HomeMy WebLinkAbout2008 CITYWIDE SIDEWALK INFILL PROJECT_2008-4503CITY COUNCIL MEETING REQUEST/CHECKLIST
CITY COUNCIL MEETING DATE: September 8, 2008
DESCRIPTION OF ITEM(S) REQUESTED: To award the bid to Brooks Concrete for the
2008 City Wide Sidewalk In -fill Project, sealed bid #08021
RESPONSIBLE DEPARTMENT(S): PLANNING
DEPARTMENTAL RESPONSE/ACTION TAKEN (complete items below prior to
submission of agenda items to the City Secretary's Office):
Items are due to the City Secretary's Office by Noon on Monday prior to the Agenda
meeting on Tuesday at 9:30 a.m. All revisions and corrections will need to be returned to
the City Secretary by 3:30 p.m. on Tuesday. The City Manager will sign and approve all
documents on Tuesday. City Secretary will copy and distribute agenda to Council by 4:00
p.m. on Wednesday.
Y' Complete City Council Meeting Request Form/Checklist
i/ Complete Request for City Council Agenda Item Form (Agenda Request Form)
Y Start Checklist for Reviewing Construction Contracts
✓Attach all back up to agenda request form
Agenda item/items that read "attached", assure that attachment are a part of the
back up
r/rt Duplicate agenda items must be stamped "Duplicate" and circle date that item was
presented to City Council.
Make sure City Attorney has signed Ordinances and approved contracts as to
form
Make sure Finance Dept. has approved funds and note information on agenda request form
IV 4 Make sure other entity (other than county or state) approve and sign the contract
prior to sending it to the City Secretary's Office
R_1A_ If amending a previous Ordinance please note the previous Ordinance Number and
extension letter or number
Page 2
Make sure caption includes proper wording and chapter notations if it requires
amendment to the Code of Ordinances
Note on Agenda Request if Public Hearing is required and provide copy of notice that
was posted 15 days in advance
✓ Proof your documents for errors and make sure the pages are numbered correctly.
Do not include any fines or misdemeanors in agenda captions.
Advise City Secretary if this items was previously tabled and date tabled:
Al 4 Make sure first and second readings are noted in your agenda request for Franchise items.
L
Personnel matters for executive session must include the employees name or title. If
more than on person is in the job title, their name must be included.
/tf Contract execution instructions: (Advise the City Secretary's Office if you will be
obtaining needed signatures from County or State and where contracts, agreements, etc.
need to be sent once signed by Mayor, City Manager and City Secretary. Instructions as
follows:
i11,4 Advise City Secretary's Office of any additional documents which need to be maintained
in vault with the agenda request that are forthcoming and not included in the Council
Packet.
DIRECTOR'S G TURE DATE
T: forms\ City Council Meeting Checklist
Revised 12/13/04
I
REQUEST FOR CITY COUNCIL AGENDA ITEM
Agenda Date Requested: Se [ember 8 2008
1
Requested By: T- Tietien
Department: Planning
Report: X Resolution: Ordinance_
Exhibits: Bid Tabulation
Budeet
Source of Funds: Fund 15
Account Number: 015-9892-927-1100
Amount Budgeted: '00 000
Amount Requested: ecn 000
Budgeted Item: YES NO
SUMMARY & RECOMMENDATION
On August 18, 2008 the City opened the 2008 City Wide Sidewalk In -fill Project, sealed bid # 08021. The project
was advertised in the local newspaper and bid invitations were sent directly to several local contractors. The City
received sealed bids from Mar -Con Services, Brooks Concrete and TeamWork Construction. The low bid was
submitted by Brooks Concrete in the amount of $47,545.64.
Action Required by Council:
Award bid to Brooks Concrete for the City Wide Sidewalk In -fill Project in the amount of $47,545.64 and to
establish a construction contingency of $2,454
Approved for City Council Agenda
Ron Bottoms, City Manager Date
BID RECORD # 08021 CITY-WIDE SIDEWALK REPLACEMENT
DESCRIPTION Teamwork Brooks Concrete I Mar -Con Services
work orders
su
PAGE: 1
R E C E I V I N G R E
RECEIPT NO.: 139415
SHIP TO:
PLANNING
VENDOR:,BROOKS CONCRETE, INC
DELIVER BY SHIP VIA F.O.B.
5/05/08 BEST WAY DESTINATION
CONFIRM BY CONFIRM TO
JEANA MASTERSON
FM
P.O. NO.: CP8068
DATE: 9/30/08
VENDOR NO.
431-126
REQUISITIONED BY
FREIGHT CONTRACT NO. REQ. NO, REQ. DATE
-----------------------------------------------------------------------------
LINE QTY RCVD
BIN LOCATION UOM ITEM N0. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 3051.38 EA 050 030 1.0000
BUILDINGS CONSTRUCTION CONSTRUCTION
Acct # 01598927095110
2 1922.24 EA 050 030 1.0000
BUILDINGS CONSTRUCTION CONTINGENCY
Acct # 01598927099110
m
RECEIVED BY: LEE, PEGG V RECEIVED DATE: 9/30/08
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2008 La Porte Sidewalk Improvement Project
TOTAL AMOUNT WORK DONE TO DATE:
$49 736.24
ORIGINAL CONTRACT AMOUNT:
$47,813.40
AMOUNT RETAINED 10% :' .,
$0
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
$44 762.62
REVISED CONTRACT AMOUNT:
TOTAL DEDUCTIONS:
$44 762.62
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$4,973.62
604 West Fairmont Parkway
LaPorte, TX 77571
CONTRACTOR:
'
Brooks Concrete Inc.
PAYMENT #3 Final Payment
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 4124/08 90 working days
WORKING DAYS TO DATE: 40
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills a ainst the above named Contractor, for labor, material and expendable equipment employed ' i80DSp
performance of said contract have been pa in full accordance with the contract requirements,: "�aY pt,B •,G e
2; 0
, Z
DATE: BY: i TITLE: yS n i Z
SIGNED a WORN fore me, a Notary Public in and for the State of Texas this �� day of —y y 20�. FxrinEs. q s
BY: ��CJ/i� k� MY COMMISSION EXPIRES: ot.
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality oft Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONT CT R.
BY: DATE: 5� 8
REQUEST FOR CITY COUNCIL AGENDA ITEM
Agenda Date Requested: September 8, 2008
Requested By: T Tipt.'enc
Department: P-Ianaing
Report: X Resolution: Ordinance:
Exhibits: Bid Tabulation
Budget
Source of Funds: Fund 15
Account Number: 015-9892-927-1100
Amount Budgeted: P50,000
Amount Requested: S50,000
Budgeted Item: YES NO
SUMMARY & RECOMMENDATION
On August 18, 2008 the City opened the 2008 City Wide Sidewalk In -fill Project, sealed bid # 08021. The project
was advertised in the local newspaper and bid invitations were sent directly to several local contractors. The City
received sealed bids from Mar -Con Services, Brooks Concrete and Teamwork Construction. The low bid was
submitted by Brooks Concrete in the amount of $47,545.64.
Action Required by Council:
Award bid to Brooks Concrete for the City Wide Sidewalk In -fill Project in the amount of $47,545.64 and to
establish a construction contingency of $2,454
Approved for City Council Agenda
Ron Bottoms, City Manager Date
CITY COUNCIL MEETING REQUEST/CHECKLIST
CITY COUNCIL MEETING DATE: September 8, 2008
DESCRIPTION OF ITEM(S) REQUESTED: To award the bid to Brooks Concrete for the
2008 City Wide Sidewalk In -fill Project, sealed bid #08021
RESPONSIBLE DEPARTMENTS): PLANNING
DEPARTMENTAL RESPONSE/ACTION TAKEN (complete items below prior to
submission of agenda items to the City Secretary's Office):
Items are due to the City Secretary's Office by Noon on Monday prior to the Agenda
meeting on Tuesday at 9:30 a.m. All revisions and corrections will need to be returned to
the City Secretary by 3:30 p.m. on Tuesday. The City Manager will sign and approve all
documents on Tuesday. City Secretary will copy and distribute agenda to Council by 4:00
p.m. on Wednesday.
Complete City Council Meeting Request Form/Checklist
V/ Complete Request for City Council Agenda Item Form (Agenda Request Form)
P' Start Checklist for Reviewing Construction Contracts'
Attach all back up to agenda request form
Agenda item/items that read "attached", assure that attachment are a part of the
back up
Duplicate agenda items must be stamped "Duplicate" and circle date that item was
presented to City Council.
Make sure City Attorney has signed Ordinances and approved contracts as to
form
Make sure Finance Dept. has approved funds and note information on agenda request form
ALMakesure other entity (other than county or state) approve and sign the contract
prior to sending it to the City Secretary's Office
IV -IA- If amending a previous Ordinance please note the previous Ordinance Number and
extension letter or number
Page 2
'�•, Make sure caption includes proper wording and chapter notations if it requires
amendment to the Code of Ordinances
rJL Note on Agenda Request if Public Hearing is required and provide copy of notice that
was posted 15 days in advance
✓ Proof your documents for errors and make sure the pages are numbered correctly.
Al 4 Do not include any fines or misdemeanors in agenda captions.
Nlil Advise City Secretary if this items was previously tabled and date tabled:
/V/4 Make sure first and second readings are noted in your agenda request for Franchise items.
Personnel matters for executive session must include the employees name or title. If
more than on person is in the job title, their name must be included.
NJ�i Contract execution instructions: (Advise the City Secretary's Office if you will be
obtaining needed signatures from County or State and where contracts, agreements, etc.
need to be sent once signed by Mayor, City Manager and City Secretary. Instructions as
follows:
o / Advise City Secretary's Office of any additional documents which need to be maintained
in vault with the agenda request that are forthcoming and not included in the Council
Packet.
DIRECTOR'S SIGNATURE
T: forms\ City Council Meeting Checklist
Revised 12/13/04
DATE
r ` •
THE AMERICAN INSTITUTE OF ARCHITECTS
11
Ala Document A310
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, thatwe
BROOKS CONCRETE, INC. 04we un"w`w orhQwdw`rcantredw)
as Principal, hereinafter called the Principal, and
Owe Ma as mme nd address or tar me of aarepl
SURETEC INSURANCE COMPANY - 9737 Great Hills Trail #320; Austin, TX 78759
a corporation duly organized under the laws of the State of
as Surety, hereinafter called the Surety, are held and finny bound undo
(VYn twat ad r=e and etl I arNgd WaofOwhr)
CRY OF LAPORTE
as Obligee, hereinafter called the Obligee, in the sum of
5% OF THE GREATEST AMOUNT BID Dollars ($ 5% GAB ),
for the payment.of which sum well and truly to be made, the said Principal and the said Surety, bind
ourselves; our halfa; executors, administrators, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, The Principal has submitted a bid for
2008 CRY WIDE SIDEWALK IN -FILL PROJECT
NOW. THEREFORE,., If the OtAgae shall accept the bid of tine Principal and the Principal shell after Into a Contract 1Nth
the OWgee.1n.accordance with the terms of such bid. and gM such bond or Norris as may be specified In the bidding or
Contract Doatnents'�. With good and surldert,suety for the re01M! performance of such Contract and for the pranKx
payment of IeGor wxl' matedab finished In the prosecution thereof, or In the event of the falkre of the Principal to enter
such contract and "''snrth bond or bonds, if the.Pdndpel Ad pay to the Obltgee the difference not to exceed the penalty
hand between: the. amout spedtled In said bid and such larger amout for wNch the Obligee may In good faith m o of
With another. party to :perform the Work Covered by said bid, than this oblWon shal be nd and void, otberwise to remain
In ful farce and effect.' .
