HomeMy WebLinkAbout2009 SIDEWALK REPLACEMENT_2009-4501,0
. v,-
s - PAGE : .1 -
'ac E C E I V I N G R E P C .. T
RECEIPT NO.: 147712
SHIP TO: P.O. NO.: 090424
PLANNING
DATE: 7/09/09
VENDOR: BROOKS CONCRETE, INC VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
5/22/09 BESTWAY DESTINATION
".CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD SHANNON GREEN
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
0000012094 5/18/09
Y
•.:__________________________
___________________________________________________
IINE QTY RCVD
BIN LOCATION. UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
;t
1 34934.10 EA 010 070 1.0000
ANNUAL CONTRACTS CONCRETE CONSTRUCTION
Acct # 01598929275130
RECEIVED BY
CVT---/
LEE PHGGY
RECEIVED DATE: 7/09/09
APPLICATION AND CERTIFICATION FOR PAYMENT
1JQ. _ moo
PROJECT - 2009 La Porte City Wide Sidewalk
t Pro'ect
TOTAL AMOUNT WORK DONE TO DATE:
$34,934.10
ORIGINAL CONTRACT AMOUNT:
$29,086.40
AMOUNT RETAINED 5% :
$0
NET CHANGE BY CHANGE ORDERS:
$5 847.77
PREVIOUS PAYMENTS:
$0
REVISED CONTRACT AMOUNT:
$34,934.10
TOTAL DEDUCTIONS:
$0
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$34,934.10
604 West Fairmont Parkway
La Porte TX '77571 .
CONTRACTOR:
Brooks Concrete Inc.
PAYMENT #1 - Final Payment
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 5/11/2009 90 working days
WORKING DAYS TO DATE: 40
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been paid 'n full accordance with the contract requirements.
DATE: BY: \O"VGti�S— TITLE: D
SIGNED and SWORN before me, a Notary Public in and for the State of Texas this 141, day of JLJ� 20_Q
BY:
MY COMMISSION
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE COR.
BY: f DATE: � �
PROJECT NAME: 2009 LA PORTE SIDEWALK IN -FILL PROJECT
PROJECT NUMBER: 2009-
CONTRACTOR: Brooks Concrete
DATI May-09
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
Description of Work
VENDOR PHONE:
VENDOR FAX:
VENDOR N:
VENDOR ADDRESS:
PURCHASE ORDER
CITY OF LA PORTE
604 WEST FAIRMONT PARKWAY
ATTN: ACCOUNTS PAYABLE
LA PORTE, TX 77571
(713)947-8440
(713)947-8444
431126
BROOKS CONCRETE, INC
4018 ALLEN GENOA
PASADENA, TX 77504
PURCHASE
ORDER NO.
090424
DATE: 6/2/2009
SHIP TO: PLANNING
PLANNING
604 W. FAIRMONT PARKWAY
LA PORTE, TX 77571
Our P.O. # MUST Appear on ALL Invoices. Packaees and Correspondence
DEr1_stl�i
u':� iTiON aEgi�
05/22/2009
OOOOOl2094
0511&7009
-
°��
^ ,. ,, - w,' ACCOUNT NUMBER : " �
AUTIIORIZ
DESTINATION
01598929275130
BOB WARD
A.
WWW*Y
UNST
EXTENDED::
N
CO
COST
1 35,000.00 /
EA
cow
CITY OF LA PORTE QUOTE #0928
Send Original and One Copy of Invoice to:
CITY OF LA PORTE
ACCOUNTSPAYABLE
604 W FAIRMONT PKWY
LA PORTE, TX 77571
AUTHORIZED SIGNATURE
Page 1 of I
1.0000 35,000.00
�PI366101
CITY OF LA
PORTE
3/23/09
PurcT 3 Order
Inquiry -
Receipt --7,ansactions
16:58:40
4PO Number CP9015
Type option, Press
Enter.
1=Select to view
detail 6=Print recv report
Receipt
Line Date
Lot
--------
Posted ---------
Opt Tp Number
No. Received
Quantity
UOM
Sz
User ID
Date
Time
RN 142090
1 1/05/09
16077.87
EA
1
CE PEGGY
1/05/09
16:27
_
IN 142264
1 12/01/08
16077.87
EA
1
FI ALLEN
1/07/09
12:56
— RN 143054
1 2/03/09
31081.46
EA
1
CE_PEGGY
2/03/09
11:34
IN 143146
1 1/28/09
31081.46
EA
12:00
RN
1
2131.
EA
1
CE PEGGY
3/23/09
16:53
F3=Exit F7=Sort by Recv Date F12=Cancel F16=Display Comments
F20=Packing slip Inq
(� A
t
i
- I PAGE: 1
R] E I V I N G S T A T U ,' R E P O R T
******** REPRINT *******
RECEIPT NO.: 144541
SHIP TO: P.O. NO.: CP9015
PLANNING
THROUGH DATE: 3/25/09
VENDOR: BROOKS CONCRETE, INC VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
1/05/09 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD LEE, PEGGY
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
0000011693 12/30/08
-----------------------------------------------------------------------------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 2131.90 EA 050 030 1.0000
BUILDINGS CONSTRUCTION CONSTRUCTION
Acct # 01598927095130
HOIct WkiT a- onl Op4&MA
RECEIVED BY: LEE, PEGGY RECEIVED DATE: 3/23/09
City of La Porte
Ac1counts Payable
Check Requisition
Vendor t
Due Date:
Vendor Name:
Brooks Concrete, Inc.
Description:
You are isquired to attach recefp& wfth all Check MqUISMOM
Retalnage for 2009 City Wide Sidewalk Replacement Project
Account 3
Project #
Invoice #
Commodity
Code
Date
Amount $$
93f-OWO-223-0000
3-23-09
$2,357.97
01
Af
Total Amount Due: $
$2,357.97
Remarks:
Prepared By:
Date: 3-23
Lee
177
DaW, 1 te:
3/
Revised 8/15/97 .�I U
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT - 2009 La Porte City Wide Sidewalk Replacement
Project
TOTAL AMOUNT WORK DONE TO DATE:
$49 291.23
ORIGINAL CONTRACT AMOUNT:
$42 077.10
AMOUNT RETAINED 5% :
$0
NET CHANGE BY CHANGE ORDERS:
$7 214.13
PREVIOUS PAYMENTS:
$44 801.36
REVISED CONTRACT AMOUNT:
$49 291.23
TOTAL DEDUCTIONS:
$44 801.38
OWNER:
AMOUNT DUE CONTRACTOR:
$4,489.87
City of La Porte
604 West Fairmont Parkway
LaPorte, TX 77571
CONTRACTOR:
PAYMENT #3 — Final Payment
Brooks Concrete Inc.
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 12/01/08 90 working
days
I WORKING DAYS TO DATE: 40
CERTIFICATE OF. THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been pai in full accordance with the contract requirements. as
ERR HALL
19 M PAII4 etebCf lbw
DATE: j ll �� BY: T
ITLE:
SIGNED and SWORN before me, a Notary Public in and for the State of Texas this 1� day of O
BY:
MY COMMISSION EXPIRES: 6)/— Ud — V 043
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONT TOR.
BY: DATE:
PROJECT NAME: 2009 LA PORTE SIDEWALK IMPROVEMENT PROJECT
PROJECT NUMBER: 2009-4501
CONTRACTOR: Brooks Concrete
nA-r ice. �nno
# 2 — _— ----
Quantity
Dollars —
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Description of Work
Est.
Q
Unit
Unit
Price
Estimated
Value
1.0
Concrete sidewalk placement
6260.0
SF
$ 5.18
$ 32,426.80
180.01
7011.6
7191.6
$ 032.40
$ 36,320.09
$ 37,252.49
2.0
Sidewalk removal
6474.0
$F
$ 0.95
$ 61150.30
210.0
7199.2
7409.2
$ 199.50
$ 6,839.24
$ 7,038.74
3.0
Type B wheelchair rams
7
EA
$ 500.00
$ 3.500.00
2
8
10
$ 1,000.00
$ 4,000.00
$ 5,000.00
S-1
Extra Bank Sand
25
CY
550.00
0
00
$
$
$
S-2
StriSoddin
50
SY
$ 150.00
0
0
0
$
$S-3
K*$22.00.$
Cement Stabilized Sand
50
CY
$ 1.700.00
0
0
0
$
$SA
Adjust MH Rims
0
EA
$ 150.00
$ 42.077.10
$ 2,131.90
$ 47,159.33
$ 49,291.23
CHANGE ORDER
PROJECT:
OWNER:
CONTRACTOR:
CONTRACT FOR:
2009 City — Wide Sidewalk Replacement
City of La Porte
604 W. Fairmont Parkway
LaPorte, Texas 77571
Brooks Concrete Inc.
4018 Allen Genoa
Pasadena. Texas 77504
You are hereby directed to make the following changes in the Contract Documents:
Description: Item 1 - add 931.6 sf sidewalks rQ $4,825.69
Item 2 - add 9352 sf for removal of existing walks @ $888.44
Item 3 — add 3 additional wheelchair ramps @ S1,500
Total $7,214.13
Purpose of Change Order:
Replace additional sidewalks and installation of additional wheelchair ramps
Attachments: (List documents supporting change)
No. 1
DATE OF ISSUANCE: 22/09
OWNER'S PROJECT NO. 2009.4501
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price
Original Contract Time
S42,077.10
90 days
Previous Change Orders
Net Change from Previous Change Orders
S-0-
-0-
Contract Price prior to this Change Order
Contract Time prior to the Change Order
$42,077.10
60 days
Net Increase (Damease) of this Change Order
Net Increase (Desrease) of this Change Order
$7,214.13
15 days
Contract Price with all Approved Change Orders
Contract Time with all Approved Change Orders
S49,29123
105 days
By:
Engineer
APPROVED:
Owner
i
PAGE: 1
RECEIVING R E a-J R T
RECEIPT NO.: 143054
SHIP TO: P.O. NO.: CP9015
PLANNING
DATE: 2/03/09
VENDOR: BROOKS CONCRETE, INC VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
I/05/09 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD LEE, PEGGY
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
0000011693 12/30/08
-----------------------------------------------------------------------------
LINE QTY RCVD
EIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 31081.46 EA 050 Q30 1.0000
BUILDINGS CONSTRUCTION CONSTRUCTION
Acct # 01598927095130
RECEIVED BY: LEE, PEGGY RECEIVED DATE:
2/03/09
2009 CITY WIDE SIDEWALK -REPLACEMENT PROJECT- GEIV 709
TOTAL IN PLACE $ 47,159.33
1ST INVOICE IN PLACE $ 16,OT.87
10% PLACED IN RETAINAGE $ 1,667.79
PAID TO CONTRACTOR $ 14,470.08
2ND. INVOICE IN PLACE.
