Source of Funds: General CIP Fund 015
Main Street Assoctn
Account Number: 015-9892-709.11-00
015-9892-700.91-50
037-9898-822.11-00
Amount Budgeted: $50,000.00
$100,000.00
$60,000.00
Amount Requested: $48,636.26
$6,471.36
$4,551.59
Bud2eted Item: IYESI IN01
Exhibit 1:
Ordinance
Exhibit 2:
Bid Tabulations
Exhibit 3:
Bidders List
Exhibit 4:
List of Sidewalk Locations
Exhibit 5:
Map of Locations
Exhibit 6:
Map of HeadStart sidewalk
Exhibit 7:
Copy of proposed contract with Brooks Concrete
SUMMARY & RECOMMENDATION
As part of the FY 2003-2004 Budget for Capital Improvement Projects, City Council approved $50,000.00
for the Sidewalk Replacement Program. The 2004 La Porte City-Wide Sidewalk Improvement Project consists of
the removal of existing sidewalks and replacement being with sidewalks or wheelchair ramps (see list of sidewalk
locations). The HeadStart project consists of placement of storm sewers and sidewalks, and the Main Street project
consists of placement of sidewalk, and driveway construction. These two items are not reconstruction, but were
considered because of the request and necessity of sidewalks available. The HeadStart is for a sidewalk from the
Northside Center to the Library. The Main Street project is for a sidewalk from Main Street to Old City Hall on
South 2nd Street. There are funds available in the Main Street fund to cover the $4,551.59 for the Main Street
project. There are enough funds in the CIP contingency fund for the $6,471.36 for the HeadStart project. Public
Works will also install storm sewers on this project at an expense of $4,500.00.
Survey, design and engineering were performed on this project utilizing City of La Porte personnel. On
April 12, 2004, the City received competitive bids from 3 qualified contractors (see attached Bid Tabulation).
Brooks Concrete, Inc. of Pasadena, Texas submitted the low bid in the amount of $56,818.30. The contract will be
complete within 120 calendar days once the "Notice to Proceed" is issued.
Staff has reviewed the bids submitted and determined the low bid from Brooks Concrete, Inc. is within the
budgeted amount and that Brooks Concrete, Inc. is well qualified to perform the work. Staff recommends that the
City Council authorize the City Manager to execute a contract with Brooks Concrete, Inc. in the amount of
$59,659.21 which includes a 5% contingency.
Action Reauired bv Council:
Consider approving an ordinance authorizing the City Manager to execute a contract with Brooks Concrete, Inc. in
the amount of $59,659.21 which includes a 5% contingency.
Approved for City Council Al!enda
<{/:;:UJ -- D +
Date
EXHIBIT 1
ORDINANCE NO. 2004- J'l ?-1
AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT
BETWEEN THE CITY OF LA PORTE AND BROOKS CONCRETE, INC.
FOR CONSTRUCTION OF THE 2004 CITY-WIDE SIDEWALK
IMPROVEMENT PROJECT; APPROPRIATING $59,659.21 TO FUND
SAID CONTRACT; MAKING VARIOUS FINDINGS AND PROVISIONS
RELATING TO THE SUBJECT; FINDING COMPLIANCE WITH THE
OPEN MEETINGS LAW; PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA
PORTE:
Section 1. The City Council hereby approves and authorizes the
contract, agreement, or other undertaking described in the title of this
ordinance, in substantially the form as shown in the document which is
attached hereto and incorporated herein by this reference. The City
Manager is hereby authorized to execute such document and all related
documents on behalf of the City of La Porte. The City Secretary is hereby
au thorized to attest to all such signatures and to affix the seal of the City
to all such documents. City Council appropriates the sum of $59,659.21
from Capital Improvement Fund 015 to fund said contract.