Signed and seal ed.this 18th day of August 0-908 --------
BRPOKS CONCRETE; INC
SU C INSURANCE COMPANY s
lsar09 (3-9...
DEBI MOON (neW
-
AIA DOCIW M A310. BID BOND. ALA O. FEBRUARY 1970 ED. THE AMERICAN -
aL MUTE OF ARCMTECTS, 1735 N.Y. AVE- NA, WASMNDTOR D.C. 30008 t
i
4
jc
POA N: 4221057
SureTec Insurance Company
LUMTED POWER OF ATTORNEY
Know AB Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Hams County, Texas, does by these presents
make, constitute and appoint
Debi Moon, Alan C. Robinson, Steven L. Thomas, Kelly D. Clark
of The colony, Texas its true and lawful Attomey(s)-in-fact, with full power and authority hereby conferred in its name, place and stead, to
execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to
include waivers to the conditions of contracts and consents of surety, providing the liond penalty does not exceed
Five Million and no/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the. corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attomey(s)-in-Fact may do in the
premises. Said appointment shall continue in force until 12/31/09 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or arty Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact my be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, rmognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate hearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20 of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this 20th day of June, A.D. 2005.
SunANt;F 12ETEC INS CE COMPANY
u�; X v ,; By:
w�w 'n Bill King, re nt
StateofTexas ss: ;s\`'�
County of Harris
On this 201h day of June. A.D. 2005 before me personally came Bill King, to me known, who, being by me duly swom, did depose and say, that he
resides in Houston, Texas, that he is President of SURBTEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company, and that he signed his name thereto by like order.
Michelle Denny
Notes pt ft
• Stale OfTeXMxm
rs WryCornmirsIM Fxphes Michelle Denny, Notary Pub m
August 27, 2008 My commission expires August 27, 2008
1, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
A lQ `�
Given under my hand and the seal of said Company at Houston, Texas this day of 20 C'' A.D. .
M. Brent Beaty, Assistant Se re ry
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:00 am and 5:00 pm CST.
BID RECORD # 08021 CITY-MDE SIDEWALK REPLACEMENT
DESCRIPTION
TeamWork
Brooks Concrete
Mar -Con Services
BASE BID
$ 58,058.00
$ 47,545.64
$ 63,131.00
Estimated days to complete work orders
Bonds, Insurance, Certification submitted
5% Bonds Paid
yes
yes
yes
NOTES:
Bid Record - This form is considered "unofficial'
Official Bid Tabulations are available after three 3 business days by contacting Purchasing 281-470-5126.
CHANGE ORDER
PROJECT:
42vw
CONTRACTOR:
CONTRACT FOR:
2008 City Wide Sidewalk In -fill Pr_ooect
City oFLa Porte
604 W. Fairmont Parkway
La Porte, Texas 77571
Brooks Concrete
4018 Allen -Genoa
Pasadena, Texas 77504
No. 1
DATE OF ISSUANCE: 9/09/2008
You are hereby directed to make the following changes in the Contract Documents:
Description:
OWNER'S PROJECT NO. k2008-4503
Revise the width of sidewalks to six (6') feet from W. Polk to W. Tyler and expand 4 wheel chair ramps to accept six feet wide
sidewalk on North 3" Street. Between W. Polk and W. Adams on N. 3"St. relocate proposed sidewalk to the west side of the right-
of-way.
Purpose of Change Order:
To incorporate the proposed path into the hike and hike trail system
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price
Original Contract Time
$47,545.64
90days
Previous Change Orders
Net Change from Previous Change Orders
S-0-
-0-
Contract Price prior to this Change Order
Contract Time prior to the Change Order
S47,545.64
0 days
Net Increase (Deemase) of this Change Order
Net Increase (Deemase) of this Change Order
$3,170.12
IOdays
Contract Price with all Approved Change Orders
Contract Time with all Approved Change Orders
$50,715.76
100 days
RECOMMENDED:
APPROVED:
By: By:
Engineer Owner
APPROVED:
Contractor
R'E CE I'V TN
RECEIPT NO.:
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
PAGE: 1
G R li Y O R 'T
141594
P.O. NO.: CP9005
DATE: 12/12/08
VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
10/29/08 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
-----------------------------------------------------------------------------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 23319.59 EA 260 120 1.0000
PROFESSIONAL SERVICES CONSTRUCTION CONSTRUCTION
- Acct.# 01598929275120 _.
Acct # 03290905195110
RECEIVED BY
LE , PEGGY RECEIVED DATE: 12/12/08
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2008 La Porte Sidewalk In -fill Project 2008-4503
TOTAL AMOUNT WORK DONE TO DATE:
$53 165.84
ORIGINAL CONTRACT AMOUNT: $47 545.64
AMOUNT RETAINED 10% :
$0
NET CHANGE BY CHANGE ORDERS: $3 170.12
PREVIOUS PAYMENTS:
$26 865.48
REVISED CONTRACT AMOUNT: $50 715.76
TOTAL DEDUCTIONS:
$26 865.48
OWNER:
AMOUNT DUE CONTRACTOR:
City of La Porte
$26,300.36
604, West Fairmont Parkway
LaPorte, TX 77571
CONTRACTOR:
Nov. ' 08 # 2 FINAL
BROOKS CONCRETE, INC.
4018 ALLEN GENOA
PASADENA,TX 77504
713-947-8440
CONTRACT DATE: 6/7/08
WORKING DAYS TO DATE: 15
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been pain in full accordance with the contract requirements.
DATE: 1 1 U� BY:Ik�QAL b . t(/ Yl �Qtt�TITLE:
SIGNED and SWO L @fore e, a Notary Public,in anddor the -State ofJ�xas b, �t L day of b 20�.
EVETTF HPAL
gy_ NotsyPubiic stateMYCOIu�SiAISSION EXPIRES: l7/- O8'a009
♦ ram;. ` My Commission Expires
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CO T �CjTJOR.
BY: t ii�%/� DATE: O�
PROJECT NAME: 2008 City Wide Sidewalk In -fill Project
PROJECT NUMBER: 20084503
CONTRACTOR: BROOKS CONCRETE, INC.
nAT=-n& ' Ax
Quantity
Dollars
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
besai Ubn of Work
Est.
Qty
Unit
Unit
Price
Estimated
Volt
1.0
Concrete Sidewalk Placement
8,758.
SF
$ 4.69
$ 41,065.84
3,451.00
5837.0
9288.0
$ 16 185.19
$ 27,375.53
$ 43,560.72
2.0
Wheelchair Rams
13
ea
$ 405.00
$ 6,435.00
8
5.0
13.0
$ 3 960.00
; 2,475.00
$ 6.435.00
3.0
Adjust GV88
3
ea
$ 15.00
$ 45.00
4.0
5.0
S-1
bank sand
25
cy
$ 10.00
S-2
sod
50
By
$ 2.00
S-3
point re 'air
50
cy
$ 16.00
CO 01
$3,170.12
$. 3,170.12
$. 50,716.76
$ 20,145.19
$ 29,850.53
$ 53,165.84
CITY OF LA PORTE
Citv Wide Sidewalk In -fill Proiect
' whole numbers only
ACCOUNT PROJECT EXPLANATION AMOUNT OF
NUMBER NUMBER OFTRANSFER INCREASE DECREASE
FROM:
TO:
015-9892-927-1100
927
const contract
:Yi'_`'ti a
50,000
015-9892-927-5120
927
50,000
FROM:
TO:
FROM:
TO:
im Lwf t t�i3
FROM:
TO:
kw.oI u u�
FROM:
TO:
FROM:
TO:
FROM:
TO:
h`s _Gsk
FROM:
TO:
the Sir ✓ it
FROM:
ttpl urc sk 'a it
w.�L....tc..•V
FROM`.
TO:
✓sYrn`
FROM:
tti:;or_
FROM:
TO:
Iti
FROM:
TO:::nrie'i
v'.«
FROM:
TO:
FROM: i•Fitxi;+,.-e.Y�.�.;
TO
TOTALI 50,000 50,000
n=0A07MCWTAI A000MIA1 1 [\Y \I� i\ I II�� \ ■
FINANCE APPROVAL:
DATE: mJ/(,108
REVISED 8124/98 .
PURCHASE REQUISITION HER: 0000011481
REQUISITION BY: LEE, PEGGY y'SRgp$plym,,,jppg9.�I8yz[JID�!,BID�ALTRIN@jyT a
PEW. DATE: 10/16/08
SHIP TO LOCATION: PLANNING StWESTED VENDOR: 4311x Np§�C6 YNC DELIVER BY DATE: 10/29/08
LINE UNIT EXTEND
HER DESCRIPTION QUANTITY UOM COST COST VENDOR PART NVME5R
1 CONSTRUCTION 53170.12 EA 1.0000 53170.12
COIMODITY: PROFESSIONAL SERVICES
SUBCOMMOD: CONSTRUCTION
REQUISITION TOTAL: 53170.12
_____________________________________
A C C O U N T I N P 0 R M A T I 0 N
LINE M ACCOUNT
PROTECT
4
AMOUNT
1 01598929275120
CONSTRUCTION COSTS
94.04
50000.00
_ _
N®
1 O3290905195130
CONSTHDCTION COSTS CDBGOT
5.96
3170.12
REQUISITION IS IN TBB CURRENT FISCAL YRAR.
F
r VK U11 I k_k
Agenda Date Requested: Si ptember 8 2008
1
Requested By: Tieteeng 1424,
Department: Planning
Report: X Resolution: Ordinance_
Exhibits: Bid Tabulation
1UNCIL AGENDA ITEM
Budget
Source of Funds: Fund 15
Account Number: 015-9892-927-1100
Amount Budgeted: C.GO 000
Amount Requested: ecn nn_� __n__
Budgeted Item: YES NO
SUMMARY & RECON9MENDATION
On August 18, 2008 the City opened the 2008 City Wide Sidewalk In -fill Project, sealed bid # 08021. The project
was advertised in the local newspaper and bid invitations were sent directly to several local contractors. The City
received sealed bids from Mar -Con Services, Brooks Concrete and TeamWork Construction. The low bid was
submitted by Brooks Concrete in the amount of $47,545.64.