Amtto be placed in retainage to equal 5%
PAID TO CONTRACTOR
TOTAL
$. 31,08t46
$ • 750.19
$ 30,331.28
$ 47,159.33 $ 2,357.98 $ 44,801,36
$ 47,159.34
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT - 2009 La Porte Sidewalk Improvement Project
TOTAL AMOUNT WORK DONE TO DATE:
$47 159.33
ORIGINAL CONTRACT AMOUNT:
$42 077.10
AMOUNT RETAINED 5% :
$2 357.97
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
14 470.08
REVISED CONTRACT AMOUNT:
TOTAL DEDUCTIONS:
$16 828.05
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$30,331.28
604 West Fairmont Parkway
LaPorte, TX 77571
PAYMENT #2
CONTRACTOR:
Brooks Concrete Inc.
4018 Allen Genoa
Pasadena Texas 77504
/
WORKING DAYS TO DATE:
� Q� r
CONTRACT DATE: 12/01/08 90 workingdays
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPF
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown or
all work has been performed and materials supplied in full accordance with the terms and conditions of th y �u
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a
contract amount up to and including the last day of the period covered by this estimate and that no part of
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and exF
performance of said contract have been paid in full accordance with the contract requirements.
DATE: 2SS O� BY:��O�a C ��f�CiC.� TITLE'
Affivalkk
E LL
SIGNED and SWORN befor me, a Notary Public in and for the State of Texas this 2 cCS day of Cl u C/o AAi AWA "PJAr.SI&dhm
J 6�Yr�01
BY: MY COMMISSION EXPIRES: /- Ok'-.2013
ENGINEER'S CERTIFICATION FOR PAYMENT
Ih accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of a Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONTRACTOR.
BY: DATE:
PROJECT NAME: 2009 LA PORTE SIDEWALK IMPROVEMENT PROJECT
PROJECT NUMBER: 20094501
CONTRACTOR: Brooks Concrete
DATE: Jan 2009
s z
Quantity
Dollars
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Description of Work
Est.
Qty.
Unit
Unit
Price
Estimated
Value
1.0
Concrete sidewalk placement
6260.0
SF
$ 5.18
$ 32,426.80
4564.3
2447.3
7011.6
$ 23,643.07
$ 12,677.01
$ 36.320.09
2.0
ISIdewalk removal
6474.0
SF
$ 0.95
$ 6,150.301
5198.3
2000.9
7199.2
$ 4,938.39
$ 1,900.86
$ 6,839.24
3.0
TYPeBwheelchairrams
7
EA
$ 5W.00
$ 3,500.00
5
3
8
$ 2,500.00
$ 1,500.00
$ 4,000.00
S-1
I Extra Bank Sand
25
CY
$ 22.00
$ 550.00
0
0
0
$
$
$
S-2
Strip Soddiri
50
SY
$ 3.00
$ 150.00
0
0
0
$
$
$
S-3
Cement Stabilized Sand
50
CY
$ 34.00
$ 1,700.00
0
0
0
$
$
$
—01
S-4
Adjust MH Rlms
EA 1
$ 1%00
$ 150.00
$ 42,077.10
$ 31,081.46
$ 16.077.87
$ 47,159.33
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT - 2009 La Porte Sidewalk Im rovement Project
TOTAL AMOUNT WORK DONE TO DATE:
$47,159.33
ORIGINAL CONTRACT AMOUNT:
$42 077.10
AMOUNT RETAINED 5% :
$2,357.97
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
14,470.08
REVISED CONTRACT AMOUNT:
TOTAL DEDUCTIONS:
$16,828.05
OWNER:
City of La Porte
AMOUNT DUE CONTRACTOR:
$30,331.28
604 West Fairmont Parkway
LaPorte, TX 77571
CONTRACTOR:
Brooks Concrete Inc.
PAYMENT #2
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 12/01/08 90 working days
WORKING DAYS TO DATE: 40
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been paid in full accordance with the contract requirements.
ENGINEER'S CERTIFICATION FOR PAYMENT In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of a Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONTRACTOR.
BY: DATE: ZV 4P9
PAGE: 1
R E. C, •E. I V I N. G R. B. Ai R T
RECEIPT NO.: 142090
SHIP TO:
PLANNING
VENDOR: BROOKS CONCRETE, INC
P.O. NO.: CP9015
DATE: 1/05/09
VENDOR NO.
431126
DELIVER BY SHIP VIA F.O.B.
1/05/09 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD LEE, PEGGY
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
0000011693 12/30/08
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
-----------------------------------------------------------------------------
1 16077.87 EA 050 030 1.0000
BUII:pINQS CQNS V(7TION" CONSTRUCTION
AC& # 01598927095130
i
RECEIVED BY: LEE,, PEcGV RECEIVED DATE: 1/05/09
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2009 La Porte Sidewalk Improvement Project
TOTAL AMOUNT WORK DONE TO DATE:
$16,077.87
ORIGINAL CONTRACT AMOUNT:
$42 077.10
AMOUNT RETAINED 10% :
$1,607.79
NET CHANGE BY CHANGE ORDERS:
$0
PREVIOUS PAYMENTS:
0
REVISED CONTRACT AMOUNT:
TOTAL PREVIOUS DEDUCTIONS:
$1,607.79
OWNER:
AMOUNT DUE CONTRACTOR:
$14,470.08
City of La Porte
604 West Fairmont Parkway
LaPorte, TX 77571
CONTRACTOR:
PAYMENT#1
Brooks Concrete Inc.
4018 Allen Genoa
Pasadena Texas 77504
CONTRACT DATE: 12/01/08 90 working days
WORKING DAYS TO DATE: 10
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been pai in full accordance with the contract requirements.
DATE: TITLE: C�
SIGNED and SWORN before me„a Notary Public in nc fQr-th Sat f Pxac 'U— day of Beo fmvwo
BY: �,/L %� L � �/ 11 �'�X�= NoraryPubiic,sIMYfGGMIN SION EXPIRES: O/- e2 a D/J f
ENGINEER'S CERTIFICATION FOR PAYMENT-—
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONTRACTO
BY: DATE: 2
PROJECT NAME: 2009 LA PORTE SIDEWALK IMPROVEMENT PROJECT
PROJECT NUMBER: 2009-4501
CONTRACTOR: Brooks Concrete
DATE: Dec, 2008
1
Quantity
Dollars
7Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Description of Work
Est.
Qty.
Unit
Unit
Price
Estimated
Value
1.0
Concrete sidewalk placement
6260.0
SF
$ 5.18
$ 32,426.80
2447.3
0.0
2447.3
$ 12,677.01
$ 12,677.01
2.0
Sidewalk removal
6474.0
SF
,$ 0.95
$ 6,150.30
2000.9
0.0
2000.9
$ 1,900.86
$ 1,900.86
3.0
Type B wheelchair rams
7
EA
$ 500.00
$ 3,500.00
3
0
3
$ 1,500.00
$ 1,500.00
S-1
Extra Bank Sand
25
CY
$ 22.00
$ 550.00
0
0
0
$ -
$ -
$
S-2
Strip Sodding
50
SY
$ 3.00
$ 150.00
0
0
0
$ -
$ -
$
S-3
Cement Stabilized Sand
50
CY
$ 34.00
$ 1,700.00
0
0
0
$ -
$ -
$ -
S-4
Adjust MH Rims
0
EA
$ 150.00
$ 150.00
$ 42,077.10
$ 16,077.87
$
$ 16,077.87
MR: 0000011693
STATUS: FUND 15 ACCOUNTS
AIMISITION BY: INS, Pfi RRASON _•_ Y � PATS: 12/30/08
SHIP TO LOCATION: PWHNINO SUCJJHSTED VENDOR: 43112#ppsmmnw
INC VRLIVSN BY PATS: 1/05/09
LINE UNIT EXTEND
MBE bNNcNIPT20N QUANTITY SUN COST MGT VENDOR PART MWEIR
i CTAWmtK:TIM 50000.00 SA 1.0000 60400.00
comw TY: BUILbINQ9
SUBCOP&M. NSSTROCTION
RHQUISITION 1VT11I,: 50000.00
A C C O U N T I N P 0 R M A T I 0 N
L_NH M ACCOUNT PROJECT I ANOUNT
1 01""2"95130 CONSTROCPION WSTS GM709 100.00 50000.00
CQNSTRUCTION ..WRACT 03 SIOSNALX REPAIRS
REQUISITION I9 IN THE CURRENT FISCAL YEAR. /A
Page 1 of 1
McPhail, Reagan
From: Miculka, Le Ann
Sent Thursday,. December 04, 2008.3.42 PM -
To: McPhail, Reagan
Subject: RE:
Hey Reagan,
2009 will be 5130. If you need anything else, just let me know.
