BUILDING PERMIT RELEASE FORM
Development Name: MIN DEV SITE PLAN FOR ACT IND. TURBO SERV
Address: 12022 N P ST UB CLP
Project No. 12-82000027
Date Project Reproducible Received: 5-17-13
Date Reproducible is Forwarded to Director for Signature: 5-20-13
Date Reproducible is Filed in Drafting Div.: 5-21-13
Date Release Form Provided to Inspection Services Div.: 5-21-13
The site plan for the proposed project has been approved and released by the Planning
Department. The project is now eligible for the issuance of building permits once all
applicable codes, regulations, and fees have been satisfied.
CITY OF LA PORTE PLANNING DEPARTMENT
604 W. Fairmont Parkway, La Porte, TX 77571
www.laoortetx.gov
Phone: (281) 471-5020 1 Fax (281) 470-5005
March 25, 2013
Mark Follis
Follis Construction, Inc.
I I I North Broadway
La Porte, TX 77571
RE: Shop Building Addition and New Blast Building— 12022 North `P' Street
(CLP. Project #12-820000027)
Dear Mr. Follis,
Staff reviewed revised site plan and found the following items need to be addressed.
1. Noticed significant changes (increased size of building, addition, and utilities relocations)
from the previous submittal.
2. Note #3 regarding water connection needs to be updated and corrected to reflect new/
proposed 1" water meter off proposed 6" public water main.
3. Note #4 regarding sewer connection needs to be updated and corrected to reflect proposed
sewer tap into existing manhole.
4. Site plan shows "Underground" what does this represent?
5. Remove floor plan/ walls/ doors of Blast building and proposed shop building addition from
proposed site plan.
6. Will existing house (pre -existing -non conforming house be demolished so that 6" public
water main can be installed?
No water line easement is shown on site plan. A minimum 10' is required for the proposed
public 6" water line and appurtenances
8. Proposed 1 ''/d' water line needs to be shown as a "metered" water line.
9. SWQP is required from the City.
10. Need to update parking legend to include accessible parking spaces.
11. Add the following to the site plan notes:
• Relocation of existing fire hydrant to be made by contractor.
• 2" sanitary sewer connection to manhole will made by the contractor.
12. Proposed private 1-1/4" water line must "tee" past the proposed 1" water meter service.
13. 1"Set Meter Only is applicable.
14. The elevation of the existing 8" sanitary sewer (N. "P" St.) will need to be verified for the
feasibility of the proposed 8"sanitary sewer.
15. A separate Utility Plan is suggested for review and approval by the City.
Once the required changes are made, please resubmit three copies for review by Staff. If you
have any questions, please contact me at (281) 470-5058.
Respectfully, /
M. ood Malik
City Planner
c: Tim Tietjens
Planning Director
12022 N. P. ST.
Site Plan Review #3
3/21/13
1. Note #3 regarding water connection needs to be updated and corrected to reflect
new/ proposed 1" water meter off proposed 6" public water main.
2. Note #4 regarding sewer connection needs to be updated and corrected to reflect
proposed sewer tap into existing man hole.
3. Version #3 of this site plan indicates "all" landscaping is existing and no
additional landscaping is proposed.?? (FYI)
4. Shown on site plan "? Underground" what does this represent???
5. Remove floor plan/ walls/ doors of Blast building and proposed shop building
addition from proposed site plan.
6. Will existing house (pre -existing -non conforming house be demolished so that 6"
public water main can be installed?
7. No water line easement is shown on site plan.
8. Proposed 1 1/4" water line needs to be shown as a "metered" water line.
9. "Significant" changes from version #2 to version #3:
A. Increased size of bldg. (Shop bldg. addition)
B. Water & Sewer line relocations.
If there are any other significant changes I have missed, please inform this reviewer.
1o. With increased size of shop bldg. addition does this impact amount of required
parking (FYI) and / or landscaping??
11. Mark Huber spoke with Mr. Follis 1-9-13. Mr. Follis agreed to bring into the I.D.
office, "corrected" copy of HCAD form- prior to permit issuance.
12. Need Engineer seal.
13. SWQP required as per R. Slaton.
14. Need to show size of parking spaces/ accesable parking spaces and access isles.
15. Update park legend to include accessible parking.
16. Site plan indicates new meter (electrical) therefore a new address is needed prior
to building permit issuance.
17. At this time, this reviewer has not seen C. Herrod comments regarding Version
III.
PUBLIC WORKS
UTILITIES DIVISION
3/21 /13
SITE PLAN
REVIEW COMMENTS
Re: Coleman Willis H Jr.
12022 N. 11P" St.
Shop Bldg Add'n & Blast Bldg
1. Add the following to the site plan notes.
• Relocation of existing fire hydrant to be made by contractor.
• 2" sanitary sewer connection to manhole will made by the contractor.
