Loading...
HomeMy WebLinkAbout2010 SIDEWALK IN-FILL_UNKNOWN1.rl� CITY OF LA PORTE BUDGET ADJUSTMENT FORM 2010 Sidewalk In -fill Pro'ect whole numbers only ACCOUNT PROJECT EXPLANATION AMOUNT OF NUMBER NUMBER OF TRANSFER INCREASE DECREASE FROM: TO: 01698929271100 927 grass seed supplies 100 01698929277120 927 100 FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: FROM: TO: 100 100 DEPARTMENTAL APPROVAL: �✓� FINANCE APPROVAL: ' / DATE: joy REVISED 8/24/98 Weger, Heather From: Harrod, Curtis Sent: Monday, February 21, 2011 11:03 AM To: Allen, Bonnie Cc: Pennell, Don; Weger, Heather Subject: RE: AT& T Claim for Damages BONNIE: NOT ASSOCIATED WITH UTILITIES. FWD TO THE PROJECT COORDINATOR FOR THE CITY WIDE INFILL SIDE WALK PROJECT( R. Mc PHAIL ) Ch/ From: Pennell, Don Sent: Monday, February 21, 2011 8:07 AM To: Herrod, Curtis Subject: FW: AT& T Claim for Damages Is this Utilities? From: Weger, Heather Sent: Monday, February 21, 2011 7:19 AM To: Pennell, Don Subject: FW: AT& T Claim for Damages Don, Did we do this? From: Allen, Bonnie Sent: Friday, February 18, 2011 4:46 PM To: Human Resources - Staff Subject: AT& T Claim for Damages Hi Heather, Do I need to send this invoice who is processing this payment Bonnie to Public Works? request. Thanks I am not sure for your help. 1 CITY OF LA PORTE I,NTEROFFI'C.E MEMORANDUM March 3, 2011 TO: G. Reagan McPhail, Public Improvement Coordinator FROM: Richard J. Spicer, Survey Party Chief SUBJECT: AT&T Bill for damages... The alleged fault for the phone line break does not belong to the City of LaPorte. I contacted Texas One Call two times during the Survey phase of this project and all underground utilities were located and plainly drawn on the Sidewalk In -Fill construction plans. Texas One Call was called by me on Jan. 61h, 2010 Ticket# 6101475 an' April April 121h, 2010 Ticket# 102100437. >1 on't agree to the fault falling on Stone Castle Industries Inc., since the equipment on sight was a small front-end loader, (Bobcat), and the scope of the work did not require digging anywhere deeper than one foot. I never actually saw the hole where the break was to see how deep it was. I would imagine that a phone cable serving 200 plus residents would be a minimum of 24" deep if not mo e.� Fy r=.0IIecti0fi e—.tractor, Stone Castle, was not a area o the break when it was documenteVhe call came in to AT&T. This would be for Stone Castle Industries'Inc. to take it up with AT&T as to their innocence in the matter. AT&T has expressed that since Stone Castle did not call in locates, they would be in violation of standard practice and be liable for py damages incurred in the construction areas. 301/ Thanks, Richard J. Spicer �I Page: 1 of 3 Date: 02/10/2011 a l8cl RECEIVED Claim for Damages FEB 15 2011 To: O ACCOUNTIN Summary of Charges LA PORTE CITY OF ij� DIVISION P.O. BOX 1115 LAPORTE, TX 77017 OF The following amounts include direct and indirect costs covering LA P� repair of this damage including but not limited to personnel, equipment and vehicles. These include the labor, contractor, Claim Number: SWBT-07-201012-04-0041-PDD material, loss of service and other miscellaneous costs Charges for Damages to: LABOR COST $1,010.63 SOUTHWESTERN BELL TEL CO., DBA AT&T TEXAS MATERIALS/UNIT COST ITEMS $240.46 Oecured/Discovered On or About: 12/10/2010 CONTRACTOR $982.50 Approximate Location: F 900 S.VIRGINIA S.W.CORNER, LA PORTE, TX LOSS OF SERVICE $408.00 How Damage Occured: DIGGING UP PLACING SIDEWALK, DAMAGED A 300PR TOTAL AMOUNT DUE: $2,641.59 BURIED CABLE, NO REQUEST FOR LOCATE Breakdown of Charges on next page Call before you dig Call 811 For Inquiries Coll: 800-894-0374 or 800-363-3234 (FAX) This payment is due upon receipt. If payment is not received within 30 days further collection action will be taken. IF A PAYMENT FOR LESS THAN THE FULL AMOUNT IS RECEIVED, IT WILL BE APPLIED AS A PARTIAL PAYMENT. Please do not pay with telephone bill. If you are covered by insurance, please forward this to your carrier for payment. Once your claim has been established with your insurance company, please contact us at 800-894-0374 with your claim information, and we will work with your insurance company to resolve. AT&T accepts checks, money orders or credit card payments. We do not accept cash. Please complete the information below and return in the enclosed envelope or you may call 800-894-0374 to pay by phone. aw TOTAL AMOUNT DUE: $2,641.59 Return this section with payment in enclosed envelope. Please write claim number on check or money cider to ensure proper credit. For credit card payment: Credit Card number: Name on Card: Amount to be charged to your card: Three digit security number on back of Expiration Date: Amount enclosed: LA PORTE CITY OF Claim Number: SWBT-07-201012-04-0041-PDD Remit Payment to: AT&T 909 Chestnut Street Room 39-N-13 St. Louis, MO 63101-3099 �n�ai�aom�ounmannwrmu�mrunmanui 11111990,91111 1 4783.001.000193.02.02.0000000 NNNNNNNY 0457.0457 at&t Breakdown of charges LABOR COST DATE OF REG REG EMPLOYEE REPAIR HRS RATE JP 12/11/2010 8.00 115.4978876 DESCRIPTION OUANTTrY ENCAP REETERABLE 3M 1900 GM 4 CABLE ANMW 0300 10 CLSR SPLC XAGA BU1650B2KT 2 CONNECTOR 710 SC1 5PK 25 2 MAPP GAS 1 LB CYLINDER 1 MARKER BALL ORANGE (LOCATION) 1 NDC TROUBLE TICKET 1 NCSC TROUBLE TICKET 1 CONTRACTOR COST CONTRACTOR NAME NEC CONSTRUCTION Page: 2 of 3 Date: 02/10/2011 OVr OVT DBL DBL HRS RATE HRS RATE AMOUNT 0.75 115.4978876 $1,010.63 Labor Cost Sub -Total $1,010.63 UNIT COST AMOUNT 12.7039120 $50.82 3.6752120 $36.75 62.8078860 $125.62 1.0834440 $2.17 3.4309060 $3.43 3.7070780 $3.71 6.5300000 $6.53 11.4300000 $11.43 Material Sub -Total $240.46 AMOUNT $982.50 Contractor Cost Sub -Total $982.50 continued on next page 4� �<YIIM I • Breakdown of charges (continued) LOSS OF USE DESCRIPTION QUANTITY POTS LOCAL EXCHANGE 200 Page: 3 of 3 Date: 02/10/2011 UNITCOST /OF DAYS AMOUNT 2.04 1 $408.00 Loss of use Sub -Total $408.00 Total Labor Cost, Materials, Contractor, Loss of Use, Other Items $2,641.59 —'---- - --- - ------------ ---- - ------------ .- - -- - -. - --- - - -- --- - - - - - -- - - -- - — - --.=I 4783,001.000193.01.02,0000000 NNNNNNNY 0455.0455 AT&T 909 Chestnut Street Room 39-N-13 St. Louis, MO 63101-3099 RETURN SERVICE REQUESTED 4783.1.1.193 1 SP 0.440 KY Ill�ll��l��rl��l��lll�ll��ll��l�l�l�ll�ll'll�llllll�ll�l�llll��l� LA PORTE CITY OF PO BOX 1115 LA PORTE TX 77572-1115 HARRIS COUNTY NOTIFICATION OF CONSTRUCTION IN RIGHT-OF-WAY 1. USER INFORMATION (Please print or type) UserName City of LaPorte User Mailing Address 604 W. Fairmont Parkway City LaPorte State Tx Zip 77571 Business Phone- 2814705065 Cell Fax 2814705005 Email mcphaiir@laportetx.gov Public Utility Name Phone Public Utility Mailing Address City State Zip Project Name 2010 City Wide Sidewalk Infill Project Project No. 2010-4503 Key Map® Page 539W HCAD Number(,) map # 6054D - no account We Bond I.D. rtf8 Amount (if applicable) nf8 2. CONSTRUCTION TYPE Overhead Cable ❑ Under Ground Cable ❑ High Pressure Underground ❑ Low Pressure Underground Pipeline Pipeline (60 psi or greater) (under 60 psi operating pressure) Require PE's seal & signature ❑ Median Opening/ ❑ Underground Utilities ❑ Monumentation Sign Other Turn Lane Typc Provide Estimated Cost: Provide Estimated Cost: S $20 000 S Facility to Cross Road . Aoad=Niime &-Block'Number, ��.�7 'Survey"&Abstract No.' ' Length of Crossmg TYPF .. E OCHECK ONE)y . Bored %''Jacked •'.