Section 2. The City Council officially finds, determines, recites,
and declares that a sufficient written notice of the date, hour, place and
subject of this meeting of the City Council was posted at a place
convenient to the public at the City Hall of the City for the time required
by law preceding this meeting, as required by the Open Meetings Law,
Chapter 551, Texas Government Code; and that this meeting has been
ORDINANCE NO. 2004- d../J r
open to the public as required by law at all times during which this
ordinance and the subject matter thereof has been discussed, considered
and formally acted upon. The City Council further ratifies, approves and
confirms such written notice and the contents and posting thereof.
Section 3. This Ordinance shall be effective from and after its
passage and approval, and it is so ordered.
PASSED AND APPROVED, this April 26, 2004
CITY OF LA POR~
B~ne, ·
Mayor
ATTEST:
'1l!tau:~ 4<<dL
M ha Gillett,
City Secretary
EXHIBIT 2
CITY OF LA PORTE
2004 CITY WIDE SIDEWALK IMPROVEMENT PROJECT
CLP PROJECT 2003-4401
BID OPENING: APRIL 12, 2004
BID TABULATION
~CONTRACTOR NAME
I BID BOND IDAYS TO COMPLETE I BASE BID IBASE BID PLUS ALTERNATES l
BROOKS CONCRETE, INC. ATTACHED 120 $ 46,320.25 $ 60,243.30
CHEROKEE CONCRETE COMPANY ATTACHED 120 $ 64 472.36 $ 87.848.48
IDEAL CONSTRUCTION SERVICES ATTACHED 120 $ 64400.00 $ 94,310.00
~
~
. -'"::
!
~~~
"""Io(SEIt__
~_"""ATUIlf
NUD'ot(10"olCC5)
~~
.........'-
CRAPKlC $CAlX
'lo.r ..J--.J-1
(.,.'f)
T.wuG& T. IOOERlI
taDO'<ll>.nU~
B.C.C.F. UOO4tI
LOCA:~ MAP
KEY ...AP I9Q-P
1ii1Ol1llCf...... -...:.... -.r...... orr _....,... Ul'CfloIllllD IHII:
an',t.nJT~_I44"",,"lI[QuII(DlUOII:""'I[JI""Xe.ulIl[_.
F(IA'lal_'.I'IlIIt~_G.\l[lIl6'!li:_JOl)IIIAII:flRt
KPUIWITtclOUBUC_1oCCD5.
-
~:.:.-~~:.~~&=..~......_.------....
=-=-~':~:""1:==':"''''''-- ..'-_.....~
:r=z~n..'=J:::l~~~.==~~RP II>
:'.==:;r;:=-::::.r-----.--.-
_............._.._IIIEl'.w:u.............un
=:{,.~.:=-..~...a:r.==-o::;:::":-.....
~=:r....~~M~s:.-~-----..,....,'r,-
=.;...~..="'..'=;.,-:::\._. _IKI. ____
--.......-............-,--
=:.:.~~::-:::"~~~":u~;o:.":"~nn-
-............-.............---
-"',..........--.-......-.--
_1InI"....._.._.............__
~--;~~-=,::::.......s,\'<.'::.#"'...-:.:.:':='
=",101'V..:;}':-=~"=,,,"".:c.."""" ,......._. _.-.. _IVI "'...
='"~:::_..=_~..':".:..u:.........~-.....-. -...........
\
\
SiWlYB!V&ll:St:CT!Otl::1
Vo!.14l1,P..1i7ILC..ll.a.
FlUNG O.l.TE: IolARCt1 11, 2004
'.
".,,,
--'';;:.~~'-(
/
/ /~"'-'~J
\
\
/
/
PRESERVE AT T AYLOR BAYOU
GENERAL PLAN
I~",_~
,\
"
BEING A 101.19 ACRE: TRACT OF LAND OUT OF THE W.P. HARRIS
SURVEY, ABSTRACT NO. A-JO. HARRIS COUNl'Y. TEXAS
3 BLOCKS. 0 RESfR~
BlOCK 1 - 1 LOT. PLANNED UNIT OEVElOPr.tENT (PUO) - 28.4J ACRES
PHASf 1 Hilll UNITS
PHASE 2 220 UNITS
--.....
