REQUEST FOR CITY COUNCIL AGENDA ITEM
Agenda Date Requested:
~'2'"
Appropriation
Utility CIP Fund
Requested By:
S. Gillett
Source of Funds:
Department:
Public Works
Account Number:
Contingency Fund
Report:
Resolution:
Ordinance:
x
Amount Budgeted:
N/A
Exhibits: Ordinance
Amount Requested:
$33,127.00
Exhibits:
Professional SeJ'vices Al!:reement
Budgeted Item:
NO
Exhibits
SUMMARY & RECOMMENDATION
Harris County is soon to complete the construction of Bay Area Blvd. from Fairmont Parkway to Spencer Highway. As a component of
this Project, the City constructed the Bay Area Blvd. Trunk Sewer from Fairmont Parkway, across Spencer Highway to 0 Street,
eliminating a Lift Station and diverting flows from the South 16th Street Service Area to the Fairmont Trunk Sewer. The Engineer,
Wayne Smith Engineering, also examined the potential to divert flows as far north as possible from the Northwest Service Area, with the
idea of eliminating as many lift stations as possible. This study was done to accommodate the future needs of the area when the Sens
Road Widening Project would be started, as city utilities will need to be relocated at that time. This Project has not been expected to take
place in the near future, so funds have not been programmed into the City's five (5) year CIP.
Recently the city has discovered that Harris County is actively designing this Project, using two (2) design firms, and design could be
completed within the next year, with possible construction after that time. The City has contacted one of the County's engineers, Van
De'vViele Engineering, to provide a proposal to perfoml Preliminary Engineering Services to installation ofa new 12 inch water line and
the extension of a gravity sanitary sewer trunk sewer along Sens road from North 0 Street to North P Street.
The work will involve examining the feasibility of extending the existing Bay Area Blvd Trunk Sewer as far north as possible,
eliminating as many lift stations as possible, which will also serve to relocate existing sewer from the proposed Sens Road Widening.
Additionally, the existing 8 inch waterline will be upsized to 12 inch and relocated outside the proposed Sens Road Widening. The
Preliminary Engineering Report will summarize the findings, make recommendations and provide a cost estimate for crp programming.
The cost for the proposed services is as follows:
Preliminary Engineering Report
Survey
Direct and Misc. Expenses
Total
$25,360.00 (Lump Sum not to exceed)
6,017.00
1,750.00
$33,127.00
The City did not anticipate this Project for several years, and no funds have been budgeted. Due to the accelerated schedule adopted by
the County to move forward with the widening of Sens, it is vital that the City determine location and cost of the relocation of utilities
outside the proposed construction area, and to implement the previously planned sewer improvements at the same time. Once costs have
been established, the city can plan for the orderly relocation of its utilities in advance of the Sens Road Widening Project. Funds are
available in the Utility crr Fund Contingency for this Project.
Action Required by Council: Approve an ordinance authorizing the City Manager to execute and agreement with Van
De Wiele Engineering Incorporated to provide professional engineering services for a Preliminary Engineering Report for
the relocation of utilities along Sens Road.
fB/ob
Da r
ORDINANCB NO. 2006- ii10
AN ORDINANCB APPROVING AND AUTHORIZING AN AGRBBMBNT BBTWBBN THB
CITY OF LA PORTB AND VAN DeWIBLB BNGINEBRING INCORPORATBD TO
PROVIDB A PRBLIMINARY BNGINBBRING RBPORT FOR THB RBLOCATION OF
UTILITIBS ALONG SBNS ROAD, APPROPRIATING THB SUM NOT TO BXCBBD
$ 3 3, 127 .00, TO FUND SAID CONTRACT, MAKING VARIOUS FINDINGS AND
PROVISIONS RBLATING TO THB SUBJBCT, FINDING COMPLIANCB WITH THB
OPBN MBBTINGS LAW, AND PROVIDING AN BFFBCTIVB DATB HBRBOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes
the contract, agreement, or other undertaking described in the
title of this ordinance, a copy of which is on file in the office
of the City Secretary. The city Manager is hereby authorized to
execute such document and all related documents on behalf of the
City of La Porte.
The City Secretary is hereby authorized to
attest to all such signatures and to affix the seal of the City to
all such documents.
city Council appropriates the sum not to
exceed $33,127.00 from the City of La Porte utility Capital
Improvement Fund (Fund 3) Contingency, to fund said contract.
Section 2. The City Council officially finds, determines,
recites, and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the pUblic at the city Hall of the
City for the time required by law preceding this meeting, as
required by the Open Meetings Law, Chapter 551, Texas Government
Code; and that this meeting has been open to the public as required
by law at all times during which this ordinance and the subject
matter thereof has been discussed, considered and formally acted
upon.
The City Council further ratifies, approves and confirms
such written notice and the contents and posting thereof.
Section 3. This Ordinance shall be effective from and after
its passage and approval, and it is so ordered.
PASSED AND APPROVED, this 13th day of February, 2006.
By:
CITY OF LA POR~
~~.\~~
Alton E. Porter
Mayor
ATTEST:
~a4.~
Mart a A. Gillett
City Secretary
APPROVED:
/"'1
v~iC!
Knox W. Askins
City Attorney
2
WtnDewzele.
Engineering .
Incorporated ..
2925 Briarpark, Suite 275
Houston, TX 77042-3720
713/782-0042 Fax 713/782-5337
January 27, 2006
Mr. Steve Gillette
Director of Public Works
City of La Porte
2963 North 23rd. Street
La Porte, Texas 77571
Re: Proposal for Preliminary Phase Engineering Services
Water Main & Sanitary Trunk Sewer Improvements.
Sens Road and Adjacent Service Areas
Dear Mr. Gillette:
We are pleased to submit this proposal to provide professional engineering
services for the preparation of a Preliminary Engineering Report for the installation
ofa new 12-inch diameter water main and the extension of a gravity sanitary trunk
sewer along Sens Road from North D Street to North P Street. This proposal
addresses your request for proposal made during our August 2, 2005 and January
18, 2006 meetings. This proposal includes the project's background, scope of
services, compensation and project schedule.
Background
The City of La Porte prepared a "Comprehensive Wastewater Collection and
Treatment Plan" in May 1984 (Plan) which has generally been followed. Several
service area and service line changes have been necessary to facilitate occurring
land development. The main gravity trunk sewer along Fairmont Parkway was
constructed. In March 2001 a Preliminary Engineering Report (0301 PER) entitled
Preliminary EnJ!ineerin[! Report Large Diameter Sanitary Trunk Sewer Bav Area
Boulevard from FairmontParkwav to North D Street was prepared by Wayne
Smith & Associates, Inc. for the City of La Porte. The report presented a review
and analysis of the city's existing wastewater collection system for the service
areas north ofFairmont Parkway and east and west of Sens Road. It included
surface and subsurface conditions, and rights-of-way and utility pipeline impacts.
It evaluated the gravity sanitary trunk sewer capacities for the existing and future
development, and described design criteria and factors affecting the routing of a
Mr. Steve Gillette
January 27,2006
Page 2 of5
new gravity sanitary trunk sewer. It also examined the potential elimination of the
lift stations at Sens Road and North D Street, and Sens Road and North L Street.
Subsequent to the 0301PER, a 42-inch diameter gravity sanitary trunk sewer was
constructed along Bay Area Boulevard from Fairmont Parkway to Spencer
Highway, and a 36-inch diameter gravity sanitary trunk sewer was constructed
along Sens Road from Spencer Highway to North D Street. The lift station at
North D Street was eliminated.
The Harris County Public Infrastructure Department's Engineering Division has
two engineering design contracts currently underway for the widening of Sens
Road. Binkley & Barfield Consulting Engineers, Inc. (BBI) is designing Sens
Road from 300-ft. north ofSoencer HiJ!hwav to 300 ft. north of North H Street. and
Van De Wiele Engineering, Inc. (VEl) is designing Sens Road from 300 ft. north of
North H Street to 300 ft. north of North P Street. The City of La Porte wants to
build upon the findings and recommendations of the 0301 PER, and the BBI and
VEl designs and investigate both extending the gravity trunk sewer along Sens
Road from North D Street to North P Street, and extending gravity sewer mains
east and west along the intersecting streets (North D, West Barbour's Cut
Boulevard, North H, North L and North P) to the furthest feasible extent. The
primary goal of the investigation is to redirect sewage flows which are currently
being diverted, and in some cases pumped, through other service areas to other
trunk sewers, into the proposed system as was originally intended in the Plan. By
so doing, the secondary goal of the investigation will be realized: eliminating a')
many of the city's existing wastewater lift stations within these service areas as
possible.
The City of La Porte wants to construct the Sens Road portion of the proposed
gravity sanitary trunk sewer, as well as a new 12-inch diameter water main (and
abandon an existing 6-inch line) prior to the construction of the County's roadway
projects. Once constructed, the gravity trunk sewer and water main must coexist
with the drainage and roadway improvements such that all can be maintained.
Scope of Services
1) Obtain available Sens Road topographic survey data from the BBI and VEl
projects.
2) Supplement the topographic survey data in Item 1 with additional, limited
topographic survey data (using GPS methods on the same datum) along the
intersecting streets and within the service areas. The data shall include but
is not limited to:
~nDe~ele
Engineering
Incorporated
VanDe~ele
Engineering
Incorporated
Mr. Steve Gillette
January 27,2006
Page 3 of5
a. Cross sections of the intersecting streets at approximately 500-
feet on center for various distances;
b. Manhole rim elevations, pipe diameters and alignments, and
flowline elevations of existing gravity sanitary sewers;
c. Pipe diameters and invert elevations of existing lift stations'
influent sewers;
d. Natural gas or other product pipelines that cross either Sens
Road or the intersecting streets; and,
e. Above ground utility company facilities such as telephone
company pedestals, gas valves, or fiber optic cable risers.
3) Review the 0301 PER's findings and recommendations including service
areas, waste load factors, line capacity, location, and constructability.
4) Review the BBI PER and assess the feasibility and cost to extend the
proposed gravity trunk sanitary sewer through their project. Participate in
two coordination meetings to accomplish this task.
5) Review the topographic survey data from Items 1 and 2 with respect to
existing sanitary sewers and lift stations, surface elevations, roadside ditch
and cross drainage structure flowline elevations, rights-of-way, easements,
and crossing utilities, pipelines and other subsurface conditions.
6) Refer to City of La Porte's current zoning map and develop waste load
factors for each service area. Calculate required pipe sizes and slopes
based on resulting flow estimates. Include appropriate peaking and
infiltration/inflow factors.
7) Determine the extents to which the proposed gravity trunk and main
sanitary sewers can be extended throughout the service areas. Provide pipe
sizes, slopes and preliminary flowline elevations at key nodes. Identify lift
stations that can be removed from service.
8) Participate in three meetings with the Harris County Public Infrastructure
Department's Engineering Division project manager. The first two will
address impacts, scheduling, feasibility, constructability and coordination
with the County and BBI; the third to secure design concurrence.
Mr. Steve Gillette
January 27,2006
Page 4 of5
9) Prepare an estimate of probable construction cost showing each major
portion of the proposed gravity sanitary trunk sewer, and each intersecting
street's proposed gravity sanitary main sewer.
10) Present the findings and recommendations of the investigation outlined in
Items 1 through 8 in a Preliminary Engineering Report prepared under the
direct supervision of, and sealed by a licensed Professional Engineer in the
State of Texas. Include photographs, exhibits, tables and cost estimates.
11) Furnish up six copies of the Preliminary Engineering Report to the City of
La Porte for their review and approval.
12) VEl recommends postponing any geotechnical investigation(s) until the
design phase. The final locations and depths of the proposed sanitary
sewers will be known at that time.
