HomeMy WebLinkAboutR-2018-01 Agreement Between the City of La Porte and TxDot for Lighting System RESOLUTION NO.2018- 01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA PORTE,TEXAS,ENTERING INTO AN AGREEMENT WITH
TEXAS DEPARTMENT OF TRANSPORTATION FOR THE CONSTRUCTION, MAINTENANCE, AND OPERATION OF
INSPECTION LIGHTING SYSTEM UNDER SH 146 WITHIN THE CITY OF LA PORTE.
WHEREAS,the City of La Porte has requested Texas Department of Transportation to allow construction,
maintenance,and operation of a underpass lighting system underneath the freeway designated as State Highway
146 at the intersection of West Barbour's Cut Blvd. within the limits which is in accordance with 43 Texas
Administrative Code, Section 25.11;and
WHEREAS,within the City of La Porte,said lighting system hereinafter referred to as the"lighting system"
is to consist of lighting to be built underneath State Highway 146 at West Barbour's Cut Blvd. at the truck
inspection station.
NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City of La Porte will prepare or provide for the plans and specifications,advertise for bids,let
the construction contract, or otherwise provide for the construction, and will supervise the construction or
betterment work as required by said plans and specifications and the State will review the plans before
construction begins.
Section 2. The City of La Porte agrees to furnish at its expense the electrical energy required for proper
operation of the lighting system. The City further agrees to maintain and operating the lighting system in an
efficient and slightly condition. The City shall assume maintenance and operation of the lighting system once
accepted by the State.
Section 3. The City of La Porte will obtain approval of the Executive Director before making any major
changes in the design and/or operation of the lighting system as designed or before the removal of any part of
the installation except for the purpose of replacement where identical or accepted equivalent equipment to that
originally installed is used.
Section 4. The agreement shall remain in force for a period of two years from the date that maintenance
and operation responsibilities are first assumed by the City and shall be automatically renewed for two-year
periods unless modified by mutual agreement by both parties.
Section 5. This agreement may be terminated sixty days after the filing of a written notice by either party of
a desire for cancellation. The State reserves the right to remove the lighting system upon cancellation of the
agreement.
Section 6. If,at any time,the City does not maintain and operate the lighting system in a satisfactory manner,
the State reserves the right to either arrange for maintenance at the expense of the City or to remove the lighting
system. Should the lighting system be removed due to lack of maintenance,the City hereby agrees to reimburse
the State for the cost of removal.
Section 7. This Resolution shall be effective upon its passage and approval.
PASSED AND APPROVED this i 2 day of cArtias y ,2018.
CITY OF LA PORTE
t it
By:
Lo is R.Fr:by
Mayor
A T:
Patrice Fogarty
City Secretary 4°Cd11-1 .4-d-
i j
•
Agreement No.
STATE OF TEXAS §
COUNTY OF TRAVIS §
AGREEMENT FOR CONSTRUCTION, MAINTENANCE
AND OPERATION OF INSPECTION LIGHTING
SYSTEM UNDER SH 146 WITHIN THE CITY OF LA PORTE
THIS AGREEMENT, dated this /a day of zutt, by
and between the State of Texas, hereinafter referred to as t "State," party of the first
part, acting by and through the Texas Department of Transportation, and the City of LA
PORTE, HARRIS County, Texas, acting by and thr ugh its duly authorized officers
under an ordinance or resolution pass6d the !.?+ day of
2018 hereinafter called the "City," party of the second part, is made to b come effective
when fully executed by both parties.
WITNESSETH
WHEREAS, the City has requested the State to allow the construction, maintenance,
and operation of a underpass lighting system underneath the freeway designated as
SH 146 at the intersection of W Barbour's Cut Road within the limits which is in
accordance with 43 Texas Administrative Code, Section 25.11. Within the City, said
lighting system hereinafter referred to as the "lighting system" is to consist of lighting to
be built underneath SH 146 at W Barbour's Cut Blvd at the truck inspection station.
