Loading...
HomeMy WebLinkAboutO-2004-2728 REQUEST FOR CITY COUNCIL AGENDA ITEM :=~:~::21f. Appropriation Report: Resolution: Ordinance: x Source of Funds: General CIP Fund 015 Main Street Assoctn Account Number: 015-9892-709.11-00 015-9892-700.91-50 037-9898-822.11-00 Amount Budgeted: $50,000.00 $100,000.00 $60,000.00 Amount Requested: $48,636.26 $6,471.36 $4,551.59 Bud2eted Item: IYESI IN01 Exhibit 1: Ordinance Exhibit 2: Bid Tabulations Exhibit 3: Bidders List Exhibit 4: List of Sidewalk Locations Exhibit 5: Map of Locations Exhibit 6: Map of HeadStart sidewalk Exhibit 7: Copy of proposed contract with Brooks Concrete SUMMARY & RECOMMENDATION As part of the FY 2003-2004 Budget for Capital Improvement Projects, City Council approved $50,000.00 for the Sidewalk Replacement Program. The 2004 La Porte City-Wide Sidewalk Improvement Project consists of the removal of existing sidewalks and replacement being with sidewalks or wheelchair ramps (see list of sidewalk locations). The HeadStart project consists of placement of storm sewers and sidewalks, and the Main Street project consists of placement of sidewalk, and driveway construction. These two items are not reconstruction, but were considered because of the request and necessity of sidewalks available. The HeadStart is for a sidewalk from the Northside Center to the Library. The Main Street project is for a sidewalk from Main Street to Old City Hall on South 2nd Street. There are funds available in the Main Street fund to cover the $4,551.59 for the Main Street project. There are enough funds in the CIP contingency fund for the $6,471.36 for the HeadStart project. Public Works will also install storm sewers on this project at an expense of $4,500.00. Survey, design and engineering were performed on this project utilizing City of La Porte personnel. On April 12, 2004, the City received competitive bids from 3 qualified contractors (see attached Bid Tabulation). Brooks Concrete, Inc. of Pasadena, Texas submitted the low bid in the amount of $56,818.30. The contract will be complete within 120 calendar days once the "Notice to Proceed" is issued. Staff has reviewed the bids submitted and determined the low bid from Brooks Concrete, Inc. is within the budgeted amount and that Brooks Concrete, Inc. is well qualified to perform the work. Staff recommends that the City Council authorize the City Manager to execute a contract with Brooks Concrete, Inc. in the amount of $59,659.21 which includes a 5% contingency. Action Reauired bv Council: Consider approving an ordinance authorizing the City Manager to execute a contract with Brooks Concrete, Inc. in the amount of $59,659.21 which includes a 5% contingency. Approved for City Council Al!enda <{/:;:UJ -- D + Date EXHIBIT 1 ORDINANCE NO. 2004- J'l ?