2018 Comprehensive
Plan Five-Year Update
Adopted 2018
INTRODUCTION
Acknowledgments
Mayor and CouncilCity Staff
Mayor, Louis R.RigbyCity Manager, CorbyAlexander
At-Large A, John P.ZemanekAssistant City Manager, JasonWeeks
At-Large B, DottieKaminskiDirector of Planning, RichardMancilla
Council Person, District 1, DannyEarpCity Planner, IanClowes
Council Person, District 2, ChuckEngelkenDirector of Public Works, DonPennell
Council Person, District 3, DarylLeonardPolice Chief, KenithAdcox
Council Person, District 4, KristinMartinDirector of Parks and Rec., RosalynEpting
Council Person, District 5, JayMartinEmergency Mgmt. Coord., KristinGauthier
Council Person, District 6, NancyOjedaGIS Manager, AbrinBrooks
City Engineer, LorenzoWingate
Planning and Zoning Commission
Chairman, HalLawler PlanConsultantKendigKeast
At-Large A, WyattSmith Collaborative
At-Large B, NickBarrera
Bret Keast, AICP,Owner/CEO
District 1, TreyKendrick
Gary Mitchell, AICP,President
District 2, RichardWarren
Luis Nunez, ProjectManager
District 3, HelenLaCour
Meredith Dang, AICP,
District 4, MarkFollis
SeniorAssociate
District 5, Lou AnnMartin
Janis Burall AICP, SeniorAssociate
District 6, ChristinaTschappatt
Hanna James, GraphicDesigner
2|LaPorteTX2018ComprehensivePlan5-YearUpdate
INTRODUCTION
Table of Contents
Introduction ......................................................................................................................... 4
By the numbers ......................................................................................................................... 7
High Priority Implementation Action Status Summaries ......................................................14
Conclusion ................................................................................................................................39
LaPorteTX2018ComprehensivePlan5-YearUpdate|3
INTRODUCTION
Executive Summary
The 2018 Comprehensive Plan Update and Progress Report is a 5-year update to the City of La
2012 Comprehensive Plan. This update provides guidance on moving forward with high
priority action items identified in the 2012 plan, confirms new planning and study efforts and
capital improvements completed since 2012, and through the Progress Report, provides anim-
plementation status summary as well as a new prioritization of the 2012 implementation actions.
The 2018 Update and Progress Report were a City of La Porte Department led effort. City De-
partment heads met in December 2017 to evaluate and prioritize the 2012 high priority
implementation actions and provide feedback on the status of current and completed actions,
projects, plans, and initiatives. The Plan Update process provided an opportunity for all depart-
ments to meet together to discuss the importance of the Comprehensive Plan for the City of La
Porte and to weigh-in on future priorities. As this interim Plan Update did not revise the 2012
Comprehensive text, data, or other underlying items, the planning process did not include
a full-scale public engagement effort.
A major Plan amendment, such as occurred in
2012, should be undertaken with the aim of an
adopted updated Comprehensive Plan in 2022,
ten years after the last major update. Such an
update should include extensive public engage-
ment to ensure the updated vision, goals, and
priorities reflect the desires of the community.
The results of the Comprehensive Plan Progress
Report show that significant progress has been
Photo: December 2017 City Department Head Meeting
made by the City of La Porte toward implemen-
tation of the 2012 high priority action items, with 12of the 16 items either completed or
in progress. Of those items that have not yet been started the most common reason was staff
vacancies in key positions. The Progress Report results include a re-prioritization of the high pri-
ority action items, based on Department Head input as well as Planning and Zoning Commission
and a Public Open House held in March 2018.
4|LaPorteTX2018ComprehensivePlan5-YearUpdate
INTRODUCTION
Highest Priority Actions2018 Rank
Infrastructure Improvements1 (tie)
Drainage Improvements1 (tie)
Neighborhood Improvement Program2 (tie)
Strategic Downtown Improvements2 (tie)
Public Safety Improvements3
Business Retention and Expansion Program4 (tie)
Business Incubator4 (tie)
Safe Sidewalks Program5
Strategic Corridors Program6
Park and Trail System Improvements7
Increasing Sustainability8
Coordinated Tourism Strategy9
Market Retail Analysis10
Streamline Permitting11
Unified Development Code/ Modification of 12
Regulatory Provisions
The La Porte 2030 Comprehensive Plan is a 20-year master plan intended to serve asan official
public document, adopted by the City Council, to guide policy decisions relating to the physical
and economic development of the community. In general, the plan indicates how the community
desires to develop and redevelop over the course of the next twenty years. The original version
of the comprehensive plan was adopted in 1984 after extensive community involvement. Since
that time, City Council and staff have been implementing that plan as intended. Even good plan-
ning, however, needs to be updated. To ensure the plan continued to represent the future of
the community envisioned in 2001, the plan recommended updates at a minimum of five-year
intervals. In 2005, City staff evaluated the plan to update the goals and objectives, reflect prog-
ress and accomplishments, identify goals that required attention or deletion, and to recommend
any additional goals that were needed to better achieve the 2001 community vision. In 2012, 10
years into the implementation of the plan, City Council approved a second revision to the plan.