Thanks
Le Ann
From: McPhail, Reagan
Sent: Thursday, December 04, 2008 3:19 PM
To: Miculka, Le Ann
Subject:
Hi LeAnh,
Here we go again,
Thanks
Reagan
I need a construction account number (51XX) within GEN 709 for this years sidewalk replacement project
12/4/2008
I . 3ASE PROPOSAL: Bidder agrees to perform all.of the work.shown on the plan . s and
further described in the
specificatlo - ns for - the sum of Q105
words and figures. In case Of
I. (Amount shall be shown n both 140
dollars ($ 0 'o discrepancy, the amount shown in words will govern
Bidder understands that the Owner reserves the right to reject any or all bids . and to....
waive any infomn6litles; in the bidding.
with
The bidder agrees that this bid shall be good and. may not be withdrawn for a: period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt. of written . notice: of the acceptance of this bid, bidders will execute. the
formal contract attached within ton (10) days and delivery Surety Bond or Bonds as required by
the General Conditions.
The bid security attached In sum of 0 0 5aA
ks
of the owner In the event.the contract and
:doIIars.($-LLQ-�P �.Sl is to become the property 9 delay and
set forth,
ted Within the time above as liquidated: damages for.th
bond are notexecu
additional expense to the owner caused thereby.
BY:
pectfully miffed
ature o uthol 14M ar on
not ame 0 u onze WWII
--:8�&D—Kiness Address)
fate 1p o fate
(Telephone NurlL)wi)*
BP-1
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT: $ Z
ALL OTHER CHARGES:. $ 18 q 3 y - bq
TOTAL: .. $ O i i I O
This total must agree with the total'Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.:.
BP-2
BID FORM
2009 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 20694601 -
DATE: 6. 1D .fig
B eY� �1 C 1 C1�• (herainaffer Called "Bidder') an individual proprietorship; a corporation .
genized ago existing under laws. of the State of Texas,' a partnership;. or. individual .consisting. of
15K00Ys -0 �Ac. for Construction of :the 2009 .La Porte City:, WI
de .Sidewalk
Harris County, Texas (hereinafter called'Ownsfl
Replacement project, for the City of La Porte,
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley; Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this . Proposal, the General .
conditions of Agreement 'the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described' and referred -to in the Invitation to BidJs familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined'tne',site of the work and
agrees to .provide all necessary labor, superintendence, machinery, equipment; tools, materials; supplies,
services and other means of construction to complete, all the work upon which he bids within the time set forth
Specifications; and In the manner prescribed therein and according to
herein, as called for in the Contract, the
ounts below. These. prices are to cover all
the requirements of the.Engineer as therein set forth for the am
uired under the contract documents, of which this Bid Form is a
expenses incurred in performing the work req
part. .
Item Description of Item with Unit Bid Price Approx.
No. in Written Words . Unit Quantity
SIDEWALK REPLACEMENT
1. Concrete 4' wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (ruin). Complete
In place. nn
V`� �ot�a2.5II GLKI
Lk SF 6,260
Per S are Foot
BP-3
Unit . Total
Amount Price
s5 IS s32 2�.go
Item Description of Item with Unit Bid Price
No. in Written Words
2.
Approx.. Unit Total
Unit Quantity Amount, Price
ITEMS 1-3
Removal end disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
��t_ a CAM ;-V Ceh�s
SF 6.474
Per Square Foot
3 Concrete Type "B' wheelchair ramps. In
accordance with`details and complete in place.
_Q .
�12 t ej, �ol 1wrs
0.wp, hn cf�:T S EA 7
Per Each
TOTAL BASE BID (ITEMS 1-3)
s�ZO'�i.Io
SUPPLE VIENTAL BID ITEMS
S-1. Extra bank sand (ordered by City). Complete in place.
np CY 0 $22.po g 2—o
a
. - �il.lndt 1� O CPS-_%s
Per Ton
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
sY o s 3. $
3 Oo
t�
Per Square Yard
BP-4
• S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
$ �
•ylo •CP �'S - CY 0 $
Per Cubic Yard •
S-4 • Adjust Manhole Rims. Complete and in place •
liars a &o Ca .F s EA o s I ZS, °° $ 15
Per each
BP-5
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during`
the progress of the Work: ,The separated progress billings.from Contractor to the Owner shall reflect the actual .
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
1.
(Add) (Deduct):
2.
(Add) (Deduct) $_ A
Bidder hereby agrees to commence work under this contract on a.date to be specified in written ."Notice to
Proceed" of the Owner and to fullyeompiete the project within ninety(90) conec sutive working days thereafter.
stipulated in the specifications. Bidder.further agrees. to pay as liquidated damages, the sum of $500.00 for .
each consecutive calendarday thereafter as provided'forin Paragraph SC-5 of the Supplementary, Conditions
of the Agreement.
it is agreed thatthe contract price may increased or decreased. to. cover work added or deleted by order of..
the Engineer; in accordance with the provisions of the General Conditions of Agreement.
The award maybe made on the. Base Bid alone or. the Base Bid and any:or-all of the Items:isted under.
Alternates or Substitutions; if any:
The unde.rsigneo.agrees that the amounts bid 'in this proposal will not be withdrawn or Modified for sixty (60)
days following date of bid opening.
It is understood thatthe bid security ,accompany'ing this proposal shall be returned to the undersigned unless .in
case of.the acceptance of this proposal the undersigned should fail to, enter into a construction contract and
execute bonds:as provided In the specifications., In the evenfthe,undersigned should fail to enter Into ;a
construction contract and .execute bonds' as.required within 10 working days after the Engineer has given
unsigned contracts to.the Contractor, lt'is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other Inconveniences.suffered by the
Owner as a result of such failure on the part of the undersigned:
It is understood that the Owner reserves'the right to reject any and all bids
BP-6
000--
BP-7
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been fumished a copy.of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goodso . r services by the City of La Porte from any person firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidderis not in compliance with Ordinance.98-2217, it hereby assigns to the City, of La
Porte, the amount of its delinquent indebtedness to the CRy of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bld, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
VThe undersigned hereby certifies that it Is in compliance with Ordinance 98-2217.
or
The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
Business Name:"-
Address:OI�
A -7-7so
Authorized Signature: 5
Printed Name: 5 2 00 5
2M
—jRETEC INSURANCE COMI — >7Y
- 53P I
KNOW ALL MEN BY THESE PRESENTS, that we BROOKS CONCRETE, INC. as principal, hereinafter called the Principal,
and SURETEC INSURANCE COMPANY, 5000 Plaza on the Lake, Suite 290, Austin, TX 78746, as Surety, hereinafter called
the Surety, are held and firmly bound unto CITY OF LA PORTE as Obligee, hereinafter called the Obligee, in the sum of
FIVE Percent of the Greatest Amount Bid (_§Yo) for the payment of which sum well and truly to be made, the said Principal and
the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the principal has submitted a bid for
2009 LA PORTE CITY WIDE SIDEWALK REPLACEMENT PROJECT. BID NO. 09002.
NOW, THEREFORE, if the contract be timely awarded to the Principal and the Principal shall within such time as specified in
the bid, enter into a contract in writing or, in the event of the failure of the Principal to enter into such Contract, if the Principal
shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such
larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then
this obligation shall be null and void, otherwise to remain in full force and effect.
PROVIDED, HOWEVER, neither Principal nor Surety shall be bound hereunder unless Obligee prior to execution of the final
contract shall furnish evidence of financing in a manner and form acceptable to Principal and Surety that financing has been
firmly committed to cover the entire cost of the project.
SIGNED, sealed and dated this 10th day of November, 2008.
(Principal)
BY:
BY:
M
POA a: 4221 102
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Kevin McQuain, Debra McQuain, Justin McQuain, Erin McQuain, Linda E. Magruder
of Spring, Texas its true and lawful Attomey(s)-in-fact, with full power and authority hereby conferred in its name, place and stead, to
execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to
include waivers to the conditions of contracts and consents of surety, providing the bond penalty does not exceed
Two Million Five Hundred Thousand and no/100 Dollars ($2,500,000.00)
and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attomey(s)-in-Fact may do in the
premises. Said appointment shall continue in force until 12/31/09 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be It Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attomeydn-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Ruolwd, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20" ojApril,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this 20th day of June, A.D. 2005.
guannloFeSkMTEC INS CE COMPANY
By.
a 6 !a Bill King, re nt
State of Texas ss:
County of Harris
On this 20th day of June, AD. 2005 before me personally came Bill King, to me known, who, being by me duly swom, did depose and say, that he
resides in Houston, Texas, that he is President of SURBTEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company, and that he signed his name thereto by like order.
Al 0610 Denny
may ftm
My Exphm Michelle Denny, Notary Publfc
AUgUSf 27, 2008 My commission expires August 27, 2008
1, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this 10th day of November 2008 'A.D.
Yf.. Arent Beaty, Assistant Se re ry
Any Instrument issued In excess of the penalty stated above is totally void end without any. vnlldlty.
For verification of the authority of this power you may call (713) 812-0800 any buslnsas day between 8:00 am and 5:00 pm CST.
BASE BID PROPOSAL 0 COPY
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and
further described in the specifications for the sum of i m27tl - f- -e -trl ✓SA J D
F-Ovr- (4v-,vorj T-k(rry-Tkrct ac..�.�s AND F(F'rY Crr,.rEf
dollars ($ 4.5, `' 33 - 50 ). (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions. / /
The bid security attached in sum of �n Leo v s a i wo �-F„J
t= 1GY Y, a cc_
dollars ($ 31 2 50 . ) is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby.