-1 AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT BETWEEN THE CITY OF LA PORTE AND BROOKS CONCRETE, INC. FOR CONSTRUCTION OF THE 2004 CITY-WIDE SIDEWALK IMPROVEMENT PROJECT; APPROPRIATING $59,659.21 TO FUND SAID CONTRACT; MAKING VARIOUS FINDINGS AND PROVISIONS RELATING TO THE SUBJECT; FINDING COMPLIANCE WITH THE OPEN MEETINGS LAW; PROVIDING AN EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE: Section 1. The City Council hereby approves and authorizes the contract, agreement, or other undertaking described in the title of this ordinance, in substantially the form as shown in the document which is attached hereto and incorporated herein by this reference. The City Manager is hereby authorized to execute such document and all related documents on behalf of the City of La Porte. The City Secretary is hereby au thorized to attest to all such signatures and to affix the seal of the City to all such documents. City Council appropriates the sum of $59,659.21 from Capital Improvement Fund 015 to fund said contract. Section 2. The City Council officially finds, determines, recites, and declares that a sufficient written notice of the date, hour, place and subject of this meeting of the City Council was posted at a place convenient to the public at the City Hall of the City for the time required by law preceding this meeting, as required by the Open Meetings Law, Chapter 551, Texas Government Code; and that this meeting has been ORDINANCE NO. 2004- d../J r open to the public as required by law at all times during which this ordinance and the subject matter thereof has been discussed, considered and formally acted upon. The City Council further ratifies, approves and confirms such written notice and the contents and posting thereof. Section 3. This Ordinance shall be effective from and after its passage and approval, and it is so ordered. PASSED AND APPROVED, this April 26, 2004 CITY OF LA POR~ B~ne, · Mayor ATTEST: '1l!tau:~ 4<<dL M ha Gillett, City Secretary EXHIBIT 2 CITY OF LA PORTE 2004 CITY WIDE SIDEWALK IMPROVEMENT PROJECT CLP PROJECT 2003-4401 BID OPENING: APRIL 12, 2004 BID TABULATION ~CONTRACTOR NAME I BID BOND IDAYS TO COMPLETE I BASE BID IBASE BID PLUS ALTERNATES l BROOKS CONCRETE, INC. ATTACHED 120 $ 46,320.25 $ 60,243.30 CHEROKEE CONCRETE COMPANY ATTACHED 120 $ 64 472.36 $ 87.848.48 IDEAL CONSTRUCTION SERVICES ATTACHED 120 $ 64400.00 $ 94,310.00 ~ ~ . -'":: ! ~~~ """Io(SEIt__ ~_"""ATUIlf NUD'ot(10"olCC5) ~~ .........'