2. Note # 3 conflicts with Prop. tap & 1" water meter shown . Revise or remove
accordingly to clarify.
3. Note # 4 conflicts with Prop. private 2" sanitary sewer force main as shown.
Revise or remove accordingly to clarify.
4. A note is needed to indicate if the existing non- conforming building will be
removed / demolished. The proposed 6" water line conflicts with the building
shown on the site plan.
5. A minimum 10' is required for the proposed public 6" water line and
appurtenances.
6. The proposed private 1-1/4" water line must "tee" past the proposed 1" water
meter service.
7. A 1" Set Meter Only is applicable.
8. The Sewer connection fee not applicable if made by the contractor.
Submitted 3/22/13
Ch/.
Malik, Masood
From: Malik, Masood
Sent: Thursday, January 17, 2013 10:53 AM
To:'mfollis@follisconstruction.com'
Subject: North'P' Street Project
Good Morning Mark,
Reference to our site plan meeting and revised site plan submittal, staff review comments are as follows:
1. As applicable , show location of proposed water line, size and fire hydrant(s) on the site plan.
2. A dedicated 10ft. utility easement for the proposed water line is required. The easement must include the fire
hydrant(s).
3. The site plan should note that the proposed phase III buildings will or will not be utilizing on -site water and
sanitary sewer. Exiting on- site water and sanitary sewer is proposed and shown for the proposed buildings.
4. Nearest fire hydrant should be shown. (Ref. to your discussion with the Fire Marshal & PW)
5. Storm Water Quality Permit (SWQP) shall be applicable.
6. Submit revised HCAD form for combining a/c#.
Once addressed, please resubmit for the staffs review. Thanks-masood
F:A
PUBLIC WORKS
UTILITIES DIVISION
1109/13
SITE PLAN
REVIEW COMMENTS
Re: Coleman Willis H Jr.
12022 N. "P" St.
PHASE III
1. As applicable , show location of proposed water line, size and fire hydrant(s)
on the site plan.
2. A dedicated 1 Oft. utility easement for the proposed water line is required. The
easement must include the fire hydrant(s).
3. The site plan should note that the proposed phase III buildings will or will not
be utilizing on -site water and sanitary sewer. Exiting on- site water and
sanitary sewer is proposed and shown for the proposed buildings
5. Nearest fire hydrant should be shown.
Submitted 1/9113
Chl.
Follis Construction, Inc.
111 N Broadway • La Porte, Texas 77571 • Ph. 281/471-6881 • Fax 281/471-6038
ECEIV�
1AN-92013
City of La Porte
Masood Malik
La Porte TX, 77571
Mr. Malik,
January 03,2013
This letter is in response to your review letter of 12/20/12 for 12022 N. 'P' Street - Shop Building
Addition & New Blast Building - Project (CLP. #12-82000028).
1. Need engineer/surveyor's seal and signature on the site plan.
Engineers/surveyor's seal and signature will be provided after final review is complete.
2. Total area (sq. ft.) does not match with lot sizes shown on the site plan.
Not sure what you mean by this. Outbound information taken from survey shows the same square
footage. See attached survey.
3. Need to combine HCAD # to include tract 912.
see attached application.
4. Show number of accessible spaces provided and include in the parking calculations on the site plan.
Is any additional landscaping for this development phase proposed?
Reference sheet S-1, 'one accessible space shown - reference parking space #10. Parking
calculations are shown under 'Parking Requirements. No additional landscaping is required
Show routing of all public and private utilities (water, sewer, electric etc.). Indicate, if there is need
for any new water/sewer taps or separate electric meters for the proposed buildings.
Shown on sheet S-1.
6. Remove driveways and drainage swale construction details from the site plan.
Reference sheet S-1, driveway & drainage swale construction details have been removed
7. Add a note under Site Detention: "Detention is not required in the F10I Watershed per PICM.
Reference sheet S-1, Site Detention, 'no detention provided'statement from previous site plan
changed to 'Detention is not required in the FI01 Watershed per PICM.
8. The flood statement states the project is in the Zone yet abase flood elevation is called out.
Please clarify.
13' is the nearest 100 year base flood elevation as shown on previous site plan.
Reference sheet S-1, the 13' elevation noted has been removed
9. Please specify the overall project area both presently and in the future in order for the City to 1/
determine the applicability of Storm Water Quality measures.
Project area is 37,075 sf. Total disturbed area is 43,239 sf.
No other development planned at this time and there is no Common Plan of Development or sale.
10. It appears from the grading plan for the proposed concrete that the FF elevation of the proposed
building is not high enough. Please Clarify. (�
All development will drain to the F101 Watershed outfall to the South.
11. The site plan should note if no additional water connection will be requested.
Reference sheet S-1, note added
12. The site plan should note if no additional sanitary sewer connection will be requested.
Reference sheet S-1, note added
13. The site plan should note that the proposed phase III buildings will or will not be utilizing on -site
water and sanitary sewer.