-Driven ,Cased. Facility to Parallel County Road Within Right -of -Way k:;Road Name and�Block.Number ::. From i ' To t. `: - r. Distance ' •: Underwood Rd Myrtle Creek North "H" Street 1,000 LF Facility in Harris County Flood Control District Right -of -Way HCFCD Unit Number(s) Component affecting ROW (Check One) From To Distance ❑ Bride ❑ Channel ❑ Owfall ❑ Utility ❑ Trail --- ❑ Basin Type of Pipe and/or Main (Steel, Cast Iron, Concrete, etc.) Pipe Size & Grade Wall Thickness Type of Material or Substance to be carried Anticipated Working Pressure 1, , the undersigned have carefully reviewed this notification and my answers to all questions. To the best of my knowledge the answers at all we and correct. / V )21111,0 SIGNATURE of UsedAvent or Attomev A_77r// �L. 0 Dale Receivin -•' ',IPlancherJcin ' - Cashier ,iDate'Noti6cation<Aeceived ..ApphcanE No r A. Plari""checker; :Approved'By/Date ti Road Use Fee' " . Request No Common Camer. ;:Census Tract: Receipt No. I W)) Nortnwest Vrwy, butte itu, r7ouston IA //uYL-ooiD (713) 956-3000 PAFORMS\Applicadons Receiving AreaWOTICE-APPL Aug 2009 t g rK Kek:L To: A R-►Zi S 6Cu h f p rrn )-F5 A dd,-L� 4dp 10- � � ( - Z. .a .a=.. . \�. = 2 ?» &§-- . : 2\ AN. CIM\_LA � � ~ ^ . PAGE: 1 R E C E I V I N G R E P O R T RECEIPT NO.: 161476 SHIP TO: PLANNING VENDOR: STONE CASTLE INDUSTRIES INC. DELIVER BY SHIP VIA F.O.B. 10/28/10 CONFIRM BY CONFIRM TO ERIC HEUGLE BOB WARD FREIGHT CONTRACT NO. REQ. NO. 0000013741 P.O. NO.: CP1124 DATE: 12/07/1t VENDOR NO. 434964 REQUISITIONED BY GREEN, SHANNON REQ. DATE 10/21/10 ----------------------------------------------------------------------------' LINE QTY RCVD BIN LOCATION UOM ITEM NO. AND DESCRIPTION UNIT COST ----------------------------------------------------------------------------' 1 23245.35 EA 260 150 1.0000 PROFESSIONAL SERVICES OTHER 2010 SIDEWALK IN -FILL PROJECT 927 CONSTRUCTION Acct # 015§8929279100 RECEIVED BY: GREEN,SHANNON RECEIVED DATE: 12/07/10 CONTRACTOR'S APPLICATION FOR PAYMENT CAP702L PAGE 1 OF 2 PAGES TO: City of La Porte PROJECT., 10-1001 LA PORTE SW Distribution to: 604 West Fairmont Parkway SIDEWALKS AND HANDICAP RAMPS FOwner La Porte, Tx 77571 Architect ._' Contractor VIA ARCHITECT, FROM LA PORTE Construction Mgr CONTRACTOR: Slone Castle Industries, Inc. APPLICATIONNO: 1 3615 Almeda Genoa Rd. PERIOD TO: 11/12010 Houston, TX 77047 CONTRACT DATE: 11/19/9t2010 PROJECT NOS: CONTRACT FOR: SIDEWALKS AND HANDICAP RAMPS CONTRACTOR'S APPLICATION FOR PAYMENT The Undersigned Contractor certifies that to the best of the Contractor's knowledge infor- Application is made for payment as shown below, in connection with the contract. Continuation Sheet, Document CAP703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net Change by Change Orders 3. CONTRACT SUM TO DATE (Line 1+ - 2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on CAP703) 5. RETAINAGE: a. 0.00 % of Completed Work (Columns D + E on CAP703) b. 0.00 % of Stored Material (Column F on CAP703) Total Retainage (Line 5a + 5b or Total in column I of CAP703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) 10. TOTAL REQUESTED TO DATE Billing 11. PAYMENTS RECEIVED TO DATE Summary 12. CREDITS APPLIED TO DATE 13. NET PAYMENT DUE L iANGE ORDER SUMMARY I ADDITIONS Total changes appproved in previous months by Owner0.00 Total approved this Month 1:408.95 _......... _—_— —_ ._1 ._.__..-_ TOTALS 1,408.95 $ 39,556.00 $ 1,408.95 $ 40,964.95 $ 23,245.35 $ 2,324.54 $ 0.00 $ 2,324.54 $ 20,920.81 $ 0.00 I I$ 20,920.81 i L 20,044 -------------- .14---= $ mation and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and pay- ments received from the Owner, and that current payment shown herein is now due. CONR: Stone Castle Industries, Inc. By: Date: 11/30/2010 State of: T County of: GL(fiS Subscribed and sw o before In accordance with the Contract Documents, based on on -site obervations and the data Owner that to the best of the has progressed as indicated, the )ocuments. and the Contractor me this �� day of PS Notary Public: jZ.TX'WdyrPub lic,StateofTexas_-MCommission ExpiresMy Commission expires::` Septembor 23. 2011 ARCHITECT'S CERTIFICATE FOR PAYMENT $ 20,920.81 is entitled to payment of the AMOUNT CERTIFIED. $ 0.00 AMOUNT CERTIFIED................................................5 . �Or-lo�-O• S I $ 0.00 (Attach explanation if amount certified differs from the amount applied for. Initial $ 20,920.81 -� all fi�ures on this Application and on the Continuation Sheet that are changed to - __ DEDUCTIONS- E - CTIO- -- --- con orm to the amount certified.) -DEDUCTIONS-_l . ARCHITECT: i NET CHANGES by Change Orderi 1.408.95 Forms &Software by PEM Software 1.BOb.803.1315 By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Con- tractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or ontractor under this contract. l� CAP703 DETAIL PAGE(S) City nfLoPorte 004West Fairmont Parkway ioPorte, Tx77571 PAGE 2 OF 2 PAGES FROM: PROJECTAPPUC/qlOw#�------ APPLICATION DATE: 11/30/2010 ! Stone Castle |ndusthesInc.O|nc 10O1LAPORTESVV i ' . ' i pEKmT0� 11/15/20 o1V� 3O15A|noeda(�enoaF<d. ''----- - � - ' Houston, TX77U47 COwTHxCTDATE: 11/19/2010 xoCo|TECTSPaUJcCTM ITEM NO. DESCRIPTION OF WORK VALUE WORK COMPLETED -�ROM PRE\)f(YGS APPLICATION THIS PERIOD MATERIALS STORED (NOT IN -------------- TOT L TO DATE (C - G) Forms & Software by PEM Software 1.800.803.1315 2.183.64 0.00 140.90 CONTRACTOR'S APPLICATION for PAYMENT PAGE 1 OF 2 PAGES CAP702 SUMMARY PAGE TO: City of La Porte 604 West Fairmont Parkway La Porte, Tx 77571 FROM CONTRACTOR Stone Castle Industries, Inc. 3615 Almeda Genoa Rd. Houston, TX 77047 PROJECT: 10-1001 LA PORTE SW SIDEWALKS AND HANDICAP RAMPS VIA ARCHITECT: LA PORTE CONTRACT FOR: SIDEWALKS AND HANDICAP RAMPS Application No.: 1 Application Date: 11/30/2010 Period To: 11/15/2010 Contract Date: 11/19/2010 Architects Project No.: Distribution to: OWNER ARCHITECT CONTRACTOR ^i CONSTRUCTION MGR 1. Original Contract Sum 39,556.00, -------- ----- — - - — --—----------- ------ —- 2. Change Order Summary ADDITIONS DEDUCTIONS Total changes ap roved in iprevious months gy Owner 0.00 0.00 Total approved this Month 1,408.95 0.00 TOTALS 1.408.95 0.00 Net Change by Change Orders 1,408.95 1 3. CONTRACT SUM TO DATE (Line 1+ - 2) 40,964.95 4. TOTAL COMPLETED & STORED TO DATE(Column G on CAP703) 23,245.35 5. RETAINAGE: a. 0.00 % of Completed Work 2,324.54 (Columns D + E on CAP703) b. 0.00 % of Stored Material 0.00 (Column F on CAP703) Total Retainage (Line 5a + 5b or Total in Column I of CAP703) 2,324.54 O. 1 V 1 ri cmMl\C✓ LCJJ nC 1 %-- - .—.1 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. THIS REQUISITION 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3less Line 6) 10. TOTAL REQUESTED TO DATE 11. PAYMENTS RECEIVED TO DATE 12. CREDITS APPLIED TO DATE - 13. NET PAYMENT DUE Architect's Certification: Amount Certified: Architect: Contractor Certification: Signature: Date: 11/30/2010 State of: TX County of: Oarri S Forms & Software by PEM Software 1.800.803.1315 Date: Subscribed and sworn t fore me this 150 ay of elrflx.. 0 0 Notary Public: 1 My 'd!,� ANGE M. PHILLIPS A7' Notary Public, State of Texas My Commission Expires September 23, 2017 Contractor's affidavit of Payment of Debts and Claims CAP G706 Project: (Name and Address) Architect's Project Number.-1 OWNER 10-1001 LA PORTE SW Jl ARCHITECT SIDEWALKS AND HANDICAP RAMPS Contract for: CONTRACTOR SIDEWALKS AND HANDICAP RAMPS I SURETY OTHER To Owner: (Name and Address) City of La Porte 604 West Fairmont Parkway La Porte, Tx 77571 State of: Texas County of: Contract Dated: 11/19/2010 The undersigned herby certifies that, except as listed below, payment has been made in full and all obligations have otherwise been Satisfied for all materials and equipment furnished, for all work, labor, and services performed, and for all known indebtedness and Claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above For which the Owner or Owners property might in any way be held responsible or encumbered. Exceptions: SUPPORTING DOCUMENTS ATTACHED.HERETO: 1. Consent of Surety to Final Payment. Whenever Surety is involved, Consent of Surety is required. A Consent of Surety, may be used for this purpose. Indicate Attachment I The following supporting documents should be attached hereto if required by the Owner: (Printed Name and We) Subscribed anZ tsom to re on this date: II/3O/lo Notary Public /L My Commission Expires: 9/a3 Contractor: (Name and address) Stone Castle Industries, Inc. 3615 Almeda Genoa Rd. Houston, TX 77047 BY: (signature or authorized re sentative) •°°•" ANGELA M. PHILLIPS •� Notary Public, State of Texas My Commission Expires September23 2011 Forms & Software by PEM Software 1.800.803.1315 Contractor's affidavit of Release of Liens CAP G706A Project: (Name and Address) 10-1001 LA PORTE SW SIDEWALKS AND HANDICAP RAMPS To Owner: (Name and Address) City of La Porte 604 West Fairmont Parkway La Porte, Tx 77571 State of: Texas County of: Architect's Project Number: ❑ OWNER i 7, ARCHITECT Contract for: I CONTRACTOR SIDEWALKS AND HANDICAP RAMPS I SURETY =I OTHER Contract Dated: 11/19/2010 The undersigned certifies that to the best of the undersigneds knowledge, information and belief, except as listed below, the Release or Waivers of Lien attached hereto include Contractor, all Subcontractors, all suppliers of materials and equipment, and all performers of Work, labor or services who have or may have liens or encumbrances or the right to assert liens or encumbrances against any property of the Owner arrising in any manner out of the performance of the Contract referenced above. Exceptions: Supporting Documents attached hereto: 1. Contractor's Release of Waiver of Liens, conditional upon receipt of final payment. 