The 2012 revision is more comprehensive in nature and includes an updated community vision
to ensure that the City is still moving towards a future that represents the desires, needs, and
aspirations of the community.
LaPorte TX2018Comprehensive Plan 5-Year Update |
INTRODUCTION
2018 5-Year Comprehensive Plan
Update
This update to the 2012 Comprehensive Plan isan opportunity to revisit the 2012 Plan and pro-
vide guidance on moving forward with high priority action items identified in the Plan. This up-
date seeks to:
confirm any new or revised goals, initiatives, policies, and strategic project
priorities;
confirm any planning or study efforts completed since the 2012 Plan,
provide the status of initiatives since the 2012 Plan, with emphasis on
those projects that still need tobe completed
identify completed projects and items accomplished, summarizing plan
implementation progress and success.
This update is not intended tobe a full revision of the plan and as such does not include revisions
to the data and inputs of the 2012 plan. The update is intended to be an opportunity to bring
the 2012 Comprehensive Plan back to the forefront for City Departments and staff, making them
aware of the Plan, its contents, and its progress.
The five-year period from 2012-2017 did bring changes and significant happenings to the City of
La Porte. The following pages present milestones, accomplishments, and highlight data for the
five years (2012-2017) that have passed since the 2012 Comprehensive Plan.
6|LaPorteTX2018ComprehensivePlan5-YearUpdate
BY THE NUMBERS
125
Birthday the City of La Porte celebrated in
2017highlightingtherichhistoryand
heritage of the La Porte community. The
125th anniversary celebration events
included a parade,aconcertseriesfeaturing
ClayWalker, a rodeo, a gala, and more.
The events garnered local and regional
media coverage for theCity.
471
Number of homes estimated damaged by
HurricaneHarveyinLaPorteinAugust2017.
The resilience of the La Porte community
shone through during the aftermath of
Harvey.
#LaPorteStrong.
LaPorte TX2018Comprehensive Plan 5-Year Update
BY THE NUMBERS
32
Number of dog runs at the new City of La
Porte Animal shelter opened in 2014.
2
Number of new Splash Pads opened since
2012(NorthsideandFairmontSpray
Parks).
8|LaPorteTX2018ComprehensivePlan5-YearUpdate
BY THE NUMBERS
$10,091,771
Fiscal Year 2017 budget increase over the
previousyear,representinga12%increase.
Alargeportionofthatincreaseisrelatedto
capitalimprovements.
10
City wide geocaches hidden at the newest
La Porte street festival that debuted in
LaPorte TX2018Comprehensive Plan 5-Year Update |
BY THE NUMBERS
50%
Percent of the trail system envisioned in
-Pedestrian Trail Mater
Plan completed, including major east-
west connector along Fairmont Parkway.
12
Numberoftopfinalistsinthe2016
of the Awards that the La Porte
Water ToweronFairmontParkwaywas
honoredin. The$875,000projectdepictsLa
(Photo: Courtesy Of Tnemec Company, Inc.)
10|LaPorteTX2018ComprehensivePlan5-Year
BY THE NUMBERS
130
490,387
Number of new commercial permits issued
Square feet of estimated retail demand
from 2013-2017, representing a valuation of
documentedinthe2013RetailAnalysisand
over $183.5 million. During the same time
MerchandisingPlan.
period 309 residential permits were issued,
representing a valuation of over $55.5 million.
LaPorte2018ComprehensivePlan5-YearUpdate|11
BY THE NUMBERS
12|LaPorteTX2018ComprehensivePlan5-YearUpdate
BY THE NUMBERS
2018 Assessed Property
Values
The map shows the assessed property values of parcels within the City of
La Porte, current asof January 2018.
As can be seen on the map, there is a wide range of property values
within the city, ranging from less than $10,000 up to $60,000,000.
The City tracks these values as they change over time and this
information can be used to inform planning and economic development
efforts.