Reference sheet S-1, note added, 'the proposed phase III buildings will be utilizing on -site water
and sanitary sewer unless additional fire hydrants are required
14. The site plan should note that water and sanitary sewer connections are existing.
Reference sheet S-1, note added
15. a neazest fire hydrant should be shown on the site plan
Reference sheet S-1, nearest fire hydrant is shown on plan.
Existing fire hydrant is within 518' from any point of the front building and 802' from any point of
the back building.
16. Off -site water and sanitary sewer are not shown.
Reference sheet S-1, 'off -site water and sanitary sewer' are shown on plan.
17. Water development cost $6,006.26
Noted
18. Sewer development fee equals $13,901.94
Noted
Thank you,
Mark Follis
Follis Construction, Inc.
CITY OF LA PORTE PLANNING DEPARTMENT
604 W. Fairmont Parkway, La Porte, TX 77571
www.laportetx.pov
Phone: (281) 471-5020 / Fax (281) 470-5005
December 20, 2012
Mark Follis
Follis Construction, Inc.
1 11 North Broadway
LaPorte, TX 77571
RE: North `P' Street Project (Phase 3) — 12022 North `P' Street
(CLP. Project #12-82000028)
Dear Mr. Follis,
Staff reviewed the above referenced site plan and found the following items need to be addressed.
1. Need engineer/surveyor's seal and signature on the site plan.
Total area (sq.ft.) does not match with lot sizes shown on the site plan.
3. Need to combine HCAD # to include tract 912.
4. Show number of accessible spaces provided and include in the parking calculations on the site plan. Is
any additional landscaping for this development phase proposed?
5. Show routing of all public and private utilities (water, sewer, electric etc.). Indicate, if there is need
for any new water/sewer taps or separate electric meters for proposed buildings.
6. Remove driveways and drainage swale construction details from the site plan.
✓ ' Add a note under Site Detention: "Detention is not required in the F101 Watershed per PICK
8. The flood statement states the project is in Zone "X" yet a base flood elevation is called out. Please
clarify.
9. Please specify the overall project area both presently and in the future in order for the City to
ermine the applicability of Storm Water Quality measures.
10. It appears from the grading plan for the proposed concrete that the FF elevation of the proposed
building is not high enough. Please clarify.
11. The site plan should note if no additional water connection will be requested.
12. The site plan should note if no additional sanitary sewer connection will be requested.
13. The site plan should note that the proposed phase III buildings will or will not be utilizing on -site
water and sanitary sewer.
14. The site plan should note that water and sanitary sewer connections are existing.
15. The nearest fire hydrant should be shown on the site plan.
16. Off -site water and sanitary sewer are not shown.
17. Water development costs $6,006.26
18. Sewer development fee equals $13,901.94
Once the required changes are made, please resubmit three copies for review by Staff. If you have any
questions, please contact me at (281) 470-5058.
Respectfully,
Masood Malik
City Planner
c: Tim Tietjens
Planning Director
w
SENS R O_A D (R. o. W. VARIES)..P.O.C. - .., ._ . _.�.._........ _.
—` Donna S. Cote
Quinton Lw Berry HC.C.F. No. XZ79368
W62351 to
H.C.C.F. NO.
P.O. B.
rnd V I.P.
N03002'26"W 899.78' Frd 1/2" I.R.
MeA D..J
A
00
1 0 CO
Clenn M. Parmer t�
City of La Porte
Vol 7121 Pg 162 H.C.D.R 4 a.. ar•Y O.Ie DtiM
�IA,e R
,f.C.C.F NO. T099690 j ._
IM.... sae—•
' W
347,326 SQ. FT. eJ
7.9735 ACRES D � � . Q
I
.�9
a
0% N
W.O'eWA' eL+'
1
Ie.O'd.t
0"
N-F.t 0..
on Bbeb CO ^
el.Y
ata'att
R-360.00' set r/r e,.x
oB7..A.
on
A=8°07'46" %
o x a Y
a e � A
LC= S59 °06 ' 10" E
51.04'
--
S02'55'36E 1158.95' lr.d Azle
Fnd I/t 1
\�
HOUSE L
N2s
Southern Aacific Scale: 1"=30'
HyAm� �T Cspdy.,
THCTC£ONOaH96718 +..
i
eT' �,
YBT
~
\
!
-BASIS FOR OLAWACS' WAS Jrrrr
,,W$jrr STJTAM ftOTZ aMM" soar (III 82)
^
..
-➢aTAAM SWIM ARt CAW" ➢WAAW
_All ARTTAACTIAW BUMS BY TITLE COITAMr
�• p^+ at
LWZND
lre+a a PSa...s
St"
—%-- 6' DARBLD r/K fZACL
TITLE7.97E SURVEY 7. SSZ
a 7.9735 acre (307,326
TETRALAND
Being
1E OF tE
suevLrs a hrrRwlsALs
vase t tract o IaTld - & \ .