2. Separate Releases or Waivers of Liens from Subcontractors and material and equipment suppliers, to the extent required by the Owner accompanied by a list thereof. Contractor: (Name and address) Stone Castle Industries, Inc. 3615 Almeda Genoa Rd. Houston, TX 77047 BY: imt-u—moXathonzetna senta6ve) r _C,��16)ase fPnnted Name a Subscribed an syvorn o b ore n t!ry�'sdate: 1//3d/ 16 Notary Publi . /i . yP{�% ' My Commission Expires: ANGELA M. PHILLIPS =?• Notary Pubic, Stare of'rexas - My Commission Expires t September 23, 2011 I` Forms 8 Software by PEM Software 1.800.803.1315 CAP701 - CHANGE ORDER FORM Change Order Number: 1 Change Order Date: 11/30/2010 Architect's Project Number: Our Project Code: 10-1001 LA PORTE SW Contract Date: 11/19/2010 To: City of La Porte 604 West Fairmont Parkway La Porte, Tx 77571 Project: SIDEWALKS AND HANDICAP RAMPS Contract for: SIDEWALKS AND HANDICAP RAMPS From: Stone Castle Industries, Inc. 3615 Almeda Genoa Rd. Houston , TX 77047 Original Contract Sum: 39,556.00 Net Change by Previous Change Orders: 0.00 Contract Sum: 39,556.00 , Value of this Change Order: 1,408.95 New Contract Sum: 40,964.95 The Contract Completion date will change by5 days The expected completion date will be: 12/03/2010 The Contract is Changed as Follows; South "H" Street- Driveway Apron addition 95.70sf @ $4.31 = $412.47 Driveway curb cuts- 14' of sawcutting @ $5.60 = $78.40 Driveway demo/haul-off 25.20sf @ $2.00 = $50.40 Underwood- 63.8' of sawcutting @ $5.60 = $357.28 demo/haul-off of asphalt 255.20sf @ $2.00 = $510.40 Total of completed change order work = $1408.95 Architect Signature Date Contractor gnature /�__bJo — Date DISTRIBUTE TO: Owner Signature /Z/ /V _ Data form by; PEM SOFTWARE SYSTEMS, LTD. - 800-803-1315 coy CITY OF LA PORTE AMENDMENT #1 SEALED BID #10035 — 2010 LA PORTE CITY WIDE SIDEWALK IN -FILL PROJECT August 24, 2010 DEAR VENDOR Please note the changes of the following information for Sealed Bid #10035 — 2010 La Porte City Wide Sidewalk In -Fill Project. Include this document as part of your returned bid. The bid opening date of Thursday, August 26. 2010 will remain the same. • Select fill sub -grade is not required under proposed sidewalk; a sand level up course is allowable to fill voids within the sub -grade; • A joint sealer is not required for score joints; a score joint is a tooled joint to a depth of approximately 1/8" — 3/16" Q 5' intervals; • Expansion joints shall have minimum separation distance of 30 linear feet; • Wheel Chair Ramps as.per plan shall be dyed burnt red; • No sod or seed is anticipated; e The undercutting of the street shall be required for street tie-ins. The street shall be undercut to a minimum distance of one foot (1'). If you have any questions, please call Purchasing at 281-470-5126. Thank you for your cooperation in this matter. Y urs truly,Q� fIA '1 � l��M — Jeana Masterson Buyer I acknowledge the ^receipt of Amendment #1. S' to e 4org Allek �e.0-p` 713-qO-SW CITY OF LA PORTE CERTIFICATION BY BIDDER City of La Porte Ordinance #98-2217 prohibits any expenditure for goods or services by the City of La Porte from any person, firm, or corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it is in compliance with the requirements of said ordinance. A copy of the ordinance may be obtained by contacting the City of La Porte Purchasing Division at 281- 470-5126. If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La Porte from the amounts due the undersigned. Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for rejection or disqualification of bid. /The undersigned hereby certifies that it is in compliance with Ordinance 98-2217. Or The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be deducted by the City of La Porte from the amounts due the undersigned. (Initial one of the above) Business Name: Address: Authorized Signature: Printed Name: Date: MAIM 16- STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: ALL OTHER CHARGES: TOTAL: $ 915.109a, 80 This total must agree with the total "Total Amount Bid" figure shown on the bid proposal. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. E Proposal, 2010 La Porte City Wide Sidewalk In -fill Project CLP Project No. 2010-4503 DATE: O Bid of A //�� II � I T`1/ -r''' 4N�ILC t /JV('1PJ4e, N. (hereinafter called "Bidder") an individual prop etorship,' a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of , for Construction of the 2010 La Porte City Wide Sidewalk In -fill Project , for the City of La Porte, Hams County, Texas (hereinafter called 'Owner.') To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in pla,{ce. p 1 - ,00lve- (7_e_* ,s SF Per Square Foot 10,000 $ 4, /a Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-2 2. Concrete Type'B' wheelchair ramps. In accordance with plans and complete in place. hrPW- hL'tna2pzz `YAIne1g4 !)11(-F_t_ (iv .YI,D,. EA 12 Per Each Z�1 TOTAL BASE BID (ITEMS 1-21 $ ��' .prPD 00 The amounts set forth above are current estimates by Contractor of the amounts that will be determined during 11D the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actueI "1t amounts expended for the items enumerated in (1) and (2) above. y SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. 2. (Add)(Deduct) (Add)(Deduct) Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. 12 In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the submitted as correct and final Date C� bid prices contained in this proposal have been carefully checked and are 6A'6t-�O Witness SEAL (if Bidder is a Corporation) I -'7/3-g4r)-X�(to (Telephone Number) 13 PROTECTION OF RESIDENT WORKERS The City of La Porte, Texas actively supports the Immigration and Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (1-9). The Contractor shall establish appropriate procedures and controls so no services or products under the Contract Documents will be performed or manufactured by any worker who is not legally eligible to perform such services or employment. 14 AFFIDAVIT OF ACCURACY The foregoing prices shall include all labor, materials, equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. The undersigned affirms they are duly authorized to represent this firm, that this bid has not been prepared in collusion with any other firm, and that the contents contained herein have not been communicated to any other firm prior to the official opening. Respectfully submitted: C.r ..WE WIF M. 011 Office Phone K, � I • .I r i • �• ill / / !I 713-R4g-8444 Fax Number BASE BID PROPOSAL BASE PROPOSAL: Bidde agrees to the specifics ions for the s6mof dollars ($ . (Amount h amount shown m words will govern.) all ,of the work shown on the plans and In case of Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. Ob The bid security attached in sum of f� Z<, .