, it will take 14 weeks for the supplier to fabricate the metal
building and L & M Contractors, Inc. will erect the structure in two weeks. Thus, L & M
Contractors, Inc. will need sixteen weeks to finish this project, while the contract
documents state that the project should be completed in 90 days.
References - There were no references for L & M Contractors, Inc. since they are a
newly formed company. However, various companies composed letters of
recommendations for the officers. The companies were impressed with the work habits of
L & M Contractors, Inc. had shown and would use them again in the future. All
references were satisfied with the quality of work.
Statement of Qualifications - There were no statement of qualifications for L & M
Contractors, Inc. However, the officer's resumes listed work experience on buildings
such as O'Reilly's Auto Parts Store, Jack in the Box Restraints, Red Lobster Restaurants,
and over 35 years in the construction business.
L & M Contractors, Inc. appears to be a young firm operated by individuals with the
capabilities of performing the specified work in a satisfactory manner. The steel supple
problems are being experienced industry wide at this time. It is our recommendation that
the contract be awarded with an amendment to the contract time to provide an additional
four to six weeks to allow for delays in delivery. As long as L & M Contractors, Inc. is
able to be bonded, we are willing to recommend that they be give the opportunity to
perform this contract. For these reasons, we recommend that the City of La Porte award
the Total Bid of the Public Work's Metal Building to L & M Contractors, Inc. for the
amount of$65,872.00, with an extension of the contract time to 135 days.
Sincerely,
CLAUNCH & MILLER, INe.
d'Y~
Bid Date: 3/22/04
City of La Porte
Public Work's Metal Building
LOW BIDDER
Item Unit Total Unit Total
No. Description Unit Quan. Price Amount Price Amount
L + M Contractors, Inc. Stone Buildina Systems, Inc.
Base Bid
Galvanized pre-engineered metal building, including all necessary equipment, materials, construction
1 of footinas and columns, connecctions, the buildina's erection, surface restoration and rearadina L.S. 1 $65,872.00 $65,872.00 $98,700.00 $98,700.00
_Mathematical Error Corrected by Engineer Total Base Bid: $65.872.00 $98,700.00