REQUEST FOR CITY COUNCIL AGENDA ITEM
Agenda Date Requested: June S? ~
Requested By: S. Gillett ~
Department: Public Works
Appropriation
Source of Funds: UTL897
Account Number: 003-9890-897-1100
Report:
Resolution:
Ordinance: XX
Amount Budgeted: $J50,OOO
Exhibits:
Ordinance
Amount Requested: $269,96320
Exhibits:
EDl!ineer's Recommendation
Budgeted Item: YES
Exhibits:
Rid Tahulation
The FY 2004-2005 Utility CIP Fund included the replacement of water and sewer lines along
Bayshore Drive, near Sylvan Beach. The Project is a continuation ofthe systematic replacement of
utilities within the older sections of the City.
The Project, designed by Freese & Nichols, Inc., received bids on June 13, 2005, with three (3)
bids received. Low bid was submitted by Insituform Technologies, Inc. in the amount of
$257,108.20. Completion date is 90 days after receipt of notice to proceed. A total of $300,000.00
was budgeted for construction of this Project
References were provided, and checked by the Engineer. The Engineer recommends award to
Insituform Technologies, Inc. for the bid amount.
~rr ~ ~Wc. Cb~Iir.a.c:1; ~Dd.J,Ze- <>,i> 1/'2~~
Action Required by Council: Approve an Ordinance authorizing the City Manager to execute a
contract with Insituform Technologies, Inc. in the amount of $257,108.20 for the construction of
the Project, and authorize $12,855.00 for contingency.
Approved for City Council Aeenda
6/6f~
Dati
ORDINANCE NO. 2005- ~g.30
AN ORDINANCE APPROVING AND AUTHORIZING A CONTRACT BETWEEN THE CITY
OF LA PORTE AND INSITUFORM TECHNOLOGIES, INC., FOR THE CONSTRUCTION
OF THE BAYSHORE DRIVE UTILITY PROJECT, APPROPRIATING $257,108.20
PLUS A CONTINGENCY OF $12,855.00, TO FUND SAID CONTRACT, MAKING
VARIOUS FINDINGS AND PROVISIONS RELATING TO THE SUBJECT, FINDING
COMPLIANCE WITH THE OPEN MEETINGS LAW, PROVIDING AN EFFECTIVE DATE
HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council hereby approves and authorizes
the contract, agreement, or other undertaking described in the
title of this ordinance, a copy of which is on file in the office
of the City Secretary. The City Manager is hereby authorized to
execute such document and all related documents on behalf of the
City of La Porte.
The City Secretary is hereby authorized to
attest to all such signatures and to affix the seal of the City to
all such documents.
City Council appropriates the sum of
$257,108.20 plus a contingency of $12,855.00, from Fund 003,
Project Number UTL897, to fund said contract.
Section 2.
The City Council officially finds, determines,
recites, and declares that a sufficient written notice of the date,
hour, place and subject of this meeting of the City Council was
posted at a place convenient to the public at the city Hall of the
City for the time required by law preceding this meeting, as
required by the Open Meetings Law, Chapter 551, Texas Government
Code; and that this meeting has been open to the public as required
by law at all times during which this ordinance and the subject
matter thereof has been discussed, considered and formally acted
upon.
The City Council further ratifies, approves and confirms
such written notice and the contents and posting thereof.
Section 3. This Ordinance shall be effective from and after
its passage and approval, and it is so ordered.
PASSED AND APPROVED, this 27th day of June, 2005.
By:
CITY OF LA PORTE
~~~~
Alton E. Porter
Mayor
ATTEST:
vfI!~
Mareha A. i lett
City Secretary
/.1/ a)
/,/ ,
IV(>{~ ,
Knox W. Askins
City Attorney
APPROVED:
2
Freese
and Nichols, Inc.
Engineers
Environmental Scientists
Architects
2010 East Broadway
Pearland, TX 77581-5502
281/485-2404
281/485-4322 fax www.freese.com
June 15, 2005
FNI04-346
Mr. Steve Gillett
Director of Public Works
City of La Porte
2963 North 23rd Street
La Porte, Texas 77571
Re: Bayshore Drive, Water and Sanitary Water and Sewer Line Replacement
Dear Steve:
On June 13,2005, three (3) bids were opened for the referenced project. Bids were
checked and tabulated. The low bidder is Insituform Technologies, Inc. with the total
base bid of $257,108.20. Enclosed are ten (10) copies of bid tabulation sheet.
Based on the Company's reputation and references, Insituform Technologies, Inc. is a
responsible and responsive company with experience in this type of work. Therefore, we
recommend award ofthis contract to Insituform Technologies, Inc.
We are looking forward to the successful implementation of this project. Please call me
if I can be of service to you.