Action Required by Council:
Award bid to Brooks Concrete for the City Wide Sidewalk In -fill Project in the amount of $47,545.64 and to
establish a construction contingency of $2,454
Approved for City Council Agenda
Ron -Bottoms, City Manager Date
A
11
CHANGE ORDER
PROJECT:
CONTRACTOR
CONTRACTFOR:
`d•2008 City Wide Sidewalk In--fI1 Pt'oject
C-tfy, ofi.a Porte
604 W. Fairmont Parkway
LaPorte, Texas 77571
8 en-G n a
.Pasadena Texas 77504
No. I
DATE OF ISSUANCE: 9/09/2008
You are hereby directed to make the following changes in the Contract Documents:
Description:
OWNER'S PKQ7ECT NO. #2008�4503
Revise the width of sidewalks to six (6') feet from W. Polk to W. Tyler and expand 4 wheel chair ramps to accept six feet wide
sidewalk on North Yd Street, Between W. Polk and W. Adams on N. 3`d St. relocate pr
of -way.
Purpose of Change Order.
Ta 6n$orpprate tk P.mo.sW path into the [tike and hike trait system
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE:
CH?
Original Contract Price
Original Contract Ti
$47,545.64
Previous Change Orders
Net Change from Pr
$-0-
Contract Price prior to this Change Order
Contract Time prior
$47,545,64
Ne esFea e) of an a Order
i
Net Increase (Dee&e
Contract Price with all Approved Change Ord;
q
Contract Time with
$50,715.76
A
RECOdNIIEII: q
qi
.L�
Engineer
r
PURCHASE ORDER
CITY OF LA PORTE
604 WEST FAIRMONT PARKWAY
ATTN:ACCOUNTSPAYABLE
LA PORTE, TX 77571
VENDORPHONE:
(713)947-8448
VENDOR FAX:
(713)947-8444
VENDOR N:
431126
VENDOR ADDRESS:
BROOKS CONCRETE, INC
4018 ALLEN GENOA
PASADENA, TX 77504
PURCHASE
ORDER NO.
CP8017
IDMI=rj117KIIIN
SHIP TO: PLANNING
PLANNING
604 W. FAIRMONT PARKWAY
LA PORTE, TX 77571
.►ur P O. # MUST A fYenr or: ALL Invofces, Packages and Correspondence
4
� 1YG x REQUISITIONff zticQulszTxo AA
--
12/28/2007 0000010729 2/2RI2007
—? ... : � _ i+..:- R AT1TI10
Multiple Accounts SANDRA GARCIA
r'}'. hrc kip y � : _ _ UNIT —EXTENDED
.e^P �4°""V+iCE COST
F COST
1 59,178.00 /CONSTRUCTION/REPAIR OF SIDEWALKS
EA
2 7,359.00 / CONSTRUCTION CONTINGENCY
EA
9999
APPROVED BY COUNCIL 11/12/07
BID #07029
1.0000 59,178.00
1.0000 7,359.00
Ag
l'i0IN1 .i
Send Original and One Copy of Invoice to:
CITY OF LA PORTE
ACCOUNTSPAYABLE
604 W FAIRMONT PKWY
LA PORTE, TX 77571
AUTHORIZED SIGNATURE d —
PURCHASE ORDER
CITY OF LA PORTE
604 WEST FAIRMONT PARKWAY
ATTN: ACCOUNTS PAYABLE
LA PORTE, TX 77571
VENDOR PHONE:
(713)947-8448
VENDOR FAX:
(713)947-8444
VENDOR N:
431126
VENDOR ADDRESS:
BROOKS CONCRETE, INC
4018 ALLEN GENOA
PASADENA, TX 77504
Our P.O. # MUST Appear on ALL Invoii
1)v'I,IwIt13Y REQUGSITj
12/28/2007 0000010'
b00
L_
N
/ca R
R
PURCHASE
ORDER NO.
CP8017
DATE: 1/10/2008
SHIP TO: PLANNING
PLANNING
604 W. FAIRMONT PARKWAY
LA PORTE, TX 77571
BY
Multiple Accounts
_.-- .
"pE5CRTPTTON
COST
AccOtllltlProjectl
Amount
01598929275110
IGEN927
1 59,178.00
01598929279110
GEN927
1 7,359.00
Page 2 of 2
PAGE: 1
R B I R T
RECEIPT NO.: 140526
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
P.O. NO.: CP9005
DATE: 11/05/08
VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
10/29/08 BESTWAY DESTINATION
CONFIRM BY CONFIRM.TO REQUIS.I.TIONED BY!
BOB WARD
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
-----------------------------------------------------------------------------
LINE QWX RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
2985.05 EA 260 120 1.0000
PROFESSIONAL SERVICES CONSTRUCTION CONSTRUCTION
Acct # 01598929275120
Acct # 03290905195110
RECEIVED BY: LEE, PEGGY lticEI FED DAT$:11j05/08
City of La Porte
604 W Fairmont Parkway
Le Porte, TX 77571
VOID 80 DAYS AFTER DATE
GENERAL OPERATING ACCOUNT
No. 241211
Amegy Bank
La Porte, TX
35-1125l1130
VENDOR NUMBER
DATE
CHECK NUMBER.
Amount
931126
11/07 2008
291217
$26,865.48
PAY THE SUM TWENTY SIX THOUSAND EIGHT HUNDRED SIXTY FIVE AND 48/100 DOLLARS `
OF
TO BROOKS CONCRETE, INC�
THE 4018 ALLEN GENOA OVAYOR
ORDER PASADENA TX 17504
OF • GER
-al 21,1 2 L 7ua 4 1 i 30 1 L 2 58I: 00000 3 L 208811• .
DATE INVOICE DESCRIPTION - PO AMOUNT
10/31/2008 APPLt 1 08 SIDEWALK FILL IN CP9005 **2B4O71.44
10/31/2008 APPLY 1 08 SIDEWALK FILL IN CP9005 ***1,779.09
City f LPVENDOR NUMBER DATE
ty oLa .431126 1 11/07/2008
804 W Fairmont Parkway
La Porte, TX 77571 CHECK NUMBER Amount
281-471-5020 241217 $26,B65.48
PAGE 1
PAGE:
1
RECEIVING REPORT
RECEIPT NO.: 140493
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
P.O. NO.: CP9005
DATE: 11/05/08
VENDOR NO.-
431126
DELIVER BY SHIP VIA F.O.B.
10/29/08 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
---- 7--------------------------------------------------------------- =--------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 26865.48 EA 260 120 1,0000
PROFESSIONAL SERVICES CONSTRUCTION CONSTRUCTION
Acct # 01598929275120
Acct # 03290905195110
PAGE: 1
RECEIVING REPORT
RECEIPT NO.: 140526
SHIP TO: �.d. NO.: CP9005
PLANNING
DATE: 11/05/08
VENDOR: BROOKS CONCRETE, INC VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
10/29/08 BESTWAY DESTINATION
CONFIRM.BY CONFIRM TO REQUISITIONED BY
BOB WARD
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
-------------------------------------------------
LINE QWY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
---------`-------------------------------------------------------------------
-2985.05 EA .260 120 1.0000
PROFESSIONAL SERVICES CONSTRUCTION CONSTRUCTION
Acct # 01598929275120
Acct # 03290905195110
PROJECT NAME: 2008 City Wide Sidewalk In -fill Project
PROJECT NUMBER: 2008-4503
CONTRACTOR: BROOKS CONCRETE, INC.
DATE:Oct. ' 08
Total
To Date
Mg
Concrete SidewaMPlacement
t
1:
1'
t '
f
rf
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2008 La Porte Sidewalk In -fill Project 2008-4503
TOTAL AMOUNT WORK DONE TO DATE:
$29 850.53
ORIGINAL CONTRACT AMOUNT: $47 545.64
AMOUNT RETAINED 10% :
$2 985.05
NET CHANGE BY CHANGE ORDERS: $3,170.12
PREVIOUS PAYMENTS:
$0
REVISED CONTRACT AMOUNT: $50,715.76
TOTAL DEDUCTIONS:
$2,985.05
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
604 West Fairmont Parkway
$26,865.48
LaPorte, TX 77571
CONTRACTOR:
OCT' OB # 1
BROOKS CONCRETE, INC.
4018 ALLEN GENOA
PASADENA, TX 77504
713-947-8440
CONTRACT DATE: 617/08
WORKING DAYS TO DATE: 15
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true a tr�iaESYx...
contract amount up to and including the last day of the period covered by this estimate and that no part of the " UE C TOR
has been revised. W Conn�on �m
Octoow �ppq
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expends ent employed in'the
performance of said contract have been paid' n full accordance with the contract requirements.
DATE: 1 �f I� BY:�I. �t,� �Y�L• \i.31—� TITLE:
SIGNED and SWORN pefore me, a Notary Public in and for the State of Texas this _ day of ' . ' . ` L .'I,, 20 l
BY: L.'ltl( ., yl.rt-fit .��o/ MY COMMISSION EXPIRES: �C'r�c(C�-'t ri-1{ 4-C�i��
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quailof the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
R.
DUE CONTRACTO11)
coo LA PORTE
BUDGET ADJUSTMENT FORM
City Wide Sidewalk Replacement Project'09
VAMW nundwm only
ACCOUNT PROJECT EXPLANATION AMOUNTOF
NUMBER NUMBER OF TRANSFER INCREASE DECREASE
FROM:
TO:
015-9892-709-1100
GEN 709
construction contract
50,000
015-9892-709-6130
GEN 709
60,000
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
15
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
E
FROM:
TO:
FROM:
TO:
TOTALL
60,000
60,000
I
DEPARTMENTAL APPROVAL:
FINANCE APPROVAI-v
DATE:
REMSED &24198
GacP o_cc��ti
��
t ,
7v1'2 Icf S, /�'!/Zl�e /f ��nJ✓�
�- �
�.
BASE BID PROPOSAL 0 copy
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and
further described in the specifications for the sum of SBA/deJTY - F1 vc _.ASAVJ13
'Iwo -I".-J A•,o SeyeexT( -EyGorr Detc-n as 9o/io0'5
dollars ($ -75, Za_ 79. _). (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions. a/
The bid security attached in sum of N14
dollars ($ ) is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby.
Respectfully submitted
(Signature of Authorized Pers )
not Name of AuthorizedPerson)
(SEAL) PRCSo OGJ-r—
(Title)
Zg01 ��1- Pews en1 AyE•
(Business Address)
(?ASA ba JA T+C -7 7 So3
(City) (Sta ) (Zip Code)
(z8�) "( - '73 3o
(Telephone Number)
FM
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT: $ Z�� Q3�• m
u
ALL OTHER CHARGES: $ 7 g `� =09
?5 TOTAL: $ � 2 7t
This total must agree with the total "Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
LM
BID FORM
2008 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 20084501
DATE: ptnO ZOOS
Bid of(hereinafter called "Bidder") an individual proprietorship, a corporatiop
organized and existing under laws of the State of Texas, a partnership, or individual consisting of
, for Construction of the 2008 La Porte City wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete 4' wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
5 E VO J T>o /-,LAR5
040 lioo5 SF 4,104
Per Square Foot
BP-3
S % oo $ 2� 7Z8 03
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
BASE BID ITEMS 1-4
2. Removal and disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
Two -�e&-" A,S k,i0
� w
501,008S SF 5,900 $ a $ I yll50'
Per Square Foot
Per Each
3 Concrete Type "B" wheelchair ramps. In
accordance with detaiills and complete in place.
