HomeMy WebLinkAbout2013 WAVE POOL RENOVATION PROJECT_UNKNOWNThe Murillo Company
10325 LANDS9URY STE, 400 - HOUSTON. TX T7090..
PHONE 125119.33-9702 - FAx 12311933,1051
}�°y,n o L. REPORT OF CONCRETE INSPECTION
nu`� Yaity a Po ire Station PROJECT NO.: TS 012067 PAGE 1 of
PROJECT: No. 1 — outh 3 ° Street
La P TX. REPORT NO.: 55
CLIENT: City of La Porte L,�� CLASS/DESIGN: 4,000 PSI
CONTRACTOR: ,SCYLINDER-
w,�at� rw, SPECIFICATION:
4.000 PSI (d 28 DAYS
AZ SPECIFICATION:
SUPPLIER: Allday Concrete
Design SSD Weights/(yd)
Properties of Fresh Concrete
Sampling Data
Cement
N/A
lbs.
Field
Measure
-
Specification
Requirement
Date
Sam led
4-12-13
Fly Ash
N/A
lbs.
Time
12.56
Sampled
Coarse Aggregate
N/A
lbs.
Air-Temp.('F)
74.0
Yards
10
Batched
Fine Aggregate
N/A
lbs.
Concrete Temp. ('F)
80.0
Time
2:OD
Batched
Admixture (ASTM C494)
N/A
oz.
Slump (in.)
3.5
4 t 2
Truck
N/A
Number
Admixture (ASTM C-260)
N/A
oz.
% AEA by Volume
4.0
4 m 1
Ticket
43935
Number
Other
WA
oz.
Unit Weight
N/A
Yards
10
Placed
Total Water
WA
lbs.
Water added at site
0 GALLONS
Cylinders
4
Made
LOCATION OF PLACEMENT Wall behind Swimming Pool
COMPRESSION STRENGTH TEST RESULTS
Cylinder
Mark
Age
Days
Cylinder
Diameter in.
Surface
Area in.
Date
Tested
Maximum Load
bs.
Compressive Strength
i
Type of
Fracture
13 A
7
5,999
28.2649
4-19
113,720
4,020
e
13 B
7
5.999
28.2649
4-19
119,560
4,230
d
13 C
28
5-10
13 D
28
5-10
Type of Fracture: a. Cone, b. Cone & Split, c. Corner Fracture, d. Shear, e. Columnar, I. Corner Fracture w/Paint
Note: Unlade StaW Oth"se 1. Cylindva molded in armdenm w ASTM CJ/ arsept for Geld mdn9
2. Tut Method: Slump ASTM C-1a3, AFA ASTM C.231 or ASTM C-173, Urit WaVd ASTM C-138, Tamperaera ASTM C-10641C-1064 M
3. Lerpm a cy9ndera AtNn ASTM to«enm; namW coin&, tlm W • 17
4. Cyllndm tested in eccadenm with ASTM CJg m ASTM C-1231
Inspector: S. Boateng, NICET II Regular Hours: 4.5 Overtime Hours:
Copies To: THE MURILLO COMPANY, F-2911
City of La Porte
Summit Builders BY
Ray & Hollington Architects Daniel Gutierrez, P.E.
BY
— R n rein,Manager
71r n.uln ae e{gkeaM der iF m..Rna. im.a.Ma MMaea uw r. mu nauuenry Mbtlra a ms cwaa aetwupmuav TM
R.pw1 Y Mr N. utlu.M ur tl M. UW m xawn. b.COn.wa, Tn uH el wr Ma.n nun. m,d ntwn dv pparY. Fwm Cd Rrv. oY10
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2013 Wave Pool Renovation
TOTAL AMOUNT WORK DONE TO DATE:
j :YJD LJ
ORIGINAL CONTRACT AMOUNT:
$175,000
AMOUNT RETAINED 5% :
$ S .a- . d;b
NET CHANGE BY CHANGE ORDERS:
$
PREVIOUS PAYMENTS:
oZ g J a%
REVISED CONTRACT AMOUNT:
$
TOTAL DEDUCTIONS:
c3 J4'J 25:
OWNER:
AMOUNT DUE CONTRACTOR:
g a 17-Y
City of La Porte
604 W. Fairmont Parkway
LaPorte, TX 77571
7 y
ESTIMATE NO.
CONTRACTOR:
Aztec remodeling & landscaping co.