Sincerely,
~~L.S
Senior Project Manager
Enclosure:
T.LPT04346Gillett3Itr
BIDTABULA"fION
ern OF t.A PORTE
BAYSHORE DRIVE - WATER AND SANITARY SEWER LINE REPLACEMENT
BID NO. 05024
Bids Opened: 06--13-05
Prepared By: Freese & Nichols, Inc.
FNI No, 04-346
SECTION -A" - WATERLINE!:
ITEM BID
NO. ITEM DESCRIPTION UNIT QUANTITY
1 Right-of-Way Preparation For Wa!eOOe LS 1.0<
2 Traffic Control For Waterline Construction LS 1.0<
S" PVC. (C 900 DR.1S), Waterilna,lncludlng 1,471.0<
excavation, bedding, & backfll.l.llg n open CUI LF
4 S- PVC (C 900, DR-1S) Walerline In Uncased '48.0<
Bore Hole LF
sla- PVC (C-900, OA-1B) Waler.,e W'lCludklg - 40.0<
excava.tion, beddng and backflllW'lg In open cut LF
6 - PVC (C900, DA-1S) Waterline kl uncased
borehole LF 205.0
74" PVC (C-900, DR-1S) Walerline Including 200.0<
excavation, bedding, & backfilling ill open cut LF
S Fire Hydrant with 6' PVC lead (W) EA '.0<
94" G. V. wI Box (MJ) EA 12.0C
10 6"G. V.w/Box (MJ) EA 6.0<
11 "0. V. w1Box(MJ) EA W
12 S" 90- Bend (MJ) EA 2.0<
1 4"111/4" Bend (Ml) EA 18.0<
14 8"x S"x 6" Tee (Ml) EA 6.0<
15 8" x 6" Reducer (MJ) EA 2.0<
, " x 2' Reducer IMJ) EA 8.0
17 l' poly service lWle lneludW'lg bore under the 1.0<
road and tie-in 10 existing meter (/orIg side) EA
11 1" Poly service line and tie-In to existing meter
(shorlside) EA 3.0
1 E TIe-in 10 existflg 8' wa.terline EA 1.0<
2l Tie"*' to existing 6" waterline EA 2.01
21 Tie-in to existing 4' waterline EA 6.0<
22 ie-in to existing 2" waterline EA 8.0<
23 Remove existing fire hydrant and valve and 5.0<
plug the line EA
2 Trench Safety LF 1,800.0
25 Flller Fabric Fence (1nstaR & Remove) LF 650.0
26 !construction Exit (Type 1) (Install & Removel SY 200.0<
27 Complete Site Restoration ..eluding Clean
Up, Seeding, Sodding, pavl'lg as necessary LS 1.0
SUBTOTAl SECTION -A-
1
Insituform Technologles,lnc,
UNIT
PRICE AMOUNT
$3,000.0< $3,000.00
$300.00 $300.00
$35.00 !li51 485.00
$3.5.n1 1.19180.00
"'?'" $1 680.00
$41.00 $8 405.00
$41.00 $8 200.00
$2,250.00 $11 250.00
$400.00 S4 800.00
510.00 $3 060.00
$760.00 $5,320.00
$175.00 $350.00
$100.00 $1,800.00
$240.00 $1 440.00
$18Q.nl $360.00
$160.00 $1,280.00
$1 000.0 $1 000.00
'700.00 $2 100.00
$1500.00 $1 500.00
$1 500.00 "000.00
$1000.'" $6 000.00
$800.00 $6 400.00
'280.00 $1 400.00
$0.01 $18.00
$1.00 $650.00
$20.00 S4 000.00
sa,800.oo $8 600.0
$156,578.00
2
Horseshoe Costructlon, Inc,
UNIT
PRICE AMOUNT
$5 000.00 $5 000.0
$5,000.00 $5,000.00
$38.00 $55898.00
$45.00 $24 660.00
$38.01 $1520.0<
$40.00 $8 200.00
$40.00 $8000.00
$2 200.00 $11 000.00
$400.0< $4 BOO.(J(
$500.00 $3000.00
$850.00 $5 950.00
$175.00 $350.00
'50.00 $900.00
$120.0l $720.00
070.00 $140.00
$40.00 $3W.0<
$750.00 $750.
$57'.0< $1 725.00
$600.00 $600.00
$600.00 $1 200.~
$500.00 .3000.0<
$400.00 1.3 200.00
$500.0< $2 500.00
$3.00 $5 400.00
$4.50 $2,925.0<
$10.00 $2 000.00
$5,000.00 $5 000.0<
$163,758.00
3
Troy Construction, L.L,P.