Res ectfully submitted
BY: f W
(Signature of Authorized Person
DIA�l )k4:A/OozA
(Print
` acme of AuthorizedPerson)
(SEAL) r Rcs Dr,.r-f—
(Title)
Z90 I /L P/2FS7-v j A ✓�
(Business Address)
PA54•pcJA i7o53
(City) (state) (Zip Code)
�z 99/ - -7 3 3,0
(Telephone Number)
11M
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT: $ / � / Zoo
ALL OTHER CHARGES: $ 2-q,2 `33,, So
SD
TOTAL: $ Y5 q 3 3
This total must agree with the total "Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
FTOJR
BID FORM
2009 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 2009-4501
DATE:
�^�w021G (noN ST2✓qn.J
Bid of S6.=R ✓,ors 57-dr- - (hereinafter called "Bidder") an individual proprietorship, a corporation
organized and exis ing under laws of the State of Texas, a partnership, or individual consisting of
, for Construction of the 2009 La Porte City Wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed. therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete 4' wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
FOV(Z �o CLq 2S
A I N T `l erc aTS SF 5,260
Per Square Foot
ma
$
$ 30 6 A
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
BASE BID ITEMS 1-3
2. Removal and disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
@ cONE �oc-�A2 RN 7
�S 50
S�ycni-L1/— FVIE �Zjrs SF 6.474 $ L-' $ 3Z9,
Per Square Foot
3 Concrete Type "B" wheelchair ramps. In
accordance with details and complete in place.
o_a o0
tiJlNt✓ r�oc� ait5 !%Z�,✓r5 EA 7 $ `�90 $ 3��/30,
Per Each
5 � '� 3 3 ,
TOTAL BASE BID (ITEMS 1-3) L(5-0$
SUPPLEMENTAL BID ITEMS
S-1. Extra bank sand (ordered by City). Complete in place.
(Sb t'004' bnc14-/Z5
o�
CY 0 $ 2 l $
Per Ton
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
/ '6n) V o t- L A A>
No 1 100 'S SY 0 $ ��,_ $
Per Square Yard
EM
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
(8 �WO-Trlo�S� '�r✓F
1-I ,J,V Or c) ACY
Per Cubic Yard
S4 Adjust Manhole Rims. Complete and in place
ND /'0J,s
Pereach
BP-5
90
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
_(Add) (Deduct)
(Add)(Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids
:• .
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the
submitted as correct and final
Date f l 1 d o 8
Witness
SEAL (if Bidder is a Corporation)
bid prices contained in this proposal have been carefully checked and are
Acknowledge receipt of Addenda Below:
Addendum No. N/�
Date Received N 14
Signed D m ' 2 r
(Compan
By /�Iz rz s c 4—
(Tide) A
?A SA 7�ir a j 1 %��3
(Address)
--000--
iAM
2fr0 99/_. -733-0
(Telephone Number)
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
1
or
_ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
Business Name:
Address:
Authorized Signature:
Printed Name:
ME
BASE BID PROPOSAL
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and
further described in the specifications for the sum of
SDCTY TWO THOUSAND FOUR HUNDRED TWENTY FOUR DOLLARS & FORTY CENTS
dollars ($ 62,424.40 1. (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees, that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions.
The bid security attached in sum of
FOUR THOUSAND DOLLARS & ZERO CENTS
dollars ($ 4,000.00 ) is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby. 11
M.
7 R20McWPMm0H0CU,C
l.- Glem Haat4P[htdcat
(Print Name of AuthorizedPerson)
(SEAL)
(Title)
6602 GUHH ROAD
(Business Address)
HOUS
TON 04 TX 770
i (State)
(Zip ode)
713-690-0791
(Telephone Number)
BP-1
X.
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT: $ 37,454.44
ALL OTHER CHARGES: $ 24,969.96
TOTAL:
$ 62.424.40
This total must agree with the total 'Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
BID FORM
2009 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 2009-4501
DATE: NOVEMBER 10, 2008
HARRIS CONSTRUCTION
Bid of COMPANY. LTD. (hereinafter called "Bidder")
a partnership, or individual consisting of
GLENN HARRIS AND LARRY HARRIS for Construction of the 2009 La Porte City Wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
LaPorte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he bids within the time set forth
herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. In Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete 4' wide sidewalk placement four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
6b SEVEN DOLLARS & EIGHTY CENTS
SF 6,260
Per Square Foot
MW
$ 7.80 $ 48.828.00
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
BASE BID ITEMS 1-3
2. Removal and disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
@ ONE DOLLAR & TEN CENTS
SF 6.474 $ 1.10 $ 7,121.40
Per Square Foot
3 Concrete Type "B° wheelchair ramps. In
accordance with details and complete in place.
@NINE HUNDRED.TWENTY FIVE DOLLARS &
ZERO CENTS EA 7 $ 925.00 $ 6,475.00
Per Each
TOTAL BASE BID (ITEMS 1-3) $ 62,424.00
SUPPLEMENTAL BID ITEMS
S-1. Extra bank sand (ordered by City). Complete in place.
@ EIGHTEEN DOLLARS & TWENTY CENTS
Ton
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
@ FIVE DOLLARS & NINETY CENTS
Per Square Yard
ME!
CY 0 $ 18.20 $ 0.00
SY 0 $ 5.90 $ 0.00
i
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete In place
@FORTY THREE DOLLARS & TWENTY CENTS
CY 0 $ 43.20 $ 0.00
Per Cubic Yard
S-4 Adjust Manhole Rims. Complete and in place
@ NINETY TWO DOLLARS & SIXTY CENTS
EA 0 $ 92.60 $ 0.00
Per
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
2.
(Add) (Deduct)
(Add)(Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance. with the provisions of the General Conditions of Agreement.
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the. amounts bid in this proposal will not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter Into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
MW
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices
submitted as correct and final
Date NOVEMBER 10, 2008
ness JE ER THORNBURY
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below:
Addendum No.
Date Received
By
(Company
HARRIS CONSTRUCTION CO ANY, LTD.
Its General Psxna GHCC LLC
Glen Huds, Pmident
6602 GUHN ROAD HOUSTON TX 77040
(Address)
713-690-0791
(Telephone Number)
--000--
are
BP-7
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies It has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte; the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
e undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
Business Name: HARRIS CONSTRUCTION COMPANY, LTD.
Address: 6602 GUHN ROAD
Authorized Signature:
LV Aa uNv ONCC LLC
Printed Name: G)=Hmrta,PresJ&nt
i
BASE BID PROPOSAL
BASE PROPOSAL: Bidder agrees to perform all of the work shown on the/plans and
further described in the specificati ns for the sum of /d in( •Ysgn�/
dollars ($ O. -° ). (Amount shall be shown in both words and figures. In case of
discrepancy, the amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions. Q
The bid security attached in sum of > �e �rPaSf ( / /I►90!/I7f /�/ol
dollars (�,19./f ) is to become the property of the Owner in the event the contract and
bond are not executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby.
BY:
(SEAL) D/.!//��'✓ .
(Title)
(Business/Address�)}-
CLe
ity) (State) (Zip Code)
(Telephone Number)
koIO�
0\1
BP-1
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT:
ALL OTHER CHARGES:
TOTAL:
�5
$ /�� 735.
$ T%
This total must agree with the total 'Total Amount Bid" figure shown on the bid sheet.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
BP-2
BID FORM
2009 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 2009-4501
/"p/�, DATE:
Bid of /�!p/fC el4/� 9e %pjifs, 1-Le - (hereinafter called "Bidder") an individual proprietorship, a corporation
organizV ex ng under laws of the State of Texas, a party of hip, or individual consisting of
�y , for Construction of the 2009 La Porte City Wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner.")
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gentlemen:
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project, and has carefully examined the site of the work and
agrees.to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete aA the work upon which he bids within the time set forth
herein, as called. for in the Contract, the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
part.
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
Concrete 4' wide sidewalk placement: four inches
thick, poured with 3000 psi concrete (min). Complete
in place.
Groh z-*h�f SF 6,260
Per Square Foot
BP-3
$ 3/, 92�.
lt�.
Item Description of Item with Unit Bid Price
No. in Written Words 'apron Unit Total
Unit Quantity Amount Price
BASE BID ITEMS 1-3
2. Removal and disposal of existing concrete sidewalk.
Excavated sidewalk to become property of
Contractor to be disposed of in a legal manner.
i .? 4C l P�Ls
Per Square SF 6.474 $� $_/� s'ea
Foot
Concrete Type "B" wheelchair ramps. In
accordance with /details and complete in place.
Per Each
TOTAL BASE BID (ITEMS 1.3)
SUPPLEMENTAL BID ITEMS
EA 7 $ 71Z e $
S-1. Extra bank sand (ordered by Ci ). Complete in place.
��/feey
Per Ton
S-2. Strip Sodding as directed by City and in accordance
with Specification 00112. Complete in place.
@-. roar- D" 1"5.
Per Square Yard
CY
SY
s.'
QM
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place y
3SG 00.
Per Cubic Yard
S-4 Adjust Manhole Rims. Complete and jp place
CY 0 $ $
@
EA 0 $ Ay. $
Per each
OW
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
2.
(Add) (Deduct)
(Add) (Deduct)
Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to
Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions
of the Agreement.
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement.
The award may be made on the Base. Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will *not be withdrawn or modified for sixty (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to reject any and all bids.
In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as correct and final/O�
Date �� /D-U Signed 1/%7rvi"�r
i / �� !(tnmronvl
Witness
SEAL (if Bidder is a Corporation)
Acknowledge receipt of Addenda Below:
Addendum No.
Date Received
By i �� ✓T� — CJG✓/ir'�
(Title)
--000--
`� FW Z14- � RJkcle,, TX 775 -93
(Address) '
71Y-z1 /bon
(Telephone Number)
AM
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been furnished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for
rejection or disqualification of bid.
