Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C1.0 SITE PLAN
UNION PACIFIC RAILROAD 100' R.O.W. 16 12 20 16 2 3 11 3 14 19 16 20 16 SCALE IN FEET 30' 15' 0 30' 60' 90' Know Call what's before you dig. below. 1 2 4 D 3 1 2 3 4 5 C B A D C B A 5 SHEET NUMBER SHEET TITLE KEY PLAN PROJECT NAME PROJECT ADDRESS DATE ISSUE © 2017 Kirksey Enterprise Morgan's Point These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time. C1.0 KIRKSEY PROJECT NO. HARVEY PROJECT NO. A 18 OCT 2018 PRICE SETTING SITE PLAN