- CRAPKlC $CAlX 'lo.r ..J--.J-1 (.,.'f) T.wuG& T. IOOERlI taDO'<ll>.nU~ B.C.C.F. UOO4tI LOCA:~ MAP KEY ...AP I9Q-P 1ii1Ol1llCf...... -...:.... -.r...... orr _....,... Ul'CfloIllllD IHII: an',t.nJT~_I44"",,"lI[QuII(DlUOII:""'I[JI""Xe.ulIl[_. F(IA'lal_'.I'IlIIt~_G.\l[lIl6'!li:_JOl)IIIAII:flRt KPUIWITtclOUBUC_1oCCD5. - ~:.:.-~~:.~~&=..~......_.------.... =-=-~':~:""1:==':"''''''-- ..'-_.....~ :r=z~n..'=J:::l~~~.==~~RP II> :'.==:;r;:=-::::.r-----.--.- _............._.._IIIEl'.w:u.............un =:{,.~.:=-..~...a:r.==-o::;:::":-..... ~=:r....~~M~s:.-~-----..,....,'r,- =.;...~..="'..'=;.,-:::\._. _IKI. ____ --.......-............-,-- =:.:.~~::-:::"~~~":u~;o:.":"~nn- -............-.............--- -"',..........--.-......-.-- _1InI"....._.._.............__ ~--;~~-=,::::.......s,\'<.'::.#"'...-:.:.:':=' =",101'V..:;}':-=~"=,,,"".:c.."""" ,......._. _.-.. _IVI "'... ='"~:::_..=_~..':".:..u:.........~-.....-. -........... \ \ SiWlYB!V&ll:St:CT!Otl::1 Vo!.14l1,P..1i7ILC..ll.a. FlUNG O.l.TE: IolARCt1 11, 2004 '. ".,,, --'';;:.~~'-( / / /~"'-'~J \ \ / / PRESERVE AT T AYLOR BAYOU GENERAL PLAN I~",_~ ,\ " BEING A 101.19 ACRE: TRACT OF LAND OUT OF THE W.P. HARRIS SURVEY, ABSTRACT NO. A-JO. HARRIS COUNl'Y. TEXAS 3 BLOCKS. 0 RESfR~ BlOCK 1 - 1 LOT. PLANNED UNIT OEVElOPr.tENT (PUO) - 28.4J ACRES PHASf 1 Hilll UNITS PHASE 2 220 UNITS --..... 1./ '. / '. illOCK 2 - 1 lOT, NEIGHBORHOOD COl.tIolERCIAL .. 1.JS ACRfS ( \,. BLOCK J - 1 LOl, NAtuRE PR.(SERVE - 11.41 ACRES _101.19 ACRES tBlOC!< 1 W1U HAIlE 14.70 APARTMENT UNITS PER ACREI / \... '/ 1'........1 I:>> Bury+Partners-Houston Inc. ~ Ja,bmrI lid SVft)on ~"'~l""~ --....~- j; I j..-.-.... -.....-.,. ,.v~t~= PETTY ac ASSOCIA lES 7066 lAKEVI(W HA""" OR. SUItE 1,9 IiOU$TOH, lX T7WS (281) 3.(5-4+40 DaB' SHORL\CRIllISUBDlVI8lOlI YaI. L Pt- 10 a.c.w.J. BUROlFIELD DE~T, LP 212J I'tfST GO..umOR'S ORCLE. SUITE .fOO HOUSTON, TX n099 (713) $50-0555 IU.'I'OU f'OUSt. 1'!WIr. O)Q; - stC'11OM oMl rum ec..t. No. 3MI05-t K.c.It.J. CITY OF LA PORTe 2004 CITY WIDE SIDEWALK IMPROVEMENT PROJECT CLP PROJECT 2003-4401 BID T ASUI.A TlON BROOKS CONCRETE CHEROKEE CONCRETE IDEAl. CONSTRUCTION COMPANY SERVICES NO. ITEM UNIT QUANTITY UNIT AMOUNT TOTAl. PRICE UNIT AMOUNT TOTAL PRICE UNIT "MOUNT I TOT AI. PRICE Move-in and start up including performance ood 1 peyment bonds for 100 percent (100%) of the LS 1 $ 2,500.00 $ 2,500.00 $ 30.00 $ 30.00 $ 3,500.00 $ 3,500.00 contract amount concrete sidewelk placement: four inch.. thick, 2 poured with 3000 psi concrete (min). Complete in SY 865 $ 23.85 $ 20,630.25 $ 44.44 $ 38,440.60 $ 30.00 $ 25,950.00 lace Removal and disposal of existing concrete sidewalk. 