4 foot) !
e'
p, ; iiij4,. �.
R
�
w1111p0,
zt' \ \\ rMt CrlA/rlClrroM tftDYY !lflaDY /a AIYOIaD AMD slur mMllr is
ated in the ETtoch Brinson �^
Ef t+r' \\\.X �� !M AM Y4YMr1s UJLD
:'! 9
VI ! N
yy
STor SOU111 W11 l00
q,1 A1e1, II%wS 11401
1111)467 C100 FAX (111)AI2-IDol
$u
co
L7...nt. I.6• \ \ `•\\ \\` \� MIFitLD. "D Y0/0 l) rios DOa/YLK /r ArrrKD
y, Abstract NO. 5, Harris (� \ Ky /pM Mr ANY PMOM ore" rYAN rIMS ADDKasrD
y, Texas and being all of --- ----\\ \\�.,] �] ���\\' OlRYSMA �l��R "A AM oRIGMAL JZAL "D JICMANK Or rxr
f' ••..
W
lots 903 and 912 and the "—' �\, \\\�\
\ ` \\\ \\ \ \\ ` A(z MAC TO FLOOD IMSURAW9 RATS YAP 4 8 t D 1 C 0 e J 5 L
42 8 ;;: Qr
.:10
BORROITER
no
h p0 J f `\\ \\•'.\ \ :\ '.\ . \ DArrD a-1B-er THIS TRACT NLRLBr SURYLrLD LILS Y7N/N tONL
riven o Outlot 917 0
9 3��+' yC)
D
A.J. SMITH III
La
Porte Outlots, a Subdivision _� AND Ia Nor IN THE too TEAR FLOOD PLAIN THIS
thereof STIfLYLI? 1J BASLD ON SCALIAC THE LOCArIOM Or SAID SURYLT ON
f 13 r1M FLOOD IMWAAACL RATES
SUR`��
r ma OT a! rHf AWYL RCP£RLW1`D YAP AND
P plat
ADDRESS.per
12018 k 12022 .NORTH P STREET
(
recorded
in Volume 61, Page ONLr AND MOT IllrfMD£D M IACXrlrr SRCIrX FLWDIAC WND?IOM.
! of the Dead Records of ,
HarrtS CouTLt y. Texas
AMERICAN TITLE COMPANY
rxr DM KM eT I rx•r rNls
SVRv IAS qN r C MD" IR
SCALa:
DA"F..•
DRAWN:
svr rrsro anus x Nrs
rKVAas D A Ns n Rrn.
T'= wo
l-15-08
!MR
'
Sit Exhibit -A- Mates & Bounds 5003 COLLEGE PARK
/ \ 2
C.F HUMBEI!
JOB NO.
nay COUMy STATE DEER PARK, TEXAS 77571 n
•
2008 CS R22Il3-C
073NO803
PORTS HARK/S TEXAS
LA
vrr%ts rRtrarl➢MAL soermR Ao ,Ire
rffx= TITLE
Malik, Masood
From: Malik, Masood
Sent: Friday, December 21, 2012 4:03 PM
To: 'mfollis@follisconstruction.com'
Cc: Garza, Julian
Subject: North P Street Project
Attachments: Site Plan Review ltr.pdf
Mark & Jack,
Please see site plan review comments letter attached.
If any questions or require additional information, please contact or email me.thanks
Happy Holidays & Merry Christmas.
masood
CITY OF LA PORTE PLANNING DEPARTMENT
604 W. Fairmont Parkway, La Porte, TX 77571
www.laoortetx.gov
Phone: (281)471-50201Fax (281)470-5005
December 20, 2012
Mark Follis
Follis Construction, Inc.
I 1 I North Broadway
La Porte, TX 77571
RE: North `P' Street Project (Phase 3) — 12022 North `P' Street
(CLP. Project # 12-82000028)
Dear Mr. Follis,
Staff reviewed the above referenced site plan and found the following items need to be addressed.
1. Need engineer/surveyor's seal and signature on the site plan.
2. Total area (sq.ft.) does not match with lot sizes shown on the site plan.
3. Need to combine HCAD # to include tract 912.
4. Show number of accessible spaces provided and include in the parking calculations on the site plan. Is
any additional landscaping for this development phase proposed?
5. Show routing of all public and private utilities (water, sewer, electric etc.). Indicate, if there is need
for any new water/sewer taps or separate electric meters for proposed buildings.
6. Remove driveways and drainage swale construction details from the site plan.
7. Add a note under Site Detention: "Detention is not required in the F101 Watershed per PICK
8. The flood statement states the project is in Zone "X" yet a base flood elevation is called out. Please
clarify.