The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Initial one of the above)
f}j2 (an
Business Name: SP v✓/CCf LLL
Address:
Authorized Signature: �-
Printed Name: /�a �.a
M-1
BASE BID PROPOSAL
BASE PROPOSAL: Bidder agrees to perfor((m�all of the work shown on the plans and
Wrther lescriped in the specifications fir � sum' of T h�'� �'►
dollars ($ 4 5 g 5J1 s° . (Amount shall be shown in I oth'words and figures. In case of
discrepancy, th amount shown in words will govern.)
Bidder understands that the Owner reserves the right to reject any or all bids and to
waive any informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of
sixty (60) calendar days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidders will execute the
formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by
the General Conditions.
The bid secunli attached i i su m of
I
dollars ($ 10 Z 13 �' ) is to become the property of the Owner in the event the contract and
bond are nof executed within the time above set forth, as liquidated damages for the delay and
additional expense to the Owner caused thereby.
Respectfully submitted
I1
BY: C-9-L..
ignatu o ronz erson —�
CLAY L MT-:LENDE7,
(P int Name of AuthorizedPerson)
_ r
...: (SEAL)
(Title)
281a Akikc-E
(Business Address)
_. �o�sbd►.l T81(As -1Zo39
nY fate pCode)
a4l-4+z—Z.4��
(Telephone Number)
BP-1
STATEMENT OF MATERIALS AND OTHER CHARGES
00
MATERIALS INCORPORATED INTO THE PROJECT: $ 2 5, 0 0 0
20 as, so
ALL OTHER CHARGES: $ �
TOTAL: $
This total must agree with the total 'Total Amount Bid" figure shown on the bid sheet
_ For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for
any material incorporated into the project in excess of the estimated quantity provided for herein
will be no less than the invoice price for such material to the Contractor.
BP-2
BID FORM
2009 La Porte City Wide Sidewalk Replacement Project
CLP Project No. 2009.4WI
DATE:
Bid of C i L15TiZ11.C�0 QS (hereinafter called 'Bidder*) an individual proprietorship, a corporation
organized and existing under laws of the State of Texas, a partnership, or individual consisting of
for Construction of the 2009 La Porte City Wide Sidewalk
Replacement Project, for the City of La Porte, Harris County, Texas (hereinafter called 'Owner.')
To: City of La Porte
604 West Fairmont Parkway
La Porte, Texas 77571
Attention: Susan Kelley, Purchasing Manager
Gent_
The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General
Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte
for the work herein above described and referred to In the Invitation to Bid, is familiar with all of the conditions
surrounding the construction of the proposed project and has carefully examined the site of the work and
agrees.to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies,
services and other means of construction to complete all the work upon which he buds within the time set forth
herein, as called for in the Contract. the Specifications, and in the manner prescribed therein and according to
the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all
expenses incurred in performing the work required under the contract documents, of which this Bid Form is a
Part
Item Description of Item with Unit Bid Price Approx. Unit Total
No. in Written Words Unit Quantity Amount Price
SIDEWALK REPLACEMENT
1. Concrete 4' wide sidewalk placement four inches
thick, poured with 3000 psi concrete (min). Complete
_ in place.
if W { — NTH l'�MdD SF 6,260 $ S y 3 R j 4
Per Squa
BP-3
Item Description of Item with Unit Bid Price
Approx.
Unit
Total
No. in Written Words Unit
Quantity
Amount
Price
BASE BID ITEMS 1.3
2. Removal and disposal of existing concrete sidewalk.
- Excavated sidewalk to become property of
'
Contractor to be disposed of in a legal manner.
u V �NVcq lU SF
6.474
$
$ dq
Per Squar6 Mot
3 Concrete Type'B' wheelchair ramps. In
- accordance with details and completein place.
vo
400
G EA
7
$7OQ
$ 4 OQ r
Per Each
TOTAL BASE BID (ITEMS 1-3)
y-6. 85.1 lc
SUPPLEMENTAL BID ITEMS
- S-1. Extra bank sand (orderneAd by City). Complete in place.
A
G. 4 l4-) CY 0 $ i. 5 O $
Per on
S-2. Strip Sodding as directed by City and In accordance
with Specification 00112. Complete in place.
� n^
CDSY 0 $ 4. oa $
Per Square Yard
- BP-4
S-3. Sidewalk point repair including cement stabilized
sand and removal of soil. Complete in place
CY 0 $ 166
Per Cubic Yard
S-4 Adjust Manhole Rims. Complete and in place
CTU)76 fVL41 k4j- J64JaY4)_
Per ea ch EA 0 $
El
BP-5
The amounts set forth above are current estimates by Contractor of the amounts that will be determined during
the progress of the Work The separated progress billings from Contractor to the Owner shall reflect the actual
amounts expended for the items enumerated in (2) and (3) above.
SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.
5 1111 9n. .
2.
_ Bidder hereby agrees to commence work under this contract on a date to be specified in written 'Notice to
Proceed' of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter
stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for
each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions
of the Agreement
It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of
the Engineer, in accordance with the provisions of the General Conditions of Agreement
The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under
Alternates or Substitutions, if any.
The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sbdy (60)
days following date of bid opening.
It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in
case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and
execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a
construction contract and execute bonds as required within 10 working days after the Engineer has given
unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the
Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the
Owner as a result of such failure on the part of the undersigned.
It is understood that the Owner reserves the right to rejed any and all bids.
Q::
In the event of Award of the Contract to the undersigned, the undersigned agrees. to furnish Performance and
Payment Bonds as provided in the Specifications.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are
submitted as correct and final /I
Date 11— l 0` 09 Signed QJ�
PT (COm )
By 1/l9nl
(Title)
otg l� A N t Qe r 90U500, - SC -77039
(Address)
q42---24G$
(Telephone Number)
Witness
SEA! ('rf Bidder is :a Cbrporation)
Acknowledge receipt of Addenda Below.
Addendum No.
Date Received
-000--
BP-7
CITY OF LA PORTE
CERTIFICATION BY BIDDER
The undersigned bidder hereby certifies it has been fumished a copy of City of La Porte Ordinance #98-
2217 prohibiting any expenditure for goods or services by the City of La Porte from any person, firm, or
corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it
is in compliance with the requirements of said ordinance.
If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La
Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La
Porte from the amounts due the undersigned.
Failure to remit this certification with the bid, or noncompliance with said ordinance shall be just cause for
rejection or disqualification of bid.
The undersigned hereby certifies that it is in compliance with Ordinance 98-2217.
or
_ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be
deducted by the City of La Porte from the amounts due the undersigned.
(Inifial one of the above)
Business Name:
Address:
Authorized Signature:
Printed Name:
BP-8
BID BOND
For Use With The American Institute of Architects Contract Proposals Bond
KNOW ALL BY THESE PRESENTS, That we, C&D Constructors, Inc.
and the American Safety Casualty Insurance Company , of Atlanta
organized under the laws of the State of
unto City of LaPorte
Oklahoma
in the sum of Five Percent of the Greatest Amount Bid
as Principal, hereinafter called the Principal,
Georgia , a Corporation duly
as Surety, hereinafter called the Surety, are held firmly bound
as Obligee, hereinafter called the Obligee,
Dollars
(S 5% of G.A.B. ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves,
our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Remove & Replace 4 Foot Sidewalk on City Wide Sidewalk Program
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee
in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with
good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in
the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the
Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such
larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect.
Signed and sealed this
10th
day of November
rrr:
t_
Co
&D 0
C Constructors, Inc. �' ,' (Seal)
i Principal
RsLAx
Title
�16A��4
Mary Rifaat, ur ty Ass ant Witness {
AnrqFi4an Safety Casu Ity Insur nce mpany
By A .
Roxanne G. Hebert Attomey-in-Fact
I
WON All KW By TMMs DRUM B. Ml Asedca &aft OebRy tesmaca (�Wassy bn muds, —ah—d and apydeb4 and by Des p6tmII data mkt
consdadst sod "'hn BRUCE C. DEHART, EDWARD L. MOORE;'DAVID R. GROPPELL, MARY E. MULLINS, BEVERLY
A. IRELAND, ROXANNE G. HEBERT, SHAREN GROPPELL^ OF SPRING TEXAS
la as mod bwfW mwmpishct fa t sad is sme, plso, and and to cwcme on beb*U of the said Calpey. as malt bads, aadauting and wabaro of smcwhils
bbetisub e,
ALLORLIGM
pswiRd dae no bond a mdvutlop a mmaa daa;cgablp earmted mlts dds amI l 3 sbN'eaiced u sonamt tbu ams of .. - .
'THREE MILLION"'(E3,000,000.00) DOLLARS"'
This PbwmcfAttaaerisgatedmd'usprdmdaaWbyhedn admsed�by&t m2a11 tithe toOeMe{Rpdalm adopted by do Bead ofD'ec=n dths Clmpmq
on the Ryba dry ofSepteam, I00.7.
RRSOLVRD. don da Eaddw In CMY=doa with don Snaeusy Cr my Asdaant Seaemy my aMda absQysiaGa a ►gem witb satho I) a &A5 a lionised in that
Imauzoad avl0eaft the tlppaumem In ad cans, for ad on bcloatf d.M Cmpay, to a snot; and dolim and dh &A and of On Courtesy b bads, andutaldoM
rx0�lamas,.ad.smaysblp odlpdm of all kiem; cad ssd woes ®y .. aq aaW Mmsmy�e-tiel m agm ad i�at: any poweo d mbsesy P h g b
Iamb lx�
RESOLVED ►urram am any bead.. � •mdsteffii , or arm dit dm disc be Ysillid and bladbi upon the Can
0) whist tilted by the phddeal a my Vlea-RalAta sad antsW ad abd Of a sea be ngdsed) by my Seaetmy o Ass&um Smsery or Gr7 •ba Biped by the pleudeat
o my Vic►hnideo or Seavury or Assistant Seoeusy, and mmmay¢ed and waled (if a xa be required) by a dolt' aamodud amsmy-Ia-hd a ag= or (HO wbm d*
eaxrted and aced Of a as bat rapiied).by cost a cacao awnryro-fw a aleau paimam so and within the Bm{u of the aAody er* 1 'by thn paaa of *=m y tuned
by the Cmpay to soch pernon w Pamar .."