1./
'.
/
'.
illOCK 2 - 1 lOT, NEIGHBORHOOD COl.tIolERCIAL
.. 1.JS ACRfS
(
\,.
BLOCK J - 1 LOl, NAtuRE PR.(SERVE - 11.41 ACRES
_101.19 ACRES
tBlOC!< 1 W1U HAIlE 14.70 APARTMENT UNITS PER ACREI
/
\... '/
1'........1
I:>> Bury+Partners-Houston Inc.
~ Ja,bmrI lid SVft)on
~"'~l""~
--....~-
j; I
j..-.-....
-.....-.,.
,.v~t~=
PETTY ac ASSOCIA lES
7066 lAKEVI(W HA""" OR. SUItE 1,9
IiOU$TOH, lX T7WS
(281) 3.(5-4+40
DaB'
SHORL\CRIllISUBDlVI8lOlI
YaI. L Pt- 10 a.c.w.J.
BUROlFIELD DE~T, LP
212J I'tfST GO..umOR'S ORCLE. SUITE .fOO
HOUSTON, TX n099
(713) $50-0555
IU.'I'OU f'OUSt. 1'!WIr. O)Q; - stC'11OM oMl
rum ec..t. No. 3MI05-t K.c.It.J.
CITY OF LA PORTe
2004 CITY WIDE SIDEWALK IMPROVEMENT PROJECT
CLP PROJECT 2003-4401
BID T ASUI.A TlON
BROOKS CONCRETE CHEROKEE CONCRETE IDEAl. CONSTRUCTION
COMPANY SERVICES
NO. ITEM UNIT QUANTITY UNIT AMOUNT TOTAl. PRICE UNIT AMOUNT TOTAL PRICE UNIT "MOUNT I TOT AI. PRICE
Move-in and start up including performance ood
1 peyment bonds for 100 percent (100%) of the LS 1 $ 2,500.00 $ 2,500.00 $ 30.00 $ 30.00 $ 3,500.00 $ 3,500.00
contract amount
concrete sidewelk placement: four inch.. thick,
2 poured with 3000 psi concrete (min). Complete in SY 865 $ 23.85 $ 20,630.25 $ 44.44 $ 38,440.60 $ 30.00 $ 25,950.00
lace
Removal and disposal of existing concrete sidewalk.
3 Excavated sidewelk to become property of Contractor SY 928 $ 11.25 $ 10,440.00 $ 10.89 $ 10,105.92 $ 12.50 $ 11,800.00
to be dlSllOSOd of in a I_I manner.
4 Concrete Type 'A' wheel chair ramps. in accordance EA 10 $ 400.00 $ 4,000.00 $ 441.50 $ 4,415.00 $ 800.00 $ 8,000.00
with deteils and completion place.
5 Concrete Type 'B' wheel chair ramps. In accordance EA 20 $ 350.00 $ 7,000.00 $ 448.40 $ 8,968.00 $ 750.00 $ 15,000.00
with deteils and completion place.
6 Adjustment of existing valve boxes. Complete in EA 7 $ 250.00 $ 1,750.00 $ 95.00 $ 665.00 $ 50.00 $ 350.00
place.
TOTAL BASE BID $ 46,320.25 $ 62,624.52 $ 84,400.00
ALTERNATE A
Concrete sidewelk placement: four inches thick,
A-l poured with 3000 psi concrete (min). Complete In SY 152 $ 23.85 $ 3,625.20 $ 49.85 $ 7,577.20 $ 30.00 $ 4,560.00
place
A-2 Remove and dispose of existing concrete. Removed SY 172 $ 11.25 $ 1 ,935.00 $ 11.11 $ 1,910.92 $ 12.50 $ 2,150.00
concrete to become property of contractor and to be
disposed of in a legai manner. Complete in place.
Conerete driveway placement: six inches thick,
A-4 poured with 3000 psi concrete (min). Compiete in SY 20 $ 30.15 $ 603.00 $ 44.44 $ 888.60 $ 150.00 $ 3,000.00
Olace.