9. Please specify the overall project area both presently and in the future in order for the City to
determine the applicability of Storm Water Quality measures.
10. It appears from the grading plan for the proposed concrete that the FF elevation of the proposed
building is not high enough. Please clarify.
11. The site plan should note if no additional water connection will be requested.
12. The site plan should note if no additional sanitary sewer connection will be requested.
13. The site plan should note that the proposed phase III buildings will or will not be utilizing on -site
water and sanitary sewer.
14. The site plan should note that water and sanitary sewer connections are existing.
15. The nearest fire hydrant should be shown on the site plan.
16. Off -site water and sanitary sewer are not shown.
17. Water development costs $6,006.26
18. Sewer development fee equals $13,901.94
Once the required changes are made, please resubmit three copies for review by Staff. If you have any
questions, please contact me at (281) 470-5058.
Respectfully,
Masood Malik
City Planner
c: Tim Tietjens
Planning Director
CITY OF LA PORTE PLANNING DEPARTMENT
604 W. Fairmont Parkway, La Porte, TX 77571
www.laoortetx.aov
Phone: (281) 471-5020 / Fax (281) 470-5005
December 20, 2012
Mark Follis
Follis Construction, Inc.
1 I 1 North Broadway
La Porte, TX 77571
RE: North `P' Street Project (Phase 3) — 12022 North `P' Street
(CLP. Project # 12-82000028)
Dear Mr. Follis,
Staff reviewed the above referenced site plan and found the following items need to be addressed.
1. Need engineer/surveyor's seal and signature on the site plan.
2. Total area (sq.ft.) does not match with lot sizes shown on the site plan.
3. Need to combine HCAD # to include tract 912.
4. Show number of accessible spaces provided and include in the parking calculations on the site plan. Is
any additional landscaping for this development phase proposed?
5. Show routing of all public and private utilities (water, sewer, electric etc.). Indicate, if there is need
for any new water/sewer taps or separate electric meters for proposed buildings.
6. Remove driveways and drainage swale construction details from the site plan.
7. Add a note under Site Detention: "Detention is not required in the FI01 Watershed per PICK
8. The flood statement states the project is in Zone "X" yet a base flood elevation is called out. Please
clarify.
9. Please specify the overall project area both presently and in the future in order for the City to
determine the applicability of Storm Water Quality measures.
10. It appears from the grading plan for the proposed concrete that the FF elevation of the proposed
building is not high enough. Please clarify.
11. The site plan should note if no additional water connection will be requested.
12. The site plan should note if no additional sanitary sewer connection will be requested.
13. The site plan should note that the proposed phase III buildings will or will not be utilizing on -site
water and sanitary sewer.
14. The site plan should note that water and sanitary sewer connections are existing.
15. The nearest fire hydrant should be shown on the site plan.
16. Off -site water and sanitary sewer are not shown.
17. Water development costs $6,006.26
18. Sewer development fee equals $13,901.94
Once the required changes are made, please resubmit three copies for review by Staff. If you have
any questions, please contact me at (281) 470-5058.
Respectfully,
Masood Malik
City Planner
c: Tim Tietjens
Planning Director
Malik, Masood
From:
Slaton, Rodney
Sent:
Friday, December 21, 2012 3:41 PM
To:
Malik, Masood
Subject:
12022 North "P" Street
Masood
The following are my comments:
1) The flood statement states the project is in Zone "X" yet a base flood elevation is called out. Please clarify.
2) Please specify the overall project area both presently and in the future in order for the City to determine the
applicability of Stormwater Quality measures.
3) It appears from the grading plan for the proposed concrete that the FF elevation of the proposed building is not high
enough.
PUBLIC WORKS
UTILITIES DIVISION
12/14/12
SITE PLAN
REVIEW COMMENTS
Re: Coleman Willis H Jr.
12022 N. "P" St.
PHASE III
1. The site plan should note that no additional water connection will be
requested.
2. The site plan should note that no additional sanitary sewer connection will be
requested.
3. The site plan should note that the proposed phase III buildings will or will not
be utilizing on -site water and sanitary sewer.
4. The site plan should note that water and sanitary sewer connection are
existing
5. Nearest fire hydrant should be shown.
6. Off -site water and sanitary sewer not shown.
Chl.
PUBLIC WORKS
UTILITIES DIVISION
2/02/12
SITE PLAN
REVIEW COMMENTS
Re: Coleman Willis H Jr.
12022 N. "P" St.
1. Will this be a phased development for the use by more than one
separate businesses ?? Should this be shown ? / -
2. For a phased development, water and sewer extensions would be
applicable. The design must be in accordance with the Public
Improvements Criteria Manual.
3. The elevation of the existing "8 sanitary sewer ( N. "P"St) will need to 2
be verified for the feasibility of the proposed 8"sanitary sewer. ? u�
4. A separate Utility Plan must be submitted for Staff review and
approval.
