HomeMy WebLinkAbout2010 CITY WIDE SIDEWALK REPLACEMENT PHASE II_UNKNOWNJb b(Phe, A rei STANDARD FORM OF AGREEMENT CLP Project No. 2010-4501 THIS AGREEMENT, made this 233 day of December , by and between the CITY OF LA PORTE, hereinafter called "Owner", acting herein through its CITY MANAGER andoates Industries, Inc. (Name of Contracting Firm) Strike out inapplicable terms: (a corporation) (acpavtmWzJ0jp) or (xmk)dM0 N) doing business as: Oates Industries, Inc. hereinafter called "Contractor." WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the construction described as follows: 2010 LA PORTE CITY WIDE SIDEWALK REPLACEMENT PROJECT CLP PROJECT NO. 2010-4501 hereinafter called the pro' ct for tthh Totagl Pr' e of Sixty: Eight . Thousand Eight uddfred'�Phirty i�neght� WW (g 68, 831. 82 ) and all extra work in connection therewith, under the terms as stated in the General and Supplementary Conditions of the Contract; and; Further, that the CONTRACTOR agrees, at his (its or their) own proper cost and expense, to furnish all the knowledge, materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with: A. The terms and conditions stated in the Bid Proposal and in the General Conditions, and Supplementary Conditions of this Contract; Scope of Work, Instructions to Bidders, Sidewalk Location Documents, and Bid Form, B. The plans, which include all maps, plats, blue prints, and other drawings and printed or written explanatory matter thereof; and C. The Specifications and other contract documents therefore, as prepared by the City of La Porte, all of which are made a part hereof and collectively evidence and constitute the contract. SF-1 The CONTRACTOR hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 90 calendar days thereafter. The CONTRACTOR further agrees to pay, as liquidated damages, the sum of $500 or each consecutive calendar day thereafter as hereinafter provided in Paragraph SC-5 of the Supplementary Conditions. IN WITNESS WHEREOF, the parties to these present have executed this contract, each of which shall be deemed an original, in the year and day first above mentioned. M Ron Bottoms City Manager Oates Industries, Inc. Name of Contrac i Danny Earp By: 6 Signature of Authorized Person Vice President Title of Authorized Person 2900 East X Street, 77571 Address and Zip Code ity Attorney Attest: 0 City of La Porte Name of Owner SEAL Martha Gillett Title: City Secretary SEAL Witness SF-2 and furnishing of the Work in respect of changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph. Written notice of each such claim, dispute or other matter will be delivered by the claimant to ENGINEER and the other party to the Agreement promptly (but in no event later than 30 days) after the start of the occurrence or event giving rise thereto, and written supporting data will be submitted to ENGINEER and the other party within 45 days after the start of such occurrence or event unless ENGINEER allows an additional period of time for the submission of additional or more accurate data in support of such claim, dispute or other matter. The opposing party shall submit. any- response .to. ENGINEER and the claimant within. 30_days. after receipt of the claimant's last submittal (unless ENGINEER allows additional time). ENGINEER will render a formal decision in writing within 30 days after receipt of the opposing party's submittal, if any, in accordance with this paragraph. The Engineer's rendering of a formal decision shall be a condition precedent to further dispute resolution actions. Mediation: Any Claim arising out of or related to the Contract may, by mutual agreement between the parties, and after initial decision by the ENGINEER, be subject to mediation. . By mutual agreement, the parties may endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Mediation Rules of the American Mediation Association currently in effect. Request for mediation shall be filed in writing with the other party to the Contract and with the American Mediation Association. The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. Arbitration: All parties agree that under no circumstances. shall any dispute or claim arising of or