3 Excavated sidewelk to become property of Contractor SY 928 $ 11.25 $ 10,440.00 $ 10.89 $ 10,105.92 $ 12.50 $ 11,800.00 to be dlSllOSOd of in a I_I manner. 4 Concrete Type 'A' wheel chair ramps. in accordance EA 10 $ 400.00 $ 4,000.00 $ 441.50 $ 4,415.00 $ 800.00 $ 8,000.00 with deteils and completion place. 5 Concrete Type 'B' wheel chair ramps. In accordance EA 20 $ 350.00 $ 7,000.00 $ 448.40 $ 8,968.00 $ 750.00 $ 15,000.00 with deteils and completion place. 6 Adjustment of existing valve boxes. Complete in EA 7 $ 250.00 $ 1,750.00 $ 95.00 $ 665.00 $ 50.00 $ 350.00 place. TOTAL BASE BID $ 46,320.25 $ 62,624.52 $ 84,400.00 ALTERNATE A Concrete sidewelk placement: four inches thick, A-l poured with 3000 psi concrete (min). Complete In SY 152 $ 23.85 $ 3,625.20 $ 49.85 $ 7,577.20 $ 30.00 $ 4,560.00 place A-2 Remove and dispose of existing concrete. Removed SY 172 $ 11.25 $ 1 ,935.00 $ 11.11 $ 1,910.92 $ 12.50 $ 2,150.00 concrete to become property of contractor and to be disposed of in a legai manner. Complete in place. Conerete driveway placement: six inches thick, A-4 poured with 3000 psi concrete (min). Compiete in SY 20 $ 30.15 $ 603.00 $ 44.44 $ 888.60 $ 150.00 $ 3,000.00 Olace. TOTAL OF ALTERNATE 'A" $ 8,183.20 $ 10,376.92 $ 9,710.00 ALTERNATE B Concrete sidewelk piacement: four inches thick, B-1 poured with 3000 psi concrete (mln). Complete in SY 120 $ 23.85 $ 2,862.00 $ 44.44 $ 5,332.60 $ 30.00 $ 3,800.00 place Concrete drivewey placement: six inches thick, 8-2 poured with 3000 psi concrete (min). Complete in SY 19 $ 30.15 $ 572.85 $ 55.60 $ 1,056.40 $ 150.00 $ 2,S!!O.00 place. 8-3 Remove and salvage existing brick pavers, Including LS 1 $ 300.00 $ 300.00 $ 395.00 $ 395.00 $ 3,000.00 $ 3,000.00 transporting to location designated by Owner. 8-4 Remove existing downspout drains, including bsckfill, EA 4 $ 150.00 $ 600.00 $ 220.00 $ 880.00 $ 500.00 $ 2,000.00 curb repair, and adjusting downspouts to final grade. TOTAL OF ALTERNATE 'B' $ 4,334.85 $ 7,664.20 $ 11,450.00 SUPPLEMENTAL BID ITEMS 5-1 Extra bsnk sand (ordered by City). Complete in $ 22.00 $ 550.00 $ 12.00 $ 300.00 $ 875.00 place. CY 25 $ 35.00 S-2 Strip sodding as directed by City and in accordance $ 5.00 $ 250.00 $ 10.60 $ 530.00 $ 1,000.00 with Specification 00112. Complete in place. SY 50 $ 20.00 S-3 Sidewelk point repair including cement stabilized $ 35.00 $ 1,750.00 $ 60.00 $ 3,000.00 $ 5,000.00 sand and removal of soil. Complete in place. CY 50 $ 100.00 S-4 Cement-stabilized sand including compaction. $ 35.00 $ 875.00 $ 60.00 $ 1,500.00 $ 1,875.00 Compiete in place. CY 25 $ 75.00 TOTAL OF SUPPLEMENTAL $ 3,425.00 $ 5,330.00 $ 8,750.00 TOTAL BID (CALCULATED) $ 60,243.30 $ 85,995.64 $ 94,310.00 TOTAL BID (SUBMITTED) $ 60,243.30 $ 87,848.48 $ 94,310.00 EXHIBIT 3 CITY OF LA PORTE 2004 LA PORTE CITY-WIDE SIDEWALK IMPROVEMENT PROJECT CLP PROJECT #2003-4401 Advertising The Bayshore Sun - April 4, 2004 and April 11, 2004 La Porte Bayshore Chamber of Commerce La Porte, TX 77571 Phone: 281-471-1123 Fax: 281-471-1710 Moore & Moore Contractors P.O. Box 1517 La Porte, TX 77572-1517 Phone: 281-471-0145 Fax: 281-471-0601 Invitation to Bid Faxed Follis Construction 111 N. Broadway La Porte, TX 77571 Phone: 281-471-6881 Fax: 281-471-6038 FORCE Corp. P.O. Box 1079 La Porte, TX 77572-0853 Phone: 281-470-0550 Fax: 281-471-9627 Contractors that Picked up Plans & Specifications Brooks Concrete, Inc. 4018 Allen-Genoa Pasadena, TX 77504 Phone: 713-947-8440 Fax: 713-947-8444 T and T Construction 204 Preston Road Pasadena, TX 77503 Phone: 713-477-6660 Fax: 713-477-1465 Sunland Group 10497 Town & Country Suite 550 Houston, TX 77024 Phone: 713-467-8484 Fax: 713-467-3353 Ideal Construction. P.O. Box 2915 Sugarland, TX 77487 Phone: 281-470-0531 Fax: 281-470-0539 Glover's Concrete Works Cherokee Concrete Co 1514 W. Main St. La Porte, TX 77571 Phone: 281-842-8590 Phone: 832-549-9662 E1(IlIBlrt " 2003-2004 City Wide Sidewalk Proiect Proposed Sidewalk placement and removal limits shall be marked by the City of La Porte SHADY RIVERS LOCATION IMPROVEMENT L.F. PLACEMENT 3202 Silver Springs sidewalk 15.5 1015 Oak Leaf sidewalk (saw cut) 4.0 914 Hackberry sidewalk 63.0 Subtotals Removal Placement Saw-Cut 82.5 LF 82.5 LF 4.0LF TOWN OF LA PORTE LOCATION IMPROVEMENT L.F. PLACEMENT 312 N. 6th Street Sidewalk 60.0 Subtotals Removal Placement 60.0 LF 60.0 LF GLEN MEADOWS LOCATION IMPROVEMENT L.F. PLACEMENT 5102 Valley View sidewalk (saw cut) 8.0 5230 Valley View sidewalk (saw cut) 4.0 5102 Crestway W.C.R.- B 46.5 rem. 42.5 place. 5034 Crestway (on Glen Meadows) sidewalk 12.0 5022 Crestway sidewalk (saw cut) 8.0 5125-5205 Crestway sidewalk placement only 75.5 no removal E. Side Glen Meadows Dr. sidewalk placement only 51.0 Btwn. Crestway & Glen View no removal 9.9 W. Side Glen Meadows Dr. sidewalk placement only 81.0 Btwn. Crestway & Glen View sidewalk 9.9 Valley View @ Farrington SW W.C.R.-A 40.1 rem. 35.4 place. Valley View @ Farrington NW W.C.R.-A 32.3 rem. 30.0 place. Crestway @ Farrington SW W.C.R.-A 28.4 rem. 22.4 place. Crestway @ Farrington NW W.C.R.-A 44.8 rem. 41.9 place. Crestway @ Glen Meadows NE W.C.R-A 30.0 rem. 26.0 place. Crestway @ Glen Meadows SE W.C.R-A 35.0 rem. 33.2 place. Crestway @ Glen Meadows NW W.C.R-A 19.5 rem. 15.5 place. Crestway @ Glen Meadows NE W.C.R-A 34.5 rem. (2 G. V. Adj.) 30.5 place. Valley View @Glen MeadowsSW W.C.R.