@ SG V&'1 HJ,J DP CS
OO
too ,moo 'S EA 45 $ 700 $ 311 500 -
Per Each
4. Adjustment of existing valve boxes. Complete in
place.
@ Obi - Pl. #j ar . 4 Do"AA-S
NO A oa ' S ^—�� EA 3 $ / 00 - $ 300 -
Per Each
00
TOTAL BASE BID (ITEMS 1-4) $ 75 278,
Sr-a"JT1 _ Fi A/c
SUPPLEMENTAL BID ITEMS
T�1wsw,.J9
No too
i—wi, Aomoe- of - So.v�,JT'{ iG tjF4-
S-1. Extra bank sand (ordered by City). Complete in place.
0 Z. o S CY 0 $ 2 2, $
Per Ton
BP-4
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
if#Je. DbrL16AA.S
/JO
SY 0
Per Square Yard
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
@ S tx - (�Jwprc0. '0,�t_Ao,i
No � D i ,5 cY o $ (0oo. $
Per Cubic and
S-4 Adjust Manhole Rims. Complete and in place
NU �r • '� EA 0 $ Zoo , $—
Per each
ME
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
1.
(Add) (Deduct) $
01
(Add) (Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all.of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided, in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
i
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as
correct and final Date 88 L.00 E Signed t
(Company)
By 1 QLS ( p £.+r- —
(Title)
2901 '/i Pa.,.� AJE.
�4sA w . '7-;� 71sn3
(Address)
28t� 191- 7334
(Telephone Number)
u
Witness
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below:
Addendum No. d- L
Date Received
BP-7
CITY OF LAPORTE
PLANNING DEPARTMENT
LETTER OF TRANSMITTAL
604 WEST FAIRMONT PKY.
LAPORTE, TX 77571
PHONE: 281- 471-5020
�.�S�:�i►�?iC�Z1aiY1Z17.7
To:
Date:
Project N
ber: Zm0$- Kol
Attn:
Re:
Routing
We Are Sending Yo :
DShop Drawings
Original Drawings
DPrints
Specifications
❑Reports
Contracts
These are Transmitted:
[]As Requested
❑For Your Use
DFor Your Signature
�aor Review and Comment
DFor Your Approval
oeq
5tz;APA1
/OJ/e/NT
191MIN.Va
Remarks
Distribution:
are not as noted kindly notity us at
✓eri;y
ereVwL'a. in/L
(�ar.k¢ts do yal-)
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
2008 LA PORTE CITY WIDE SIDEWALK
REPLACEMENT PROJECT
CITY OF LA PORTE, TEXAS
HARRIS COUNTY, TEXAS
February 2008
CLP Project No. 2008-4501
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
2008 LA PORTE CITY WIDE SIDEWALK REPLACEMENT PROJECT
FOR
CITY OF LA PORTE, TEXAS
IN
HARRIS COUNTY, TEXAS
TABLE OF CONTENTS
Page No.
Invitationto Bid...................................................................................
A-1
Scopeof Work....................................................................................
A-3
Instruction to Bidders...........................................................................
A-4
Sidewalk Locations..............................................................................
A-8
BaseBid Proposal...............................................................................
BP-1
Statement of Materials and Other Charges ...............................................
BP-2
BidForm...............................................................................................................
BP-3
CertificationBy Bidder..........................................................................................
BP-8
CONDITIONS OF THE CONTRACT
Standard Form of Agreement.............................................................................. SF-1
Performance Bond............................................................................... PP-1
PaymentBond.................................................................................... PP-3
General Conditions of the Contract......................................................................00700-1
SpecialConditions............................................................................................... SC-1
Supplementary Condition to the Agreement .............................................. SC-7
CONSTRUCTION SPECIFICATIONS
,42/�
Submittals....:..................:....................................................................................01300-1
Shop Drawings, Products Data and Samples.....................................................01340-1
Testing Laboratory Services................................................................................
01410-1
Field Project Representatives Services..............................................................
01420-1
Temporary Facilities and Controls.......................................................................
01500-1
Cleaning and Adjusting........................................................................................01710-1
Project Record Documents.................................................................................
01720-1
aGo w� Se2
C//-, C-k
TECHNICAL SPECIFICATIONS
Removing Old Concrete........................................................................00104-1
Concrete Sidewalk Replacement............................................................00105-1
Adjustment of Meter Boxes, Valve Boxes, and Manhole Rings and Covers ......
00108-1
Dole- ....................................................
BankSand........................................:...........................................'.....00111-1
Sodding.............................................................................................00112-1
Concrete Pavement.............................................................................00360-1
11
SCOPE OF WORK
CLP Project No. 2008-4501
2008 L'a Porte City Wide Sidewalk Replacement Project
Project consists of the removal of approximately 5,900 square feet of standard four foot
wide sidewalks and replacing with approximately 4,100 square feet of new sidewalk
including the construction of 45 wheelchair ramps. Sidewalks and wheelchair ramps
shall meet the minimum criteria as established by the American Disabilities Act. Included
in the project is the vertical adjustment of 3 water valve boxes. Removed concrete shall
become the property of the contractor to be removed from the site, and disposed of in a
legal manner. It shall be the contractors responsibility to provide all necessary
barricading to ensure the health and welfare of both citizens; employees and the
product.
Performance and Payment Bonds shall be required for these projects.
S
L�rar�Or
A-3
BID FORM
2008 La Porte City Wide Sidewalk Replacement Project
CLIP Project No. 2008-4501
Bid of
organized and existing under laws
DATE:
_ (hereinafter called "Bidder") an individual proprietorship, a corporation
of the State of Texas, a partnership, or individual consisting of
for Construction of the 2008 La Porte City wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal,. the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed the and according,to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete 4' wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
Per Square Foot
FEW
SF 4,104 $ $
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
BASE BID ITEMS 1.4
2. Removal and disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
Per Square Foot
Per Each
3 Concrete Type "B" wheelchair ramps. In
accordance with details and complete in place.
Per Each
4. Adjustment of existing valve boxes. Complete in
place.
Per Each
TOTAL BASE BID (ITEMS 1-4)
$
SF 5,900
EA 45
EA 3
SUPPLEMENTAL BID ITEMS
S-1. Extra bank sand (ordered by City). Complete in place.
Per Ton
BP-4
CY 0 $ $
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
Per Square Yard
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
Per Cubic Yard
S-4 Adjust Manhole Rims. Complete and in place
Per each
fIM
SY 0 $ $
CY 0 $ $
EA 0 $ $
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
1.
(Add) (Deduct) $
(Add) (Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-6 of the -Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter. into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids
9
,1
,
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as t
correct and final Date
Witness
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below:
Addendum No.
Date Received
Signed
(Company)
By
(Title)
(Address)
(Telephone Number)
��
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
Business Name:
Address:
Authorized Signature:
Printed Name:
r-9m;
STANDARD FORM OF AGREEMENT
CLP Project No. 2008-4501
THIS AGREEMENT, made this _ day of , by and
between the CITY OF LA PORTE, hereinafter called "Owner", acting herein
through its CITY MANAGER and (Name of
Contracting Firm)
Strike out inapplicable terms: (a corporation) (a partnership) or (an individual)
doing business as: hereinafter
called "Contractor."
WITNESSETH: That for and in consideration of the payments and
agreements hereinafter mentioned, to be made and performed by the OWNER,
the CONTRACTOR hereby agrees with the OWNER to commence and
complete the construction described as follows:
2008 LA PORTE CITY WIDE SIDEWALK REPLACEMENT PROJECT
CLP PROJECT NO. 2008-4501
hereinafter called the project, for the Total Price of
($ ) and all extra work in connection therewith, under the terms
as stated in the General and Supplementary Conditions of the Contract; and;
Further, that the CONTRACTOR agrees, at his (its or their) own proper
cost and expense, to furnish all the knowledge, materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and other accessories and
services necessary to complete the said project in accordance with:
A. The terms and conditions stated in the Proposal and in the General
Conditions, and Supplementary Conditions of this Contract; Scope of Work
B. The plans, which include all maps, plats, blue prints, and other
drawings and printed or written explanatory matter thereof; and
C. The Specifications and other contract documents therefore, as
prepared by the City of La Porte, all of which are made a part hereof and
collectively evidence and constitute the contract.
SF-1
ou�G/�o�o,vY�t9 1'PruyS V
A
`/a , QW° "r�p4 o r otilc
(D 4illYlry t our b6idaarj
"S;iZU/dk /ocaJ,�gvl
ctwGo.uALAdj _
he:i 6J
A/ra aa`G4 �, h' �e�
The CONTRACT hereby agrees to commence woi.. _.ider this contract on or
before a date to be specified in a written "Notice to Proceed" of the Owner and to
fully complete the project within 90 calendar days thereafter.
The CONTRACTOR further agrees to pay, as liquidated damages, the
sum of $500 or each consecutive calendar day thereafter as hereinafter provided
in Paragraph SC-6 of the Supplementary Conditions.
IN WITNESS WHEREOF, the parties to these present'have executed this
-7
contract, each of which shall be deemed an original, in the year and day first
above mentioned.
City of La Porte
SG _ Name of Owner
SEAL'
Attest:
r
By: By:
Ron Bottoms Martha Gillett
City Manager Title: City Secretary
SEAL
Name of Contracting Firm
By:
Signature of Authorized Person
Title of Authorized Person Witness
Address and Zip Code
SF-2
SUPPLEMENTARY CONDITIONS OF THE AGREEMENT
SC-1 PRECEDENCE: These supplementary conditions of the Agreement are a supplement and
where in conflict, they take precedence over the "Standard General Conditions of the
Construction Contract" of this Specification.
SC-2 OWNERIENGINEER: The word "OWNER" in these Specifications shall be understood as
referring to the City of La Porte, Texas. The word "ENGINEER" in these Specifications shall be
understood as referring to the City Engineer for the City of La Porte, Texas.
SC-3 SCOPE OF WORK: The work to be performed under this contract consists of furnishing all
materials, labor, supervision, tools, and equipment necessary to complete the work.
SC-4 TIME OF COMPLETION: The CONTRACTOR shall complete the work as provided in the
Contract Documents and within the time limitations described in the bid proposal, Sequence of
Work, unless otherwise stipulated to proceed. Calendar days shall be computed beginning and
inclusive of the first day of the Notice to Proceed. CONTRACTORS shall notify OWNER in writing
48 hours prior to start of construction. The time of completion shall include delivery time of all
equipment and materials required to complete the work in conformance with the Drawings and
Specifications.
SC-5 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed between the parties
hereto that time is of the essence of this Contract, and that for each calendar day of delay beyond
the completion date (after due allowance for such extension of time as provided herein) the
CONTRACTOR shall pay the OWNER as liquidated damages the sum of five hundred dollars
($500.00), it being understood between the parties hereto that such sum shall be treated not as a
penalty, but as liquidated damages for loss of revenue to the OWNER.
