Loading...
HomeMy WebLinkAboutPages from Markups 21-840signature ct / 2. (1 ct FOREST AVENUE 80' R—O—W ftd I.B. �a set I.B. 50.00 Set I.B. 2- 14 8 M �) N u ,•i ni a ocg P4 -,-4 8 7 6 3. rA O •' L Set I.H. � 50.00 Set I.B. �+ P1od I.B. ifs'Iffy 10 1 11 12 SURVEY OF LOT.'---, BLOCK 18, SYLVAN BEACH FIRST SUB —DIVISION. LA PORTE, HARRIS COUNTY, TEXAS 'SCM: 1"=20' -�y�.9=�p-.12/19/20 : SOIL Bro. B.L.B. MAYA 3rp B.L.S. IM: DRW. COXIB jon WD.- 391-7 7M 10193000 1: tttul�a3t.caa ,:Ih V b. hFi'. ,.�-. :4- Vr:{,•./ .ailll, 11 1821 490Y c�or na :x:, 7sr . 7r1. 7751* UK U_ 2 Site Coverage 1 /1611=1'-01, Total Lot Area = 6,250 Sq.Ft. Covered Area = 3,117 Sq. Ft. Uncovered Area 3,133 Sq.Ft. Percentage of Coverage = 50.13% DRIVEWAYS: ALL DRIVEWAYS TO BE 4" THICK, 3000 PSI, FINISHED CONCRETE REINFORCED WITH #3 BAR 15" ON CENTER EACH WAY, EXCEPT FOR THE IN TURN FROM THE STREET CURB TO THE PROPERTY LINE WHICH WILL BE THICKENED TO 6" AND BE REINFORCED WITH 6 GAUGE WIRE MESH EACH WAY. DRIVEWAYS LOCATED ON CITY PROPERTY OR THE RIGHT OF WAY TO BE INSTALLED AS REQUIRED BY THE CITY OR COUNTY. ALL JOINTS ARE "PICTURE FRAMED" WITH SMOOTH METAL TOOL. WALKS: ALL WALKS SHALL BE 4" THICK, 3000 PSI CONCRETE REINFORCED WITH 6 GAUGE WIRE MESH EACH WAY. EXPANSION JOINTS: AT CONCRETE WALKS - TREATED #2 S.Y. P. 1 X 4 JOINTS SPACED 12'-0" APART WITH SCORED CONTROL JOINTS BETWEEN AT 4'-0" ON CENTER. AT CONCRETE DRIVEWAYS - TREATED PINE 1 X 4 JOINTS APPROXIMATELY 10' TO 12% OR AS SHOWN ON SITE PLAN. ALL CONCRETE FLATWORK TO BE PLACED OVER 3"4" MINIMUM SAND FILL OR AS SPECIFIED IN SOILS REPORT. SITE NOTES: THIS SITE PLAN WAS PREPARED USING AND RELYING ON THE ACCURACY OF A SURVEY PROVIDED BY THE BUILDER. — THE LOT SHALL BE GRADED TO PROVIDE A POSITIVE Survey by Others DRAINAGE PATH DRAINAGE PLAN BY OTHERS AY MFOUNDATION. THE OTHE SON RTHIIS FORMA INFORMATION. TO DRAWINGS BY OTHERS FOR DRAINAGE INFORMATION.) 1 THE TOP OF THE SLAB OR FOUNDATION ON THE LOT SHAL BE BUILT TO THE HIGHER OF (1) 24 INCHES OVER THE BASE FLOOD ELEVATION (WHEN LOTS ARE IN THE FLOOD PLAIN); (II) 18 INCHES OVER AVERAGE TERRAIN; (111)18 INCHES OVER ELEVATION OF THE CROWN OF THE ROAD WHEN DRAINAGE IS OPEN DITCH; OR (IV)12 OVER ELEVATION OF THE CURB WHEN DRAINAGE IS BY CURB AND GUTTER. THE BUILDER SHALL CONSTRUCT A SWALE IN BETWEEN EACH LOT. REFER TO THE PLAT OR SURVEY FOR LINE AND CURVE TABLE DATA. 16' Alley 50.00' _ _ _ _ _ _ _ _ 15' Buildin8 Line _ _ _ _ _ _ _ _ I I I " �} p�i�, # ¢ a Y., ,�yjy''j�'" J#J}, 4 /ttt �✓1 � � l r(��•��'� rt£���F i'��1°��Y� $�i� �ti,�����Y�9�� jtr�'�+i��1�`�4����Fk� ��� i � r � Ly 1!�; �d Apt{S{�" tl �f )}^.��. �p Y3y y�.1.1 .A4 n) } dF' ki 3�`� i• 1 ,y r 1 i is a ,� 1 1 A'^t i 11111 {S J MAY. ��if�^' fyi SYt�155 Y✓1��R�rfYM ��f3 � 5 j�YS�� %t�b'td(' ACkI'W' �3F1 Y�fi � ig 1k 45�£514F1 I�4L`yd';$} 4 l MIN North Forest Avenue Ay 80' R.O.W. 0 V 8' 16' I 1/811 = 1'-01, ow design group 8524 Highway 6 N #163 Houston, Texas 77095 713-302-5004 tom@signaturedg.com STRUCTURAL ENGINEER: Trinity Bay Engineering 911 S 8th Street La Porte, Texas 77571 281-827-3829 OWNER: AES Builders 3515 Preston, Suite 100 Pasadena, Texas 77505 Date 1Description 3/2121 linifialSketch 13/2921 (Construction Documents I APR BY: _.`______--. New 1-Story Home Lot 7, Block 18 Sylvan Beach First Subdivision Hams County, Texas 12 North Forest Avenue La Porte, Texas 77571 Site Plan Project #21-117.04 Date March 29, 2021 A2-0 Scale As indicated