-B 23.4 rem. 20.3 place. Valley View @Glen MeadowsNW W.C.R.-B 23.3 rem. 20.2 place. Valley View @Glen MeadowsSE W.C.R.-B 35.7 rem. (G.v. Adj.) 32.6 place. Valley View @Glen MeadowsNE W.C.R.-B (come around power pole) 28.6 rem. 24.6 place. Subtotals Removal Placement W.C.R. G. J-: Adj. Saw-Cut 473.9 LF 636.4 LF 13 ea. 3 ea. 20LF BROOKGLEN/COLLEGEVIEW LOCATION IMPROVEMENT L.F. PLACEMENT 3231 Fern Rock sidewalk (saw cut) 8.0 8406 Collingsdale sidewalk (saw cut) 4.0 8418 Collingsdale sidewalk (saw cut) 4.0 8715 Beechaven sidewalk (saw cut) 4.0 8710-8714 Beechaven sidewalk 46.1 8702 Beechaven sidewalk (saw cut) 4.0 8615-8703 Bandridge sidewalk 8.8 8730 Collingsdale sidewalk (saw cut) 8.0 3123 Gladwyne sidewalk (g.v. adj.) (saw cut) 4.0 3303 Ashwyne Ct. sidewalk 5.8 3310 Gladwyne sidewalk 52.4 3331 Gladwyne sidewalk (saw cut) 4.0 3335 Gladwyne sidewalk 4.0 8835-8831 Oakhaven sidewalk (relocate w. meter) 4.0 (saw cut) 3723 Somerton sidewalk (saw cut) 4.0 3831 Somerton sidewalk (saw cut) 4.0 8511 Lazy Brook-3842 Fair Brook sidewalk 15.9 Subtotals Removal Placement Saw Cut G. J': Adj. 185 LF 185 LF 56LF 1 ea. FAIRMONT PARK EAST LOCATION IMPROVEMENT L.F. PLACEMENT 10906 Idlewood sidewalk 5.5 10908 Idlewood sidewalk 35.0 3809 Redbud sidewalk (saw cut) 4.0 10920 Birch sidewalk (saw cut) 4.0 00000 Rosewood sidewalk 12.5 Subtotal Removal 61.0 LF Placement 61.0 LF Saw-Cut 8.0 LF FAIRMONT PARK CENTRAL LOCATION IMPROVEMENT L.F. PLACEMENT 10322 Antrim sidewalk (saw cut) 4.0 10338 Antrim sidewalk 41.0 10438 Antrim sidewalk 4.9 10306 Belfast sidewalk (saw cut) 4.0 10346 Belfast sidewalk (saw cut) 4.0 10314 Carlow sidewalk (saw cut) 8.0 10338 Carlow sidewalk 14.7 10350 Carlow sidewalk 47.3 10439 Carlow sidewalk 53.0 10322 Winding Trail sidewalk (saw cut) 4.0 10326 Winding Trail sidewalk 16.5 10306 Winding Trail sidewalk 15.4 10410 Belfast sidewalk 26.9 10418 Belfast sidewalk 19.2 10420 Belfast sidewalk 10.3 10424 Belfast sidewalk (saw cut) 4.0 3110 Oaken Ln. sidewalk (saw cut) 4.0 3214 Oaken Ln. sidewalk 7.0 3214 Oaken Ln. sidewalk (on Belfast) (saw cut) 4.0 3109 Old Hickory sidewalk (saw cut) 12.0 10439 Catlett sidewalk (on Oaken) 14.2 10439 Winding Trail sidewalk 6.0 10458 Winding Trail sidewalk (on Old Hickory) 10.0 10459 Winding Trail sidewalk (on Old Hickory) 8.0 (saw cut) 10407-10411 Collingswood sidewalk 10.1 10423 Collingswood sidewalk 10.9 10439 Quiet Hill sidewalk 13.3 10439-10443 Quiet Hill sidewalk 8.4 10458 Quiet Hill sidewalk (on Old Hickory) 4.0 (saw cut) 10439-10443 