HomeMy WebLinkAboutR-2009-03 Speed and Intersection Traffic Control
D
REQUEST FOR CITY COUNCIL AGENDA ITEM
Agenda Date Requested:
03-09-09
'"";(.. f\ ~
Budget
Requested By: Ken Adem-
Source of Funds:
Department:
p()lic~
Account Number:
Report:
Resolution: X Ordinance:
Amount Budgeted:
Speed and Intersection Traffic Control
STEP Resolution
Amount Requested:
Exhibits:
Bndgeted Item: YES NO
Exhibits:
5 Year Cost Assumption Plan
Exhibits
SUMMARY & RECOMMENDATION
The La Porte Police Department is applying for a third year TXDOT STEP grant for overtime reimbursement for
Speed and Intersection Control. This grant, if awarded, will result in maximum reimbursement award of
$58,767.74.
As indicated last year, due to the success of our previous and current grant we have been advised that we may be
eligible for a fourth year and possible a fifth year grant. The attached 5 Year Cost Assumption Plan indicates that a
higher level of match will be required for years four and five if we choose to apply for the grant and receive the
award. A 5 Year Cost Assumption plan is required each year as part ofthe grant request submittal process.
As in previous years, we are able to meet our match requirement through our employee benefits, mileage, fuel, etc.,
as the grant only pays base salary.
~/1 ~.,
Date
~CJJ1. O~
RESOLUTION
* * * *
WHEREAS, injuries and deaths from traffic crashes bring loss and suffering to the
citizens of this community; and
WHEREAS, the cost of such injuries brings economic hardship to families; and
WHEREAS, the community's health care system and emergency response resources are
significantly impacted by injuries of traffic crashes; and
'WHEREAS, research shows that speed is a causative factor in many traffic crashes; and
WHEREAS, failure to obey traffic control devices, signs and signals at intersections
causes many traffic crashes; and
WHEREAS, the National Highway Traffic Safety Administration statistics have shown
that reducing speed limit and traffic control violators prevents crashes, saves lives and
reduces non-fatal injuries while resulting in economic savings to society;
WHEREAS, the Speed/Intersection Traffic Control STEP includes public education and
intensified law enforcement to get the community to comply with speed limits and traffic
control devices, signs and signals;
NOW THEREFORE, BE IT RESOLVED that The City of La Porte approves the City
Manager to execute all documents for the Speed/ITe STEP Grant for October 1, 2009
through September 30, 2010; joining public and private sector leaders across Texas
supporting the campaign; urging all residents and visitors of La Porte to abide by traffic
laws, to protect life and the quality of life in this community.
Signed by:
Lfflarffi- r!i:fI
Authorized 0 ficial
ATTEST:
~aAd1L~ ~
City Secl'etmy 0 .
/ eGrants
Page 1 of2
Proposal/Grant: 201O-LaPorte-
$-SYG-0042
Status: Prapasalln Progress
User: Red Dalfis
Role: SUOgrantee Mmlnlstratc-r
logout
;',s P,I![!O,;C,Il~Ct(;,,; I
','I
The information has been saved.
Created By: Davis, Rod on 2/18/2009 12:54:36 PM
last Modified By: Davis, Rod on 2/19/2009 2:33:54 PM
Go to Related Paoes
COST ASSUMPTION PLAN
n Not Applicable (Click here ONLY If this is a New Project or Yrl/Yr2 of the Multi-Year Project)
Complete the information on this page In the third year of the Multi-Year proposal or for the second or subsequent years of a
Single-Year project.
All proposals for a second or subsequent year of funding or multi-year projects must Include a CAP, demonstrating how the project will have an
increasing share of costs by the proposing organIzation and how the project will be funded after TxDOT funding ends.
Insert the appropriate federal fiscal year, starting with the first year of grant funding and for each year during the anticipated term of the project.
Include an actual dollar amount of planned expenditures by fund source (TxDOT, Other/State/Local, Other Contributions). For project year(s)
already completed, Include actual expendItures, If available.
Other Contributions: The purpose of this section Is for the subgrantee to show support and commitment to the success of the project that Is not
otherwise recorded In the Approved Project Budget. Items not In the Approved Project Budget cannot be claimed as matching funds. If there are
routine project-related costs being borne by the subgrantee, but which are not listed as match In the Approved Project Budget, space Is provIded
so that such contrlbutlons can be recorded. These contributions could Include Items such as; part- or full-time employees working on the project,
but not paid with project funds; volunteer services; travel performed that Is project related, but not reimbursable under the grant; vehicles used In
support of the project, but mileage Is paid by the subgrantee and not claimed under the grant; fringe; etc.
~ IxI20I .Millh Program Income** Non-Budaeted
Fiscal Year Contributions
$ 0/0* $ 0/0* $ % $ %
1. 12008; 1 ~42,218.00i 74.67% b~i,R4..78t 25.33% L $01 0.00% I ~oj 0.00%
,--~
2. 12009] L~~2,!gL3?1 80.86% 1 $16,497.81f 19.14% I $01 0.00% I $01 0.00%
3. 12..Q.~Qj 1$58,767.741 80.63% J $14,116.011 19.37% L--~ 0.00% L____~gJ 0.00%
4. L2..Qll! 1$62,000.001 64.94% 1$33,472.741 35.06% I ---~Q] 0.00% I $0) 0.00%
5. 12012! ~LOOO.~ 50.00% 1$62,000.001 50.000/; I $01 0.00% I $0: 0.00%
* Percent of total Grant Budg et
** Any projected Program Income must be approved In advance by TxDOT
Other/State/Local (Match): Briefly explain In a narrative the Subgrantee's intention to assume an
Increasing share of project costs. The narrative should include an explanation of what source(s)
the Subgrantee will use to provide the matching funds (cash, indirect, In-kind, etc.).
It Is our Intention to assume an Increasing share of program costs. Frlnge
match today Is FICA 7.6%, TMRS 14.71%, W.Comp 1.71%; this will Increase
through pay Increases. We are also using vehicle operatIonal costs as match.
't~
i
- I
.'---~-- ~
223 of 2000
If project will run beyond year 5, indicate years, amounts, and percentages below (years beyond 5
requIre a Mln match of 50%)
I~
~'.'.".'
,~
,
J
~
~f~
https://www.dot.state.tx.us/apps/egrants/ObjectPage.aspx?omnID= 143 95&pgeID=25 65&0... 2/19/2009
eGrants Page 2 of 2
o of 500
Indicate when all project costs will be assumed
L
RELATED PAGES
F ~.ml Frtnae Benefits - 1Q~..2QQ
Traver and Per DIem' Non-F.n{or~ent Travel.... 300
n:~vel and Per DIem: STEP Enforcement Mlleaa!:.=-JM
t !;auloment. 4QQ
I ~!;iQQ
r CQ!Jilltc;t)Jal Services - 9..Q.Q.
r mher Nlscellaneou~
l--1~tt..:...e..QQ
~ Budaet Summary
L ~/llptlon Plan
II SAVE I l';oJ>nrl: I li;V~~WJ!o~:1 HA.oJ).jRO,"rfi,..,j
122546
F')o(.-.;,rt.dl7tlrt-tL"'Gn:.~
1) COJ:"ir'.g:d 2O'X"2C'J7 A;p;!.;, SW.~-a:~, It;t.
https://www.dot.state.tx.us/apps/egrants/ObiectPage.aspx?omnID= 143 9 5&pgeID=2565&o... 2/19/2009