LaPorte2018ComprehensivePlan5-YearUpdate|13
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
ThefollowingactionitemswereidentifiedashighprioritiesfortheCityofLaPorteinthe2012Comprehensive
PlanUpdate.Aspartofthe20185-yearComprehensivePlanProgressReport,CityDepartmentsmetinDecem-
ber2017toevaluateprogresstowardsachievingthesehighpriorityactions.Therankingswerealsoevaluated
bythePlanningandZoningCommissionandthroughaPublicOpenHouseheldinMarch2018.
Highest Priority Actions2012 Rank2018 RankOverall Status
Streamlined Permitting
111Complete
Process
Public Safety Improve-
23In progress
ments
Neighborhood Improve-
32 (tie)In progress
ment Program
Business Retention and
44 (tie)In progress
Expansion Program
Park and Trail System Im-
57In progress
provements
Market Retail Analysis610Complete
Infrastructure Improve-
71 (tie)In progress
ments
Unified Development Code/
Modification of Regulatory 812Not started
Provisions
Downtown Master Plan92 (tie)Not started
Drainage Improvements101 (tie)In progress
Coordinated Tourism Strat-
119Not started
egy
Business Parks12RemoveComplete
Business Incubator134 (tie)Not started
Safe Sidewalks Program145In progress
Increasing Sustainability158In progress
Strategic Corridors Program166In progress
For each high priority action departments answered the following:
oHasthisactionbeenachieved(orportionsofthisaction)?
oIf yes, whichcomponents?
oIfno,whatdoyouseeasthemainreasonswhy?(mayincludebutnotlimitedto:funding,
lackofauthority,politicalorpublicwill,lackoftime,knowhowtoachieve)
oDoyouseethisactionbeingachievedinthenext5years?Ifno,whynot(mayincludebut
notlimitedto:nolongerapriority,nofunding,lackofpoliticalorpublicwill)Ifyes,what
is the timing forcompletion?
The results of this exercise are summarized in the charts beginning on page 20.
14|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Aspartoftheplanupdate,CityDepartmentsalsoidentifiedplansthathavebeencompletedbytheCityofLa
Portesince2012,orthatareongoing.Thefollowingplans/studieswereidentified:
LaPorteMunicipalAirportBusinessPlan,completed2017
HazMatCommodityFlowStudyandRMP
Hazard MitigationPlan
ParkandRecreationMasterPlan(tobeginin2018)
DesignGuidelinesforGC,NC,andBIDistricts(2014)
Northside Neighborhood Plan (2012Update)
WestLomaxAreaSanitarySewerFeasibilityStudy
Citywide Street ConditionAssessment
Pine Bluff DrainagePER
Coupland Drive DrainageAssessment
N. 6th Street DrainageAssessment
Update2009WaterMasterPlan(tobeginin2018)
Airport DrainageAssessment
F 101 DrainageAssessment
Initiatives Capital Project Priorities Identified by City Departments:
Expansion of fitnesscenter
Renovation of wave pool(2018)
Renovation of Northwest Pool(2018)
Sidewalks
WestLomaxAreaSanitarySewerReplacementandLiftStationElimination-Design
AnnualContractsAsphaltStreetRepairsConcreteStreetRepairs-Construction
PineBluff-Street,DrainageandUtilitiesDesignandConstruction
CouplandDriveDrainage-DesignandConstruction
SomertonPavementandWaterlineReplacement
Hillridge Pump StationConstruction
LaPorteTX2018ComprehensivePlanProgressReport|15
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Evaluating Existing Studies for Impacts and Overlap to Comprehensive Plan
AsplansandstudiesarecompletedbyCityDepartmentsintheCityofLaPorte,suchasthoseidentifiedinDe-
cember2017inthelistabove,theyshouldbeevaluatedforanypotentialimpactstoitemsintheComprehen-
sivePlan.Asanexample,theLaPorteMunicipalAirportBusinessPlan,completedin2017,hasthefollowing
relationship to Comprehensive Planelements:
oRecommendsfuturemasterplansorairportlandusecompatibilitystudies.
oIdentifiesareaforimprovementthatoverlapwithcomprehensiveplanactions/prior-
ities,including:
Drainage infrastructureimprovements
Airport CapitalImprovements
Economic Development: Analyzes the economic advantage the Airport pro-
vides the City of LaPorte
Landdevelopment:Acresavailablefordevelopmenttosupportaviationand
other commercialuses.