Rustic Gate sidewalk (saw cut) 4.0 10454 Rustic Gate sidewalk 7.3 10458 Rustic Gate sidewalk (on Old Hickory) 14.2 10315 Rustic Rock sidewalk (saw cut) 4.0 10327 Rustic Rock sidewalk (saw cut) 4.0 10431 Rustic Rock sidewalk (saw cut) 4.0 10438 Rustic Rock sidewalk (saw cut) 4.0 10458 Rustic Rock sidewalk (on Old Hickory) 14.7 10459 Rustic Rock sidewalk (on Old Hickory) 28.4 10307 Shell Rock sidewalk (saw cut) 4.0 10311 Shell Rock sidewalk (saw cut) 4.0 10327 Shell Rock sidewalk (saw cut) 8.0 10447 Shell Rock sidewalk (saw cut) 4.0 10447-10451 Shell Rock sidewalk (saw cut) 4.0 10451 Shell Rock sidewalk (saw cut) 4.0 10458 Shell Rock sidewalk 18.4 10422 Rocky Hollow sidewalk (saw cut) 8.0 10442 Rocky Hollow sidewalk (saw cut) 8.0 3113 Old Hickory sidewalk (saw cut) 4.0 Subtotals Removal 558.9 LF Placement 558.9 LF Saw-Cut 104 LF FAIRMONT PARK WEST LOCATION IMPROVEMENT L.F. PLACEMENT 10002 Wilmont sidewalk 29.5 10006 Wilmont sidewalk 4.0 10110 Wilmont sidewalk 74.0 10002 Winding Trail sidewalk (on Dover Hill) 31.8 10115 Winding Trail sidewalk 11.9 10127 Winding Trail sidewalk (on Roseberry) 9.3 10026 Rocky Hollow sidewalk (saw cut) 4.0 10119 Rocky Hollow sidewalk 17.6 10010 Rustic Gate sidewalk 8.5 10 111 Charmont sidewalk 8.1 10119 Belfast sidewalk 20.8 10118 Belfast sidewalk 29.8 10106 Catlett sidewalk (saw cut) 4.0 3507 Roseberry sidewalk (saw cut) 8.0 Roseberry @ Catlett S.E. W.C.R.- B 40.0 rem. 16.0 place. Roseberry @ Catlett S.W. W.C.R.-B 25.0 rem Roseberry @ Catlett N.W. W.C.R.-B 22.2 rem. Winding Trail & Dover Hill S.E. W.C.R.-B 22.8 rem. Winding Trail & Dover Hill N.E. W.C.R.-B 24.5 rem. Carlow @ Catlett N.W. W.C.R.- B 13.7 Carlow @ Catlett N.E. W.C.R.- B 13.4 Carlow @ Belfast N.W. W.C.R.- B 14.6 Carlow @ Belfast N.E. W.C.R.- B 13.8 Cedarmont @ Charmont N.E. W.C.R.- B (2 g.v. adj.) 34.6 Cedarmont @ Charmont N.W. W.C.R.-B 15.9 Cedarmont @ Charmont S.E. W.C.R.- B 18.5 Cedarmont @ Charmont S. W. W.C.R.- B 11.0 Subtotals Removal 531.3 LF Placement 277.3 LF W.C.R. 13 ea. G. Jt: Adj. 2ea. CREEKMONT LOCATION IMPROVEMENT L.F. PLACEMENT Myrtlecreek @ CanyonSprings SW W.C.R.-A 31.5 rem. 19.0 place. Myrtlecreek @ CanyonSprings NW W.C.R.-A 37.5 rem. 25.0 place. Sugar Hill @ Canyon Springs W.C.R.-B 29.9 rem. 14.4 place. Pine Creek @ Canyon Springs W.C.R.-B (g.v. adj.) 36.0 rem. 26.0 place. Subtotals Removal 134.9 LF Placement 84.4 LF W. C.R. 4 ea. G. Jt: Adj. 1 ea. EXHIBIT 5 EXHIBIT 6 FAIRMONT PARK WEST BROOKGLEN ~1. Sl'<NCIll HI"''''IY GLEN MEADOWS FAIRMONT PARK CENTRAL FAIRMONT PARK EAST WIST llMIlOlJR'S CUT IUD. BBB >>, = BBBB <>> B BB ,~ ,~ BB'~ .. ~ mOO" .rnrn"'~~t, I rn,. ~ ffiG ...1'" I OBGB. M DOE]'" ,~~ ~ GDG. GBG .' '0\j~ 1 BGB q GtJlli~~ I GBB">>>> BDrn\Q~ GIGGGGGGG[]3~y /".