NOW THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto to be by them respectively kept and performed, as
hereinafter set forth, it is agreed as follows:
AGREEMENT
Article 1. CONSTRUCTION RESPONSIBILITIES
A. The City will prepare or provide for the plans and specifications, advertise for bids,
let the construction contract, or otherwise provide for the construction, and will
supervise construction or betterment work as required by said plans and
specifications and the State will review the plans before construction begins.
B. The City construction, maintenance, and operation responsibilities shall be a
heretofore agreed to condition, accepted, and specified in the Agreement to which
these plans are made a part.
Article 2. MAINTENANCE AND OPERATION RESPONSIBILITIES
A. The City hereby agrees to furnish at its expense the electrical energy required for
proper operation of the lighting system. The City further agrees to maintain and
operate the lighting system in an efficient and sightly condition, including the
furnishing of all equipment and labor and making any replacements which may
CITY OF LA PORTE Page 1 of 3 LIGHTING OF TRUCK INSPECTION AREA
•
Agreement No.
become necessary, without cost to the State in accordance with the National
Electrical Code and State Standards.
B. The City shall assume maintenance and operation on a date to correspond with the
date construction of the lighting system is accepted by the State. The State will
provide written notification to the City of such acceptance. The City hereby agrees
to furnish at its expense the electrical energy consumed by the system during the
period of trial operation prior to the acceptance by the State.
C. The City will obtain approval of the Executive Director before making any major
changes in the design and/or operation of the lighting system as designed or before
the removal of any part of the installation except for the purpose of replacement
where identical or accepted equivalent equipment to that originally installed is used.
Article 3. GENERAL
A. This Agreement shall remain in force for a period of two years from the date that
maintenance and operation responsibilities are first assumed by the City and shall
be automatically renewed for two-year periods unless modified by mutual agreement
by both parties.
B. The State will not incur any financial obligation to the City as a result of the
Agreement.
C. This Agreement may be terminated sixty (60) days after the filing of a written notice
by either party of a desire for cancellation. The State reserves the right to remove
the lighting system upon cancellation of the Agreement.
D. If, at any time, the City does not maintain and operate the lighting system in a
satisfactory manner, the State reserves the right to either arrange for maintenance at
the expense of the City or to remove the lighting system. Should the lighting system
be removed due to lack of maintenance, the City hereby agrees to reimburse the
State for the cost of removal.
E. Should disputes arise as to the parties' obligations under this Agreement, the State's
decision shall be final and binding.
F. The City shall comply with all federal, state, and local laws, statutes, ordinances,
rules and regulations, and the orders and decrees of any court, or administrative
bodies or tribunals in any matter affecting the performance of this Agreement.
G. Changes in time frame, character, cost, or obligations authorized herein shall be
enacted by written amendment. Any amendment to this Agreement must be
executed by both parties within the contract period.
H. This Agreement shall bind, and shall be for the sole and exclusive benefit of the
respective parties and their legal successors. The City shall not assign or transfer
its interest in this Agreement without written consent of the State.
I. In case any one or more of the provisions contained in this Agreement shall, for any
reason, be held invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability shall not affect any other provision thereof and this
Agreement shall be construed as if such invalid, illegal, or unenforceable provision
had never been contained herein.
J. This Agreement constitutes the sole and only agreement for lighting at the location
described herein of the parties hereto and supersedes any prior understandings or
written or oral agreement between the parties respecting within subject matter.
CITY OF LA PORTE Page 2 of 3 LIGHTING OF TRUCK INSPECTION AREA
Agreement No.
K. The state auditor may conduct an audit or investigation of any entity receiving funds
from the state directly under the contract or indirectly through a subcontract under
the contract. Acceptance of funds directly under the contract or indirectly through a
subcontract under this contract acts as acceptance of the authority of the state
auditor, under the direction of the legislative audit committee, to conduct an audit or
investigation in connection with those funds. An entity that is the subject of an audit
or investigation must provide the state auditor with access to any information the
state auditor considers relevant to the investigation or audit.
L. At the request of the State, the City shall submit any information required by the
State in the format directed by the State.
Article 4. INDEMNIFICATION
The City acknowledges that it is not an agent, servant, or employee of the State and,
thus, is responsible for its own acts and deeds and for those of its agents or employees
during the performance of the work defined in this agreement.