ThenewhighpriorityrankingsfortheCityofLaPortetofocusonintheupcomingyearsareas
follows:
Highest Priority Actions2018 Rank
Infrastructure Improvements1 (tie)
Draingage Improvements1 (tie)
Neighborhood Improvement Program2 (tie)
Strategic Downtown Improvements2 (tie)
Public Safety Improvements3
Business Retention and Expansion Program4 (tie)
Business Incubator4 (tie)
Safe Sidewalks Program5
Strategic Corridors Program6
Park and Trail System Improvements7
Increasing Sustainability8
Coordinated Tourism Strategy9
Market Retail Analysis10
Streamline Permitting11
Unified Development Code/ Modification of Regulatory 12
Provisions
16|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
ThehighestpriorityactionitemchartsprovideproposedimplementationactionstepsfortheCityofLaPorteto
undertaketoadvanceeachitem.Therearefiveplanimplementationmethods,withthecorrespondingmethod
identified for each actionstep.
LaPorteTX2018ComprehensivePlanProgressReport|17
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Capital Investments
TheCityofLaPorteusesafive-yearCapitalImprovementProgram,orCIP,toidentifyandbudgetfortick-
project,especiallythosethatmustbephasedand/orcoordinatedwithotherinitiatives.Thismayinclude
streetinfrastructure,water,wastewater,anddrainageimprovements;parks,trails,andrecreationfacilitycon-
structions, and upgrades; and, construction of public buildings. Anticipating and adequately budgeting for
majorcapitalprojectswillbeessentialtoimplementingthehighpriorityactionsidentifiedintheComprehen-
sivePlan.Likewise,decisionsregardingtheprioritizationofproposedcapitalimprovementsshouldreflectthe
directionandprioritiesofthisplan.
Programs and Initiatives
ProgramsinvolvetheroutineactivitiesofCitydepartmentsandstaff,aswellasspecialprojectsandinitiatives
theymayundertake.AspartofComprehensivePlanimplementation,thismethodmayincludeinitiatingnew
oradjustingexistingCityprogramsandactivities,expandingcommunityoutreachefforts,orprovidingspecial-
izedtrainingtoaccomplishapriorityobjectivemorepromptlyand/oreffectively.
Regulations and Standards
Giventhatprivateinvestmentdecisionsaccountforavastmajorityofaphysicalform,landdevelopment
regulationsandengineeringstandardsarefundamentalforplanimplementation.Consequently,inLaPorte,
regulationsanddevelopmentcriteriaandtechnicalengineeringstandardsarethebasickeystoensuringthat
the form, character, and quality of development reflect the planning objectives. These codesshould
advancethedesireforqualitydevelopmentoutcomeswhilerecognizingeconomicfactors.They
shouldnotdelayorinterfereunnecessarilywithappropriatenewdevelopmentorredevelopmentthatiscon-
sistentwithplanprinciplesanddirectives.
18|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Partnerships and Coordination
SomecommunityinitiativesidentifiedinthisplancannotbeaccomplishedbyLaPorteonitsown.Theymay
requiredirectcoordination,intergovernmentalagreements,orfundingsupportfromotherpublicentitiesor
levelsofgovernment.Additionally,theuniqueroleofpotentialprivateandnon-profitpartnerstoadvancethe
actionagendashouldnotbeunderestimated.Thismayoccurthroughcooperativeefforts,vol-
unteeractivities,andin-kindservices(whichcancounttowardthelocalmatchrequirementsforvariousgrant
opportunities),andfrompublic/privatefinancingofcommunityimprovements.
Targeted Planning/Studies
VariousareaofCitygovernancerequiremoredetailedstudyandplanning,especiallyasrequiredtoqualifyfor
externalfundingopportunities.Thesestudiesinvolvetargetedplanningworkatalevelofdetail
thanisappropriateforcomprehensiveplanningpurposes.Assuch,somepartsofthisplanwillbeimplement-
edonlyaftersomeadditionalplanningorspecialstudiesclarifynextstepsandassociatedcostsandconsider-
ations.
LaPorteTX2018ComprehensivePlanProgressReport|19
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
PROGRESS ICON LEGEND (IMPLEMENTATION STATUS)
Graphic IconMeaning
0%
ƓƚƷ ǤĻƷ ƭƷğƩƷĻķ
not yet started
25%
ĬĻŭǒƓ
begun
50%
źƓ ƦƩƚŭƩĻƭƭ
in progress
75%
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
almost complete
100%
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
complete
20|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Streamlined Permitting ProcessStudyexistingdevelopmentprocessesandregulationstodetermineaplanof
actiontoresolveissueswithoutcompromisingtheintegrityoftheprocessor
enforcementofestablishedregulations.Thisalsocouldincludesuchthingsas
fast-trackpermitting,assistancewithdemolitionofstructures,etc.