related to the contract be eligible for arbitration. . Limitation on Consolidation or Joinder. No mediation arising out of or relating to the Contract shall include, by consolidation or joinder or in any other manner, the ENGINEER, the ENGINEER'S employees or consultants, except by written consent containing specific reference to the Agreement and signed by the ENGINEER, OWNER, CONTRACTOR or any other person or entity sought to be joined. No mediation shall include, by consolidation or joinder or any other manner, parties other than the OWNER, CONTRACTOR, and other persons substantially involved in a common question of fact or law whose presence is required if complete relief is to be accorded in mediation. No person or entity other than the OWNER, CONTRACTOR shall be included as an original third party or additional third party to an mediation whose interest or responsibility is insubstantial. Consent to mediation involving an additional person or entity shall not constitute consent to mediation of a Claim not described therein or with a person or entity not described therein. The foregoing agreement to mediate and other agreements to mediate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court having jurisdiction thereof. Claims and Timely Assertion of Claims. The party filing a notice of demand for mediation must assert in the demand all Claims then known to that party on which mediation is permitted to be demanded. SC-30 DRUG AND ALCOHOL POLICY: The CONTRACTOR shall have in place a drug and alcohol policy that shall govern the actions of his employees and any workers in his employ SC-13 undertaking the awarded contract work on the OWNER'S property. The OWNER expects the CONTRACTOR to enforce his own drug an alcohol policy. Lack of a drug and alcohol policy governing the actions and/or behavior of the CONTRACTOR'S personnel or failure to on the part of the CONTRACTOR to enforce said drug and alcohol policy shall be grounds for non -award or constitute breach of this contract. SC-14 BASE BID PROPOSAL BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and further described in the specifications for the sum of Sixty Eight Thousand Eight Hundred Thirty One Dollars and Eighty Two Cents. dollars (S 68,831.82 ). (Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.) Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. The bid security attached in sum of Sixty Eight Thousand Eight Hundred Thirty One Dollars and Eighty Two Cents. dollars (t 68 , 8 31. 82 ) is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. Respec ty submitted BY: (Signature f 4Jthorized Person) Danny Earl) (Print Name of Authorized Person) (SEAL) Vice President (Title) 2900 East X Street (Business Address) La Porte, TX 77571 (City) (State) (Zip Code) . 281-930-9305 (Telephone Number) (Ta STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: $ 24,013.00 ALL OTHER CHARGES: TOTAL: 44,818.82 68,831.82 This total must agree with the total "Total Amount Bid" figure shown on the bid sheet. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. rium BID FORM 2010 La Porte City Wide Sidewalk Replacement Project CLP Project No. 2010-4501 DATE: 12/23/09 Bid of Oates Industries , Inc (hereinafter called "Bidder") an individual proprietorship, a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of General Contractor , for Construction of the 2010 La Porte City Wide Sidewalk Replacement Project , for the City of La Porte, Harris County, Texas (hereinafter called 'Owner.") To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Kelley, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the.City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price SIDEWALK REPLACEMENT Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. Per Square Foot SF 7411 $ 5.26 $ 38,981.86 ME Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-3 2. Removal and disposal of existing concrete sidewalk. Excavated sidewalk to become property of Contractor to be disposed of in a legal manner. SF Per Square Foot 3 Concrete Type "B" wheelchair ramps. In accordance with details and complete in place. Per Each TOTAL BASE BID (ITEMS 1-3) 7431 EA 1 SUPPLEMENTAL BID ITEMS S-1. Extra bank sand (ordered by City). Complete in place. Per cubic yard S-2. Strip Sodding as directed by City and in accordance with Specification 00112. Complete in place. Per Square Yard $ 3.75 $27,866.25 $ 1,983.71 61,983.71 68.831.82 CY 24 SY 66 g 44.68 6 1,072.32 g 42.97 $ 2,836.02 SP-4 S-3. Sidewalk point repair including cement stabilized sand and removal of soil. Complete in place Perton ton 14 556.82 S 795.48 RM The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (2) and (3) above. SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. 