TOTAL OF ALTERNATE 'A" $ 8,183.20 $ 10,376.92 $ 9,710.00
ALTERNATE B
Concrete sidewelk piacement: four inches thick,
B-1 poured with 3000 psi concrete (mln). Complete in SY 120 $ 23.85 $ 2,862.00 $ 44.44 $ 5,332.60 $ 30.00 $ 3,800.00
place
Concrete drivewey placement: six inches thick,
8-2 poured with 3000 psi concrete (min). Complete in SY 19 $ 30.15 $ 572.85 $ 55.60 $ 1,056.40 $ 150.00 $ 2,S!!O.00
place.
8-3 Remove and salvage existing brick pavers, Including LS 1 $ 300.00 $ 300.00 $ 395.00 $ 395.00 $ 3,000.00 $ 3,000.00
transporting to location designated by Owner.
8-4 Remove existing downspout drains, including bsckfill, EA 4 $ 150.00 $ 600.00 $ 220.00 $ 880.00 $ 500.00 $ 2,000.00
curb repair, and adjusting downspouts to final grade.
TOTAL OF ALTERNATE 'B' $ 4,334.85 $ 7,664.20 $ 11,450.00
SUPPLEMENTAL BID ITEMS
5-1 Extra bsnk sand (ordered by City). Complete in $ 22.00 $ 550.00 $ 12.00 $ 300.00 $ 875.00
place. CY 25 $ 35.00
S-2 Strip sodding as directed by City and in accordance $ 5.00 $ 250.00 $ 10.60 $ 530.00 $ 1,000.00
with Specification 00112. Complete in place. SY 50 $ 20.00
S-3 Sidewelk point repair including cement stabilized $ 35.00 $ 1,750.00 $ 60.00 $ 3,000.00 $ 5,000.00
sand and removal of soil. Complete in place. CY 50 $ 100.00
S-4 Cement-stabilized sand including compaction. $ 35.00 $ 875.00 $ 60.00 $ 1,500.00 $ 1,875.00
Compiete in place. CY 25 $ 75.00
TOTAL OF SUPPLEMENTAL $ 3,425.00 $ 5,330.00 $ 8,750.00
TOTAL BID (CALCULATED) $ 60,243.30 $ 85,995.64 $ 94,310.00
TOTAL BID (SUBMITTED) $ 60,243.30 $ 87,848.48 $ 94,310.00
EXHIBIT 3
CITY OF LA PORTE
2004 LA PORTE CITY-WIDE SIDEWALK
IMPROVEMENT PROJECT
CLP PROJECT #2003-4401
Advertising
The Bayshore Sun - April 4, 2004 and April 11, 2004
La Porte Bayshore
Chamber of Commerce
La Porte, TX 77571
Phone: 281-471-1123
Fax: 281-471-1710
Moore & Moore Contractors
P.O. Box 1517
La Porte, TX 77572-1517
Phone: 281-471-0145
Fax: 281-471-0601
Invitation to Bid Faxed
Follis Construction
111 N. Broadway
La Porte, TX 77571
Phone: 281-471-6881
Fax: 281-471-6038
FORCE Corp.
P.O. Box 1079
La Porte, TX 77572-0853
Phone: 281-470-0550
Fax: 281-471-9627
Contractors that Picked up Plans & Specifications
Brooks Concrete, Inc.
4018 Allen-Genoa
Pasadena, TX 77504
Phone: 713-947-8440
Fax: 713-947-8444
T and T Construction
204 Preston Road
Pasadena, TX 77503
Phone: 713-477-6660
Fax: 713-477-1465
Sunland Group
10497 Town & Country Suite 550
Houston, TX 77024
Phone: 713-467-8484
Fax: 713-467-3353
Ideal Construction.