Implementation
Priority Ranking 2012Status SummaryFuture Actions
Status
Streamlined permitting Continue to review permitting pro-
processestablished.cesstoensureitisresultingindesired
Baseline comparison outcomes.
#1
of La develop-
ment review and per-
mitting process with
neighboringcommuni-
tiescompleted.
Priority Ranking 2018
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
Review time for dif-
ferent categories of
permittingtracked.
#11
Key implementation Department(s): Planning and Development
Types offutureactions:Regulations andstandardsandPartnerships andcoordination
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
(Y/N)
Y
DevelopabaselinecomparisonofLadevelopmentreviewandpermitting
Y
processwithneighboringcommunities(e.g.,DeerPark,Pasadena,etc.).
If no such baseline comparison already exists, then the City should begin tracking
Y
the review time for different categories of permitting.
Developashort-andlong-termactionplantoresolveissuesthatdonotcompro-
misetheintegrityoftheprocessorconformitywithestablishedregulations.Rele-
N
vantfeedbackfromthisanalysisshouldbepresentedtothePlanningandZoning
Commission and CityCouncil.
LaPorteTX2018ComprehensivePlanProgressReport|21
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Public Safety ImprovementsContinue to support an excellent system of public safety services.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Continuetoreviewpersonnelneeds
3 new full-time officers addedto
Police Department in 2017.including an additional DOT officer
#2
Policevehiclesbeingrotated to address increased commercial
every 5years.
motor vehicletraffic
Training being conductedvia ConductmanpowerstudyforFire
Priority
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
emergency servicesdistrict.
Department.
Ranking
NewLaPorteAnimalShelterand Continue to provide high quality
2018
AdoptionCenterfacilitycomplet-
trainingopportunitiesforpersonnel.
ed.Updateactionstepsbasedonnew
departmentpriorities.
#3
Key implementation Department(s): Police, Fire, EMS, OEM
Types offutureactions:Programs/InitiativesandTargetedplanning/studies
Completed or in progress? (Y/N)
Detailed components/action steps identified in 2012 Comprehensive Plan:
PeriodicallyreviewthePolicepersonnelneedsandhireaddition-
alstafftoaccommodateincreasedcallsforserviceconcurrentwithpopulation
growth. This could include: a. Full-time law enforcement officers concurrent
Y
withpopulationgrowth;b.Oneadditionalcrimeanalyst;c.Oneadditionaljailer
per shift; and d. One additional dispatcher per shift so that Fire/EMS Depart-
mentshaveadedicatedpersontakinganddispatchingtheircalls.
PeriodicallyreviewtheFirepersonnelneedsandhireadditional
stafftoaccommodateincreasedcallsforserviceconcurrentwithpopulation
growth. This could include conducting a manpower study specifically to de-Manpower study not yet conducted.
terminewhetherornotasecondfull-timefirefighteriswarrantedateachfire
station.
Provide adequate funding to expand the amount and quality of more cost-ef-
Y
fective in-house training for patrol officers and other staff.
Adequatelyfundtrainingopportunitiesforfirepersonneltoimproveperson-
alskillsanddepartmentalcapabilities.UtilizethenewFireTrainingOfficerto
Y
expandcost-effectivein-housetrainingcapabilities.
Constructanewjoint6,000squarefootanimalshelterthatissufficientto
Y
achieve certificationrequirements.
22|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Completed or in progress? (Y/N)
Detailed components/action steps identified in 2012 Comprehensive Plan:
Establishaformalizedreplacementandprocurementprogramforvehiclesand
equipmenttokeeppacewithstate-of-the-artfirerescuetechnologyandcapa-
Y
bilities.Ataminimum,thisshouldincludeareplacementscheduleasfollows:
Engines:20years;Laddertrucks:25years;Commandvehicles:10years.
Establishaformalizedreplacementandprocurementprogramforvehiclesand
equipmenttokeeppacewithstate-of-the-artlawenforcementtechnology
Y
and capabilities. This could include: Rotating cars every three years; Replacing
laptops and software in patrol cars in a timely manner.
LaPorteTX2018ComprehensivePlanProgressReport|23
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Neighborhood Improvement Developaformalizedneighborhoodimprovementprogramthatensuresthequality
Programofexistingneighborhoodsaremaintainedorimprovedovertime.