CONTRACT DATE: !':I
nn
WORKING DAYS TO DATE:
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for
performance of said contract have been paid in full accordance with the contract re
employed in the
DATE: J�(1� f 3 BY: \ TITLE: v I ls�,.c1 ems'
SIGNED and SWORN "before me, a�Nottary Public in and for the State of Texas this OZ7J day of t2c g20D2 I,�j
BY: MY COMMISSION EXPIRES:
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer certifies to
the Owner that the uality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE3yro,
BY: DATE:li/
'4
PROJECT NAME: Wave Pool Renovation
PROJECT NUMBER - GEN647
CONTRACTOR: Aztec Remodel and Landscaping
DATE: April 23, 2013
Quantity
Dollars
Installed
This
Period
Installed
Previous
Periods
Total
Installed
To Date
This
Period
Income
Previous
Periods
Income
Total
Income
To Date
Item
No.
Est.
Description of Work Qty. Unit
Unit Estimated
Price Value
1
Mobilization, Bonds and Insurance
0
$ -
$
30,000.00
$
30,000.00
$
30,000.00
Demolition
2
Concrete Plenum Related
0
$ -
$
18,000.00
$ 18,000.00
$
-
$
18,000.00
3
Mason
0
$ -
$
19,000.00
$ 19,000.00
$
-
$
19,000.00
4
Roof
0
$ -
$
54,000.00
$ 35,000.00
$
-
$
35,000.00
5
Electrical
0
$
27,000.00
$ 12,000.00
$
12,000.00
6
Area Paving
0
$
18,000.00
7
Chemical Feed System
0
$
9,000.00
$ 2,500.00
$
2,500.00
$ 175,000.00
$ 86,500.00
$
30,000.00
$ 116,500.00
APPLICATION AND CERTIFICATION FOR PAYMENT
PROJECT: 2013 Wave Pool Renovation
TOTAL AMOUNT WORK DONE TO DATE:
% �f� ap'
ORIGINAL CONTRACT AMOUNT:
$175,000
AMOUNT RETAINED 5% :
Sr7liD_OZ
NET CHANGE BY CHANGE ORDERS:
$
PREVIOUS PAYMENTS:
1�0
REVISED CONTRACT AMOUNT:
$
TOTAL DEDUCTIONS:
2 ]�CA
OWNER:
AMOUNT DUE CONTRACTOR:
y 6a-s
City of La Porte
604 W. Fairmont Parkway
LaPorte, TX 77571
---- -
CONTRACTOR:
ESTIMATE NO.
Aztec remodeling & landscaping co.
CONTRACT DATE: o
WORKING DAYS TO DATE: c�
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge, I certify that all items, quantities and prices of work and materials shown on the face of the estimate are correct; that
all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contractual
documents between the Owner and the Contractor, all changes authorized thereto; that the foregoing is a true and correct statement and of the
contract amount up to and including the last day of the period covered by this estimate and that no part of the "AMOUNT DUE CONTRACTOR"
has been revised.
I further certify that all just and lawful bills against the above named Contractor, for labor, material and expendable equipment employed in the
performance of said contract have been paid in full accordance with the contract requirements.
DATE:J BY:
—
a Notary Public in and for the State of Texas this day of
BY:
MY COMMISSION
TITLE: �9 ,
ENGINEER'S CERTIFICATION FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data comprising the above application, the Engineer cemnes to
the Owner that the quality of Jhe Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT
DUE CONT CTO 2�
BY: DATE: 5 J
)//
PRC Wave pool renovation
PRC jest number GEN647
Co n tractor aztec remodeling
66+� &landscaping co.
DAT tr /V% 0" / / -0
•
J W
Quantity
Dollars
Installed
This _
Period
Installed
Previous
Periods
Total
_ Installed
To Date
This
Period _
Income
_Previous_ _ _
Periods
Income
_ Total
Income
To Date
_Item
No.
_ Est.
Descri don of Work Q . Unit
Unit Estimated
.. Price Value
1
Mobilization Bonds and Insurance
0
$0.00
$30 000.00
30000
30000
30,000.00
$30 000.00
Demolition
2
Concrete Plenum Related
0 -
$0.00
$18 000.00
18000
18000
$18 000.00
$18 000.00
1
3
1 Masonry
0
$0.00
$19 000.00
19000
19000
$19,000.00
$19 000.00
4
Roof -
0
$0.00
$54 000.00
19.OD0.00
35000
54000
$19 000.00
$35 000.00
$54 000.00
5
Electrical
0
$27 OD0.00
15000
12.000.00
27000
$15 000.00
$12 000.00
$27 000.00
6
Area Paving
0
$18 000.00
18000
0
18000
$18 000.00
$18 000.00
7
1 Chemical Feed System
0
$9 000.00
5500
2500
8.000.00
$5 500.00
$2,500.00
$e 000.00
$175,000.001
57500
116500
174000
1 $57,500.001
$116,500.661
$174 000.00