SC-5 GUARANTEE: The CONTRACTOR shall furnish the OWNER with a written guarantee on
all workmanship and materials provided by him for the project. The written guarantee shall be
made out to the OWNER and in a form satisfactory to the OWNER, guaranteeing all of the work
under the Contract to be free from faulty materials in every particular, and free from faulty
workmanship, and against injury from proper and usual wear; and agreeing to replace or to re -
execute without cost to the OWNER such work as may be found to be imperfect or improper, and
to make good all damage caused to other required replacement or re -execution. The guarantee
shall be made to cover a period of one year from the date of Certificate of Substantial Completion
under this Contract. This guarantee must be furnished to the OWNER for approval, prior to
acceptance and final payment. Neither the final certificate nor payment nor any provision in the
Contract Documents shall relieve the CONTRACTOR of the responsibility for neglect or faulty
materials or workmanship during the period covered by the guarantee.
SC-7 MATERIALS AND WORKMANSHIP: No material which has been used by the
CONTRACTOR for any temporary purpose whatever is to be incorporated in the permanent
structure without written consent by the OWNER.
SC-8 SANITARY FACILITIES: The CONTRACTOR shall maintain sanitary facilities at alocation
satisfactory to the OWNER, for use by the employees of the CONTRACTORS. They shall be well
ventilated, but provide proper concealment, and shall be kept scrupulously clean at all times by
the CONTRACTOR. The facilities shall be removed and the site restored to its original condition
upon the completion of the work. All such facilities shall conform to the requirements of the state
and local health authorities, ordinance and law.
SC-6
SC-9 INCONVENIENCES TO THE PUBLIC: It is the declared and acknowledged intent of these
specifications that all work such as backfilling of excavations, removing forms; repairs to roads
and drives, and clean-up or other such operations shall follow as closely as practical to the laying
or installing operations, in such a manner that the public is not unnecessarily inconvenienced nor
a hazard to public safety created. Any specific limitation in the technical specifications referring to
the control of the "follow-up" operations, such as the minimum distance of unfilled trench allowed
behind the excavating operations, shall be strictly enforced. The OWNER or OWNER'S
representative will notify the CONTRACTOR if his forces and/or equipment are insufficient to
such a degree that, the public is unnecessarily inconvenienced and/or a hazard to the public
safety is created. The CONTRACTOR, upon notification by the OWNER or OWNER'S
representative shall make necessary changes to his forces and/or equipment.
SC-10 PERMITS: Permits and licenses of a temporary nature necessary for the prosecution of
the work shall be secured and paid for by the CONTRACTOR. Easement, right-of-way and
instruments of a permanent nature shall be secured and paid for by the OWNER. CONTRACTOR
shall obtain all required permits from the City of La Porte -and any other affected agency.
SC-11 CLEAN-UP: The CONTRACTOR shall at all times keep the site and structures or facilities
thereon free from accumulations of waste material, debris or rubbish caused by his employees or
work; at the completion of the work he shall remove from the site all his tools, surplus materials,
debris, and shall leave the site and his work "broom clean" or the equivalent, unless otherwise
noted on the drawings or specified by the OWNER. If directed, the CONTRACTOR shall
promptly clean up the site to the satisfaction of the OWNER at no additional cost to the OWNER.
SC-12 OPERATIONS AND BUSINESS OF THE OWNER: It is of great importance that the
OWNER'S operations meet with a minimum of interference resulting from the work requiring by
these Contract Documents. The CONTRACTOR shall, therefore, conduct his work in such a
manner as to permit these continued operations and so as not to interfere with the business of
the OWNER. The CONTRACTOR shall use the route of entry designated by the ENGINEER at
the pre -construction meeting and restrict all his vehicle and personnel to this route and to the site.
The blocking or hindering of traffic will not be permitted.
SC-13 SEPARATE CONTRACTS: The OWNER reserves the right to let other contracts in
connection with this work. The CONTRACTOR shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their work and
where required, shall properly connect and coordinate his work with theirs.
SC-14 RIGHTS OF VARIOUS INTERESTS: Wherever work being done by the OWNER'S forces
or by other contractors contiguous to work covered by this contractor, the respective rights or the
various interests involved shall be established by the OWNER or his resident inspector, to secure
the completion of the various portions of the work in general harmony. CONTRACTOR shall issue
work schedules in conflicting areas as requested by the OWNER or his resident inspector.
SC-15 STORAGE OF MATERIALS AND EQUIPMENT: Any material which has deteriorated,
become damaged or otherwise unfit for use, shall not be used in the work. Any material or
equipment must be stored at a location directed by the ENGINEER at the pre -construction
meeting. Upon completion of all work, or when directed by the OWNER, the CONTRACTOR shall
remove such storage facilities or equipment form the site.
SC-16 PUBLIC UTILITY OBSTRUCTIONS: Pipe lines and other existing underground structures
in.the vicinity of the work are shown on the drawings according to the best information available
to the OWNER. -The OWNER does not guarantee the accuracy of this information. The
CONTRACTOR shall make every effort to locate all underground utilities by prospecting in
advance of trench excavation. The cost of repair of existing utilities damaged by the
CONTRACTOR shall be borne by the CONTRACTOR, and shall be scheduled so as to cause the
least possible inconvenience to the public.
SC-7
Any delay or extra cost to the CONTRACTOR caused by pipe lines or other underground
structures or obstructions not shown on the plans or found in different locations than those
indicated, shall not constitute a claim for extra work, additional payments, or damages.
SC-17 SUBLETTING THE WORK: The CONTRACTOR shall perform with his,own organization
and with the assistance of workmen under his immediate supervision, work not less than fifty
percent (50%) of the value of all work embraced in the Contract exclusive of items not commonly
found in contracts for similar work or which requires highly specialized knowledge, craftsmanship
and/or equipment not ordinarily available in the organizations of the contractor's performing work
of the character embraced . in the Contract. No portion of the work covered by these
specifications and materials, shall be sublet without written permission from the OWNER. If the
CONTRACTOR sublets any part of the work to be done under this Contract, he will not under any
circumstances be relieved of his responsibility and obligations. All transactions of the OWNER will
be with the CONTRACTOR. Subcontractors will be considered only in the capacity of employees
and/or workers and shall be subject to the same requirements as to character, competency,
wages and hours. The OWNER will not recognize any subcontractor on the work. The
CONTRACTOR shall at all times, when the work is in operation, be represented either in person
or by a qualified superintendent or other designated representative. A complete list of
subcontractors must be submitted within ten (10) days, after start-up.
SC-18 PROTECTION OF EXISTING FACILITIES: The CONTRACTOR shall use construction
equipment, labor, or techniques to insure that existing facilities such as but not limited to, existing
utilities are not damaged. A careful pre -construction inspection of existing facilities will be made
with the OWNER and the CONTRACTOR.
SC-19 PROTECTION OF TREES AND SHRUBS: Any trees, shrubs, plants, or ornamental
growth within the right-of-way, not directly interfering with the construction of the road bed,
sidewalks, driveways or sewer shall be protected from damage by the CONTRACTOR. Any tree,
shrub, plant or ornamental growth that interferes with the construction of the roadway, sewers,
sidewalks or driveways shall be relocated to a location satisfactory to the adjoining property
owner outside of the street right-of-way. Large trees not conducive to moving .shall be removed
and disposed.
SC-20 PROJECT SCHEDULING: CONTRACTOR shall coordinate all work with OWNER.
SC-21 WATER FOR CONSTRUCTION AND TESTING: CONTRACTOR may obtain water for
construction and testing from the City of La Porte. A construction meter will be provided at no
cost to the CONTRACTOR for the duration of construction. The CONTRACTOR shall be
required to pay for the water he uses.
SC-22 OPERATION OF EXISTING FACILITIES: The City of La Porte shall operate all existing
facilities (i.e., lift stations, valves, fire hydrants) during construction.
SC-23 OWNER'S PROPERTY INSURANCE: Owner shall not be required to provide any
additional property insurance coverage under this contract.
SC-24 REQUIRED CONTRACTOR INSURANCE: CONTRACTOR shall obtain insurance as
detailed. Each policy obtained by the CONTRACTOR for work with this contract, with exception of
the Worker's Compensation policy, shall name the OWNER and the ENGINEER as an additional
insured. The coverage and amounts designated are minimum requirements and do not establish
limits of the contractor's liability. Additional coverage may be provided at the CONTRACTOR'S
option and expense.. Insurance must include:
General Liability:
Commercial General Liability
SC-8
General Aggregate
Personal Injury
Each Occurrence
Automobile Liability:
Combined Single Limit
Excess Liability:
Umbrella Each Occurrence
Each Aggregate
Worker's Compensation:
A. Definitions:
$1, 000, 000.60
$1, 000, 000.00
$1, 000, 000.00
$1,000, 000.00
$1.000,000.00
$1, 000, 000.00
Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of
authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-
82, TWCC-83 or TWCC-84), showing statutory workers' compensation insurance coverage for
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the project
until the contractor's work on the project has been completed and accepted by the OWNER.
Persons providing services on the project - includes all persons or entities performing all
or part of the services the contractor has undertaken to perform on the project, regardless of
whether that person has employees. This includes,, without limitation, independent contractors,
subcontractors, leasing companies, motor carriers, owner -operators, employees of any such
entity, or employees of any entity which furnishes persons to provide services on the project.
"Services" include, without limitation, providing, hauling, or delivering equipment or materials, or
providing labor, transportation, or other services related to the project. "Services", does not
include activities unrelated to the project, such as food/beverage vendors, office supply deliveries,
and delivery of portable toilets.
B. The CONTRACTOR shall provide coverage, based on proper reporting of
classification codes and payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the
contractor providing services on the project, for the duration of the project.
C. The CONTRACTOR must provide a certificate of coverage to the OWNER prior to
being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must, prior to the end of the coverage period, file
a new certificate of coverage with the OWNER showing that coverage has been extended.
E. The CONTRACTOR shall obtain from each person providing services on the project,
and provide the OWNER:
. (1) a certificate of coverage, prior to that person beginning work on the project,
so the OWNER will have on file certificates of coverage showing coverage for all persons
providing services on the project; and
(2) no later than seven (7) days after receipt by the contractor, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the current
certificate of coverage ends during the duration of the project.
SC-9
F. The CONTRACTOR shall retain all required certificates of coverage for the duration of
the Project and for one (1) year thereafter.
G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal
delivery, within ten (10) days after the contractor knew or should have known, of any change that
materially affects the provisions of coverage of any persons providing services on the project.
H. The CONTRACTOR shall post on each project site a notice, in the text, form and
manner prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the Project that they are required to be covered, and stating how a person
may verify coverage and report lack of coverage.
I. The CONTRACTOR shall contractually require each person with whom it contracts to
provide services on the Project, to:
(1) provide coverage, based on proper reporting of classification codes and
payroll amount and filing of any coverage agreements, which meets the statutory requirements of
Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project,
for the duration of the Project;
(2) provide to the CONTRACTOR, prior to that person beginning work on the
Project, a certificate of coverage showing that coverage is being provided for all employees of the
person providing services on the Project, for the duration of the Project;
(3) provide the CONTRACTOR, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage period shown on the
current certificate ends during the duration of the Project;
(4) ,obtain from each other person with whom it contracts, and provide the
CONTRACTOR:
(a) a certificate of coverage, prior to the other person beginning work on
the project; and
(b) a new certificate of coverage showing extension of coverage, prior to
the end of the coverage period, if the coverage period shown on the current certificate ends
during the duration of the Project.
(5) retain all required certificates of coverage on file for the duration of the Project
and for one (1) year thereafter;
(6) notify the OWNER in writing by certified mail or personal delivery, within ten
(10) days after the person knew or should have known, of any change that materially affects the
provisions of coverage of any person providing services on the Project; and
(7) :contractually require each person with whom it contracts, to perform as
required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for
whom they are providing service.
J. By signing this contract, the CONTRACTOR is representing to the OWNER that all
employees of the CONTRACTOR who will provide services on the Project will be covered by
workers' compensation coverage for the duration of the Project, that the coverage will be based
on proper reporting of classification codes and payroll amounts and that all coverage agreements
will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the
Commission's Division of Self -Insurance Regulations. Providing false or misleading information
SC-10
may subject the CONTRACTOR to administrative penalties, criminal penalties, or other civil
action.
K. The CONTRACTOR'S failure to comply with any of these provisions is a breach of
contract by the CONTRACTOR which entitles the OWNER to declare the Contract void if the
CONTRACTOR does not remedy the breach within ten (10) days after receipt of notice of breach
from the City.
The CONTRACTOR shall be responsible for insurance to cover equipment, tools, materials,
supplies, etc. used in the performance of work, owned or rented, the capital value of which is not
included in the cost of this Contract.
Insurance policies are to be written by companies authorized to do business under the laws of the
State of Texas and on forms approved by the Insurance Commission of the State of Texas. The
CONTRACTOR shall provide the OWNER a copy of all insurance policies.
All of the insurance required to be carried by the CONTRACTOR shall be by policies which. shall
require on their face, or by endorsement, ten (10) days written notice to the OWNER before they
may be cancelled and within which ten day period the CONTRACTOR covenants that it will
provide other suitable policies in lieu of those about to be cancelled so as to maintain in effect the
coverage required under the provisions hereof. Failure or refusal of the CONTRACTOR to obtain
and keep in force the above required insurance coverage shall authorize the OWNER; at its
option, to terminate this contract at once.
The CONTRACTOR shall indemnity and save harmless the OWNER, its officers, employees, and
agents from all claims and liability due to the activities of itself, its agents, or employees
performed under this contract and which result from an error, omission, or negligent act of the
CONTRACTOR or of any person employed by the CONTRACTOR. The CONTRACTOR shall
indemnify and save harmless the OWNER from any and all expenses, including attorney fees,
which might be incurred by the OWNER in litigation or otherwise resisting said claims or liabilities
which might be imposed on the OWNER as a result of such activities by the CONTRACTOR, his "
agents, or employees.
SC-25 QUALIFICATIONS FOR SURETIES ISSUING BONDS: As required by City of La Porte
Ordinance No. 1773, approved July 22, 1991; corporate sureties issuing payment and
performance bonds payable to the City of La Porte on public works projects shall meet all of the
following criteria:
a. The surety company must be authorized to do business in the State of Texas, which
authorization must be recorded in the files of the Texas State Board of Insurance;
b. The surety company must be an approved surety company listed in the current United
States Department of Treasury list of approved corporate sureties for payment and
performance bonds for federal jobs, including specifically the rules to underwriting
limitation;
C. The surety company must be authorized to issue payment and performance bonds in the
amount required for the Contract, which authorization must be recorded in the files of the
Texas State Board of Insurance;
d. The person executing the Payment and Performance Bonds must be a licensed Texas
local recording agent and such licensing must be recorded 'in the files of the Texas State
Board of Insurance; and
e. The person executing the Payment and Performance Bonds must be authorized by the
surety company to execute performance and payment bonds on behalf of the company in
SC-11
the amount required for the Contract and such authorization must be recorded in the files
of the State Board of Insurance.
Failure to meet the criteria for acceptability of surety company issuing Payment and
Performance Bonds will result in the disqualification of the bid.
The Payment and Performance Bonds shall remain in effect at least one year beyond
final acceptance of work under the Contract by the Owner.
SC-26 RETAINAGE: If the total Contract price is greater than $400,000.00, five percent (5%) of
the total contract price will be retained until final payment as described below. If the total Contract
price is less than $400,000.00, ten percent (10%) of the total contract price will be retained until
final payment as described below. On or before the tenth (10th) day of the month, the
CONTRACTOR shall 'prepare and submit to the ENGINEER for approval or modification a
statement showing as completely as practicable the total. value of the work done by the
CONTRACTOR up to and including the last day of the preceding month; said statement shall also
include the value of all sound materials delivered on the site of the work that are to be fabricated
into the work.
For total Contract prices (Base Bid) greater than $400,000.00, the OWNER shall then pay the
CONTRACTOR on or before the fifteenth (15th) day of the following month of the following month
the amount of the approved statement, less five percent (5%) of the amount thereof, which shall
be retained until final payment, and further less all previous payments and all further sums that be
retained by the OWNER under the terms of the Agreement.
For total Contract prices (Base Bid) less than $400,000.00, the OWNER shall then pay the
CONTRACTOR on or before the fifteenth (15th) day of the following month of the following month
the amount of the approved statement, less ten percent (10%) of the amount thereof, which shall
be retained until final payment, and further less all previous payments and all further sums that be
retained by the OWNER under the terms of the Agreement.
It is understood, however, that in case the whole work be near to completion and some
unexpected and unusual delay occurs due to no fault of the CONTRACTOR, the OWNER may,
upon written recommendation of the ENGINEER, pay a reasonable and equitable portion of the
retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER'S option, may
be relieved of the obligation to fully complete the work and, thereupon, the CONTRACTOR shall
receive payment of the balance due him under the Contract subject to those conditions under the
General Conditions, Article 14, Payments to CONTRACTOR and completion.
SC-27 PREVAILING WAGES: The CONTRACTOR and his subcontractors shall expressly
comply with Article 5159A, Revised Civil Statutes of Texas, 1925, commonly known as, "The
Prevailing Wage Act' including the latest provisions. Not less than the minimum prevailing wage
for the Harris County area as attached at the end of the special conditions shall be paid for labor
which is employed by'the CONTRACTOR and his subcontractors for execution of this contract.
The CONTRACTOR and his subcontractors shall keep accurate records of the names, wage
classifications, and hourly wages paid to each worker employed on this project. These records
shall be open to inspection by the OWNER.
SC-28 CONTRACT INTERPRETATION AND WORK ACCEPTABILITY: The Engineer will be
the final interpreter of the requirements of the contract documents and sole judge of the
acceptability of work thereunder.
SC-29 DISPUTE RESOLUTION, METHODS AND PROCEDURES: ENGINEER will be the
initial interpreter of the requirements of the Contract Documents and judge of the acceptability of
the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work
or the interpretation of the requirements of the Contract Documents pertaining to the performance
SC-12
and furnishing of the Work in respect of changes in the Contract Price or Contract Times will be
referred initially to ENGINEER in writing with a request for a formal decision in accordance with
this paragraph. Written notice of each such claim, dispute or other matter will be delivered by the
claimant to ENGINEER and the other party to the Agreement promptly (but in no event later than
30 days) after the start of the occurrence or event giving rise thereto, and written supporting data
will be submitted to ENGINEER and the other parry within 45 days after the start of such
occurrence or event unless ENGINEER allows an additional period of time for the submission of
additional or more accurate data in support of such claim, dispute or other matter. The opposing
party shall submit any response to ENGINEER and the claimant within 30 days after receipt of
the claimant's last submittal (unless ENGINEER allows additional time). ENGINEER will render a
formal decision in writing within 30 days after receipt of the opposing party's submittal, if any, in
accordance with this .paragraph. The Engineer's rendering of a formal decision shall be a
condition precedent to further dispute resolution actions.
Mediation:
Any Claim arising out of or related to the Contract may, by mutual agreement between the
parties, and after initial decision by the ENGINEER, be subject to mediation.
By mutual agreement, the parties may endeavor to resolve their Claims by mediation which,
unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry
Mediation Rules of the American Mediation Association currently in effect. Request for mediation
shall be filed in writing with the other party to the Contract and with the American Mediation
Association.
The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held
in the place where the Project.is located, unless another location is mutually agreed upon.
Agreements reached in mediation shall be enforceable as settlement agreements in any cou 4V-94t
havi /Qar f r�` „4racf
Arbitration: (Q1e� /� uQ Gi/ W4ur l�tl�l3' -S
Aff p< IcT �rr����tor elar,w /x �lht6�e ��
Limitation on Consolidation or Joinder. a cation arising out of or relating to the
Contract shall include, by consolidation or joinder or in any other manner, the ENGINEER, the
ENGINEER'S employees or consultants, except by written consent containing specific reference
to the Agreement and signed by the ENGINEER, OWNER, CONTRACTOR or any other person
or entity sought to be joined. No mediation shall include, by consolidation or joinder or any other
manner, parties other than the OWNER, CONTRACTOR, and other persons substantially
involved in a common question of fact or law whose presence is required if complete relief is to
be accorded in mediation. No person or entity other than the OWNER, CONTRACTOR shall be
included as an original third party or additional third parry to an mediation whose interest or
responsibility is insubstantial. Consent to mediation involving an additional person or entity shall
not constitute consent to mediation of a Claim not described therein or with a person or entity not
described therein. The foregoing agreement to wand other agreements tlobe sp�rie with
an additional person or entity duly consented to by p ies to the Agreement shall be sp ifically
enforceable under applicable law in any court having t isdiction thereof.
Claims and Timely Assertion of Claims. The party filing a notice of demand for mediation
must assert in the demand all Claims then known to that party on which mediation is permitted to
be demanded.
J7 JS
�ELf
on Final Awa The rd rendere the ar ' r or arb' s shall
anVfFkv b enter nit in ante appliCa w in a i
SC-13
SC-30 DRUG AND ALCOHOL POLICY: The CONTRACTOR shall have in place a drug and
alcohol policy that shall govern the actions of his employees and any workers in his employ
undertaking the awarded contract work on the OWNER'S property. The OWNER expects the
CONTRACTOR to enforce his own drug an alcohol policy. Lack of a drug and alcohol policy
governing the actions and/or behavior of the CONTRACTOR'S personnel or failure to on the part
of the CONTRACTOR to enforce said drug and alcohol policy shall be grounds for non -award or
constitute breach of this contract.
SC-14
R 8 C R I V I N G R E
RECEIPT NO.: 136573
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
PAGE: 1
'R T
COPY
P.O. NO:: CP8068
DATE: 6/09/08
VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
5/0.5/08 BEST WAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
JEANA MASTERSON
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
-----------------------------------------------------------------------------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT,COST
-----------------------------------------------------------------------------
1 13112.32 EA 050 030 1.0000
BUILDINGS CONSTRUCTION CONSTRUCTION
ACCt # 01598927095110
�l
RECEIVED BY: LEE, EGGY
RECEIVED DATE: 6/09/08
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2008 La Porte Sidewalk Improvement Project
TOTAL AMOUNT WORK DONE TO DATE:
$14 569.24
ORIGINAL CONTRACT AMOUNT:
$47,813.40
AMOUNT RETAINED 10% :
$1 456.92
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
0
REVISED CONTRACT AMOUNT:
TOTAL PREVIOUS DEDUCTIONS:
$1 456.92
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$13,112.32
604 West Fairmont Parkway
La Porte TX 77571
CONTRACTOR:
Brooks Concrete Inc.