-��r r1�n �P _' Uy/ AS0 04D dollars ($ 9) . p O ) is to become the property of the OWner in the event the ontract and bond are ftot executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. Res pec ubmitted: BY: (Si ure of Authorized Person) 7nn 'ame Or onze rso (SEAL) tle Rl1P �a�w'�lJ (B siness Address (City) (State) (ip Code (Telephone Nuinber) m STANDARD FORM OF AGREEMENT THIS AGREEMENT, made this _ day of , 2010 by and between the CITY OF,LA PORTE, hereinafter called "Owner", acting herein through its CITY MANAGER and (Name of Contracting Firm) Strike out inapplicable terms: (a corporation) (a partnership) or (an individual) doing business as: hereinafter called "Contractor." WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the construction described as follows: SEALED BID #10035 2010 LA PORTE CITY WIDE SIDE WALK IN -FILL PROJECT hereinafter called the project, for the Total Price of ($ ) and all extra work in connection therewith, under the terms as stated in the General and Supplementary Conditions of the Contract; and; Further, that the CONTRACTOR agrees, at his (its or their) own proper cost and expense, to furnish all the knowledge, materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with: A. The terms and conditions stated in the Bid Proposal and in the General Conditions, and Supplementary Conditions of this Contract; Scope of Work, Instructions to Bidders, Sidewalk Location Documents, and Bid Form. B. The plans, which include all maps, plats, blueprints, and other drawings and printed or written explanatory matter thereof; and C. The Specifications and other contract documents'therefore, as prepared by the City of La Porte, all of which are made a part hereof and collectively evidence and constitute the contract. The CONTRACTOR hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within calendar days thereafter. The CONTRACTOR further agrees to pay, as liquidated damages, the sum of $500 or each consecutive calendar day thereafter as hereinafter provided in Paragraph SC-XIV of the Supplementary Conditions. IN WITNESS WHEREOF, the parties to these present have executed this contract, each of which shall be deemed an original, in the year and'day first above mentioned. 17 Attest: By: By: Ron Bottoms City Manager Name of Contracting Firm Signature of Authorized Person Title of Authorized Person Address and Zip Code City Attorney 18 SEAL City of La Porte Name of Owner Martha Gillett Title: City Secretary SEAL Witness PAYMENT BOND STATE OF TEXAS § COUNTY OF HARRIS § KNOW ALL MEN BY THESE PRESENTS: That of the City of County of and State of , as principal, and authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto The City of La Porte (Owner), in the penal sum of dollars ($ ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, dated the day of , 2010, to which contract is hereby referred to and made apart hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect; "PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Vernon's Texas Codes Annotated, Texas Government Code, Chapter 2253, as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein." Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in such change extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. 19 IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of 2010. Principal By: Title: — Address: Title: Surety Address: The name and address of the Resident Agent of Surety is: 20 CITY OF LA PORTE oDO CERTIFICATION BY BIDDER �a-> City of La Porte Ordinance #98-2217 prohibits any expenditure for goods or services by the City of La Porte from any person, firm, or corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it is in compliance with the requirements of said ordinance. A copy of the ordinance may be obtained by contacting the City of La Porte Purchasing Division at 281- 470-5126. If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La Porte from the amounts due the undersigned. Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for rejection or disqualification of bid. ZThe undersigned hereby certifies that it is in compliance with Ordinance 98-2217. Or The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be deducted by the City of La Porte from the amounts due the undersigned. (Initial one of the above) Business Name: LE<+io^/ C.-. o�v rRA�T��v fp SEg✓�Gt 3, /etc Address: 9 5 9 "7 _foci E5 Roq r7 --d3 $ 4 Authorized Signature: Printed Name: �%AG K 4V'4n/`T' Date: ��G, usr Z d—, ,?o l o STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: $ 30, 000.00 ALL OTHER CHARGES: $ 1 /, 700 .00 TOTAL: $ V/r lob . 00 This total must agree with the total "Total Amount Bid" figure shown on the bid proposal. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. 10 Proposal 2010 La Porte City Wide Sidewalk In -fill Project CLP Project No. 2010-4503 L4Ew10n/ DATE: //vausr .76, Zo/O c oN7'.4gcr7NGy Bid ofse4✓1c-as, lame-- (hereinafter called 'Bidder") a corporation organized and existing under laws of the State of Texas, a partnership, , for Construction of the 2010 La Porte City Wide Sidewalk ln-flll Project, for the City of La Porte, Hams County, Texas (hereinafter called "Owner.") To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. SF 10,000 s 3.93 $ 33, 300. 00 Per Square Foot Item Description of Item with Unit Bid Price Approx. Unit ,Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-2 2. Concrete Type "B" wheelchair ramps. In accordance with plans and complete in place. @ no ioo EA 12 $ %DO. DO $ ggc7o•00 Per Each \\V TOTAL BASE BID (ITEMS 1-21 $ z11, 70O . Do VI The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (1) and (2) above. SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. 1. (Add) (Deduct) $ 2. (Add) (Deduct) Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. 12 In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final Date g .2.4 Signed L6C,1OA1 C11,17724e7-1^16 S6Rv'1ce5, /n/C (Com By 40 pan (rne) P. JA _'ic A✓A�/T SEAL (if Bidder is a Corporation) I S 017 ,Jo ./E s 2a904'47r 1 ,c160- T)( 7706 5 '//(Address) 77 /3-°O-/,f// (Telephone Number) 13 PROTECTION OF RESIDENT WORKERS The City of La Porte, Texas actively supports the Immigration and Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (1-9). The Contractor shall establish appropriate procedures and controls so no services or products under the Contract Documents will be performed or manufactured by any worker who is not legally eligible to perform such services or employment. 14 AFFIDAVIT OF ACCURACY The foregoing prices shall include all labor, materials, equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. The undersigned affirms they are duly authorized to represent this firm, that this bid has not been prepared in collusion with any other firm, and that the contents contained herein have not been communicated to any other firm prior to the official opening. Respectfully submitted: Ltg4loN Go-17w4e_-r7 6 SfR✓,GES lac. JAGX 4V4^17- Business IS`)7 Jo./as 4014Dq-1iY Address /-�o µ5-r•aN TEK.45 -7 -7 o L S City, State, Zip Code -7/3 -'loo - Office Phone 15 Name (please print) 7D. Q��- �' 912611,9 Signatur Date JA✓ANT e 4jr4/ae//AC .NET E-mail -713-4 ZZ-V7oS Fax Number BASE BID PROPOSAL BASE PROPOSAL: Bidder agr s pertonn all of a work shown on the plaps and further es ed In the specificatig�ns for the sum of a. < ci. dollars ($ 5//, 700 . o 0 ). (Aoountoghall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.) Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. The bid sec ty attached in sum of i✓er .?EOviRrD dollars ($ .v .4 is to become the property of the Owner In the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. Respectfully submitted: /J BY: 7. Q"/ Z V' (Signature of thorized Person) JAe-K 4✓.4A/7— n ame of AuthorizedPerson) (SEAL) ✓. 