RffiOLVRD PURIHBR this the dgamas d ady at®adud omen sod tei seal d the Cmpmryaosy tie smiea by Ala b my powv d newsy a arti6atim Ihaat
aoborim` M aaeadou ad del vay of my bind. mdvukiay wmphma, a atha sseyship obligations of don Company; ad such dp waso ad nos wben no teed shall
hrn the tame face ad mkcts a dwu& mmaly zMud.
IN WrfKCSS N®t►DE, Aemalao Wily Qnahy hmranca Comppanr hu cased its atl'ids sal to b• beatmsa elEsd, and thmapsamaa to be dptd by its Heddeat and
saassA by in Seaetmy thh Eighth day of Sepumbm. 2003.
Arrest �pq^•o.. -
,CG►fig. - Guns
Madolph
STATE OE GEORGIA
L'Oumar COBS }
On ub Eiybth day of Sspocmba. 2063. bdtie. non psimlb. none Stephen L Cho. to me bo.is,.ho, bery by ma day roaq dd dspoa sad ny thaebe is IM Pmdaol of
Amaiem Safay Camky bamaoo Cacspwy, lire empewdaa daat'bed is and wbkh caamed td Wow ion r Iba bat bows die sal d the mid wpondoa: tka the sal
affaed b the nid iatr®eat a roch`owpaW auk thaau was a eased by ardo d the Bawd of Dlacaws d aid wpwaim ad tba ba sped his came rbmeb by lam ado
.+ &A
��+ 0
.� 0 f Rob Baketae. Neurl' Public ,.
owl
L the adasped, Stsmxuy d Amairao Sdey Cu=k4 In o Campevy, ■Okissaa wpmdm DO HMIEBY CERTWY dw the facg®g and smkdwd
Iowa cf Attomey p>m4m m full fora sod W oa boa revotcd; ad tmthe man that the RaWeionof Ins Boad d Dnectom sat forth In the aid Pw of Aoewey, is acm
in-
sipedadsaeamm.city atAdmix in tm s isis cc GwgbL �a:i'et riaeams loth deyof November 2008
w
t
r .
ORIGINALS OF THIS POWER OF ATTORNEY ARE PRIMED WITH RED NUMERICAL NUMBERS -
DUPLICATES SI [ALL IIAYE THE SAME FORCE AND EFFECT AS AN ORIGINAL ONLY WHEN ISSUED IN CONJUNCTION WITH THE OR
t�
w
r'
1. IMPORTANT NOTICE
To obtain information or make a complaint:
2. You may contact your agent at 281-651-0002.
3. You may call American Safety Casualty
Insurance Company's toll -free telephone number
for information or to make a complaint at:
1-800-388-3647
4. You may also write to American Safety Casualty
Insurance Company at:
100 Galleria Parkway, Suite 700
Atlanta, GA 30339
5. You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at:
1-800-252-3439
6. You may write the Texas Department of
Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: htto://www.tdi.state.tx.us
E-mail: ConsumerProtectiont7a.tdi.state.tx.us
7. PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your
premium or about a claim you should contact the
agent first. If the dispute is not resolved, you may
contact the Texas Department of.lnsurance.
S. ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
AVISO IMPORTANTE
Para obtener informacion o para someter una
queja:
Puede comunicarse con su agente al 281-651-
0002.
Usted puede Ilamar al numero de telefono gratis de
American Safety Casualty Insurance Company's
para informacion o para someter una queja al:
1-800-388-3647
Usted tambien puede escribir a American Safety
Casualty Insurance Company al:
100 Galleria Parkway, Suite 700
Atlanta, GA 30339
Puede Comunicarse con el Departamento de
Seguros de Texas para obtener informacion acerca
de companias, coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al Departamento de Seguros de
Texas:
P. O. Box 149104
Austin. TX 78714-9104
Fax: (512) 475-1771
Web: htto://www.tdi.state.tx.us
E-mail: ConsumerProtectiono)tdi.state.tx.us
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el agente primero.
Si no se resuelve la disputa, puede entonces
comunicarse con el departamento (TDI).
UNA ESTE AVISO A SU POLIZA: Este aviso es
solo para proposito de informacion y no se
convierte en parte o condicion del documento
adjunto.
CITY OF LA PORTE
BUDGET ADJUSTMENT FORM
whole numbers only
ACCOUNT PROJECT EXPLANATION AMOUNT OF
NUMBER NUMBER OF TRANSFER INCREASE DECREASE
FROM:
TO:
01598927091100
GEN 709
ool
cons[
e(NN-
bontract92
EL"21='
3,458
01598927095130
GEN 709
3,458
�'Zlf ^s''�`
FROM:
TO:
01598927091100
GEN 709
2010 cons[ contract
46,642
01698927095140
GEN 709
46,642
FROM:
TO:
Tr •,.,max w•
uir
FROM:
TO:
4
FROM:
TO:
FROM:
TO:
y=•;
FROM:
TO:
FROM:
TO
,-c,,ra'I :x• •r-•ry
FROM:
FROM:
'0'u
FROM:
TO:
rt�
i.a
FROM:
FROM:
35'it
FROM:
FROM:^"
TO:
issaikc:
50,000
60,000
DEPARTMENTAL APPROVAL:
FINANCE APPROVAL:
DATE:
REVISED 8/24/90
to/ 0i
C�
�I
Cg�o9
9
CITY OF LA PORTE
BUDGET ADJUSTMENT FORM
2009 Sidewalk Re lacement Pro ect Phase II
.. whole nw. re only
ACCOUNT PROJECT EXPLANATION AMOUNT OF
NUMBER NUMBER OFTRANSFER INCREASE DECREASE
FROM:
TO:
01598927091100
A4 709
eomtruotlon
6,260
0169892709513V
9
6,250
q „�W'
FROM:
TO:
01b98927 130
709
;'r.`�.`::a •.,'
14
98 09b
FROM:
FROM:
FROM:
TO:
FROM:
TO:
.<
FROM:
TO:
TL'M4 er V.
FROM:
FROM:
FROM:
FROM:
TO:
FROM:
TO:
FROM:
.,:.
14 464
DEPARTMENTAL APPROVAL:/"—���D/"f �N LJ e ✓`
FINANCE APPROVAL:
DATE:
REVISED W4=
/,SW
J
q
N
N
PAGE: 1
R E C E I V I N G R E P O R T
RECEIPT NO.: 150876
P.O. NO.: CP9099
SHIP TO:
PLANNING DATE: 10/28/C
VENDOR: TEAMWORK CONSTRUCTION SERVICES VENDOR NO.
434140
DELIVER BY SHIP VIA F.O.B.
8/24/09 BESTWAY DESTINATION
CONFIRM BY CONFIRM TO REQUISITIONED BY
BOB WARD LEE, PEGGY
FREIGHT CONTRACT NO. REQ. NO. REQ. DATE
0000012350 8/20/09
----- ----------------------------------------------------------------------
LINE QTY RCVD
BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST
1 17395.30 EA 050 030 1.0000
BUILDINGS CONSTRUCTION SIDEWALK REPLACEMENT CONTRACT #12
Acct # 01598927095130
RECEIVED BY: LEE,
M
PEGG RECEIVED DATE: 10/28/09
r�
TEAM K
Construction Services
2901 1/2 Preston Ave.
Pasadena, TX 77503
PH:(281) 991-7330 FAX:(281) 991-7340
M Invoice
Date Invoice #
101I S/2009 29151
Bill To
Ship To
City of La Porte
Attn: Account Payable
604 West Fairmont Parkway
La Porte, TX 77571
P.O. Number
Terms
Rep
Ship
Via
F.O.B.
Project
CP9049
10/152009
'
Quantity
Item Code
Description
Price Each
Amount
Purchase Order No. CP9049
3,257
3,163
3
04 Concrete
04 Concrete
04 Concrete
Item #I Sidewalk removal (SF)
Item #2 Sidewalk Replacement (SF)
Item #3 Wheel Chair Ramps (EA)
1.00
4.10
390.00
3,257.00
12,968.30
1,170.00
ro
Total 517,395.30
A
B
I C I
D I
E I F
I G
H
2009 SIDEWALK
REPLACEMENT PROJECT
(GEN 709
1
z
3
4
5
2nd Contract
Proposed S/WActeulS%1N;
Proposed Removal
{Actual Removal WCR proposed £Actual WCR�
Subdivision
6
ADDRESS
sf
1,684
20
{ yt2 316;.
r ' 72 ' -`
sf
1,844
20
20
k�-'�sf-.,4r.. ea ._ eai FYS
i 2 378 ".u; lr" �' <11 Ba
4' fti 3 72>y `yl ' `-' r .Ft
z58 a = j�1r�r #
Pointe Town Homes
Pecan Crossing
Summer Winds
7
8
Gardenwalk from Cedar Cove to Poplar Cove
10
3717 Pecan Crossing20
12
13602 Desert Run
20
f 26.:
.,
20
7 r �'26' '`.'f
S
Summer Winds
14
Desert Sand
15
2 Dogwood
60
4 236.:
60
{ 236 .:�
t` a r
Fairmont East
80
,'�114- t.a
80
rtT ttf4 yy?
s-. r�
Fairmont West
18
10131 QuielHill
40
e
{ �•y
40,,,A
`` <<
4v
'` y y
Creekmont
20
901 M rtle Creek Deleted from sco
128
_
4
435 .�
320
1
LY'5 1.f3' ♦ F 5.9iY
P r34�1'� 4
yry 2 `
r`-z 3
Creekmont
21F:.