Priority
Implementation
Status SummaryFuture Actions
Ranking
Status
2012
Northside Neighborhood Plan Explorefunding/grantopportunitiesto
developedbutnotimplemented.implement Northside Neighborhood
#3
Targetedinvestmentprogram Plan.
notdeveloped.Examineifotheroldercommunities
Codeenforcementprogramnot should have a neighborhood plan
Priority
ĬĻŭǒƓ
changed.developed.
Ranking
Examinepotentialfundingresources
2018
for communityinvestments.
#2
Key implementation Department(s): Planning and Development
Types offutureActions:TargetedPlanning/Studies,Programs andInitiatives
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Help older communities develop neighborhood plans, which may include elements
that would normally be required for a housing grant submittal. Such a plan would
highlightpotentialdevelopment/redevelopmentsites,infrastructureimprovements,
Y
increasedbuffering(tomitigatesuchthingsasnoisefromincreasedtrucktraffic),links
to important off-site amenities,etc.
A targeted program has
Develop a target-area community investment program focused on all infrastructure
notbeendevelopeddueto
improvements(e.g.,sidewalkinstallationinadditiontorepair,drivewayculvertclean-
ingandreplacement,alleyimprovements,treetrimming,parkingrestrictions,shielded lack of funding. Projects are
completed as opportunities
street lighting or other improved pedestrian lighting, added greenspace, improved
publicstreetscape/landscapeareas,newsignage,etc.)withinat-riskneighborhoods. arisesuchaswhenastreetis
This would be an expansion of the current program that provides dedicated funding re-donesidewalksareputin
for sidewalk repair andmaintenance.
Developaresults-basedcodeenforcementprogramtoaidincodecompliance(e.g.,
violationssuchasweeds,debris,andjunkvehicles)ratherthancitingnoncompliant
propertyowners.Akeyelementmaybethecross-trainingofenforcementadvocacy
N
officersinconflictmanagement/resolutionorthecreationofusefulinformationpack-
etslistingsourcesofhelpforhomeownerswhoareinviolationofCitycodes.
24|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Business Retention and Ex-Improve efforts to maintain relationships with existing businesses in order to deter-
pansion Programminepublic/privatestrategiestoovercomechallengesorfacilitateplansofexpansion.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Shop,eat,stay,playlocalcampaign Uponfillingofstaffvacancy,examine
isactive.potentialforre-establishingbusiness
Visitlaportetx.com website provides retentionandexpansionprogram.
#4
uptodateshopping/tourismguide.Determine,throughsurveysorinter-
New local programs have been views,howtheCitycanbestsupport
rolled out such as The Search for existing businesses andestablish
Priority
GoldandTheAiringofthe
an action plan to address identified
ĬĻŭǒƓ
Ranking
Quilts.needs and challenges
2018
Continue to support local event
Façadegrantprogramisactive.
programming and marketing and
strengthen relationship between
marketingeffortsandeconomicde-
#4
velopmentefforts.
Key implementation Department(s): Economic Development/EDC
Types offutureactions:Programs/Initiatives,Partnerships andCoordination
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Consider expanding the business retention and expansion program. A strong busi-
ness retention and expansion program should include regular visits with local em-
ployers.Thesevisitscanincludeformalsurveysorbeinformalinterviews.However,
theyshouldestablisharelationshipwiththeemployerandserveasamechanismby
N
which the Economic Development Coordinator can ascertain any major challenges
orplansforexpansion,andhelptoidentifysuppliersorcustomerswhocouldbenefit
from relocating to LaPorte.
Inadditiontositevisits,thebusinessretentionandexpansionprogramcouldbeex-
pandedtoincludesuchinitiativesasshoplocalprograms,advertisingcooperatives,
Y
shoppingguides,frequentshopperprograms,smallbusinessseminars,etc.
LaPorteTX2018ComprehensivePlanProgressReport|25
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Park and Trail System Im-Improve the quality of existing parks and recreation areas.
provements
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Parksstandardsinprogressaswellas Update Parks and Recreation
inventoryandreplacementschedule.Master Plan (in the works for
Allparkshavematchingentrysigns 2018).Consideralsoincorporat-
#5
(2013completion).ingTrailsintoMasterPlan.
FairmontandLomaxparkinglotshave Integrateparkplanningintoany
beenresurfaced.neighborhoodplans.
Playgroundreplacements(suchas Continuetoevaluatepotential
Priority
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
Seabreeze)havedesignthemes.funding sources for park im-
Ranking
Newamenitiesinclude2newsplash provements.