PAYMENT #1
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 4/24/08 90 working days
WORKING DAYS TO DATE: 10
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantifies and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been pal in full accordance with the contract requ,.,. irements.
DATE:_ BY: ` z, TITLE:
SIGNED and SWORN befor me, a Notary- iT�wdSe e{his 4 `� day of �U�F 2008
i """"" EVETTE HALL r�Lf`it,
,.:,,F.,:.,, 0 i - O
gy,� ^l;a;e Notary Public, State or l MMISSION EXPIRES: 8
Me Commission Expir�1
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of the Work iordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONTRACTOR. .�
BY: I Aa& � DATE: G Y
PROJECT NAME: 2008 LA PORTE SIDEWALK IMPROVEMENT PROJECT
PROJECT NUMBER: 2008-4501
CONTRACTOR: TEAMWORK CONSTRUCTION SERVICES
nnTr=• neat' gnna
Quantity
Dollars
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Description of Work
Est.
Qtv.
Unit
Unit
Price
Estimated
Value
1.0
Concrete sidewalk placement
4104.0
SF
$ 4.60
$ 18,878.40
1918.4
0.0
1918.4
$ 8,824.64
$ 8,824.64
2.0
Sidewalk removal
5900.0
SF
$ 1.20
$ 7,080.00
1958.0
0.0
1958.0
$ 2,349.601
$ 2,349.60
3.0
Type B wheelchair rams
45
EA
$ 485.00
$ 21.825.00
7
0
7
$ 3.395.00
$ 3,395.00
4.0
Gate valve adjustments
3
EA
$ 10.00
$ 30.00
5.0
Manhole adjustments
1
EA
$ 50.00
$ 50.00
S-1
Extra Bank Sand
25
CY
$ 15.00
$ 375.00
0
0
0
$ -
$ -
$
S-2
Strip Sodding
50
SY
$ 2.70
$ 135.00
0
0
0
$ -
$ -
$ '
S-3
Cement Stabilized Sand
50
CY
$ 29.00
$ 1,450.00
0
0
0
$ -
$
$ -
$ 47,813.40
$ 14,569.24
$
$ 14.569.24
Records
Dept. Submitting Records:
Date Records Submitted:
Type of Records/Documents:
Records/Project Description:
State Schedule & Category Titles:
State Category Number:
State Destruction Date:
Dept. Assigned Destruction Date:
Project/City Location:
Dept. Project/Number:
Company/Developer
Misc. Information:
City of La Porte
Vault Transmittal Form
CIiV�
ote: As much information as possible of the above will be included on the Records
Folder Label. Records/Project Description is very vital in locating your
documents.
Department Director's Approval Required fM-
000000000000000000000000000000000000000000
City Secretary's Office Use Only
Date Records Transmitted to Vault:
Records Manager Signature: _
Note: A completed copy of this form
be returned to the originating department.
Created on June 10, 1998
SAC WShare\-Forms, Policies & ManualslCSo\Fo=\Rmords\R=rds Vault Transmittal Form.doc
H
CITY OF LA PORTE
BUDGET ADJUSTMENT FORK
City Wide Sidewalk Replacement Project '08
wholi num0ers only
ACCOUNT PROJECT EXPLANATION AMOUNT OF
NUMBER NUMBER OF TRANSFER INCREASE DECREASE
FROM:
TO:
016-9892.709-1100
GEN 709
construction contract
4: =, „'"Z
47,814
016-9892.7095110
GEN 709
47,814
7
FROM:
TO:
015-9892-709-1100
GEN 709
construction contigency
2,167
015-9892-709-9110
GEN 709
2,167
FROM:
TO:
FROM:
t'i?
FROM:
TO:
FROM::
TO:
FROM:
TO:
L V =4-15
FROM:
TO:
FROM:
TO:
IM."..,"
FROM:
M..
FROM:
TO:
FROM:
TO:
KM
FROM:
Mir
:.. .
FROM:
TO'r
FROM:
TO:
..
TOTALI
49,981
49,981
DEPARTMENTAL APPROVAL:
FINANCE APPROVAL: o
DATE:
REVISED W4418
J�
RBOUISITION BY: "S. PG
SHIP 9O LOCATION: PLANNING
LINE
NOR DSSCRIPTICN
-------------------------------
1 CWSTRULTION
COlB903ITY: BUILDINGS
SUBCOMED: CONSTRUCTION
2 CMYIIMENCY
Ctl ITY: SUIMINO.9
BUBC09NOD: CONSTRUCTION
PURCHASE REQUISITION WEIR: 0000011026
STAYUS: MID 15 ACCWlI'S
REASON: CITY KIDS SIDBNALE REPLACEMENT PROTECT '08
SULOES'IBl VEEOR: 431126 HRCOES CONCRETE, INC
OMIT EXTEND
QUANTITY UON COST COST
41814.00 EA 1.0000 67814.00
2267.00 RA 1.0000 2167.00
RROUISITION 207AL: 49981.00
MIR: 5/01/08
DBLIVER BY MTS: 5/05/08
VENDOR PART NUMBER
-------------------------
A C C O U
N T I N P O R N A T I O N
LINE P
ACCOUNT
PROJiCT .6
AMOUNT
1
0IS98927095110
CONSTRUCTION COSTS
GM09 100.00
41914.00
COti9TRUCPION NNI4ACI 91
SIDSNALE REPAIRS
2
01590927099110
HISCHLLANHOIIS
GEM09 100.00
2167.00
CONTINGENCY. CONST.
SIDENALE REPAIRS
99991.D0
RHOUTSITIM IS
1N THE CURREPT FISCAL
PAGE: 1
'R E C E I V I N G R E R T
RECEIPT NO.: 137417
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
P.O. NO.: CP8068
DATE: 7/08/08
VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
5/05/08 BEST WAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
JEANA MASTERSON
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
--------------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO,. AND DESCRIPTION UNIT COST
--------------------------------------------- -------------------------------
1 31650.30 EA 050 030 1.0000
BUILDINGS CONSTRUCTION CONSTRUCTION
Acct # 01598927095110
e
RECEIVED BY: LEE, PEG RECEIVED DATE: 7/08/08
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2008 La Porte Sidewalk Improvement Project
TOTAL AMOUNT WORK DONE TO DATE:
$49 736.24
ORIGINAL CONTRACT AMOUNT:
$47,813.40
AMOUNT RETAINED 10% :
$4,973.62
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
$13,112.32
REVISED CONTRACT AMOUNT:
TOTAL DEDUCTIONS:
$18,085.94
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$31,650.30
604 West Fairmont Parkway
LaPorte; TX 77571
CONTRACTOR:
Brooks Concrete Inc.
PAYMENT #2
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 4/24/08 90 working days
WORKING DAYS TO DATE: 40
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised:
I further certify that all just and lawful bills
performance of said contract have been r
3t the above named Contractor, for labor, material and expendable equipment employed in the
full accordance with the contract requirements.
SIGNED and AVORN beforepe, a Notary Public in and for the
BY:
ENGINEER'S CERTIFICATION FOR PAYMENT VZ
In accordance with the contract documents, based on on -site observaflGt,
the Owner that the quality of t6(e Work is in accordance with the Contract
DUE CONTRACTOR. /
TITLE: �Q
day of p20 ()V
v EXPIRES: t-1 )
ta comprising the above application, the Engineer certifies to
and the Contractor is entitled to payment of the AMOUNT
DATE: -71116 fK
PROJECT NAME: 2008 LA PORTE SIDEWALK IMPROVEMENT PROJECT
PROJECT NUMBER: 2008-4501
CONTRACTOR: Brooks Concrete
DATE: June, 2008
Quantity
Dollars
Installed
This
Period
T Installed
Previous
Periods.
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Description of Work
Est.
Qty.
Unit
Unit
Price
Estimated
Value
1.0
Concrete sidewalk placement
4104.0
SF
$ 4.60
$ 18,878.40
5270.0
1918.4
7188.4
$ 24,242.00
$ 8,824.64
$ 33,066.64
2.0
Sidewalk removal
5900.0
SF
$ 1.20-
$ 7,080.00
6250.0
1958.0
8208.0
$ 7,500.00
$ 2,349.60
$ 9,849.60
I
3.0
Type B wheelchair rams
45
EA
$ 485.00
$ 21,825.00
7
7
14
$ 3,395.00
$ 3,395.00
$ 6,790.00
4.0
Gate valve adjustments
3
1 EA.H$2
$ 10.00
3
0
3
$ 30.00
$ 30.00
S-1
Extra Bank Sand
25
CY
$ 375.00
0
0
0
$ -
$
$
S-2
Strip Sodding50
Sy
$ 135.00
0
0
0
$ -
$
$
S-3
Cement Stabilized Sand
50
Cy
$ 1,450.00
0
0
0
$ -
$
$
$ 47,793.401
$ 35.167.001
$ 14,569.24
$ 49,736.24
I--
wcr
removal
replacement
gv
mh
Fairmont Park East
ea
If
If
10826 Collingswood
20.1
20.1
10911 Dogwood
9
`9
10837 ldlewood
48.1
48.1
108251dlewood
34.2
34.2
10901 Idlewood
182.3
182.3
10842 Mulberry
21
21
109111dlewood
8.3
8.3
109051dlewood
7.7
7.7
10829 Birch
1
62
54.5
Fairmont Park West
3818 Rosemont
1
95
79.5
3815 Rosemont
1
24
9.3
3830 Roseway
1
32
12.3
10107 Roseberry
1
68
56.3
10103 Park
1
33
22.3
10102 Park
1
39
29.5
10022 Clairmont
1
23
13.3
3810 Roseway
1
22
11.9
1
9802 Rustic Rock
1
34.4
18.5
1
9803 Rustic Rock
1
16.8
9747 Rustic Rock
1
10.6
9748 Rustic Rock
1
20.6
10
9746 Shell Rock
1
20.4
9.2
9748 Shell Rock -
1
27.8
15.8
1
9802 Shellrock
1
17.6
9803 Shellrock
1
34.3
16.8
10003 Antrim
12.8
12.8
Brookglen/Collegeview
3207 Somerton
26.4
26.4
3339 Somerton
52.1
52.1
3335 Somerton
36
35.9
3343 Somerton
46.3
46.3
8407 Beechaven
1
105.1
94.3
3106 Ashton
33.6
33.6
8415 Collin sdale
49.4
49.4
8503 Beechaven
40.2
40.2
3339 Fem Rock
51.2
51.2
8735 Collin sdale
82.4
82.4
8415 Fairbrook
75.2
75.2
8719 Ashwyne
28.9
28.9
wcr
removal
replacement
gv
mh
Town of La Porte
West "G" @ Arizona
57
57
N 6th @ Madison
13.3
Glen Meadows
5034 Meadowcrest
1
15
11
5101 Meadowcrest
1
81
72.7
Glen Meadows C Glen Valley
4
176
164.6
5101 Parkcrest
10.8
10.8
5226 Glen park
17.1
17.1
5242 Glen ark
18.8
18.8
5237 Glen ark
32.1
32.1
Glenmeadow @ Creekview
1
12.4
Valle brook @ Park
81
81
14
2052
1797
3
0
$ 6,790.00
$ 9,849.60
$ 33,064.80
$ 30.00
Protect total cost
$ 49,734.40
Sidewalk In -fill Project
Chili's SIW
140.2 sf
$ 605.66
.