2. (Add) (Deduct) (Add)(Deduct) Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids M In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final Date 12/23/09 Signed Oates Industries Inc. (Company) By 04 Witness SEAL (if Bidder is a Corporation) Acknowledge receipt of Addenda Below: Addendum No. Date Received Vice President (Title) 2900 East X Street La Porte, TX 77571 (Address) 281-930-9305 (Telephone Number) --000-- BP-7 BASE BID PROPOSAL BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and further described in the specifications for the sum of,Au f. 4?2 i av, d- 4 �p d, (l1.o/%Ps, amdstijc<•L6 nyn-ln dollars ( (Amount shall be shown in both words and figures. In case of discrepancy, the amount showd in words will govern.) Bidder understands that the Owner reserves the right to reject any or all bids and to waive any Informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. The bid security attached in sum of Alif) dollars ($mil is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. BY: (SEAL) J em Q I l P ao,u n G - (Business Add ress) ASA MAI0- ]Y ,As `171V4 (City) (State) (Zip Code) � -P13 u t yy4o (Telephone 9 ber) A-8 STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: $ �?a, _� 4 q. 04 ALL OTHER CHARGES: $ /����js , S9 TOTAL: $ HaL�3�.lna This total must agree with the total "Total Amount Bid" figure shown on the bid sheet. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. SP-1 BID FORM QUOTE #1016 2010 La Porte City Wide Sidewalk Replacement Project CLIP Project No. 2010-4501 I �/�i DATE: 22 V f) q Bid of�pf)QLS l bIC-1 pA .l P- (hereinafter called "Bidder") an individual proprietorship, a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of for Construction of the 2010 La Porte City Wide Sidewalk Replacement Project , for the City of La Porte, Harris County, Texas (hereinafter called `Owner.') To: City of LaPorte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-3 SIDEWALK REPLACEMENT Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. s �57 s iIEL9.a7 BP-3 Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price 2. Removal and disposal of existing concrete sidewalk. Excavated sidewalk to become property of Contractor to be disposed of in a legal manner. SF 7431 $D.A'5 $ � Per S uare o0 3 Concrete Type "B" wheelchair ramps. In accordance with details and complete in place. @ r .t "d,,id. (11Yl v.n0 / Pylis EA 1 $4.7p. 0' $4.-5Q,� Per Each TOTAL BASE BID (ITEMS 1-3) $� �3 Y • tPa- SUPPLEMENTAL BID ITEMS S-1. Extra bank sand (ordered by City). Complete in place. @ r- 14P.2n 146110c (k d alp O O,N s CY 24 $/S. 0Q $ Do Per cubic yard S-2. Strip Sodding as directed by City and in accordance with Specification 00112. Complete in place. @ I HrPF. too a g amd- SY 66 $ PEr 9quore Yard S-3. Sidewalk point repair including cement stabilized sand and removal of soil. Complete in place @ �l14i� n ton 14 $ A p D $ rn • u Parton SP-3 The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (2) and (3) above. SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. 