Compensation
Compensation for services rendered will be on a lump sum basis at a cost not to
exceed $25,360.00 without prior written approval from the City of La Porte. VEl
recommends a budget of $6,017.00 (cost plus 10% mark-up) for the services ofa
Registered Professional Land Surveyor to perform the limited topographic survey
(see enclosed January 26,2006 proposal from Total Surveyors, Inc.). Direct
expenses are estimated at $1,750.00 based on reproduction of 6 copies of the
Preliminary Engineering Report at $250.00 each and $250.00 in miscellaneous
expenses. The calculation of VEl's fee (by task) and the project's overall
$33,127.00 budget are presented in Exhibit A.
Project Schedule
The work will commence upon receipt of the City of La Porte's written
authorization. Surveying, field reconnaissance work, records research and agency
and utility company coordination can be completed within approximately three
weeks of authorization. The service areas can be defined, waste load and In
factors applied, base solution determined, costs estimated and a draft Preliminary
Engineering Report completed approximately three weeks thereafter. Assuming
one week for the city's review, the final Preliminary Engineering Report can be
completed two weeks thereafter. VEl therefore recommends a schedule of 60
calendar days to complete the services described herein.
~nDeWiele
Engineering
Incorporated
Mr. Steve Gillette
January 27,2006
Page 5 of5
Please indicate your acceptance of this proposal by executing both originals and
returning one for our files. We are available to initiate the work ofthis assignment
upon receipt of your written authorization to proceed.
VanDe Wiele Engineering, Inc. appreciates this opportunity to provide
professional engineering services to the City of La Porte for this important project.
Please contact me if you have any questions regarding this proposal, or if you need
any additional information.
?~--
Daniel P. Simeone, P .E.
Senior Project Engineer
Municipal Projects
Enc!.: Exhibit A: Estimated Manhours and Costs by Task
Total Surveyors, Inc. proposal dated January 27,2006
VEl Hourly Billing Rates 2006
Prpsl Phase I Svcs RevOl
Accepted By:
si;j!lMV~~
j)gR>ra fea.1-er /~
Type or Print Name
L!J \./ m~er
Title (
f)- }j-Oy
Date
llanDeWiele
Engineering
Incorporated
Exhibit A
Estimated Manhours and Costs by Task
Water Main & Sanitary Trunk Sewer Improvements
for
Sens Road and Adjacent Service Areas
City of La Porte, Texas
Senior
Task No. Description Principal Proj ect Project CADD Total
Engineer Engineer V Designer II
VI
1 Review 0301 and BBI PERs. Meet with BBI 4 14 18
2 Records and Utility Research and Site Visits 4 12 16
3 Prepare and Review Supplementary Topograhic Data 2 12 24 38
4 Design Sanitary Sewer & Water Line Improvements 4 32 20 56
5 Coordination Meetings wlBBI & County 4 8 12
6 Prepare Submit Draft PER & Cost Estimate 6 32 24 62
7 Revise & Submit Final PER 0.5 1 4 4 9.5
Subtotal Hours 0.5 25 114 72 211.5
Hourly Rate (Includes Salary, Overhead and Profit) 230 165 130 87 .5] !ii~limm~mm mm::lf\
...
Manhour Costs $115.00 $4,125.00 $14,820.00 $6,300.00 $25,360.00
Supplementary Topographic Survey (x 1.10) $6,017.00
Estimated Direct Expenses (Including 6 PERs at $250/Ea.) $1,750.00
Total Project Cost $33,127.00
1/27/2006
UlnDeWzele
Engineering
Incorporated
Page 1 of 1
JAN-27-2006 10:35 From:JA COSTANZA
2819308110
To: 7137825337
P.1/3
TSI
January 27, 2006
Mr. Daniel P. Simeone, P.E.
Senior Project Manager I
Van DeWiele Engineering Incorporated
2925 8riarpark. Suite 275 I
Houston, Texas 77042-3720
RE: Survey Proposal
Sens Road Utilities
City of LaPorte, Texas
Dear Mr. Simeone:
Total Surveyors, Inc., is pleased to present this proposal for performing the land
surveying services required for the proposed design of a utility system to serve Sens
Road, and the surrounding lateral street system, located in the City of La Porte, Harris
County, Texas.
Our estimated proposal includes the following:
I
~ Horizontal and V!8rtical Control
);0 location of all pipelines and surface utilities within the specified area
~ Cross-sections. t/- 500 foot intervals (along aU lateral streets)
~ Manhole depths fNith pipe sizes and direction
> lift station locations, with wetwel/ depths
). Drafting.service~ (continuous plan views)
The final elevations will be referenced to the vertical datum used on the original Sens
Road Topography. The a,ove services include time for all meetings required.
The following is an estimate of the hours required to complete the above scope of work:
I
I
TOTAL SURVEYORS, INC.
4301 Ce.nter Street - De~r l'ark, Texas 77536 - Otlice 28i -479-8719 Fa.x 281-930-8110
I
JAN-27-2006 10:35 From:JA COSTANZA
2819308110
To: 7137825337
Sens Road
Hours
Rate
I
,
A. Establish Horizontal and VertiC'.a1 Project Control
!
i
2 Man Crew I GPS Static Equipment
Project Surveyor I RFLS
4
2
$ 100.00
$ 75.00
Section 'A' Sub-total
,
C. Roadway Topography with Gross-Sections and Utilities
,
2 Man Craw
Project Surveyor I R!=>LS
CAD Operator :
$ 100.00
$ 75.00
$ 60.00
36
8
12
Section 'C' Sub-total
i
TOTAL SENS ROAD UTILITY PROJECT
I
The above fees are based on Van OeWiele Engineering providing a base map to
overlay the topographic inf~rmation.
DELlVERABLES
P.2/3
Sens Road Utilities
Page 2 of 3
Total
$
$
$
400.00
150.00
550.00
$ 3,600.00
$ 600.00
$ 720.00
$ 4.920.00
$ 5.470.00
I
};;o Continuous PI'an View Drawings
};> Field Notes apd Control Information
OUf total fee for the above services is $5,470.00. Billing will be submitted on a monthly
basis. We propose a time frame of 2 weeks, to complete the above task, from the date
of the notice to proceed. :
,
The staff at Total Surveyors, Inc. looks forward to working with you and completing the
proposed services in a tim~ly manner. Should you have any questions regarding this
matter, please do not hesit~te to call.
JRN-27-2006 10:35 From:JR COSTRNZR
2819308110
To: 7137825337
I
ACKNOWLEDGEMENT AND AUTHORIZATION
The signature below authof;Z8S the work described herein.
FOR:
Van DeWielei Engineering Incorporated
A Texas Corporation
BY:
tlJJMv I3da~ignature)
J)ebra. n Fe a ze / I fdPrinted Name)
(J '~'t m~tU{Vl./ (Title)
- '--- (J .
Address: :2925 Briarpark, Suite 275
Houston, Texas 77042-3720
P.3/3
Sens Road Utilities
Page 3 of 3
Exhibit B
Van De Wiele Engineering, Incorporated
Schedule of Hourly Rates
And
Reimbursable Charges
2006
Hourly Rates Rate
Administration
Clerical $ 57.50
Bookkeeper 73.50
Engineering Staff
Engineer I $ 78.00
Engineer II 83.50
Engineer III 88.50
Engineer IV 110.00
Engineer V 130.00
Engineer VI 165.00
Engineer VII 202.50
Principal 230.00
Drafting/Design
Designer I $ 76.50
Designer II 87.50
Designer III 98.00
Drafter/Computer Technician I 55.00
Drafter/Computer Technician II 62.50
Drafter/Computer Technician III 73.50
CADD Manager 105.00
Plat Manager 100.00
Inspectors
Project Representative I $ 52.00
Project Representative II 71.50
Project Representative III 78.00
Project Representative Supervisor 90.00
vanDeWiele
Engineering
Incorporated
Exhibit B
Van De Wiele Engineering, Incorporated
Schedule of Hourly Rates
And
Reimbursable Charges
2006
Reimbursable Charges
Advertising, Blueprinting, Copying, Deliveries, Materials,
Filing Fees, Equipment and Outside Professional Services
Cost plus 10%
Mileage
$0.50/Mile
Overtime Rates (authorized)
1.5 times
standard rate
NOTE: This schedule subject to annual adjustment on January 1st
~nDeWiele
Engineering
Incorporated