SITE PLAN
5. Show the proposed 20' utility easement to and through all future
phases.
6. Extend the proposed 8" water line to and through the proposed phase
one development. A fire hydrant may be applicable.
7. At the end of the line, beyond the fire hydrant call out a gate valve and
extend 10' future continuation.
8. Show the proposed 8" sanitary line to extend to and through the phase
one development. At the end and contingent on sufficient elevation,,
call out a manhole with a stub out for future continuation.
Ch/.
U Up
......... .....
....... .... ..... . .....
k
AV
City of La Porte
Established 1892
SUBMITTAL FORM
MINOR DEVELOPMENT SITE PLAN
(FIVE COPIES OF THE SITE PLAN ARE NECESSARY)
ALL FEES MUST BE PAID AT THE TIME OF SUBMITTAL
ADDRESS:
LEGAL DESCRIPTION:
OF
USE OF BUILDING:
CLASS OF WORK:
35- A C. ( 31:7) 3Z6 SF) �,vocN f32,N;o,v
NEW Li ADDITION
S.
STANDARD INDUS.T.R, AL CLASSIFICATION CODE (SIC#) / NAICS# 3-� l56/ 9-
OWNER'S NAME:001-� AP WI L15 N 54L, PH:
MAILING
/crS,
REPRESENTATIVE OR ��// �7 F1
CONTRACTOR. FOIL/5 d0AJS-7 ZN'- • PH: / 14 I I -6991,
MAILING ADDRESS: / IAX.P 7, -7 % S, 71 •
SUBMITTAL NUMBER: /2 - 8,20 000cV
RECEIPT NUMBER: 3 p 3 gl-j
FEE COLLECTED:
CASHIER:
DATE SUBMITTED:
$100.00 FOR UPTO FIVE (5) ACRES
$5.00 FOR EACH ADDITIONAL ACRE
S:%City Pl=ing ShmAS17E PLAWOPMMUBMITTAL POPM.doc
PREPARED 121 13/ 12, 13: 10: 24 PAYMENTS DUE I NVOI CE
LA PORTE. TEXAS PROGRAM PZ821L
---------------------------------------------------------------------------
PROJECT NUMBER: 12-82000027 MIN DEV SITE PLAN FOR ACT IND. TURBO SER
FEE DESCRIPTION AMOUNT DUE
--------------------------------------- ---_-__-__-_-__------------_--------
SI TE PLAN MI NOR UP TO 5 ACRES 100.00
TOTAL DUE 100.00
Please present this invoice to the cashier with I ul I payment.
CITY OF LA PORTE, TX
*** CUSTOMER RECEIPT ***
Batch ID: LAPOBFF' 12/13/12 75 Receipt no: 30391
Type SvcCd Description Amount
2012 82000027 PZ PLANNING AND ENGINEERING
Qty 1.00 $100.00
Trans number: 2520944
Tender detail
CK Ref#: 8808 $100.00
Total tendered: $100.00
Total payment: $100.00
Trans date: 12/13/12 Time: 13:19:25
THANK YOU FOR YOUR PROMPT PAYMENT
CITY OF LA PORTE PLANNING DEPARTMENT
604 W. Fairmont Parkway, La Porte, TX 77571
www.laportetx.gov
Phone: (281)471-5020IFax (281)471-5005
MEMORANDUM
TO: Rodney Slaton, Sr. Engineer
Mark Huber, Deputy Building Official
Donald Ladd, Assistant Fire Chief
Curtis Herrod, Utility Superintendent
Julian Garza, City Engineer
Clif Meekins, Fire Marshal
FROM: Masood Malik, City Planner 6W
DATE: December 14, 2012
RE: North 'P' Street Project
The above referenced site plan is attached for your review and comments.
Site Plan meeting will be held on Tuesday (12-18-12), CR-B, at 2:00 P.M., please have your
comments ready for discussion. thanks
6155C12
Hlarrils,
S.H. 225 Clopmnity
A ;;p�;riaisaill
Rlq Diistriiic +;
1425
040-177-001-0009 a �-
15.7800 AC B
1 �
2A
0 10000 �200
9 �y PUBLICAN TI�ON DATE:
6/12/2012
Gom iWI w map doW
mebUined by tee Har4a
County AWrahel Dist A N
Isbr inbrmawnsl puNo.
M am .Ynotb been
co 040�177-001-0002 < "P ren Im or W sultsde
br lapel, enpirwM1p. or
22.6700 AC N wrvaylnp W rpwea. It
tp � 4oea mvepmam en
Waeaymum wmY aM
10 ody ropmanb lee
aWro*blate botbn d
propeM bounEa4es.