7�1. (Business Address) --� 77045 (City) (State) (Zip Code) 71..3-Voo-/S/ (Telephone Number) 16 Porte City CLP Pro i� L-C*" 50cpe Bid of �21 E e Re ^O( �i (nerelnafter organized and existing under laws o the State of Tex I II., for Construction of the City of La Porte, Harris Couhty, Texas (heminaftei To: City of La Porte 604 West Fairmont Pariwitiy La Porte, Texas 77571 Attention: Susan Cream, Pul chasing Manager Gentlemen: The undersigned bidder has care ,illy examined the I of Agreement, the Technical Sp4:ifications and relal herein above described and refengd to in the Invitabi construction of the proposed protect, and has carefi necessary labor, superintendence, (machinery, equipi tn consxdion to complete all the!Iork upon which t Contract, the Specifications, plans and in the manna Engineer as therein set forth Ifer the amounts be performing the work required up . nr, the contract doe e Sidewalk In -fill Project No. 2010-4503 i� DATE: _ Ile 'Bidder an individual s, a partnership, or individual r the 2010 La Porte City Wide called 'Owner.') structions to Bidders, this Proposal, th d documents prepared by the City of i to Bid, is familiar with all of the cond y examined the site of the work and ent, tools, materials, supplies, service bids within the time set forth herein prescribed therein and according to th w. These prices are to cover all ' rents, of which this Bid Forth is a part. Ia6/ab jb rship, a corporation iof k In -fill Project , for s General Conditions -a Porte for the work bons surrounding the agrees to provide all s and other means of as called for in the 3 requirements of the xoenses Incurred in Item Description of Item with'' Unit Bid Price Approx Unit Total No. in Written Words !I Unit Quantity Amount Price 'I I 1. Concrete 4' wide sidewalk placement: four Inches thick, poured with 30001.pal concrete (min). Complete In place. Ij �ti, CV lV Per Square Foot III j SF 10,000 0 $ yo trao.6D Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words I LI Unit Quantity Amount Price 2. Concrete Type 'B' accordance with The amounts set forth atx the progress of the Work amounts expended for the SUBSTITUTIONS: If ni 1. 2. Bidder hereby agrees to oomm Proceed' of the Owner and to I stipulated in the specifications. consecutive calendar day there Agreement. It is agreed that the contract pi Engineer, In accordance with 11 The award may be made on th or Substitutions, If any. . The undersigned agrees that V following date of bid opening. It Is understood that the bid sr case of the acceptance of thi execute bonds as provided I construction contract and exr unsigned contracts to the Cor Owner and shall be considere Owner as a result of such failu It is understood that the ramps. In complete in irrent estimates t arated progress t imerated in (1) an attach detailed e) EA 12 $ 'Id Q LI S. o r Contractor of the amounts that will 1 Ilings from Contractor to the Owner s 1(2)above. $ �,oyplSi7 e determined during call reflect the actual work under this contract on a date to be specified in wrilen'Notice to omplete the project within ninety (90) consecutive working days thereafter [or further agrees to pay as liquidated damages, the sum of $500.00 for each as provided for in, Paragraph SC-5'of the SupplementarY, Conditions of the be increased or decreased to cover work added or ions of the Ge6*91 Conditions of Agreement. Bid alone or the Base Bid and any or all of the Items bid in this br000sal will not be withdrawn or y accompanying this proposal shall be retuned to the t rposal the underaigned should fail to enter Into a con r speGflcations. Iln the event the undersigned shoul bonds as required within 10 working days after the or, it is understood and agreed that the bid security st payment for damages due to delay and other inconveni the part of the urutemigned. eves the right to reject any and all bids 12 by order of the f under Alternates for sixty (60) days idersigned unless, in truction contract and I fail to enter into a Engineer has given all be forfeited to the mces suffered by the In the event of Award of the i provided in the Specifications. The undersigned certifies that submitted as correct and final Date SEAL (if Bidder Is a ict to the undersic bid prices contah Signed By_ the undersigned agrees to in this proposal have been 13 . 4) (9 a (Address) i -91n- Payment Bonds as and DOAJ)6tf 7-CITY0,F LAPORTE ' AM6fDMtWt Wj SEALED BID 01,006,— 20.10 LA ObIRft-t ' CITY WIDE WtWAiR IN -FILL PROJECT August 24i `iol 6 DEARVENDOR. Pl6a§6 note, the dtiangbg of MJ6116WM§ information for Sealed Bid -41003514610 LaPorte City Ville Sidewalk In Fill Oroject�. Include j this document ?as, of I returned, bid. The bid opening daii�',6f,Tku-rsd6y',"Au--g.Us�,'2'S, 2'010'Will (.6'rha'MAhd same. • §41le'ct MJ,:s-Ub-9rad'e'ls, not required under pr6jo6iecl sid6WaIk;'1-a sand levql. up course is_ to'fiijI Voicls.Withiii the 66154fed • A jolpt sealer Is n6trequired for'Aqore,, - j0ihfs;-,wscore joint is a toolddrJbihifto a del:�R of fe.pproximately , 1W!= 311p5_iht.ervals: 7Expansi j - *' s ion oin-ts shall have separation tanbd di`30.6h6i r feet; Wheel Chair-Rampsas;O& Oldin shall bwdybd! byrnt,req-. • No sod or -seed is anticipated; The uNde(6dttihq of the'strb§t'§hbI1 be required for 4004(tibrinsThe , street shall be undlercut to-WMIniinUFyi dist4hd6-6f;6hb f66C(l,�), ii you have:an.y'.qu6sti6ns,, 016ase'dWl PUrbKasirig dt,281 470-5126; -rhank.yowfor, your-,4zooperdtion'lhitiis:mafter: Y. - truly iirisats terson Buyer 'I -ddkh-dWIdd& the fbb6lo - of 1. A ntl#. Signature - �io Z f ajn�- C tjv'4& S�OEf cK Fu P�cr BASE BID _ PROPOSAL the specifications for the sum of dollars ($ ±% /-�' ). (Amount'shall be shown amount shown in words will govern.) Bidder understands that the Owner reserves the right to informalities in the bidding. The bidder agrees that this bid shall be good and may not be days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, attached within ten (10) days and deliver a Surety Bond or Bonds as re( The bid security attached in sum of ($ 1 is to become the property of the Owner in the ever within the time above set forth, as liquidated damages for the delay and thereby. LW (SEAL) Respectfully ess i /X- Z9/- ¢%D — o ins=and- er�escnbed=i`n�-- -- 4e-z gAe5 -e .yo In case of discrepancy, the any or all rawn for a trs will by the and to waive any of sixty (60) calendar the formal contract Conditions. and are not executed to the Owner caused NO I ne toregoing prices shall include all labor, materials, equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be days after the scheduled closing time for receiving bids. for a period of sixty (60) calendar The undersigned affirms they are duly authorized to represent this firm, that this bid t as not been prepared in collusion with any other firm, and that the contents contained herein have not been communicated to any other firm prior to the official opening. Respectfully submitted: Business /diZd� Address City, State, Zip Code 29/- 47D -OSjI Office Phone Name (please Tint) i Signature E-mail f Fax Number 1 %0 4A��_7_ 15 I I I Date Signed B (Title) (Address) Witness SEAL (if Bidder is a Corporation) umber) qqqqs,as. *, - - --, 11 J x 71-57 13 •Item' Descriptiowofltem'wlth`UhitBid-Price'' No. in Written Words Unit 2. Concrete Type'B' wheelchair ramps. In _ eccor ad nce with plans and complete in place. CAE/6/lT f%.�-A2c�4 C7nu.