P.O. Box 2915
Sugarland, TX 77487
Phone: 281-470-0531
Fax: 281-470-0539
Glover's Concrete Works
Cherokee Concrete Co
1514 W. Main St.
La Porte, TX 77571
Phone: 281-842-8590
Phone: 832-549-9662
E1(IlIBlrt "
2003-2004 City Wide Sidewalk Proiect
Proposed Sidewalk placement and removal limits shall be marked by the City of La Porte
SHADY RIVERS
LOCATION
IMPROVEMENT
L.F. PLACEMENT
3202 Silver Springs
sidewalk
15.5
1015 Oak Leaf
sidewalk (saw cut)
4.0
914 Hackberry
sidewalk
63.0
Subtotals
Removal
Placement
Saw-Cut
82.5 LF
82.5 LF
4.0LF
TOWN OF LA PORTE
LOCATION
IMPROVEMENT
L.F. PLACEMENT
312 N. 6th Street
Sidewalk
60.0
Subtotals
Removal
Placement
60.0 LF
60.0 LF
GLEN MEADOWS
LOCATION IMPROVEMENT L.F. PLACEMENT
5102 Valley View sidewalk (saw cut) 8.0
5230 Valley View sidewalk (saw cut) 4.0
5102 Crestway W.C.R.- B 46.5 rem.
42.5 place.
5034 Crestway (on Glen Meadows) sidewalk 12.0
5022 Crestway sidewalk (saw cut) 8.0
5125-5205 Crestway sidewalk placement only 75.5
no removal
E. Side Glen Meadows Dr. sidewalk placement only 51.0
Btwn. Crestway & Glen View no removal 9.9
W. Side Glen Meadows Dr. sidewalk placement only 81.0
Btwn. Crestway & Glen View sidewalk 9.9
Valley View @ Farrington SW W.C.R.-A 40.1 rem.
35.4 place.
Valley View @ Farrington NW W.C.R.-A 32.3 rem.
30.0 place.
Crestway @ Farrington SW W.C.R.-A 28.4 rem.
22.4 place.
Crestway @ Farrington NW W.C.R.-A 44.8 rem.
41.9 place.
Crestway @ Glen Meadows NE W.C.R-A 30.0 rem.
26.0 place.
Crestway @ Glen Meadows SE W.C.R-A 35.0 rem.
33.2 place.
Crestway @ Glen Meadows NW W.C.R-A 19.5 rem.
15.5 place.
Crestway @ Glen Meadows NE W.C.R-A 34.5 rem.
(2 G. V. Adj.) 30.5 place.
Valley View @Glen MeadowsSW W.C.R.-B 23.4 rem.
20.3 place.
Valley View @Glen MeadowsNW W.C.R.-B 23.3 rem.
20.2 place.
Valley View @Glen MeadowsSE W.C.R.-B 35.7 rem.
(G.v. Adj.) 32.6 place.
Valley View @Glen MeadowsNE W.C.R.-B
(come around power pole)
28.6 rem.
24.6 place.
Subtotals
Removal
Placement
W.C.R.
G. J-: Adj.
Saw-Cut
473.9 LF
636.4 LF
13 ea.
3 ea.
20LF
BROOKGLEN/COLLEGEVIEW
LOCATION IMPROVEMENT L.F. PLACEMENT
3231 Fern Rock sidewalk (saw cut) 8.0
8406 Collingsdale sidewalk (saw cut) 4.0
8418 Collingsdale sidewalk (saw cut) 4.0
8715 Beechaven sidewalk (saw cut) 4.0
8710-8714 Beechaven sidewalk 46.1
8702 Beechaven sidewalk (saw cut) 4.0
8615-8703 Bandridge sidewalk 8.8
8730 Collingsdale sidewalk (saw cut) 8.0
3123 Gladwyne sidewalk (g.v. adj.) (saw cut) 4.0
3303 Ashwyne Ct. sidewalk 5.8
3310 Gladwyne sidewalk 52.4
3331 Gladwyne sidewalk (saw cut) 4.0
3335 Gladwyne sidewalk 4.0
8835-8831 Oakhaven sidewalk (relocate w. meter) 4.0
(saw cut)
3723 Somerton sidewalk (saw cut) 4.0
3831 Somerton sidewalk (saw cut) 4.0
8511 Lazy Brook-3842 Fair Brook sidewalk
15.9
Subtotals
Removal
Placement
Saw Cut
G. J': Adj.
185 LF
185 LF
56LF
1 ea.
FAIRMONT PARK EAST
LOCATION IMPROVEMENT L.F. PLACEMENT
10906 Idlewood sidewalk 5.5
10908 Idlewood sidewalk 35.0
3809 Redbud sidewalk (saw cut) 4.0
10920 Birch sidewalk (saw cut) 4.0
00000 Rosewood sidewalk 12.5
Subtotal
Removal 61.0 LF
Placement 61.0 LF
Saw-Cut 8.0 LF
FAIRMONT PARK CENTRAL
LOCATION IMPROVEMENT L.F. PLACEMENT
10322 Antrim sidewalk (saw cut) 4.0
10338 Antrim sidewalk 41.0
10438 Antrim sidewalk 4.9
10306 Belfast sidewalk (saw cut) 4.0
10346 Belfast sidewalk (saw cut) 4.0
10314 Carlow sidewalk (saw cut) 8.0
10338 Carlow sidewalk 14.7
10350 Carlow sidewalk 47.3
10439 Carlow sidewalk 53.0
10322 Winding Trail sidewalk (saw cut) 4.0
10326 Winding Trail sidewalk 16.5
10306 Winding Trail sidewalk 15.4
10410 Belfast sidewalk 26.9
10418 Belfast sidewalk 19.2
10420 Belfast sidewalk 10.3
10424 Belfast sidewalk (saw cut) 4.0
3110 Oaken Ln. sidewalk (saw cut) 4.0
3214 Oaken Ln. sidewalk 7.0
3214 Oaken Ln. sidewalk (on Belfast) (saw cut) 4.0
3109 Old Hickory sidewalk (saw cut) 12.0
10439 Catlett sidewalk (on Oaken) 14.2
10439 Winding Trail sidewalk 6.0
10458 Winding Trail sidewalk (on Old Hickory) 10.0
10459 Winding Trail sidewalk (on Old Hickory) 8.0
(saw cut)
10407-10411 Collingswood sidewalk 10.1
10423 Collingswood sidewalk 10.9
10439 Quiet Hill sidewalk 13.3
10439-10443 Quiet Hill sidewalk 8.4
10458 Quiet Hill sidewalk (on Old Hickory) 4.0
(saw cut)
10439-10443 Rustic Gate sidewalk (saw cut) 4.0
10454 Rustic Gate sidewalk 7.3
10458 Rustic Gate sidewalk (on Old Hickory) 14.2
10315 Rustic Rock sidewalk (saw cut) 4.0
10327 Rustic Rock sidewalk (saw cut) 4.0
10431 Rustic Rock sidewalk (saw cut) 4.0
10438 Rustic Rock sidewalk (saw cut) 4.0
10458 Rustic Rock sidewalk (on Old Hickory) 14.7
10459 Rustic Rock sidewalk (on Old Hickory) 28.4
10307 Shell Rock sidewalk (saw cut) 4.0
10311 Shell Rock sidewalk (saw cut) 4.0
10327 Shell Rock sidewalk (saw cut) 8.0
10447 Shell Rock sidewalk (saw cut) 4.0
10447-10451 Shell Rock sidewalk (saw cut) 4.0
10451 Shell Rock sidewalk (saw cut) 4.0
10458 Shell Rock sidewalk 18.4
10422 Rocky Hollow sidewalk (saw cut) 8.0
10442 Rocky Hollow sidewalk (saw cut) 8.0
3113 Old Hickory sidewalk (saw cut) 4.0
Subtotals
Removal 558.9 LF
Placement 558.9 LF
Saw-Cut 104 LF
FAIRMONT PARK WEST
LOCATION IMPROVEMENT L.F. PLACEMENT
10002 Wilmont sidewalk 29.5
10006 Wilmont sidewalk 4.0
10110 Wilmont sidewalk 74.0
10002 Winding Trail sidewalk (on Dover Hill) 31.8
10115 Winding Trail sidewalk 11.9
10127 Winding Trail sidewalk (on Roseberry) 9.3
10026 Rocky Hollow sidewalk (saw cut) 4.0
10119 Rocky Hollow sidewalk 17.6
10010 Rustic Gate sidewalk 8.5
10 111 Charmont sidewalk 8.1
10119 Belfast sidewalk 20.8
10118 Belfast sidewalk 29.8
10106 Catlett sidewalk (saw cut) 4.0
3507 Roseberry sidewalk (saw cut) 8.0
Roseberry @ Catlett S.E. W.C.R.- B 40.0 rem.
16.0 place.
Roseberry @ Catlett S.W. W.C.R.-B 25.0 rem
Roseberry @ Catlett N.W. W.C.R.-B 22.2 rem.
Winding Trail & Dover Hill S.E. W.C.R.-B 22.8 rem.
Winding Trail & Dover Hill N.E. W.C.R.-B 24.5 rem.
Carlow @ Catlett N.W. W.C.R.- B 13.7
Carlow @ Catlett N.E. W.C.R.- B 13.4
Carlow @ Belfast N.W. W.C.R.- B 14.6
Carlow @ Belfast N.E. W.C.R.- B 13.8
Cedarmont @ Charmont N.E. W.C.R.- B (2 g.v. adj.) 34.6
Cedarmont @ Charmont N.W. W.C.R.-B 15.9
Cedarmont @ Charmont S.E. W.C.R.- B 18.5
Cedarmont @ Charmont S. W. W.C.R.- B 11.0
Subtotals
Removal 531.3 LF
Placement 277.3 LF
W.C.R. 13 ea.
G. Jt: Adj. 2ea.
CREEKMONT
LOCATION IMPROVEMENT L.F. PLACEMENT
Myrtlecreek @ CanyonSprings SW W.C.R.-A 31.5 rem.
19.0 place.
Myrtlecreek @ CanyonSprings NW W.C.R.-A 37.5 rem.
25.0 place.
Sugar Hill @ Canyon Springs W.C.R.-B 29.9 rem.
14.4 place.
Pine Creek @ Canyon Springs W.C.R.-B (g.v. adj.) 36.0 rem.
26.0 place.
Subtotals
Removal 134.9 LF
Placement 84.4 LF
W. C.R. 4 ea.
G. Jt: Adj. 1 ea.
EXHIBIT 5
EXHIBIT 6
FAIRMONT PARK
WEST
BROOKGLEN
~1.
Sl'<NCIll HI"''''IY
GLEN MEADOWS
FAIRMONT PARK
CENTRAL
FAIRMONT PARK
EAST
WIST llMIlOlJR'S CUT IUD.
BBB >>, = BBBB <>>
B BB ,~ ,~ BB'~ .. ~
mOO" .rnrn"'~~t,
I rn,. ~ ffiG ...1'"
I OBGB. M DOE]'" ,~~
~ GDG. GBG .' '0\j~
1 BGB q GtJlli~~
I GBB">>>> BDrn\Q~
GIGGGGGGG[]3~y
/".~
CREEKMONT
SHADY RIVER
TOWN OF LA PORTE
t
N.T.5
CITY OF
LA PORTE
604 w. FAIRMONT PI<MIY.
LA PORTE. TEXAS
PLANNING
DEPARTMENT
ENGINEERING
DIVISION
SURVEY OFFICE
o
DRA'M'l J.R.
CHECKED; B.S.
APPROVED: R.C.
REVISIONS
NO REVISION I ISSUE DATE
o ORIGINAL ISSUE 01/004
2004
CITYWIDE
SIDEWALK
IMPROVEMENT
LOCATIONS
2003-4401
01104 2 OF 5
N.T.S.
E1{IlIllIT 7
,,___.^,._~_.___w----_..~.. -......--.--..--.-- .
l
I
I
I
=1
I
I
I
_J
I
I
S. BROADWAY
+ Il1'O." -!
SCALE: 1. '" 20'
GENERAl NOTES:
.... CONCRETE FOR SIDEWAlKS Sti.-'ll ATIAlN 3ODO PSI 028 DAYS.
2. DRIVEWAY CONCRETE SHAlL AnAIN 3000 PSI GI 28 DAYS.
3. OORRUGATEDPLASnC PIPE (CPP) SHALL BE ADS N-12 PRQlINK lJl.lRA OREauAl (BY CLP~.
4. BACKFlLl OF OPEN PITCH SHALL BE COMPACTED TOA 95 % DENSITY (BY CLP).
5. CITY Of LA pORTE PLA""'ING DEPARTMENT sHollli. BE COIfTACTED 48 HOURS PRIOR TO
COMMENCING II\ORK. (281....71-5020)
6. UTILITY LOCAlES SHALL BE THE RESPONSIBIl.lTY Of THE CONTRACTOR.
7. INLETS SHALL BE E-lNLfTS (BY CLP).
a. PIPE 6,\CKALL SHAl...l BE COMPAC11;,O OS 300 OR CEMENT SAND MIX 100 PSI <<I 48 HOURS (BY CLP)
9. SIDEWALK SUBGRAOE . GRASS SHALL BE REMOVED AND SUBGRADE PROOf ROlLED, PJN
SOFT SPOTS SHALL BE EXCAVATED AND REPLACED WTH SUITABLE MAl'ERlAL APPROVED
BY THe. CITY OF LA PORlE.
10. BARRICADES & SAFETY DEVICES AND All NECESSARY TRAFFIC CONTROl. SHAU. SE THE
RESPONSIBILITY OF THE CONTRACTOR.
11. SIDEWALK EXPANSION JOINTS SHALL BE PlACED AT THE EXISTING PAVEMENTS AND
OTHER\MSE SPACED ON 30' INlERVALS.
12. SIDEWALK CONS1RUCllON JOI.NTS ON 6' IN1'ERVALS.
13. SIDeWALK STEEL REINFORCEMENT SHAl..l BE .3 RE..sAR 0 18- CENlERS OR: #4 CD 2-4~ CENTERS.
14. STRIP SOD DISlURBED AREAS WITH ST. AUGUSTINE OR MATCH EXiSnNG GRASS SPECIES - FERTILIZER
TO 8E A '\3-'\3-13 M1X1URE.
15. SIDEWALKS TO BE CONSTRUCTED TO lHE AMERICAN DISABILITY ACT STANDARDS.
16. DRIVEWAY STEEL REINFORCEMENT SHALL BE tI-4 ell 18- ON CENTERS.
LOCA :::>.!' MAP
t;
~~
~fo<
~:n
is:
~:
-~
,.;
,.I
~
I
I
I
--J
TOTAL PROPOSED
4' CONC. SIDEWALK
BIG JOE'S
YOUTH CENTER
999S. l~ST
". HE~~.TTART~ ~,,_,
:'. . i.:-' "" ~l. . .,......~. .. . . i".. .- . .
'~.C~f.~~g/~~;:~~'ff;(::if:rfl:~'1!:{
-4--
,.;
CONSTRUcTION JOINT DETAIL
N.T.5.
r-
CITY OF
LA PORTE
.
604 w. FAIRMONT P~.
LA PORTE. TEXAS
PLANNING
DEPARTMENT
ENGINEERING
DIVISION
SURVEY OFFICE
0
DRA"""'l; JR J RJS
CHECKED: GRM
APPROVED GRM
REVISIONS
NO. I REVISION I ISSUE DATE
0 ORIGINAL I 11103
1 R ISlONI 12103
PROPOSED SIDEWALK
S. 1ST STREET
&: W. "W ST. TO
S. BROADWAY
ALTERNATE A
PROJECT: SliEET:
2ll!l3-<<O'
"..'" 30F 5
01/04
SCAl,t:
1" = 20'