MAP LOCATION
6 �
{
I
I
FACET
Nc 6154B
a
• 906
902B 902C 9m 903A
902
615488
A ppp� 0
m
9
m A
�
QQQr���
p1
p(i
yQ
IN
Nrm
_Q
�N
G
p
fw aAl ,a
as 912
14 913
023-147-000-0913
4.3951 AC
S
h N
� M
Ih
awn p
»ram
914A 913A
023.147-000-M26 ',
1.7050 AC.
w 917
915A O2� 916A
y1 14
Ha�rrrii�
C�ounity
Appra�iisaill
11 1
-- SArr iict
---------
9- LDli 910
911 _
1� i
023-147400-0904
32.1666 AC.
0 1�J0
YPUBUCATION DATE:
5131/
5131I201012
Gewpatbl «map data
mabtzbed Ey at. daMa
County Appnbel Dbpl« N
b br b(«matbnal pulppaM
' Q aM maY rol rove Egan
_ _ _ _ _ _ . br legal. erpinaeMp.4
--- 920 N doo. n9purppeea.n
918 919 4th. Wl npmentan
ontaay'a as aumYaM
mlyra«ealebion
appmxlmab focatunchain of
n Eoundariea
` h,p ! `G�_ Y IWppe y
915` 09T4C.�c'�j 917A'?, i09�s Y MAP LOCATION
916 J
715 SO
023-147-000-0915 HC
3.9360AC. A 9170ae 27 5 918A
a + ,
.0928 rww mm
.xn w.
'» mrrx 4r 511 t
040-179-000-0076 I
1.0220 AC.
5 »aye wa rw.n
1801
G40.179.0"21
7.5980 AC.
n u
tit D4tilZ
4K
40
12031 a
0056
40-1 4C 4G
12031 II
FACET
6154B
Munn
nUM�/
nam®
AI '
N P8T .."`
2N.1 N
F1 �,
PL"AINBROOK'RD • ' ��.
SUNSET-RIDGE _ ti a �
FIELDCREST DR -----------
In _ :. .�
HI Ir."1 w I'4'9
I c1 ;
Legend
Parcels
Lr 1 City limits
Railroad
e 1
.
--Drainage Channels
This product is tot-info,,- -- 1,does not represent an on-he-ground survey and represents
•croeimefe relabcs locahon r;i -•red in this product The City of La Porte makes no representation
•arranty as to the awuracy of this produstor(o I A ss for a part cular pwpoe Tnc user li/ace' ..?p:ovu Slo,i"ifl ALL"UITCl2,assumes all responsibility for the use thereof,and(3)releases
of La Porte from any damage.loss.Or liability arising from such use
a City of La Porte 1 "=383 '
fi04W.orte, X77571 y La Porte GIS Mapping
La PORe,TX 77571
_ (281)471-5020
. wwwlapotteh.gov
ACT INDEPENDENT TURBO SERVICES
PROPOSE® DEVELOPMENT PLAN
ACT Independent Turbo Servic
3525 Freeland Street
Houston, TX 77061
713-910-8800
To: Planning Dept. —City of LaPorte .
Attn: Tim Tietjens
From: Billy Coleman, ACT Independent Turbo Services
Dear Mr. Tietjens,
ACT Independent Turbo Services is a rapidly growing business currently located near- Hobby
Airport in Houston. Capital investment of $20mm over 4 years is well under way to facilitate
fti Cher growth of the business. ACT Independent Turbo Services would like to purchase a large
parcel of land in the City of LaPorte to relocate the existing business and greatly expand the
current size. Enclosed are details about the company and the proposed plan.
By this letter, ACT Independent Turbo Services formally and respectfully proposes this plan for
approval by the City of Laporte.
The growth plan for ACT requires that land be. purchased by mid Jan. 2012 in order to stay on
schedule. We would ask that the City of LaPorte expedite the approval process if possible.
LaPorte is our first choice, but if we cannot get approval soon we will be forced to move on other
options outside LaPorte where zoning is already industrial.
The site plan proposed includes a very generous "green belt' in combination with wet bottom
retention pond to produce an attractive frontage view along Bay Area Blvd. The crane buildings
will be over 400 feet from Bay Area Blvd., and hidden from view due to the green belt. The
future administration building will be brick construction with appropriate landscaping.
I have worked in LaPorte for over 27 years and believe that it is a great place to live and do
business. We are eager to meet with the City Staff, the Planning and Zoning Commission, and
the City Council to discuss the plan.
Please call me with any yuestioris: r:comments you may have.
Sincerely,
X41' ' - -
Billy Coleman
Chief Operating Officer
ACT Independent Turbo Systems
8525 Freeland St. —Houston Texas, 77061
Cell# 713-898-4906
Proposed Site Construction 2012 - 2014 �+
Independent Turbo Services
SITE LOCATION OVERVIEW - SPENCER HWY & BAY AREA BLVD
_.'.i,11
Proposed Site Construction 2012 - 2014+
Independent Turbo Services
)32'-0
11/17/2013.