2018 parks.Continue to market high quality
Expansionofthefitnesscenter,poolup-of parks and consider applying
gradesandfrisbeegolfareplanned.forH-GACParksandNaturalArea
Onlineregistrationsystem(RecTrac)is awards.
#7
active.
SensTrailandParkSt.Trailinprogress.
Key implementation Department(s): Parks and Recreation
Types ofFutureActions:CapitalInvestments,TargetedPlanning/studies
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Establishaformalizedparks-to-standardsprogramtoensureallparksarebrought
upto,andmaintainedin,anequivalentqualitystandard.Thisprogramshouldin-
Y
cludeageneralmaintenanceandrepairschedule.
Establish a policy of master planning new/revitalized parks to develop a unique
designthemeforeachparktobroadenthetypesoffacilitiesandactivitiesthatare
Y
availableacrossthecommunityandtobettertietheiridentitytoadjacentneighbor-
hoods
Evaluateopportunitiestoaddnewtypesofamenitiesthatappealtointergenera-
Y
tionalandnon-traditionalusersinexistingandfutureparks
Improveon-siteandoff-siteaccessibilitytoeachparkbydevelopingasidewalkim-
Y
provementprogramtorepair,replace,orinstallnewsidewalks,crosswalks,andcurb
repairs are made as needed
cuts
(no set schedule)
Considerprovidingon-lineregistrationforanycamps,lessons,workshops,orclasses
Y
available through theCity
26|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Continuetobudget,orpursueadditionaloutsidefunding,toconstructtheremain-
ingtrailsegmentsasidentifiedintheBicycleandPedestrianTrailImplementation
Y
Plan.
Continuetoproactivelypursueadditionalparkandrecreationacquisitionofproper-
N
tyand/orprotectionofadditionalgreenspacewithintheCitylimits.
LaPorteTX2018ComprehensivePlanProgressReport|27
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Market Retail AnalysisUndertakeamarketretailanalysisseparatelyorincoordinationwithanupdatetothe
Economic Development StrategicPlan
Priority
Implementation
Status SummaryFuture Actions
Ranking
Status
2012
RetailAnalysisandMerchandisingPlan Utilizethecompletedmarketanal-
completed in 2013. The plan includes ysistodevelopacoordinatedeco-
#6
demographic analysis, retail analysis, nomic developmentstrategy.
andanalysisofcompetition.Utilizepsychographicswithinanal-
VisitLaPorteproactivelymarketsLa ysis to further market La Porte to
Priority
Porteviaavarietyofmediums.identified marketsegments.
źƓ ƦƩƚŭƩĻƭƭ
Ranking
Revise implementation action to
2018
reflectmarketretailanalysiscomple-
tion.
#10
Key implementation Department(s): Economic Development/EDC
Types offutureactions:Programs andInitiatives
Detailed components/action steps identified in 2012 Comprehensive Plan:Completed or in progress?
Undertakearetailmarketanalysistohelpidentifyopportunitiesforfutureexpan-
sionoftheretailspace.Theanalysisshouldincludeademographicanalysisof
Y
La -
nomic composition andcompetition.
Theoutcomeofthisanalysisshouldbetodevelopacoordinatedeconomicdevel-
opmentstrategycomprisedoffourmainelements:retaildevelopment,tourism,
N
aconventioncenter(consistentwiththeavailablespaceattherenovatedSylvan
BeachPavilion),andsupportforindustry.
Proactively market La Porte to identified market segments identified in the report.
Y
28|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Infrastructure ImprovementsContinuetoimplementtherecommendationsintheWaterMasterPlan,Water
ConservationPlan,andDroughtContingencyPlan.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
GIS-based Utility Mapping CompleteUtilityMappingProgramandutilize
#7
Programisinprogressbutnot as a prioritization tool to identify areas with
yetcomplete.the greatest infrastructureneeds.
Dead-endwatermainshave Continuetoeliminatedead-endwatermains
beeneliminatedinmostin-asadditionalfundingbecomesavailable.
Priority
źƓ ƦƩƚŭƩĻƭƭ
stances.Conduct WWTP feasibilitystudy.
Ranking
Consideraddingexaminingsecurityforpublic
The golf course and park use
2018
utilitiesandinfrastructureasapriorityaction
nearly95%ofdischargeduring
item.
summermonths.