22
Myrtle Creek Willow Creek Intx
23
24
Totals
2.052
2,404
-" 3 :163' ^Y'1 4
s
Prepared by Reagan McPhail 10/22/2009
Page 1
LARNAB9 RBpUIRITION RM: 0000013350
BTATUB: �N -15ZACCOOMTB
PBOIIIBITION BY: LRB, PBOUY R&1RON:C p AL[ Ru➢ 'r�+'+���� MTR: 9/20/09
6HIP TO LDCATION: PLANNING SR ZSTED VINMR: 434140 TGMMORA; ODH911tOCIIONrRRIyiQg� OBLIVBQ 8T pAT6: 9/34/09
LINE OMIT B1TBIm
NBA DBBCRIPTION ODUITITY uoN COST COST VBMODR PART N0NMR
1 SIDEVALR RBPLWENENT CONTUR R2 13930.00 U 1.0000 13930.00
COIHODITT: BUILDINGS
bOBCOlRtl0: CONSROCTIOM
RBOUIBITIOM TOTAL: 13939.00
______________ RBOOISITION QUOTES -------- ...._..._.___.__....__________
VO03oR NANB .._-
27922.0000 IGLU. CONTRACTING BnVICBS LL.0
14418.32DO BROORB CORCA8IE, INC.
20130.0000 CMB CONSRUC[ION, INC
------------------------------------------------------------------------------------------------------------------------------------
A C C O U N T I N F O R M A T I O N
LIMB 9 ACCO®TT PRp36R \ A1O@lL
1 01590927095130 CO11SRlICITON mm GM09 100.00 13930.00
CMSI'RWTION m Cr R3 BIpBNALA "PAIRS
4�1111 e?od:�
RBOUIBITION IB IN T" CURRENT YIBCAL Y .
GM201S02
CITY OF LA PORTE
7/21/09
2'
)unt Balance/Description
"-airy
10:57:09
Position to . . . . 2009
- -
- Starting
character(s)
Type options, press Enter.
1=Select
9=Graph
Opt Account Number
Budget
Actual
Balance
015-9892-709.11-00
5,250.00
5,250.00
_
015-9892-709.31-20
_
015-9892-709.46-57
_
015-9892-709.48-00
_
015-9892-709.51-04
_
015-9892-709.51-10
_
015-9892-709.51-20
_
- 015-9892-709.51-30
58,750.00
49,291.23
9,458.77
_
015-9892-709.51-90
015-9892-709.91-10
244.76
\�44.76-
_
Fund 015
64,000.00 *
49,535.99 *
14,464.01 +
r
F3=Exit F7=Account description
F17=Subset
F18=Top F19=Bottom
F21=Totalling F22=Account balance report
This is a subsetted list.
51,gV
n,s�-a�g2�oa��l o
GM201S02 CITY OF LA PORTE 7/21/09
1' aunt Balance/Description •wiry 10:57:18
Position to . . . . 2009 - - - Starting character(s)
Type options, press Enter.
1=Select 9=Graph
Opt Account Number Budget Actual
_ 015-9892-927.11-00 25,851.00-
_ 015-9892-927.46-53 174.00
_ 015-9892-927.51-10 17,482.00- 7,359.00-
_ 015-9892-927.51-20 50,000.00 50,001.18
_ 015-9892-927.51-30 35,000.00 34,934.10
_ 015-9892-927.91-10 5,841.00- 7,359.00
Fund 015 36,000.00 * 84,935.28 *
Final Totals 36,000.00 * 84,935.28 *
Balance
25,851.00-
174.00
10;123.00-
1.18-
65.90
13,200.00-
48,935.28- *
48,935.28- *
F3=Exit F7=Account description F17=Subset F18=Top F19=Bottom
F21=Totalling F22=Account balance report
This is a subsetted list.
CITY OF LA PORTE
BUDGET ADJUSTMENT FORM
whole nambem only
ACCOUNT PROJECT EXPLANATION AMOUNT OF
NUMBER NUMBER OF TRANSFER INCREASE DECREASE
FROM:
TO:
015-9892-927-9110
927
emergency sidewalk repair
8,750
015-9892-709-5130
709
8,750
FROM:
TO:
015-9892-927-9110
927
emergency sidewalk repair
5,250
015-9892-709-1100
709
5,250
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
,17 11-7
4,0001
14,000
DEPARTMENTAL APPROVAL:
FINANCE APPROVAL:
DATE:
VWTMOINIZIPM
2009-07-2315:00 IDEAL CONTRACT"" 2814700039>> P 2@
CITY OF LA PORTE
QUOTEFORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted in detail.
Be sure to Include all charges, including freight, handling, delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please fax your quotes to the Planning Deggrtment, fax number 2814704005 by
7129109
If more information is needed, please contact RgAgap McPhail at 281.4770,6065 or e-mail:
mcphallrQcl.la-porte.tx.us
SPECIFICATIONS
Complete and in place
1. Sidewalk Removal
2. Sidewalk Replacement
3, Wheel Chair Ramps (WCR)
UNIT
EXTENDED
EST. QTY PRICE
PRICE
2.404 of 2
GD v
7,052s f
,
jttL
w
�C
Construct as per City of La Porte sidewalk construction details.
Total : z 7 1lZ
Freight(Delivery $ N/A _ _ (if estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, If necessary.
TOTAL COST S (price shall be flan and may not be exceeded)
State delivery time ARO (after receipt of order) �D �d^ays
Vendor Name:
Phone0: Z8/ 471/-oT3/
Contact name:
Signature:
CITY OF LA PORTE
QUOTE FORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted in detail.
Be sure to include all charges, including freight, handling, delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please fax your quotes to the Planning Department, fax number 281-470-5005, by
7/29/09
If more information is needed, please contact Reagan McPhail at 281-470-6065 or e-mail:
mcphailr@ci.la-porte.tx.us
SPECIFICATIONS
Complete and in place
1. Sidewalk Removal
2. Sidewalk Replacement
3. Wheel Chair Ramps (WCR)
UNIT EXTENDED
EST. QTY PRICE PRICE
2.404 sf $ 0.68 $ 1,634.72
2.052 sf 4.30 8,823.60
8 $495.00 3,960.00
Construct as per City of La Porte sidewalk construction details.
Total $ 14, 418.32
FreighUDelivery $ N/A (if estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, if necessary.
TOTAL COST $ 14,418.32 (price shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) 10 days
Vendor Name: BROOKS CONCRETE, INC. _
Phone M 713-947-8440
Contact name: JESS BROOKS
Signature:
2009.07-2911:30 » _ P 212
CITY OF LA PORTE
QUOTEFORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted In detail.
Be sure to include all charges, including freight, handling, delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please fax your quotes to the Planning Department, fax number 281:470-5005, by
T13,8l.48
If more Information Is needed, please contact Reagan McPhail at 2814TOM65 or e-mail:
mcphallr@cl.la-porte.tx.us
SPECIFICATIONS
Complete and in place
1. Sidewalk Removal
2. Sidewalk Replacement
3. Wheal Chair Ramps (WCR)
UNIT
EXTENDED
EST. QTY PRICE
PRICE
2.404 ar 2.2 s
S4o . 00
ZJ
2,0529 7.4L
8 7U.00
(000.00
Construct as per City of La Porte sidewalk construction details.
Freight/Delivery S NIA (If estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, if necessary.
TOTAL COST S 20, 13 0. 00 (price shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) 1 ' days
Vendor Name: L N t3 [ o �i r R L r o ✓, �c
Phone 0: 3 81- ` ori- r, .7 2 at
Contact name: J A nn 7 .T o ,✓E r
Signature:
CITY OF LA PORTF
QUOTE FORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted in detail.
Be sure to include all charges, Including freight, handling, delivery, and any other fees, Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please fax your quotes to the Planning Department, fax number 281r470.6006, by
/27 9109
If more information is needed, please contact RejgSn McPhail at 281-470-6066 or e-mail:
mcphPilr@ci.la-porte.tx.us
UNIT
EXTENDED
SPECIFICATIONS
EST. QTY
PRICE
PRICE
4a
Complete and In place
1. Sidewalk Removal
2 9f
2. Sidewalk Replacement
2_ .062 of
is
z
�� 13'
I. Wheel )rhakr Ramps (WCR)
g
r;
Construct as per City of Le Porte sidewalk construction details.
2-0
131137.
_._._.....
Total $
_._._�..
Freight(Delivery $ N/A_ lif estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, if necessary.
TOTAL COST g / 31 937. z a (pnce shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) Z / days
`"� 5�2✓� c�S
Vendor Name: l,can �razr� �oR ✓ a7 i ° ' t �'
Phone9:
Contact name: i A J
Signature:
A B C D
E F
1
2009 SIDEWALK
REPLACEMENT
PROJECT (GEN 709)
2
3
4
5
2nd Contract
6
ADDRESS
S/W
Removal
WCR
Subdivision
Comments
7
sf
sf
ea
8
Gardenwalk from Cedar Cove to Poplar Cove
1,684
1,844
Bay Pointe Town Homes
9
10
3717 Pecan Crossing L?
20
20
Pecan Crossing
11
1602 Desert Rune
20
20
Summer Winds
14
950Sand (� �� ►
20
20
Summer Winds
15
16
10842 Dogwood /� jF3, 5
60
60
Fairmont East
17
18
10131 Quiet Hill z2 ./P
N 80
80
Fairmont West
19
2
e ree
40
40
Creekmont
delete from scope
21
22
Myrtle Creek @ Willow Creek Intx
128
320
Creekmont
23
24
25
2,052
2,404
4
�1 p-0j—
` 3
_►
26
27
•3u
31
—�-
_
32
3
334
_
35
36
37
38
39�-
Z 76 'F
Prepared by Reagan McPhail 10/20/2009 Page 1
4
Z
1.1
�.i malt.