1. (Add) (Deduct) $ NIA 2. (Add) (Deduct) $ Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security, accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. BP-3 The undersigned certifies that the sub fitted as correct and final Date 4 bid prices contained in this proposal have been carefully checked and are 4 � I i,,,,e , C) - // - SEAL (if Bidder is a Corporation) Acknowledge receipt of Addenda Below: Addendum No. Date Received 1 01i �' ' '- 2 . g47- g4gL) (Telephone Number) --000-- BP-3 CITY OF LA PORTE AMENDMENT #1 QUOTE #1016 — LA PORTE CITYWIDE SIDEWALK REPLACEMENT PROJECT December 22, 2009 DEAR VENDOR Please note Quote #1016 — La Porte Citywide Sidewalk Replacement Project does not require a bid bond. If you have any questions, please contact Purchasing at 261-470-5126 or e-mail purchasing a()laportetx.gov. Thank you for your cooperation in this matter. Yo rs truly, Jeana Masterson Buyer SCOPE OF WORK QUOTE #1016 CLIP Project No. 20104601 2010 La Porte City Wide Sidewalk Replacement Project The project consists of the removal of approximately 7,500 square feet of standard four foot wide sidewalks and replacing with approximately 7,500 square feet of new sidewalk including the construction of 1 wheelchair ramp. Sidewalks and wheelchair ramps shall meet the minimum criteria as established by the American Disabilities Act. All spoils shall become the property of the contractor to be removed from the site, and disposed of in a legal manner. It shall be the contractor's responsibility to provide necessary barricading to ensure the access, health, and welfare of citizens, employees and product. Adjustment of Water Gate Valve boxes and Manhole covers shall be considered as incidentals. A Payment Bond shall be required for this project. Main Street The sidewalk replacement proposed on Main Street the contractor shall coordinate with shop owners to schedule the work to minimize the disruption of business. Contractor shall extra precautions to protect adjacent buildings during placement of concrete. A %' bituminous felt shall be placed between new concrete and building foundations. Along the curb line new concrete shall be tied to existing concrete by embedding #3 rebar 4" into curb on 18" centers and secured with epoxy. A-3 2010 SIDEWALK REPLACEMENT PROJECT (GEN 709) 10/512009 ADDRESS removal WCR replace Subdivision Comments (so (ea) (so 9214 Caddo 40 40 Pecan Crossing mh adj. 3806 Stuart 120 120 Pecan Crossing 9209 Stuart 80 80 Pecan Crossing 3733 Chodaw 20 20 Pecan Crossing mh adj. 9218 Caddo 60 60 Pecan Crossing 10022 Stonemont 276 276 F'mnt Park West 10833 Mesquite 40 40 F'mnt Park East 10343 Rustic Rock 316 1 296 F'mnt Park Central 10438 Shell Rock 160 160 F'mnt Park Central 10439 Shell Rock 188 188 F'mnt Park Central 10402 Shell Rock 20 20 F'mnt Park Central 10330 Shell Rock 20 20 F'mnt Park Central 10327 Shell Rock 140 140 F'mnt Park Central 10311 Shell Rork 20 20 F'mnt Park Central 10302 Shell Rock 20 20 F'mnt Park Central 10450 -10459 Rustic Rock 672 672 F'mnt Park Central 10457 Rustic Gate 320 320 F'mnt Park Central gvb adjustment 10451-10459 Quiet Hill 704 704 F'mnt Park Central 10451-10459 Collingswood 824 824 F'mnt Park Central 10435 Quiet Hill 304 304 F'mnt Park Central 10431 Quiet HIII 220 220 F'mnt Park Central Farrington westside btw Clingswd and Wndng Td 400 400 F'mnt Park Central Collingswood and Winding Trail 10362 Antrim 104 104 F'mnt Park Central 5214 Meadow Crest 100 100 Glen Meadows 5205 Meadow Crest 40 40 Glen Meadows 5209 Meadow Crest 48 48 Glen Meadows 5118 Meadow Crest 160 160 Glen Meadows 5034 Meadow Crest 24 24 Glen Meadows 5009 Creekview 65 65 Glen Meadows 5017 Creekview, 160 160 Glen Meadows 5029 Creekview 160 160 Glen Meadows 5225 Creekview 120 120 Glen Meadows 5226 Creekview 200 200 Glen Meadows 300-308 Main Street 1,286.00 1,286.00 Town of LP Total 7431 1 7411 PURCHASE REQUISITION NBR: 0DOD013928 STATUSt PUMP 15 ACCgUNTS R9QVI5x'4'ION Al: Lg E, PBti G.Y REASONS (�^Otis}:Q!(B ISO gifA;li �y 8-#,L3lC E,YlIg N.TTrrYYP.,Rn.jy C..�! DATE: 2/08/10 SHED TO LOCATIOd:. PLANNING SUQGESTE9 VENDOR; tp Ep TF7;T,iE.7C;yjC;Qfj;;',�.R_9(A.x'ORS;",'4 .Uf 4ELIVBR BY DLTg: ¢/}2/30 LINE UNIT EXTEN4 NB$ DESCRIPTf ON - QUANTITY VON COST COST VgN OR PART NUM(fER i CONST.RUCTIoN 4.0542.00 EA 1.0009 4654,2.00 COMMODITY: PROF$USIONAL SERV;CES . SUBCOMMOD: CONSTRUCTION - REQUISITION TOTAL: 40512.00 __.._--___-..._ -_____ 4_ -___-____ z___.__._.��_.___f____._._,...,J_T_.,._____�_�___�_____�_____________ ____-_ 'I__�. f- -_. A c c o y N T sc o R N AN LINE, # ACCOUNT PROQECT 4 AMOUNT 1 Oj:`598927097140 CONSTRUCTION COSTS GON709 100.40 46U42.00 CONSTRUCTION CONTRACT #4 61PENAPX REPAIRS REQUISITION COMMENTg; inoludeq freight Vena9t LngoFm4tio6: PO Box 711, St4.t ford, TX 77477 Cont adt': ?hplipe Aodrig-Vex Phi 2:51-499-9030 REQUISITION IS IN THE CURRVN4'..2'I$CAL Y;AR. m JAN 0 G 2009 Ip INTEROFFICE MEMORANDUM pUiirrl;l-'liJ�Jl'J) Ch'] To: Reagan McPhail, Public Improvement Coordinator From: Jeana Masterson, Buyer Subject: Quote #1016 — 2010 La Porte City Wide Sidewalk Replacement Project Date: January 4, 2010 Please see the attached quotes for Quote #1016 — 2010 La Porte City Wide Sidewalk Replacement Project. The quote was sent to nine (9) vendors with four (4) vendors responding with a quote. Also attached are references for the apparent low bidder, Centertex Constructors. Attachment: Quote Copies Quote Tabulation. Vendor References McPhail, Reagan From: Wolny, Shelley Sent: Monday, March 22, 2010 3:48 PM To: McPhail, Reagan Subject: RE: 2010 City Wide Sidewalk Replacement Project Reagan, After the budget is adjusted for that $13,938, you should have about 9518 left. Shelley From: McPhail, Reagan Sent: Monday, March 22, 2010 1:15 PM To: Cream, Susan; Wolny, Shelley Cc: Bottoms, Ron; Joerns, John; Tietjens, Tim; Lee, Peggy Subject: 2010 City Wide Sidewalk Replacement Project Susan/Shelley Phase I of this year's project is complete, expending $37,024.69 to replace approximately 1,850 linear feet of sidewalk. Please close-out account 015-9892-709-5140 and transfer remaining encumbered funds to 015-9892-709-1100. Phase II quote proposal was submitted to six contractors, out of the six we received one proposal from Brooks Concrete in the amount of $10,597.60. Shelley, what is the total of available funds in the 1100 account? Reagan PURCHASE REQUISITION NBRt 0000612928 STATUS; FUND 15 ACCOUNTS REQUISITION ei: LE E•, PSG GY REASON; S'IiOEMAL FOP}GtIA$N�7i'p.R DATE: 2/09/10 $HLD TO LOCATION: PLANNING 8000ESTE9 VENDOR; 10E'j7:T'E Ri1',T�EX;C.'ONA'�T,y'TO R'Si'Lf DELIVER BY DATE: 2/12/10 LINE UNIT EKTENQ ' NSR DESCRIPTION QUANTITY UOM COST COST VENQOR PART NUMBER ____________________� ___ ___,e_____,. - r n _ ___ _ 1 CONSTRUCTION COMMODITY: PROFESSIONAL SERVjCES SUBCONMOD: CONSTRUCTION 46542.00 EA 1:0000 46542.00 REQUISITION TOTAL: 46542.00 .n t .. _1 e _ ____ _ ______ _ ____ A C C O U N T I 0 r O R. 14 A Y I O U LINE # ACCOUNT PROJECT Y AMOUNT 1 01596927095140 CONSTRUCTION COSTS GSN709 100.00 45,542.00 CONSTRUCTION CONTRACT #4 SIDENA$.R REPAIRS REOU191TION COMMLIITS: includes fr#i9ht Vendot infosmatdod: PO Bo% 711, Stafford, TIE 71477 Contact: ?helipa AodrigVes Ph: 2�#1-499-9030 REgUISjTjON IS IN THE CURRENT.¢ISCAL YaAR. , crG�r Lee, Peggy From: McPhail,.Reagan Sent: Monday, March 29, 2010 9:29 AM To: Lee, Peggy; Wolny, Shelley Cc: Cream, Susan Subject: 2010 City Wide Sidewalk Replacement Project Phase II Attachments: Quote.pdf; budget adjustment.pdf Shelley, please make the above budget adjustment. Peg, will need to make application for a PO in the amount of $10,598. The construction account number is 015-9892- 709-51-40. We.only received 1 proposal. Follis, Teamwork, Mar -con, Ideal Construction and AI-conwere invited to submit a bid as well. Thanks Reagan MAR-22-2010 07:36 FROM:BROOKS CONCRETE INC 7139478444 T0:2814705005 P.1/1 CITY OF LA PORTE QUOTE FORM, TheCity of La Porte Is requesting quotes on the 2010 City Wide Sidewalk Replacement Project Phase'll. Any exceptions to the following specifications must be noted in detail. Be sure to include all Charges, including freight, handling, delivery, and any other fees. Quote must be returned on Wei form. Prices shall be firm for a.minimum of thirty (30) days. Please fax your quotes to the Planning Department, fax number 261d7Qy600$,.by .3/22/10 If more Information Is needed, please contact Reagan McPhail at 281-470.5069 or e-mail: mcphai lrac i.la-portoAx.us SPECIFICATIONS Complete and In place 1. Sidewalk -Removal 2. Sidewalk Replacement UNIT EXTENDED EST. QTY PRICE PRICE 2.-038 of 2,038 sf ,1)_ 2'ssq• 60 Bid per attached plans and specifications, TotalJQi.�9.7. !6 a Frelght/Deltvery 1414, (if estimated, state "not to exceed" price) Itemize any additional fees or charges: You may use another sheet, If necessary. TOTAL COST 8 ID .61?2 fa,(price shall be firm and may not be exceeded) State delivery time ARO (after receipt of order) . /Q days Vendor Name:,e�S /'.rrnnar�c .Te P. Phone#: N • 91�/��0 Contact name: 11 PJXIL Signature: - CITY OF LA PORTE BUDGET ADJUSTMENT FORM oA4A n1T 1AllnE 4InCWAI K PVPI ACFMFNT PHASE 11 ... .. .. .. .. .. ..., .,,.. .. ,, wAob numEen onh'.::.'.: A000UNT`i1::!.',,,:PROJECT.......EXPLANATION..;:::.`,;:::i.::;.AMOUNTQF;,::.`.,'.. 'NUMBER `. "`.NUMBER OF TRANSFER `" '' `INCREASE '.DECREASE: FROM: TO: 016.9892.700-9160 GEN 700 FUND CONST CONTRACT ,ra 1 600 016.9892-709-6140- GEN-709 1600 FROM: TO: FROM: TO: FROM: TO: FROM: TO: TO: FROM: TO: FROM: TO: FROM: TO: �5 ° - FROM: TO: IN FROM: . TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: Wig NE 1 600 1 600 / 11� DEPARTMENTAL APPROVAL: FINANCE APPROVAL: DATE: 3/29/2010 REVISED 8I24/98 9-34-- - o IV -1 -51k w /r.�.,,� 70_9_. _Paw Aq-sV- 30, - - - - MAR-22-2010 07:36 FROM:BROOKS CONCRETE INC 7139476444 TO:2814705005 P.1/1 CITY OF LA PORTE QUOTE FORM The City of La Porte is requesting quotes on the 2010 City Wide Sidewalk Replacement Project Phase II. Any exceptions to the following specifications must be noted in detail. Be sure to include all charges, including freight, handling, delivery, and any other fees. Quote must be returned on this form. Prices shall be firm for a minimum of thirty (30) days. Please fax your quotes to the Planning Department, fax number 281.470-6006, by 3/22/10 If more Information Is needed, please contact Reagan McPhail at 281-470.5065 or e-mail: mcphailr@ci.la-porte.tx.us SPECIFICATIONS Complete and in place 1. Sidewalk Removal 2. Sidewalk Replacement UNIT EXTENDED EST. QTY PRICE PRICE 2,038 sf /. 6 0 �a, Q-3 oD 2,038 sf J. a o sgq- 60 Bid per attached plans and specifications. Total Freight/Delivery if estimated, state "not to exceed" price) Itemize any additional fees or Charges: You may use another sheet, if necessary. TOTAL COST 5697 !a4 (price shall be firm and may not be exceeded) State delivery time ARO (after recelpt of order) /D days Vendor Name: Phone M Contact name: Signature: CITY OF LA PORTE BUDGET ADJUSTMENT FORM 2010 CITY WIDE SIDEWALK REPLACEMENT PHASE II whole numbers only ACCOUNT PROJECT EXPLANATION AMOUNT OF NUMBER NUMBER OF TRANSFER INCREASE DECREASE FROM: TO: 015-9892-700-9150 GEN 700 FUND CONST CONTRACT 1,500 015-9892-7095140 GEN 709 1,500 FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: 1,5001 1,500 ,lor DEPARTMENTAL APPROVAL: 4a0a FINANCE APPROVAL: DATE: REVISED 8/24/98 3/29/2010 PURCHASES REQUISITION NBR: 0000013074 STATUS: FUND 15 ACCOUNTS REQUISITION BY: LEE, PEGGY REASONi 2010 SIDEWALK REPLACEME ASE II DATE: 3/31/10 SHIP TO LOCATION: PLANNING SUGGESTJSD VENDOR: 431126 BROOKS CONCRETE, INC DELIVER BY DATE: 4/07/10 LINE UNIT EXTEND NBR DESCRIPTION ------------------------------------------------------------------------------------------------------------------------------------ QUANTITY DOM COST COST VENDOR PART NUMBER 1 SIDEWALK REMOVAL 203B.00 SFT 1.0000 2038.00 COMMODITY: BUILDINGS SUBCOMMOD: CONSTRUCTION 2 SIDEWALK REPLACEMENT COMMODITY: BUILDINGS SUBCOMMOD: CONSTRUCTION 2038.00 SFT 4.2000 REQUISITION TOTAL: 8559.60 10597.60 ___________________________________________________________________________________________..____-_---___--___-_--___---_—_-_-_ A C C O U N T I N F O R M A T I O N LINE .S ACCOUNT PROJECT 9 AMOUNT 1 01508927095140 CONSTRUCTION COSTS GEN709 100.00 2038.00 CONSTRUCTION CONTRACT 04 SIDEWALK REPAIRS 2 01599927095140 CONSTRUCTION COSTS GON709 100.00 8559.60 CONSTRUCTION CONTRACT #4 SIDEWALK REPAIRS REQUISITION COMMENTS: freight included Contact: JOSS Brooks Q 713-947-8440 RE QUISSTION I6 IN THE CURRENT FI9CAL YEA R'R% . U V 10597. 60 •:MM-22-2010 07:36 FR0M:BR00KS CONCRETE INC 7139478444 T0:2014705005 P.1/1 CITY -OF LA PORTE QUOTE FORM The City of 4a Porte is requesting quotes on the 2010 City Wide Sidewalk Replacement Project Phase II. Any exceptions to the following specifications must be noted In detail. Be sure to Include all charges, Including freight, handling, delivery, and any other fees. Quote must be returned on this form. Prices shall be firm for is minimum of thirty (30) days. Please fax your quotes to the Planning Department fax number 2by = If more Information. is needed, please contact Beagan McPhail at 281-470.5085 or e-mail: mcphai IrQci.la•p orte.tx.us SPECIFICATIONS Complete and In place 1. Sidewalk Removal 2. Sidewalk Replacement UNIT EMNDEO EST. QTY PRICE PRICE 2.038 of �/. 6 D'D 21038 of Bid per attached plans and specifications. Total 5,7;— Frelght/Dellvory $ /S (if estimated, state "not to exceed" price) Itemize any additional fees or charges: You may use another sheet, If necessary. TOTAL COST S lb jV J /.;a . (price shall be firm and may not be exceeded) State delivery time ARO (after receipt of order) /D days Vendor Name: LP ^nL T Phone #: i%�R„1� W o Contact name: IP100L Signature: -- Lee, Peg From: McPhail, Reagan Sent: Monday, March 29, 2010 9:29 AM To: Lee, Peggy; Wolny, Shelley Cc: Cream, Susan Subject: 2010 City. Wide Sidewalk Replacement Project Phase II Attachments: Quote.pdf; budget adjustment.pdf Shelley, please'm8ke the above budget adjustment. Peg, will need to make application for a PO in the amount of $10,598. The construction account number is 015-9892- 709-5140. We only received 1 proposal. Follis, Teamwork, Mar -con, Ideal Construction and AI -con were invited to submit a bid as well. Thanks Reagan CITY OF LA PORTE BUDGET ADJUSTMENT. FORM.. on4n r.ITv wlnF RmFWAI K RFPLACEMENT PHASE II • 1 11 1 . . �T{��'i����Lftl 11 Ci��y��11 • � Imo'?-'...�.tt�.i • • ISM`.,'= - E HE- DEPARTMENTAL %kl FINANCE APPROVAL: DATE: 3/29/2010 REVISED 812498 Lee.Peggy From: Lee, Peggy Sent: Wednesday, March 31, 2010 1:59 PM To: Purchasing - Staff Cc: Tietjens; Tim; McPhail, Reagan Subject: CP1030 - CenterTex Contractors $2,975.31 is encumbered on Purchase Order #CP1030 (CenterTex Contractors). Please close out this purchase order as this phase of the sidewalk project has been completed. Thanks. -Peggy Peggy Lee, Office Coordinator City of La Porte Planning Department 604 W. Fairmont Parkway, La Porte, TX 77571 Phone: 281-470-5057, Fax: 281-470-5005 IeeoCdlaoortetx.eov 12/29/2009 15:52 FAX 2812615565 Allgood Construction Co. QUOTE #1 Please list your comp Name of Business: Contact Name: Address: Phone Number. Email Address: Type of Job; Amount of Job. Name of Business: Contact Name: Address: Phone Number.; Email Address: Type of Job: Amount of Job: Name of Business: Contact Name: Address: Phone Number. Email Address: Type of Job: Amount of Job: REFERENCE 016 - 2010 LA PORTE REPLACEMENT PR tny's last five (6) like jobs -over $ City of Pearland (Pearland Parkway) ITY.1 JEi ;000.0 . Ms. Jennifer Phan 3501 E. Orange Street, Pearland 281-652-1914 Install waterline and replace sidewa $52,248.00 City of Alvin (Lang Street-Waterli ) Mr. Jim Nance 1100 W. Hwy 6, Alvin, TX 77,511 281-388-4294 Install waterline and replace sidewalks $104,000.00 Allgood Construction Co., Inc. Mr. Roy Rodriguez 2647 Jo Ann Street Stafford,TX 7 477 281-808-5882 utilities and sidewalks $30,000 to 80,000 NIDE SIDEWALK. ;T Dforreferences: i i i I I' i i i i i i i j j i f i i QUESTIONS FOR VENDOR REFERENCES Vendor: (i&+ 1. Whe did the vendor provide service for your company? Ofik' 'C� 1A �3 " - 2. Were you satisfied with the service or did you encounter any problems? , -�b ro 3. If so, quickly did they respond? 4. Were you satisfied with the quality of work? W 5. Did the vendor complete the project in a timely manner and within the original budget? VD 6. Would you use this vendor in the future, if no, why not? VD 7 On a scale of 1 to 10, how pleased were you with the overall prict. (� Reference Company: Contact Name: Phone Number: QUESTIONS FOR VENDOR REFERENCES Vendor: i 1. When did the vendor provide service for your company? 2. Were you satisfied with the service or did you encounter any problems? P P4�1` 3. If so, how quickly did they respond? 4. We ere you satisfied with the quality of work? 5. Did the vendor complete the project in a timely manner and within the original budget? 6. ld Wouo y u use this vendor in the future, if no, why not. �D 7. On a scale of 1 to 10, pleased were you with the overall project? 1 Reference Company: Contact Name: Phone Number: 7i$ . �j`(�Pj • �ti$ QUOTE TABULATION #1016 - CITY WIDE SIDEWALK REPLACMENT DESCRIPTION CITY. CENTERTEX CONSTRUCTORS BROOKS CONCRETE OATES INDUSTRIES MAR -CON SERVICES 1. Concrete 4' wide sidewalk placement ITEM #1 TOTAL 7411 $3.32 $4.57 $5.26 6.20 2. Removal and disposal. ITEM #2 TOTAL 7431 $0.90 $0.85 $3.75 3.90 3. Concrete Type B wheelchair ramps ITEM #3 TOTAL 1 $800.00 $450.00 $1,983.71 1,476.00 TOTAL BASE BID $32,092.42 $40,634.62 $68,831.82 $76,405.10 Supplemental Bid Items S-1. Extra band sand (ordered by City) ITEM # S-1 TOTAL 24 $16.50 $15.00 $44.68 $20.90 S-2. Strip Sodding as directed by City ITEM # S-2 TOTAL 66 $15.00 $3.50 $42.97 $6.00 S-3. Sidewalk point repair ITEM # S-3 TOTAL 14 $18.25 $29.00 $56.82 $418.40 TOTAL SUPPLEMENTAL BID ITEMS $1,641.60 $997.00 $4,703.82 $6,755.20 Information represents pricing only, and other factors may or may not be considered during the evaluation process BASE BID PROPOSAL BASE PROPOSAL: Bidder agrees to perform all off the hown on the /plans further described in the spegifipations for.fJ�e sum of E�f� r_ /t'+ l RO✓Sli dollars ($ 'S /60 . '= ). (Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.) Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. �+ The bid security attached in sum of A4 dollars ($ Al & ) is to become the property of the Owner in the event the contract and bond are not a ecuted within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. Respectfully su ed . BY: (Signal re of Authoriz d Person) /j�'io G. rsJs (Print Name ot AuthorizedPerson) (SEAL) QCJIry�/ (Title) /y/afn:,l7d.���.�. (Business /Address) 7 Gf�Alr1 �1 /X j % i0 3 (City) (State) (Zip Code) -//--y13'l�°° (Telephone Number) Ma STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: ALL OTHER CHARGES: TOTAL: 2: OKI' This total must agree with the total "Total Amount Bid" figure shown on the bid sheet. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. Q& BID FORM 2010 La Porte City Wide.Sidewalk Replacement Project CLP Project No. 2010-4501 DATE: 12-23''/ Bid of LL ( • (hereinafter called "Bidder") an individual proprietorship, a corporation organized a ex}}sting unde? laws of the State of Texas, a.,partnership, or individual consisting of At'No ylP , for Construction of the 2010 La Porte City Wide Sidewalk Replacement Project , for the City of La Porte, Harris County, Texas (hereinafter called "Owner.") To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Kelley, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are, to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price SIDEWALK REPLACEMENT Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. /ii�a�7i/ �ieH7s SF 7411 Per Square Foot ;Zv Zo Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-3 2. Removal and disposal of existing concrete sidewalk. Excavated sidewalk to become property of Contractor t/o be disposed of in a legal manner. @ / fire , /.,NJl- <c N c� /I/// A C/nfS SF 7431 Per Square Foot Concrete Type "B" wheelchair ramps. In accordance with details and complete in place./ @ - .O ✓d 5;;yyd tY �Y -7),1 .1 ✓S EA Per Each TOTAL BASE BID (ITEMS 1-3) SUPPLEMENTAL BID ITEMS pv So $ 3. ' $ z8, 9go. $ l q76. $- y7G S-1. Extra bank sand (ordered /by City). Complete in place. @ /yi nPTi/ �rhlfs CY 24 $ LO . $ Per cubic d S-2. Strip Sodding as directed by City,and in accordance with Specification 00112. Complete in place. SY 66 $ Per Square Yard S-3. Sidewalk point repair including cement stabilized sand and removal of soil. Complete in place I i @�°ur �y�i�tar� C��4TNeep aO.) ��ty Crh�s Per ton ye ton 14 $ 1S 6e MM The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (2) and (3) above. SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. 2. (Add)(Deduct) (Add) (Deduct) Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should failto enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days - after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. im In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this prop I have been carefully checked and are submitted as correct and final e Date 2 2 S- d 9 Signed (Company) yIt• C rt SNP/tY j 11c Witness SEAL (if Bidder is a Corporation) Acknowledge receipt of Addenda Below: Addendum No. Date Received /2-22-V 9 By (Title) 61W17Y' 1y11e ;Er44f T 772'? (Address) 1/3- 173'-/7o0 (Telephone Number) --000-- AM