PLAN OVERVIEW
y _ c
a �F
S� g� �,•—
42'— _
U
Proposed Site Construction 2012 - 2014
BUILDINf�, 1
vv�✓.V'W", I nub IIVIV
DETENTION POND
11i1?'2G1
ELEVATION OVERV.IEW.(VIEW-1)
C-onfid _miai
Ill
Independent Turbo Services
i
a
EA
Proposed Site Construction 2012 - 2014
Independent Turbo Services
Rtm nwr. i
LAKUL LKANL BAY - METAL
BUILDING CONSTRUCTION
111/1710011
ELEVATION OVERVIEW (VIEW-2)
Will
BAYAREA
CorifidLntlal 4
EA
Proposed Site Construction 2012 - 2014
Independent Turbo Services
'ELEVATION OVERVIEW (VIEW-3)
ADMIN
BUILDIN
(MASONRY / BRICIQ 180'-0"
I R
PIPELINE
EASEMENT
1.1/17/2011 Confi�a-ntlo- '
.--
��� GRUBB & ELLIS.
/ =3 v From Insight to Results
November 9.2011
W. John Simons
Corporate Managing Director
Studley
333 Clay Street, Suite 3700
Houston, TX 77002
Re: . +40 acres at Bay Area Blvd. between Fairmont Parkway and Spencer Highway (See
Exhibit "A")
Dear John:
On behalf of my client, PPG, we hereby submit the following non -binding Letter of Intent on the
above referenced property and further shown on the Exhibit A attached hereto.
Property: +40 acres as shown on the attached Exhibit "A"
Purchase Price:
Review of Survey & Title Buyer shall have a period of thirty (30) days after Buyer's receipt
Commitments: of the Title Commitment and Survey in which to give written
notice to Seller specifying Buyer's objections, if any. Seller shall
bear the cost of such Title Insurance, Premium and Survey.
Feasibility Period: During the period commencing with the Effective Date and
ending seventy five (75) days thereafter, Buyer shall conduct all
inspections, tests, examinations of all leases, contracts,
warranties, environmental studies, appraisals, etc. of the property
at Buyer's sole cost and Buyer's sole determination of
acceptance.
Closing: The closing date shall be on the fifteenth (151h) day after the
Feasibility Period or such earlier date as mutually agreed to in
...writing by Seller and'Buyer:: ..: :..... .. ..'
Commission: Seller shall pay a real estate brokerage fee of six percent (6%) of
the total sales price to be split 50% to Studley and 50% to Grubb
and Ellis Company. The commission shall be paid in cash at
Closing.
Earnest Money: Buyer will deposit the sum of One Hundred Thousand Dollars
($100,000.00) with Star -Tex Title Company ("Title Company") as
earnest money:
Grubb & Ellis Company
1330 Post Oak Blvd., Suite 1400 Houston, TX 77056 713.626-3988 713.626.2288 fax
Comments: This non -binding letter of intent is intended to set forth the parties'
basic understanding regarding their desire to enter into a purchase and
sale of the Property, but does not purport to summarize all of the terms,
conditions, covenants, representations, warranties and other provisions
that may be contained in the definitive agreements that are to be
negotiated, including, without limitation, a purchase and sale agreement
for the sale of the Property and is subject to acceptance by the
Management Board of PPG.
This letter is intended to be non -binding. No party will be under any legal obligation of any kind
whatsoever with respect to the purchase and sale of the Property or otherwise by virtue of this letter of
intent or any other written or oral expression with respect to the purchase and sale of the Property.
Please note that thus Letter of Intent shall be null and void after 5:00 p.m. on Monday, November
21, 2011.
Sincerely,
J. Douglas Nicholson, $IOR, CRE
Executive Vice President
Investment/Industrial Services
AGREED & ACCEPTED:
Buyer: Seller-:
By: By.
this day of
11 this day of
Enclosures:
Information on Agency Relationships; and
• Sale/Lease Americans with Disabilities Act, Hazardous Materials and Tax Disclosure
• TAX Notice to all Buyers and Sellers of US Real Property Interests
SiBmkvs .h*.DazUIOJ] APM-00-c a Bry An 131 dp
Grubb & Ellis Company
1330 Post Oak Blvd., Suite 1400 Houston, TX 77056 713.626.8388 713.626.2288 fax
2011
1(E'/iOTA�T—ASUftVET
20 s4mvevovscwmoN
/s 9VMGY¢4 -Np'G�p 1
��'.�ilp .tom �: Giii.•:,.,':.:.'rv'��..
EXHIBIT "A"
�1 _` ie SW4VE'(DFA44WG IM I -14- •r'i..4
�SLK
ionan'ii n1OSm+
CONFRO1,UN0 MONUMENT&
uNs rwvr
- xmre•w
9 tFasuo
17 eDUE
rn
Pm4u¢nlLw'aA,:ra
CIE �J;Vk
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.