UNIT
PRICE AMOUNT
$1,200.00 $1 200.00
$1,200.00 $1 200.00
$66.00 $97 086.00
$95.00 $52,060.00
$65.00 $2,600.00
$76.00 >tiS 580.00
$56.00 $11 200.00
$1 956.00 $9 700.00
$492.00 $5 904.00
$624.00 $3,744.00
$960.00 $6720.00
$924.00 $1 848.00
$96.00 ~1 728.00
$600.00 $3 600.00
$360.0 $720.00
$180.00 $1 440.00
$960.00 $960.00
$600.00 $1 800.00
$1,668.00 $1568.'"
$1 596.00 $3,192.00
$1 248.00 $748S.00
$1 152.00 $9216."
$1,400.00 $7000.00
$1.00 $1800.00
$2.00 $1 300.00
$18.00 $3,600.00
$3 000.00 $3000.00
$257,434.00
ITEM BID
NO. rrEM DESCRIPTION UNIT QUANTrrv
1 Right-of-Way Preparation For Sewer Line LS W
2 TraffIC Control For Sewer Line Construction LS ..0<
~ 10' HOP Pipe through Existing 8" Clay
Sanitary Sewer Une by Pipe BurstKlg Insertion
Method, Including Tie..., to Existing MH, 1..55.0<
comlete, In place LF
4 S" HOP Pipe through Exlstilg 8" Clay Sanitary 100.00
Sewer Une by Pipe Burslng Insertion Method LF
5 Remove and Replace Existing S" Sanitary
Sewer Line wlSDR-26 Gravity Sewer Line 20.00
{6'-8' Deep) LF
a TIe-in 10 Existing 8" Sanitary Sewer Line with 2.0<
High Pressure Clamp EA
7 By-pass Pumping, as necessary, As Directed "0<
by Engineer LS
a Trench Salety LF 20.0
9 Complete site restoration .,cludlng clean up, 1.0<
seeding, sodding and paving as necessary LS
10 4' Sanitary Sewer Service Reconneclion 5.0<
(Short Side) EA
SUBTOTAL SECTION "S"
SECTION .C' - EXTRA WORK
To be done where authorized by the Engineer and In quantities 10 be authorized.
Contractor shan provide unit prices ONLY lor this Section.
ITEM BID I
NO. rrEM DESCRIPTION UNIT QUANTITY
1 Extra Labor (unSkilled) ManHr .- - I
2 Extra Labor (skilled) ManHr -- ...-
3 Extra Excavation (machine) CY .... --
4 Extra Cemenl Slabnlzed Sand BackflU CY -.. .-.
5 Extra Ductile Iron Fittings, aM classes
and sizes, In place TN ..- ..-
SUBTOTAL SECTION .C"
BID SUMMARY
SECTION "A.
SECTION "B"
SECTION .C.
TOTAL BASE BID
UNIT
PRICE AMOUNT
$2,600.00 $2,600.00
$300.00 $300.00
$36.00 $70 380.00
$34.00 $3400.00
$140.00 $2 600.00
$1 500.00 $3,000.00
$100.00 $100.00
$0.01 $0.20
$2 750.00 $2,750.00
$1 000.00 $5,000.00
$90,530.20
1
Insltuform Technologies, Inc.
UNIT
PRICE AMOUNT
$16.00 -- .-
$25.00 - ---
$6.00 -.-- ----
$25.00 --- ....
$1,000.00 .--.
$10,000.00
$156,578.00
$90,530.20
$10,000.00
$257.108.20
_...oo.;..o;;:~,~,.
/?:"J:"1L":"'h...tt.';-"~
; .il . \\..\
& ., - .~...,.".. f..
f. ~.:....:si.ii~t.D~~~ '''1
" ."~.)......"'."""" ;0:1
~':1~", ~3233 <3'/!tt~
",.()"".tf~C;lo,.<.'?;..jN.I /'
UNII
PAICE AMOUNT
$5,000.00 $5,000.00
$5 000.00 $5 000.00
$42.50 $83,087.50
$65.00 $6 500,00
$150.00 $3,000.00
$750.00 $1,500.00
$1,000.00 $1 000.00
$25.00 $500 .00
$5 000.00 $5 000.00
$950.00 $4 750.00
$115,337.50
2
Horseshoe Costructlon, Inc.
UNIT
PRICE AMOUNT
- ..--
---- ....
..- --.
.- -..
-..
$10,000.00
$163,758.00
$115.337.50
$10,000.00
$289.095.50
V''''
PRICE AMOUNT
$2 400.00 $2.400.00
$1 800,00 $1800.00
$46.00 $89,930.00
$37.00 $3 700,00
$68.00 $1,360.00
$240.00 $480.00
$600.00 $600.00
$10.00 $200.00
$600.00 $600.00
$588.00 $2940.00
$104,010.00
3
Troy Construction, L.L.P,
UNIT
PRICE AMOUNT
$27.00 - -
$35.00 --- -.-
$35.00 -- --
$50.00 -.. -.-
$2,500.00 .... --
$10,000.00
$257,434.00
$104,010.00
$10,000.00
$371 ,444.00