~ CREEKMONT SHADY RIVER TOWN OF LA PORTE t N.T.5 CITY OF LA PORTE 604 w. FAIRMONT PI<MIY. LA PORTE. TEXAS PLANNING DEPARTMENT ENGINEERING DIVISION SURVEY OFFICE o DRA'M'l J.R. CHECKED; B.S. APPROVED: R.C. REVISIONS NO REVISION I ISSUE DATE o ORIGINAL ISSUE 01/004 2004 CITYWIDE SIDEWALK IMPROVEMENT LOCATIONS 2003-4401 01104 2 OF 5 N.T.S. E1{IlIllIT 7 ,,___.^,._~_.___w----_..~.. -......--.--..--.-- . l I I I =1 I I I _J I I S. BROADWAY + Il1'O." -! SCALE: 1. '" 20' GENERAl NOTES: .... CONCRETE FOR SIDEWAlKS Sti.-'ll ATIAlN 3ODO PSI 028 DAYS. 2. DRIVEWAY CONCRETE SHAlL AnAIN 3000 PSI GI 28 DAYS. 3. OORRUGATEDPLASnC PIPE (CPP) SHALL BE ADS N-12 PRQlINK lJl.lRA OREauAl (BY CLP~. 4. BACKFlLl OF OPEN PITCH SHALL BE COMPACTED TOA 95 % DENSITY (BY CLP). 5. CITY Of LA pORTE PLA""'ING DEPARTMENT sHollli. BE COIfTACTED 48 HOURS PRIOR TO COMMENCING II\ORK. (281....71-5020) 6. UTILITY LOCAlES SHALL BE THE RESPONSIBIl.lTY Of THE CONTRACTOR. 7. INLETS SHALL BE E-lNLfTS (BY CLP). a. PIPE 6,\CKALL SHAl...l BE COMPAC11;,O OS 300 OR CEMENT SAND MIX 100 PSI <<I 48 HOURS (BY CLP) 9. SIDEWALK SUBGRAOE . GRASS SHALL BE REMOVED AND SUBGRADE PROOf ROlLED, PJN SOFT SPOTS SHALL BE EXCAVATED AND REPLACED WTH SUITABLE MAl'ERlAL APPROVED BY THe. CITY OF LA PORlE. 10. BARRICADES & SAFETY DEVICES AND All NECESSARY TRAFFIC CONTROl. SHAU. SE THE RESPONSIBILITY OF THE CONTRACTOR. 11. SIDEWALK EXPANSION JOINTS SHALL BE PlACED AT THE EXISTING PAVEMENTS AND OTHER\MSE SPACED ON 30' INlERVALS. 12. SIDEWALK CONS1RUCllON JOI.NTS ON 6' IN1'ERVALS. 13. SIDeWALK STEEL REINFORCEMENT SHAl..l BE .3 RE..sAR 0 18- CENlERS OR: #4 CD 2-4~ CENTERS. 14. STRIP SOD DISlURBED AREAS WITH ST. AUGUSTINE OR MATCH EXiSnNG GRASS SPECIES - FERTILIZER TO 8E A '\3-'\3-13 M1X1URE. 15. SIDEWALKS TO BE CONSTRUCTED TO lHE AMERICAN DISABILITY ACT STANDARDS. 16. DRIVEWAY STEEL REINFORCEMENT SHALL BE tI-4 ell 18- ON CENTERS. LOCA :::>.!' MAP t; ~~ ~fo< ~:n is: ~: -~ ,.; ,.I ~ I I I --J TOTAL PROPOSED 4' CONC. SIDEWALK BIG JOE'S YOUTH CENTER 999S. l~ST ". HE~~.TTART~ ~,,_, :'. . i.:-' "" ~l. . .,......~. .. . . i".. .- . . '~.C~f.~~g/~~;:~~'ff;(::if:rfl:~'1!:{ -4-- ,.; CONSTRUcTION JOINT DETAIL N.T.5. r- CITY OF LA PORTE . 604 w. FAIRMONT P~. LA PORTE. TEXAS PLANNING DEPARTMENT ENGINEERING DIVISION SURVEY OFFICE 0 DRA"""'l; JR J RJS CHECKED: GRM APPROVED GRM REVISIONS NO. I REVISION I ISSUE DATE 0 ORIGINAL I 11103 1 R ISlONI 12103 PROPOSED SIDEWALK S. 1ST STREET &: W. "W ST. TO S. BROADWAY ALTERNATE A PROJECT: SliEET: 2ll!l3-<<O' "..'" 30F 5 01/04 SCAl,t: 1" = 20'