�/1S Per Each TOTAL BASE BID (ITEMS 1-2) 4� Total' ' Price The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner' shall reflect the actual amounts expended for the items enumerated in (1) and (2) above. SUBSTITUTIONS: If necessary, attach detailed explanation to 2. (Add) (Deduct) (Add) (Deduct) d Bidder hereby agrees to commence work under this contract on a date Proceed" of the Owner and to fully complete the project within ninety (: stipulated in the specifications. Bidder further agrees to pay as liquidat consecutive calendar day thereafter as provided for in Paragraph SC-5 Agreement. It is agreed that the contract price may be increased or decreased to coy Engineer, in accordance with the provisions of the General Conditions of The award may be made on the Base Bid alone or Base Bid and any or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be following date of bid opening. It is understood that the bid security accompanying this proposal shall I case of the acceptance of this proposal the undersigned should fail t execute bonds as provided in the specifications. In the event the construction contract and execute bonds as required within 10 wort unsigned contracts to the Contractor, it is understood and agreed that Owner and shall be considered as payment for damages due to delay Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all be specified in written 'Notice to consecutive working days thereafter damages, the sum of $500.00 for each the Supplementary Conditions of the Work added or tleleted by order of the all of the Items1listed under Alternates or modified for sixty (60) days I returned to the undersigned unless, in enter into a construction contract and idersigned should fail to enter into a g days after the Engineer has given te bid security shall be forfeited to the i other inconveniences suffered by.the 12 Bid of -LoEhL (hereinafter called "Bidder") organized and existing under laws of the State of Texas, a partnership, , for Construction of the 2010 La Poi the City of LaPorte, Hams County, Texas (hereinafter called "Owner.') To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: DATE: individual proprietorship, a corporation individual consisting of City Wide Sidewalk In -fill Project, for The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal,lthe General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work, and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according tolthe requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit I Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place./ /UD �C7vi 5 SF 1 Per Square Foot 11 STATEMENT OF MATERIALS AND OTHER CHARG MATERIALS INCORPORATED INTO THE PROJECT: ---------------------- ---- ---- ALL OTHER CHARGES: TOTAL: This total must agree with the total 'Total Amount Bid` figure shop For purposes of complying with the Texas Tax Code, the Conti material incorporated into the project in excess of the estimated less than the invoice price for such material to the Contractor. on the bid agrees the charges for any for herein will be no 10 City of La Porte Ordinance #98-2217 pr Porte from any person, ir-m undersigned bidder further certifies that copy of the ordinance may be obtained 470-5126. If undersigned bidder is not in complian Porte, the amount of its delinquent inde La Porte from the amounts due the uncle Failure to remit this certification with the for rejection or disqualification of bid. ✓ The undersigned hereby certifies 1 The undersigned assigns to the C deducted by the City of La Porte (Initial one of the above) Business Name: Address: Authorized Signature: Printed Name: Date: bits or ti« it is in compliance with the requirements by contacting the City of La Porte Purch :e with Ordinance 98-2217, )tedness to the City of La it hereby' as Porte, to be di rsigned. bid, or non-compliance with said ordinar hat it is in compliance with Ordinance 98- Or ty of La Porte, the amount of its delinquei 'rom the amounts due the undersigned. 0kt_ d�>� � sue, 107 Z (o eC%2frf �Z42t2-'� ��J I $/zlo/O T� 9 s by the City of La to—t�City. The said ordinance. A iq Division at 281- to the City of La .d by the City of shall be just cause 7. it indebtedness, to be .o WE CITY OF LA PORTE CERTIFICATION BY BIDDER City of La Porte Ordinance #98-2217 prohibits any expenditure for goods or services by the City of La Porte from any person, fine, or corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it is in compliance with the requirements of said ordinance. A copy of the ordinance may be obtained by contacting the City of La Porte Purchasing Division at 281- 470-5126. If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La Porte from the amounts due the undersigned. Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for rejection or disqualification of bid. AThe„ undersigned hereby certifies that it is in compliance with Ordinance 98-2217. Or _ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be deducted by the City of La Porte from the amounts due the undersigned. (Initial one of the above) Business Name: Address: Authorized Signature: . Printed Name: Date: iio.<d ?+ock (-0n5'AYUC+0Y) PC> Bow 34687 u -X 22a3 cnartdo (ac.rc�.a� STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: $ 32-, zoo-o 0 ALL OTHER CHARGES: TOTAL: $ 32, top. op $ (- 4, yc)o, 00 This total must agree with the total 'Total Amount Bid' figure shown on the bid proposal. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated Into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. 10 Proposal 2010 La Porte City Wide Sidewalk In -fill Project CLP Project No. 2010-4503 DATE: e (2l,6zoi0 Bid of &(A KO Gk CO2$Irrucbof) (hereinafter called 'Bidder) an individual proprietorship, a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of q' ocr o.w±Ym for Construction of the 2010 La Porte City Wide Sidewalk In -fill Project, for the City of La Porte, Harris County, Texas (hereinafter called 'Owner.') To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. Per Square Foot SF 10.000 $ 501) $ Oo .o0 11 Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-2 2. Concrete Type'B' wheelchair ramps. In accordance with plans and complete in place. (ca Gne *{ A005041 -}wo �Aurl&eJ EA 12 $ I,200.00 $ I 400.00 Per Each TOTAL BASE BID (ITEMS 1-2) $ Go Li W.ca Q VI vo V� The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (1) and (2) above. SUBSTITUTIONS:. If necessary, attach detailed explanation to proposal. 2. Bidder hereby agrees to commence work under this contract on a date to be speed in written 'Notice to Proceed' of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. 12 In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final Date Signed (Company) By ZIOCkO&U ro. (Tide) Po Eok 3458'7 c Witness SEAL (if Bidder is a Corporation) itous4on --Tx 77a3y (Address) I-4791 -a05.3, (Telephone Number) 13 PROTECTION OF RESIDENT WORKERS The City of La Porte, Texas actively supports the Immigration and Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (1-9). The Contractor shall establish appropriate procedures and controls so no services or products under the Contract Documents will be performed or manufactured by any worker who is not legally eligible to perform such services or employment. 14 AFFIDAVIT OF ACCURACY The foregoing prices shall include all labor, materials, equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled dosing time for receiving bids. The undersigned affirms they are duly authorized to represent this firm, that this bid has not been prepared in collusion with any other firth, and that the contents contained herein have not been communicated to any other firth prior to the official opening. Respectfully submitted: 44at-d �2oc{� Canslr�chor Business N)0 Box a4G'A-) Address ilo L)5 w -m 11 a 3 4 City, State, Zip Code 281-i9� - 8os3 Office Phone @ma.\ @ hcrd rockcoes-►rvcfiorinc. coq E-mail 2-ai-4qi- gl�33 Fax Number 15 BASE PROPOSAL: Bidder r the specifications for the sum of J dollars ($ fo4. 400. oo ). (AI amount shown in words will govern.) BASE BID PROPOSAL all of the work shown on the pplane and further described in o0bgnd �p0r �1u�dred dolla�5C'WJ nomni-s sown in both words and figures. In case of discrepancy, the Bidder understands that the Owner reserves. the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled dosing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. The bid security attached in sum of rem osan8 +-* li-ndya Cke dollars ($. 3� z� o, so ) is to become the property of the Owner in the event the con ct and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. BY: (SEAL) Pces�d.�h-� (Title) Qo J3ox Bg5$7 (Business Address) -nc �7aay - (Gity)(State) (rp e) 2RI-95r - 8o53, e ep one umber) i< F : • , KNOW ALL MEN BY THESE PRESENTS, that we Hard Rock Construction, Inc. as Principal, hereinafter called the Principal, and Western Surety Company a corporation duly organized under the laws of the State of South Dakota as Surety, hereinafter called the Surety, are held and firmly bound unto City of La Porte as Obligee, hereinafter called the Obligee, in the sumof Five Percent of the Greatest Amount Bid Dollars ($ 5% G.A.B.