A
B
C
D
E
F
40
41
42
43
44
45
f
46
47
1
48
49
50
51
52
53
54
55
56
57
58
59
60
61
1
62
_
63
64
65
_
66
67
_
68
I
69
70
71
72
73
74
75
76
77
78
Prepared by Reagan McPhail 10/20/2009 Page 2
i
Lee, Peg9Y
From: McPhail, Reagan
Sent: Tuesday, August 18, 2009 2:08 PM
To: Lee, Peggy
Subject: 2nd Contract Sidewalk Replacement
Attachments: Quotes.pdf, Budget Adjustment 1.pdf
Peg, need to set up another PO for Teamwork in the amount of $13,938.00 in account 5130.
Thanks Reagan
2009-07-2315:00 IDFALCOtn& 2814700839»
P L2
CITY OF LA PORTE
QUOTEFORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following speclfications must be noted In detail.
Be sure to include all charges, Including freight, handling, delivery, and any our fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please tax your quotes to the Planning DMrtment fax number 281470.1006. by
YMM9
If more Information is needed, please contact RagAn McPhail at M 470.6060 or *-mail:
mcphallr@ci.la-porta.tx.us
UNIT
EXTENDED
SPECIFICATIONS
EST. QTY PRICE
PRICE
Complete and In place
s�
•�
1. Sidewalk Removal
2404
2 Sidewalk Replacement
0 a G
,312
3. Wheel Chair Ramps (WCR)
_8 /1
Construct as per City of La Porte sidewalk construction details.
Total s 2,70 `Jd2
Freight/Delivery S N/A __ (If estimated, state °not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, If necessary.
TOTAL COST i (price shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) %D daye
Vendor Name: E1iL 6A.1-94,-f7,t6 :5c c65 Z.L•G'.
Phone 0. 28/ `�%Il 0Jf r/
Contact name: o ��
Signature:
CITY OF LA PORTE
QUOTE FORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted in detail,
Be sure to include all charges, including freight, handling, delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please fax your quotes to the Planning Department, fax number 281-470-6008, by
7129109
If more information is needed, please contact Reagan McPhail at 281-470-ti066 or e-mail:
mcphailr@ci.la-porte.tx.us
SPECIFICATIONS
Complete and In place
1. Sidewalk Removal
2. Sidewalk Replacement
3. Wheel Chair Ramps (WCR)
UNIT EXTENDED
EST. QTY PRICE PRICE
2,4049 $ 0.68 $ 1,634.72
2.062 sf 4.30 8,823.60
8 $495.00 3,060.00
Construct as per City of La Porte sidewalk construction details.
Total $ 14, 418.32
Freight/Delivery $ N/A (if estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, if necessary.
TOTAL COST S 14,410.32 (price shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) 10 days
Vendor Name: BROOKS CONCRETE, INC.
Phone M 713-947-8440
Contact name: JESS BROOKS
Signature:
200"1.29 t1:30 r p 212
CITY OF LA PORTE
QUOTEFORM
The City of La Porte is requesting quotes on La Porte City Wide Sidewalk Remove and
Replacement Project. Any exceptions to the following specifications must be noted In detall.
Be sure to include all charges, Including freight, handling; delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minlmum of thirty (30) days.
Please fax your quotes to the Planning Department, fax number 3§14M 05 by
�nwog
If more Information Is needed, please contact Reagan McPhail at 281dT0-50M8 or a -mall:
mcphailr@ci.la-porte.tx.us
SPECIFICATIONS
Complete and in place
1. Sidewalk Removal
2. Sidewalk Replacement
3. Wheal Chair Ramps (WCR)
UNIT
EXTENDED
EST. QTY PRICE
PRICE
2,404ar Z .7 5: _
5,40 . o
20_, 52sf qZs
j2 O6
a 7A.Va
(000.00
Construct as per City of La Porte sidewalk construction details.
Total 1 2 0,13 0.On
Frelght/Delivery S N/A I estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet, If necessary.
TOTAL COST t Z 0,13 0.00 (price shall be firm and may not be exceeded)
State delivery time ARO (after receipt of order) ! 5� days
Vendor Name: 4 M a o�tR c r r e ✓� . rc
Phone 0 - 1v
Contact name: 3 A nn 7 .7 o ,✓,£ f_
Signature:
CITY OF LA PORTE
QUOTE FORM
The City of Le Porte is requesting quotas on La Porte City Wide Sidewalk Remove and
Replacement Project Any exceptions to the foitvMng speciftwoons must be noted In detall.
Be sure to Include all charges, Including freight, handling, delivery, and any other fees. Quote
must be returned on this form. Prices shall be firm for a minimum of thirty (30) days.
Please tax your quotas to the Plannlna Nnat11110 fax number 281.470,M 1 by
7129109
If more Information is needed,
please contact Reacraa McPhail at 281-470.80 IL or e-mail:
mgphpilr@ol.la-porta.tr-ua
UNIT
EXTENDED
SPECIFICATIONS
EST. QTY PRICE
PRICE
Complete and In place
'1.
ao
Z yoq
Sidewalk Removal
��
¢
B, � 13, 2 e
2. Sidewalk Replacement
?.062 et i•
.ram
3� � zo
L Wheel ('.b* Ramps (WCR)
a
Construct as per City of Le Porte sidewalk construction details. Zo
Total-
Freightl0ellvery S N/A Ilf estimated, state "not to exceed" price)
Itemize any additional fees or charges: You may use another sheet If necessary.
TOTAL COST S / 3, 937. a.o (price shall be firm and may not be exceeded)
State delivery time ARO (eater receipt of order) 2 / days
Vendor Name: 16f
Phona M 28
Contact name:
Signature:
oagrR ra7,o�1 52R✓tC-� , XAJC.
- 7330
CITY OF LA PORTE
BUDGET ADJUSTMENT FORM
Ln= whole numbers OW
ACCOUNT PROJECT EXPLANATION AMOUNTOF
NUMBER NUMBER OFTRANSFER INCREASE DECREASE
FROM:
TO:
01598927091100 a!L709
comaiwtlon
5,280
0159892709513U Q
709
0.260
FROM:
TO
4 0 698927M130
0414
27095131 ol
FROM:
TO:
FROM:
TO:
FROM::
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO;
A
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
FROM:
TO:
Pwi
FROM:
TO:
FROM:
TO:
_NW
14,484L_--"X64
DEPARTMENTAL APPROVAL:
FINANCE APPROVAL:
DATE:
REVISED &24=
"-SLJ
59,60
McPhail Reagan
From:
Wolny, Shelley
Sent:
Friday, August 07, 2009 2:59 PM
To:
McPhail, Reagan; Miculka, Le Ann
Cc:
lee, Peggy
Subject:
RE: 2009 Sidewalk Replacement Budget adjustment phase II
I was out of town last Thursday and Friday when these emails were going around, and this week has been dedicated to
preparing for the Budget Workshops with Council. I am just now getting around to looking at this, sorry for the delay.
Yes, it appears that you have $14,464 available, but none of that is in 9110. You will need to change the budget
adjustment to move $5250 out of the 1100 account and $9214 out of the 5130 account. As for the question regarding
setting up different accounts each year, we will use up the accounts faster. The only option would be that after the fifth
year, we start back over with 5110.
Shelley
From: McPhail, Reagan
Sent: Thursday, July 30, 2009 12:51 PM
To: Miculka, Le Ann
Cc: Lee, Peggy; Wolny, Shelley
Subject 2009 Sidewalk Replacement Budget adjustment phase II
Hey LeAnn, take a look at this making sure I have the correct accounts/amounts before I get my people to sign -off.
Thanks Reagan
A I B I
C I D I
E
F
1
2009 SIDEWALK
REPLACEMENT
PROJECT (GEN 709
2
3
4
5
2nd Contract
6 IADDRESS
Stw
Removal
WCR
Subdivision
Comments
7
sf
sf
ea
8
Gardenwalk from Cedar Cove to Poplar Cove
1,684-
1,844
4
Bay Pointe Town Homes
9
10
3717 Pecan Crossing
20
20
Pecan Crossing
11
12
3602 Desert Run
20
20
Pecan Crossing
13
14
9502 Desert Sand
20
20
Pecan Crossing
15
16
10842 Dogwood
60
60
Fairmont East
17
8
10131 Quief
80
80
Fairmont West
1
20
rtle Creek
40
40
Creekmont
21
22
1 Myrtle Creek Willow Creek Inbr
128
320
4
Creekmont
23
24
2,052
2,404
8
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Prepared by Reagan McPhail 8/1212009 Page 1
HULL & HULL, INC. genemI Comet, tore Since 1940
WILLIAM C. HULL, Pres.-C.E.O.
DEBORAH A. HULL, Vice Pres.
JONNA TO W ERY, Secty - Treas.
LETTER OF TRANSMITTAL
Project:
Fire Training Facility Classroom Addition
Project No.
09020
Date:
08/10/09
Co./Dept.:
City of La Porte
604 W. Fairmont Pkwy
La Porte, Texas 77571
Attention:
Reagan McPhail
We Transmit the Following:
❑
Drawings
❑
Certificate for Payments
❑
Samples/Submittals
❑
Specifications
❑
Shop Drawings
❑
Product Literature
®
Other
2223KELLEY
HOUSTON, TEXAS 77026
(713)699-2577
F A X (713) 699-2581
For Your:
❑ Approval
❑ Use
❑ Information
❑ Review & Comment
® Distribution to Parties
® Signature
Copies
Date
Description
6 sets
08/10/09
Signed Contracts
6 sets
08/10/09
Payment and Performance Bonds
6
Insurance Certificates
1
08/04/09
Schedule of Values
I
Preliminary List of Subcontractors and Suppliers
1
Preliminary Schedule
Remarks:
Received By:
Received Date: