REQUEST FOR CITY COUNCIL AGENDA ITEM
Appropriation
Source of Funds:
CDBG
Department: Planninl!
Account Number:
Grant Fund 032
Budgeted Item:
$117.535.00
$113.133.41
YES
Report: X Resolution:
Ordinance: X
Amount Budgeted:
Exhibits: Bid Tab CLP #06012
Ordinance
Letter from Harris County Dated 7-5-06
Amount Requested:
SUMMARY & RECOMMENDATION
Harris County Community & Economic Development Department previously awarded the City a CDBG grant to extend and pave
North 2nd Street to the E Street ROW. The original grant proposal was to extend 2nd Street and utilities. The original amount
awarded was $56,475.00 with $55.910.25 for construction. The scope that came back with the contract was only for paving. The
contract also did not allow the use of in-house assets to pave the street. The City notified Harris County that the project was short
funds to complete the project. On March 27, 2006, City Council amended the budget to accept an additional Harris County award
of $40,000 bringing the total construction funding to $95,910.
Since awarding the grant, Harris County has changed project officers twice. Although not stated in the scope, the new County
project officer stated that the extension ofthe water line with the paving was allowable. As part of the City's leveraging funds,
the City has cleared and grubbed the North 2nd Street ROW, surveyed the project area and the Engineer Division designed and bid
the project. Given the additional funding, the project was designed with the water line extension included. There were no
bidders on the first publication. Harris County instructed the City to re-bid.
On the second bidding period, the City received 2 bids with low bid of$132,936.33 from TEXCOR Construction:
. Paving $92,332.01
. Drainage $ 8,769.99
. Waterline $21,lB4.33
. Contingencies/Other Work $10,000.00
Value engineering was considered by substituting the lime stabilized sub-grade with low plasticity select fill as well as using
calcium sulfate instead of cement as a binder in the flexible base. These prospective changes resulted in a net decrease in the cost
of the project by $2,506.81. Accepting the substitutions, however, would increase maintenance costs over the lifespan of the
street so the substitutions were rejected.
The apparent low bidder was over the budgeted amount and City staff requested additional CDBG funding to augment the
construction fund. After several months Harris County came back with an additional $21,625, bringing the total construction
funding to $117,535. Since the initial opening ofthe bids enough time has elapsed where the contractor can amendhis/her prices
due to material and labor increases. The following is the amended low bid from TEXCOR Construction reflecting these changes
(the bold indicates the change):
. Paving $92,332.01 + $5,927.10
. Drainage $ ~,7690.99+ 1,505-.6&
. Waterline $21,834.33 + no change
· Contingencies $10,000.00 + no change
The amended bid total is $140,369.03. City staff has notified the contractor and it is mutually agreed that the waterline portion ofthe
contract will be omitted from the contract, reducing the contract price to $118,534.70. Public Works has agreed to extend the
waterline and pay for the materials, as approved. Additionally, City will provide traffic control for the project at an additional savings
of$5,401.29, bringing the construction project within budget ($113,133.41).
Staff recommends awarding the bid to TEXCOR Construction for the paving and drainage ofN. 2nd Street.
Action Required bv Council:
1. Consider and take action on an Ordinance to award a bid in the amount of$113,133.41 to TEXCOR Construction for the
paving and drainage for North 2nd Street.
2. Direct Staff to issue a notice to commence construction.
A d for Ci Co ncil A enda
q -- d-f) --0 ~
Date
BID TABULATION - NORTH SECOND STREET EXT. #06012
MATERIALS
$29,093.87
$143,698.41
OTHER CHARGES
$103,842.46
$77,376.06
TOTAL
$132,936.33
$221,074.47
Information represents pricing only, and other factors mayor may not
be considered during the evaluation process
ORDINANCE NO. 2006- 01 91l/
AN ORDINANCE APPROVING AND AUTHORIZING AN AGREEMENT
BETWEEN THE CITY OF LA PORTE AND TEXCOR CONSTRUCTION
SERVICES CO., FOR PAVING AND EXTENSION OF NORTH 2ND STREET;
APPROPRIATING $113,133.41 TO FUND SAID CONTRACT; MAKING
VARIOUS FINDINGS AND PROVISIONS RELATING TO THE SUBJECT;
FINDING COMPLIANCE WITH THE OPEN METTINGS LAW; PROVIDING
AN EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes the contract,
agreement, or other undertaking described in the title of this ordinance, a copy of which
is on file in the office of the City Secretary, as set forth in this section. The City Manager
is hereby authorized to execute such document and all related documents on behalf of the
City of La Porte. The authority given to the City Manager to execute the contract or
agreement approved by this ordinance shall expire sixty (60) days from its passage and
approval. The City Secretary is hereby authorized to attest to all such signatures and to
affix the seal of the City to all such documents. City Council appropriates the sum not to
exceed $113,133.41 from the City of La Porte Grant Fund No. 032, to fund said contract.
Section 2. The City Council officially finds, determines, recites and declares that
a sufficient written notice of the date, hour, place and subject of this meeting of the City
Council is posted at a place convenient to the public at the City Hall of the city for the
time required by law preceding this meeting, as required by the Chapter 551, Texas
Government Code; and that this meeting has been open to the public as required by law at
all times during which this ordinance and the subject matter thereof has been discussed,
considered and formally acted upon. The City Council further ratifies, approves and
confirms such written notice and the contents and posting thereof.
Section 3 This Ordinance shall be effective from and after its passage and
approval, and it is so ordered.
Passed and Approved this d6ff- day of ~ - , 2006.
CITY OF LA PORTE
By:
i/'\ r---")
( .; \L. \{ \/ /__1\-.
\J~" . c-\JLL__
Alton E. Porter, Mayor
ATTEST:
~JJiid, 4- vl/flU/
Mart a A. Gillett, City Secretary
APPROVED:
~-r~
C ark T. Askins, Assistant City Attorney
HARRIS COUNTY, TEXAS
COMMUNITY & ECONOMIC DEVELOPMENT DEPARTMENT
David B. Turkel
Director
8410 Lantern Point Drive
Houston, Texas 77054
Tel (713) 578~2000
Fax (713) 578-2190
July 5, 2006
The Honorable, Alton Porter
Mayor of The City of La Porte
604 W. Fairmont Parkway.
LaPorte, Texas 77571
Attention: Debra B. Feazelle, City Manager
Re: Northside Neighborhood North Second Street Project
Project Numbers: CD 2004-019
Dear Mayor Porter:
The Harris County Community and Economic Development Department (HCCEDD) is in
receipt of project bids, bid tabulations, and the recommendation from City Engineer, Rodney
Slaton for the above-referenced project. Based on our review of the submitted documents, this
office concurs with Mr. Slaton's recommendation to award the contract for the Northside
Neighborhood North Second Street Extension Project to the apparent responsible bidder. Texcor
Construction Services, Inc. who submitted the lowest and best bid with a base bid of
$132,936.33; therefore, the City of La Porte. may issue the Notice of Award and proceed with
the letting of the contract.
Pursuant to the terms of Agreement between Harris County and the City of La Porte, please
forward to this office for review and approval as to form, a copy of the contract for construction
with T excor Construction Services, Inc prior to contract final execution.
If you have any questions or comments, you may contact Ms. Millicent T. Bradford, Senior
Project Monitor at (713) 578-2000.
Sincerely,
~ ~~cl~
Director
DBT/DAUER W/JWmb
cc: Rodney Slaton, P.E.
J;'lgmshareIQAIB.,.tlM\GM D"""lll"'U\Std Lel1...WFI Bid C0C10ID'\La1>ort>e 14 2nd St Bid ApprovalLtr :I.OO4-019.doc