--------- ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted bid for #10035 2010 La Porte City Wide Sidewalk NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documentswith good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, If the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 26th day of August 2010 (Witness) Hard Rock Construction, Inc. (Pdncipal) (Seal) By: n71 (Title) A Western Surety. Company (Suret (Seal),- fitness Barbara A. Burcham `• BY7I ' , •" �^ - (Ti „ 7/ - . Kimberly J. Smith, Attomey-in-Fa6t Printed in cooperation withthe American Institute of Architects (AIA) by the CNA Insurance Companies. The language in this document conforms exactly to the language used in AIA Document A310- Bid Bond - February 1970 Edition. G-108041-A DUPLICATE QRIQiNAL Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organiud and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Dick Bright, Kimberly J Smith, Nancy T Berry, Steven Berry, Morris D Plagens Jr, Barbara A Burcham, Individually of Houston, TX, its we and lawful Attorney(s}in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, arc hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hercof, duly adopted, w indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Senior Vice President and its corporate seal to be hereto affixed on this I7th day of November, 2009. +s µerrs WESTERNSURETY COMPANY f�hr Paul VrBruflat, Senior Vice President State of South Dakota 1 County of Minnehaha 1 ss On this 17th day of November, 2009, before me personally came Paul T. BrnBat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Senior Vim President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expire �•"""""""""""• D. ELL • DAKO e November 30, 2012 •/� NOTARY PUBLIC SOUTH DAKOTA (SEAL11 D. Krell, NoTlry Public CERTIFICATE I, L. Nelson, Assistant Secretary of WESTERN SURETY, COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in form, and further certify, that the By -Law of the corporation printed on. the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this — 26 th day of August 2010 WESTERN SURETY COMPANY a�-o ) / �4'M o✓'tl`` (mow /� L. Nelson, Assistant Secretary Face F4280-09-06 DUPLICATE ORIGINAL Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. State of Texas Claim Notice Endorsement To be attached to and form a part of Bond No. In accordance with Section 2253.021(f) of the Texas Government Code and Section 53.202(6) of the Texas Property Code any notice of claim to the named surety under this bond(s) should be sent to: CNA Surety 333 South Wabash Chicago, IL 60604 Telephone: (312) 822-5000 Form F6944 DUPLICATE ORIGINAL r Figure: 28 TAC §1.601(a)(3) 1 IMPORTANT NOTICE To obtain information or make a complaint: 2 You may contact Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company at 312-822-5000. 3 You may call Continental Casualty Company National Fire Insurance Company, American Casualty Company or Continental Insurance Company's toll -free telephone number for information or to make a complaint at: 1-877.672-6115 4 You may also write to Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company at: CNA Surety 333 South Wabash Chicago, IL 60604 5 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 6 You may write the Texas Department of Insurance: P.O. Box 149104 Austin. TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-Mail: ConsumerProtection@tdi.state.tx.us 7 PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Puede comunicarse con Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company al 312-822-5000. Usted puede Ilamar al numero de telefono gratis de Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company's para informacion o para someter una queja al: 1-877-672-6115 Usted tambien puede escribir a Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company: CNA Surety 333 South Wabash Chicago, IL 60604 Puede comunicarse con el Departamento de Seguros de Texas para obtener irformacion, acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-Mail: ConsumerProtection@tdi.state.tx.us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el Continental Casualty Company, National Fire Insurance Company, American Casualty Company or Continental Insurance Company primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). 8 ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este aviso as This notice is for information only and does not solo para proposito de informacion y no se become a part or condition of the attached convierte an parte o condicion del documento document. adjunto. Form F8277 OUPLICA-f E URIGINAL CITY OF LA PORTE CERTIFICATION BY BIDDER City of La Porte Ordinance #98-2217 prohibits any expenditure for goods or services by the City of La Porte from any person, firm, or corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it is in compliance with the requirements of said ordinance. A copy of the ordinance may be obtained by contacting the City of La Porte Purchasing Division at 281- 470-5126. If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La Porte from the amounts due the undersigned. Failure to remit this certification with the bid, or non-compliance with said ordinance shall be just cause for rejection or disqualification of bid. The undersigned hereby certifies that it is in compliance with Ordinance 98-2217. Or _ The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be deducted by the City of La Porte from the amounts due the undersigned. (Initial one of the above) Business Name: ��,f/NfItPS CZn5 1{'f r_4N1l Tk7C. Address: It txL-kS Fd Authorized Signature: Printed Name: Date: s109 1)10 Y STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: ALL OTHER CHARGES: TOTAL: This total must agree with the total "Total Amount Bid" figure shown on the bid proposal. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. 0 Proposal 2010 La Porte City Wide Sidewalk In -fill• Project CLP Project No. 2010-4503 DATE: 071,* 1;01 o Bid of �U/p�-Y�z (tx'nlyw--iYop?hereinafter called "Bidder') an individual proprietorship, a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of , for Construction of the 2010 La PorteCityWide Sidewalk In -fill Project , for the City of La Porte, Harris County, Texas (hereinafter called "Owner.') To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen: The undersigned bidder has carefully examined the Instructions to Bidders„this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, -supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. 1 r�J Ji SF 10,000 $ 6.50 $ 1MO.00 Per Square Foot Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-2 2. Concrete Type "B" wheelchair ramps. In accordance with plans and compleete, in place. . @I-M-o . . -ISII ,k ba4nL2L _ J[j(�CA EA 12 Per. Each TOTAL BASE BID (ITEMS 1-2) $ p ,11 The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (1) and (2) above. SUBSTITUTIONS: If necessary, attach detailed explanation to proposal. (Add) (Deduct) $ (D 2. (Add) (Deduct) $ L/J Bidder hereby agrees to commence work under this contract on a date to be specified in written 'Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the'sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. 12 In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final Date _0_ $�o�lA /aO�D Signed lJ�i(%�RIi �'�S CUf 1S7lrLtG77[/ll�l� (Company) BY I. m-P— I 1 � (T,ta?