IN WITNESS WHEREOF, the parties have thereunto affixed their signatures, the City of
LA PORTE on the 11 day of E EA e-)rt-1- , 20 6, and the Texas
Department of Transportation on the g day of Ctlftat-i-t 20 lg
THE CITY OF LA PORTE
Execut d on behalf of the ity by:
By ..� Date z/ILI/8
Typed or Printed Name and Title (-)17 A UL£ /d ev
f*, 1 r'fanage s'
THE STATE OF TEXAS
Executed for the Executive Director and approved for the Texas Transportation
Commission for the purpose and effect of activating and/or carrying out the orders,
established policies or work programs heretofore approved and authorized by the Texas
Transportation Commission.
ByO. C Gt L- Date 3/e/Z0f 8
HOU-s-tonEi;Tact Engineer
CITY OF LA PORTE Page 3 of 3 LIGHTING OF TRUCK INSPECTION AREA
*.
Ar Texas Department of Transportation
P.O.BOX 1386 I HOUSTON,TEXAS 77251-1386 I (713)802-5000 I WWW.TXDOT.GOV
December 15, 2017
The Honorable Louis Rigby
Mayor
City of La Porte
City Hall
601 Fairmont Parkway
La Porte, Texas 77571-6215
RE: Lighting System under SH 146 at W. Barbour's Cut Road for Truck Inspection Station
Dear Mayor Rigby:
The captioned project area includes the installation of a Lighting System under SH 146 at West
Barbour's Cut Road. It is necessary that we have an executed agreement with the City of La Porte
concerning the maintenance of this illumination system.
The proposed agreement allows the City of La Porte to construct, maintain and operate the truck
inspection station lighting system within the City of La Porte under this highway within the city limit at
its own cost. The City of La Porte would be responsible for the maintenance and operation of these
luminaires at the completion of the construction. The agreement must be accompanied either by a
resolution or an ordinance passed by the city.
Please return to us both of the two original copies of the agreement with your signature and title, and
we will return to you a completed copy once it is executed by our District Engineer.
If you have questions please contact Gaurang Pandit, Transportation Engineer at(713)802-5859.
Sincerely,
/1111r
, ! , I ---
Ugonn. ifghanz: E.
Directo of Transpo-ation Operations
Houston District
Attachments
cc: Gaurang S. Pandit, P.E.
David Hefner - Building Maintenance Supervisor, City of La Porte
Marcus Upchurch - Sergeant, City of La Porte
OUR VALUES; People•Accountability•Trust•Honesty
OUR MISSION: Through collaboration and leadership,we deliver safe,reliable,and integrated transportation system that enables the movement of people and goods.
An Uwe Opportunhy Employer
f
F
kt , 15 City of La Porte City Manager's Office
v m
\4 � Esta6lisked 1892 The City of La Porte embraces our heritage,community values and
i2dopportunities,while enhancing the quality of life for our citizens.
February 16, 2018
Ugonna U. Ughanze, P.E.
Director of Transportation Operations
Houston District
RE: Lighting System under SH 146 at W. Barbour's Cut Road for Truck Inspection Station
I I
Dear Mr. Ughanze,
Enclosed in this packet, please find a copy of Resolution No. 2018-01, approved by the City of La Porte
City Council on February 12, 2018. This resolution authorizes the agreement between the City of La
Porte and the Texas Department of Transportation for the Lighting System under SH 146 at W.
Barbour's Cut Road for Truck Inspection Station project.
We have also enclosed two signed original copies of the agreement and a copy of your letter for your
reference.
If you have any questions, please contact the City Manager's office at (281)470-5013.
Sincerely,
TXDOT
RECEIVED ON
or lexander FEB 2 7 2018
City Manager
MAIL OPERATIONS HOUSTON
Attachments
cc: Gaurang S. Pandit, P.E.
David Hefner—Building Maintenance Supervisor, City of La Porte
Marcus Upchurch—Sergeant, City of La Porte
SCANNED ON
FEB 272018
06CAOCkSOVCI
MAIL OPERATIONS HOUSTON
604 W.Fairmont Parkway • La Porte,Texas 77571 • (281)470-5011 • www.Iaportetx.gov