WCR'S
11ea
$ 5,335.00
EMS
602.8 sf
$ 2.604.10
$ 8,544.76
L C-
3copy
BASE BID PROPOSAL
r BASE PROPOSAL: Bidder agrees to perform all of the work shown on the p�1r�d
further described in the specifications for the sum of 9
stat"A"
dollars ($ (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to 'reject any or all bids and to
waive any informalities in the bidding.
... The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time. for receiving bids_
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
— formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions. t
The bid security attached in sum of Woi
dollars ($ Z 3_� �?g t is to dome the property of the Owner in the event the contract and
a bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the owner caused thereby.
BY:
a
(B iness, Address)
1 Y1C(YS �'75�`i
(City) (State) (Lip Code)
gk5-94')-�4q0
(Telephone Number)
F.
I
J
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT:
ALL OTHER CHARGES:
TOTAL:
$ Z(Q)so. 10 -
$ ZI 395.s`�
This total must agree with the total "Total Amount Bid" figure shown on the bid sheet
For purposes of complying -with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
e•
4
i
fi
5
A
L f
yy�
7M
, sa
BID FORM
,a 2008 City Wide Sidewalk In -fill Project
CLP Project No. 2008-4503
a
DATE:
a Bid o *` D d„l S l . feZIlQi iereinafter called 'Bidder) an individual proprietorship, a corporation
an¢ed a d existing under laws of the State of Texas, a partnership, or individual consisting of
�a , for Construction of the 2008 La Porte Sidewalk Improvement Project,
for the City of La Porte, Hams County, Texas (hereinafter called 'Owner.')
To: City of La Porte
604 West Fairmont Parkway
a La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
a Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
a Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
,• herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
a expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
' a Item Description of Item with Unit Bid Price Approx. Unit Total
No, in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete wide sidewalk placement four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
v\ -, ✓\ y CY � � SF 8,756
Per Square Foot
BP-3
$ (�9 s O65.6y
Item
No.
Description of Item with Unit Bid Price
in Written Words
2 Concrete wheelchair ramps. In
accordance with plans & details
��complete in place.
r�1l OU-J
11iVNl:.T�1 V`�
0,4 ZY-_ o C-` tJ5 EA
Per Each
3. Adjust Gat(ee Valve Boxes complete and in place
EA
Per each
_ SUPPLEMENTAL BID ITEMS
S-1. Extra bank sand (ordered by City). Complete in place.
Q-e CY
Per Cubic Yard
S-2. Slip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
a �n5 t L A -a- OL
_ 1\ 1` c, 9 Li C- `C.w� S SY
Per Square
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
@�WO
3
C cY
Per Cubic Yard
TOTAL BASE BID (ITEMS 1-3)
13 $ 5 �0 $ 3.5, 00
3 $" $ 5.°°
5 00 $ 3'75, o
25 $I
—
50 $�
11 ��}}�� $ o0
00
50 $ ZZ. Oo $ oo,
BP-4 �51 / 00 b
w
M
w
The amounts set, forth above are current estimates by Contractor of the amoo.,— fiat will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual:
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
(Add) (Deduct) $ N
2.
(Add) (Deduct) $
Bidder hereby agrees to commence work under this contract on a date to be specified in written 'Notice to
Proceed' of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-6 of the Supplementary Conditions
of the Agreement
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement
The award may be made on 'the Base Bid alone or the Base Bid and any or all of the Items listed under
Aftemates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be retained to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as 'required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
In the event of Award of the Contract to the undersigned, the undersigned agrees to famish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as c rrect and final
Date os
BP-5
w
IN
Witness
- ----- ----
o-:' -SEAL Of Bidder is a Corporation)
F%*6owleidge receipt of Addenda Below:
Addendum No.
Received
Signe
30
4 CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, fine, or
ass to the City. The undersigned bidder further certifies that it
corporation owing any delinquent indebtedn
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
ZThe undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, t ba
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
Business Name:
Address:
Authorized Signature:
Printed Name:
BP-7
C, \
BASE BID PROPOSAL COPY
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and f7
further described in the specifications for the sum of S L` � N O A. 3
Tio i-lu,J0 e Q Aa> iFr4ht S�
(45
�_ of
dollars ($ �G ZOS � )• (Amount shall be shown in both words and riyuira
discrepancy, t e amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions.
The bid security attached in sum of J
dollars ($�—)
is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay an
additional expense to the Owner caused thereby.
M(Signatureo
usubmitted
f AuthonzedPerson)
not Name Or ut onze erson)
(SEAL) r 5 I ..
(Title)
VIE.
(Business Address)
i`'' SAOE.�h TiC 775�3
(City) (S ate) (Zip Code)
ZS i - 99/ - 73 30
(Telephone Number)
BP-1
STATEMENT OF MATERIALS AND OTHER CHARGES
_ v�
MATERIALS INCORPORATED INTO THE PROJECT: $_ 2 7/ GZ 1 S "
ALL OTHER CHARGES: $ y� /�%,3, y
TOTAL:
76, ZOS,2'
This total must agree with the total "Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
LIM
BID FORM
2008 City Wide Sidewalk In -fill Project
CLP Project No. 2008-4503
/E.hM..vor2k Cc,JsTa✓�s�o.J
DATE: A �9 L1 s A 160 LCio P
Bid of ZA1G. (hereinafter called "Bidder") an individual proprietorship, a corporation
organized and existing under laws of the State of Texas, a partnership, or individual consisting of
, for Construction of the 2008 La Porte Sidewalk Improvement Project,
for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
@ F1 ✓r VOLLA-t�S A/Jri
F, G T 71 (f e j- s SF 8,756
Per Square Foot
AM
Item Description of Item with Unit rice
No. in Written Words
.. �o mn ITEMS 1-5
Approx.
Unit Quantity
2 Concrete wheelchair ramps. In
accordance with plans 8, details' complete innpplace.
G: A/1) -e4
EA
Per Each
3. Adjust Gate Valve Boxes complete and in place
S EA
No �/o�
Per each
SUPPLEMENTAL BID ITEMS
Extra bank sand (ordered by City). Complete in place.
S-1
13
3
��reN T ✓ I Li. A2�
CY 25
Per Cubic Yard
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
Ci � 1 pLL Q
SY
o /o
Per Square Yard
S-3. Sidewalk point repair including cement stabilized
sand and
/removal
lOff soil. Complete in place
J /id-CG tiJ N9(e- Q kA)� "r
4 D CY
ri VF
Per Cubic Yard
TOTAL BASE BID (ITEMS 1-3)
U' -- � Total
Ar . t Price
a.1
s�
$L10 61.-
50 $�-
1XI
3#51 $ 171 y�
50 $-�
a.,
$ 5. ores.
,I A
BP-4 I
C"
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
2.
(Add)(Deduct)
(Add) (Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-6 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as correct and final
A
Date .4LX,U;7
9M
i EAMW4.vt/c �o.vsT2✓cr/o.J
Signed SE2✓icc'5 - TAJ
(Company) I /
By zA
?(Title)
2tSrn,a j E
/-L PR,i7aj f �✓� 45A .3241I.t >( 7-75�3
(Address)
9c! — 7 3 3co
(Telephone Number)
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below: /
Addendum No. Node
Date Received z l .�-
-.000--
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
V The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
_ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(initial one of the above)
Business Name: 'r VIIU2rc 001iY7RIJe7-1�1*3
Address: d/Z Es a,� AV
5103
Authorized Signature: �T�
Printed Name: ' )Aa M 0-3Qa2,
BP-7
Sze✓16e5 '10�.
RECEIVED
AUG 1 8 2008
PURCHASS,!NG
COPY
BASE BID PROPOSAL
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and
further described in the specifications for the sum of �� f t Wo !Xea5"ald
T a hun /✓t./ /�✓, irt�/ rii ✓�+C ��� il' aa,J ���/ l'�°� S
dollars ($ 9% • 29?, sa ). (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions. I1 ��j] �./ c/
The bid security attached in sum of �/� C��i'd/rl/ /4ZOA/ /
dollars ($ �C1i 6 4- b' ) is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby.
Respectfull su ed
BY:
(Signature of Auth red Person)
i
(Print Name of AuthorizePerson)
(SEAL) �w��✓
(Title)
//IlD I"✓YS%N /'CCU•/t�o. YJ.
(Business Address)
(City) (State) (zip Code)
7 �3-y73-/Plod
(Telephone Number)
BP-1
r �
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT:
ALL OTHER CHARGES:
TOTAL:
30
Td
This total must agree with the total 'Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
M. WA
BID FORM J
2008 City Wide Sidewalk In -fill Project
CLP Project No. 2008-4503
DATE: g-/7-p Y
Bid of��='�" �v✓5, LLC. (hereinafter called "Bidder") an individual proprietorship, a corporation
organized and existing under laws of the State of Texas, a partnership, -or individual consisting of
c , for Construction of the 2008 La Porte Sidewalk Improvement Project,
for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions. to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
Per Square Foot
BP-3
SF 8,756
Oc Ili
$ 1p, $
Item Description of Item with Unit Bid Price
No. in Written Words
BASE BID ITEMS 1-5
2 Concrete wheelchair ramps. In
accordance with plans &ndetaiils complete in place.
Per Each
3. Adjust Gate Valve Boxes complete and in place
@ k %! Ile
Per each
SUPPLEMENTAL BID ITEMS
Approx. Unit Total
Unit Quantity Amount Price
49
EA 13 $ $ /')
//^^ p a a?
EA 3 $ 65 $
S-1. Extra bank sand (ordered by City). Complete in place.
@ GdtN� O ✓s /.il2N
CY
Per Cubic Yard
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
I
Per Square Yard
25
SY 50
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
CY
Per Cubic Yard
TOTAL BASE BID (ITEMS 1-3) $
� I / 1/ / /
[-I=,
5�
So
op oe
$ S $ .25D.
old
50 s
"e1.
The amounts set forth above are current estimates by Contractor of the amount- ...-it will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
►1
(Add) (Deduct)
(Add) (Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written 'Notice to
Proceed' of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-6 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as correct and final
Date a-/ F-0
rM
gr,-,,p s'
Witness
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below:
Addendum No.
Date Received
Signed
B)
/3o/y A I., K/ ?7'SLg
(Address)
7/3—l77—/300
(Telephone Number)
--000--
MM
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
•/#" The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
_ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
r-
.
Business Name: � 4' �'""Pr• Z' L
Address:
�r s�s�ity� x 750
L�
Authorized Signature:
i
Printed Name:
BP-7