-IcS }-ious-b1nT�c�,S �bl�_ (Address) 13-1 p9N-94n (Telephone Number) //Iezzle-�2 itness SEAL (if Bidder is a Corporation) 13 AFFIDAVIT OF ACCURACY The foregoing prices shall include all labor, materials, .equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good. and may not be withdrawn for a period of sixty (60) calendar days after the scheduled dosing time for receiving bids. The undersigned affirms they are duly authorized to represent this firm, that this bid has not been prepared in collusion with any other firm, and that the contents contained herein have not been communicated to any other firm prior to the official opening. Respectfully submitted: 1W 41'111'ks ( Wshl�4l C. Business 1Iq (zd Address City, State, Zip Code 0 I '�- (91)y-gL1C0 Office Phone �13-Lo�13- as l o Fax Number 15 BASE BID PROPOSAL BASE PROPOSAL: Bidder agrees to erform all of the work shown on th pla s and further describen the specifications for the sum of Ji -� I �n A J 0 �rn Ab �)�y � n 0 ��(�l dollars ($_�3r6(ry 9=' ). (Frmount snail be shown in both words and figures. In case of discrepancy, the amount shown in words will govem.) Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety. Bond or Bonds as required by the General Conditions. The bid security attached in sum of,Ij I . 00 0 r dollars ($ ° is to become¢rta property of the Owner in the event the cunt nd nd are not executed within Fe -time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. ;ig K Ily submitted: BY: of Aut riz d Pars ) (PnnLAarnd o u t{hunze. erso (SEAL) (Title) //1? 61_- (Business Address) , �YIDI� (City) r (State) (Zip ode) (Telephone Number) 16 DUPLICATE 2010 La Porte City Wide Sidewalk In -Fill Project Bid H 10035 CITY OF LA PORTE CERTIFICATION BY BIDDER City of La Porte Ordinance #98-2217 prohibits any expenditure for goods or services by the City of La Porte from any person, firm or corporation owing any delinquent indebtedness to the City. The undersigned bidder further certifies that it is in compliance with the requirements of said ordinance. A copy of the ordinance may be obtained by contacting the City of La Porte Purchasing Division at 281- 470-5126. If undersigned bidder is not in compliance with Ordinance 98-2217, it hereby assigns to the City of La Porte, the amount of its delinquent indebtedness to the City of La Porte, to be deducted by the City of La Porte from the amounts due the undersigned. Failure to remit this certification with the bid or non-compliance with said ordinance shall be just cause for rejection or disqualification of bid. X The undersigned hereby certifies that it is in compliance with Ordinance 98-2217. The undersigned assigns to the City of La Porte, the amount of its delinquent indebtedness, to be deducted by the City of La Porte from the amounts due the undersigned. (Initial one of the above) Business Name: NuWest Golf Course Construction Address: Authorized Signature: Printed Name: Tom Benveenu Date: August 26, 2010 STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT: $ 28,503.00 ALL OTHER CHARGES: $ 68,161.00 TOTAL: $ 96,664.00 This total must agree with the total "Total Amount Bid" figure shown on the bid proposal. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. _ ". Nu�iYest .GOLF COURSE CONSTRUCTION 3835 Dscom, street Houston. Tem, 77092 Proposal P.O. Box 925429 Houston, Terns 77292 2010 La Porte City Wide Sidewalk In -fill Project t. 713.681.6041CLP Project No. 2010-4503 f. 713.681.6155 15� DATE: August 26, 2010 Bid of Nu West Golf Course Construction (hereinafter called "Bidder") an individual proprietorship, a corporation organized and existing under laws of the State of Texas, a partnership, or individual consisting of Tom Benveenu & Westfall Constructors , for Construction of the 2010 La Porte City Wide Sidewalk In -rill Project, for the City of La Porte, Harris County, Texas (hereinafter called "Owner") To: City of La Porte 604 West Fairmont Parkway La Porte, Texas 77571 Attention: Susan Cream, Purchasing Manager Gentlemen The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and related documents prepared by the City of La Porte for the work herein above described and referred to in the Invitation to Bid, is familiar with all of the conditions surrounding the construction of the proposed project, and has carefully examined the site of the work and agrees to provide all necessary labor, superintendence, machinery, equipment, tools, materials, supplies, services and other means of construction to complete all the work upon which he bids within the time set forth herein, as called for in the Contract, the Specifications, plans and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid Form is a part. Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price Concrete 4' wide sidewalk placement: four inches thick, poured with 3000 psi concrete (min). Complete in place. @ Seven and 42/100 Dollars SF 10,000 $ 7.42 $ 74,200.00 Per Square Foot Item Description of Item with Unit Bid Price Approx. Unit Total No. in Written Words Unit Quantity Amount Price BASE BID ITEMS 1-2 2. Concrete Type "B" wheelchair ramps. In accordance with plans and completed in place. @ One Thousand Eight Hundred Seventy -Two and no/100 Dollars Per Each TOTAL BASE BID (ITEMS 1-2) EA 12 $ 1,872.00 $ 22,464.00 t^� t° $ 96,664.00 n Ybw The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner shall reflect the actual amounts expended for the items enumerated in (I ) and (2) above. SUBSTITUTIONS: If necessary, attached detailed explanation to proposal. I. (Add)(Deduct) $ No Substitutions Y (Add)(Deduct) $ No Substitutions Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive working days thereafter stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided for in Paragraph SC-5 of the Supplementary Conditions of the Agreement. It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The award may be made on the Base Bid alone or the Base Bid and any or all of the Items listed under Alternates or Substitutions, if any. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60) days following date of bid opening. It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 10 working days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. It is understood that the Owner reserves the right to reject any and all bids. In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Payment Bonds as provided in the Specifications. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final. Date August 26, 2010 Signed NuWest GAZourse Construction By P n r Tom Benvegnu, President 3835 Dacoma Street, Houston, Tx. 77092 713.681.6041 Witness SEAL (if Bidder is a corporation) AFFIDAVIT OF ACCURACY The foregoing prices shall include all labor, materials, equipment, removal, overhead, profit, freight, insurance, etc., to cover the finished work specified in this bid. All items bid and installed under this procurement must be new and unused and in undamaged condition. The City of La Porte is tax exempt and no taxes shall be included in the pricing of this bid. . Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. The undersigned affirms they are duly authorized to represent this firm, that this bid has not been prepared in collusion with any other firm, and that the contents contained herein have not been communicated to any other firm prior to the official opening. Respectfully submitted: NuWest Golf Course Construction Business 3835 Dacoma Street Address Houston, Tx. 77092 City, State, Zip Code 713.681.6041 Office Phone Tom BenveawAl Name ( Z�4t-j' print) 8.26.10 Sign Date tomb(@nuwestgolf.com Email 713.681.6155 Fax Number BASE BID PROPOSAL BASE PROPOSAL: Bidder agrees to perform all of the work shown on the plans and further described in the specifications for the sum of Ninety -Six Thousand Six Hundred Sixty -Four and no/100 dollars ($ 96.664.00 ). (Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.) Bidder understands that the owner reserves the right to reject any or all bids and to waive any informalities in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidders will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the General Conditions. The bid security attached in sum of Four Thousand Eight Hundred Thirty -Three and 20/100 dollars ($ 4,833.20 ) is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. Respectfully sub BY: (Signatu a QfAAorized Person) Tom Benvepnu (Print Name of Authorized Person) (Title) 3835 Dacoma Street (Business Address) Houston Texas 77092 (City) (State) (Zip Code) 713.681.6041 (Telephone Number)