#1
Key implementation Department(s): Public Works
Types of future actions: Capitalinvestments,Programs andinitiatives,
Targeted planning/studies
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Complete the geographic information system (GIS) mapping database, i.e., Utility
Mapping Program, by providing additional resources to capture and input the neces-
sarydataforacompleteassetmanagementprogram.Thissystemshouldbeutilizedto
Y
maintainrecordsoninflowandinfiltrationproblemsandmainbreaks,typesandsizes
in progress
ofpiping,datesofimprovementsandrepairs,andotherinformationrelevanttoanas-
setmanagementsystem.Datashouldbeusedasaprioritizationtoolinthepreparation
ofannualbudgetsandcapitalimprovementprograms.
Conductasystem-wideconditionanalysisofallutilityinfrastructure,i.e.,stormsewer,
water,andwastewater,todetermineanappropriateshort-andlong-termplanofaction
Y
to repair, rehabilitate, or replace existing utility infrastructure. Information should be
in progress
enteredintotheUtilityMappingProgramtoidentifytargetedgeographicareaswith
the greatest needs.
Identify and eliminate any dead-end water mains
Y
Conductafeasibilitystudytodetermineifthewastewatertreatmentplant(WWTP)can
beimprovedtoincreasethetotalavailablequantityofreusewaterandtodetermine
N
whereadditionalpublicorprivatereuseopportunitiesintheCitymightbelocated.
LaPorteTX2018ComprehensivePlanProgressReport|29
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Unified Development CodePrepare a Unified Development Code (UDC) to ensure an effective transition from
/ Modification of Regulatory
comprehensive plan to the implementing regulations.
Provisions
Priority
Implementation
RankingStatus SummaryFuture Actions
Status
2012
Thedevelopmentcodewasupdat-Assesspotentialadvantagestogoingfor-
edin2015andthezoningcodewas wardwithaUDC.IfaUDCisnotdesired,
updated in 2014. Although these examine whether existing codes ade-
#8
codeswereupdatedtheywerenot quately address all provisions and if not
combined into a Unified Develop-develop supplementalprovisions.
ment Code(UDC).ReviewlegalprecedentssuchasReedv.
Priority
ƓƚƷ ǤĻƷ ƭƷğƩƷĻķ
Gilbert that may necesitate updates to
Ranking
ordinances (in this instance, sign ordi-
2018
nance).
Updated2015developmentcodeshould
bemadeavailableonline,replacing1985
#12
versioncurrentlyonCitywebsite.
Key implementation Department(s): Planning and Development
Types offutureactions:Regulations andstandards
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
PrepareaUnifiedDevelopmentCode(UDC)toensureaneffectivetransitionfrom
comprehensiveplantotheimplementingregulations.Modifiedprovisionsshould
include,butnotbelimitedto:
o building placement, design, andmaterials;
o parkinglot,streetscape,andfoundationlandscaping;
N
o screening, lighting, andbuffering;
o lot design and openspace;
o streetandpedestrianconnectivityandaccessmanagement;and,
o sidewalk design, placement, andamenities.
30|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Downtown Master PlanPrepare a master plan for the Downtown area
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
The Downtown Master Prior to launching a Downtown Master Plan
Planhasnotprogressed.effort,pre-engagementworkwithexistingprop-
#9
ertyandbusinessownersinthepotentialstudy
areaneedstooccur.Thiscouldincludevisioning
sessionsandworkingtoaddressconcerns.
ExaminepotentialforparticipatinginTexasMain
ƓƚƷ ǤĻƷ ƭƷğƩƷĻķ
Priority
Streetprogramandre-startingMainStreetCoor-
Ranking
dinatorPosition.
2018
Seekfundingforrevitalizationandpursuegrant
opportunities.
ParticipateinH-GACBringingBackMainStreet
RoundtableProgram.
#2
Key implementation Department(s): Planning and Development, Economic Development
Types offutureactions:PartnershipsandCoordination,Targetedplanning/studies
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
PrepareamasterplanfortheDowntownarea,includingMainStreetandSylvanBeach,
theconnectionsbetween,andthetransitiontoadjacentareas.Thisincludes:
o settingaclearandcollectivelysupportedvision;
N
o determinationofimplementationframeworktoguidenew/reinvestment;and,
o coordinatingwithpreviousworkcompletedonmarketingandbranding.
LaPorteTX2018ComprehensivePlanProgressReport|31
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Drainage ImprovementsContinue to implement the recommendations identified in the Citywide Drainage
Study.
Priority
Implementation
RankingStatus SummaryFuture Actions
Status
2012
Theareasforimprovementidenti-Evaluate how drainage infrastructure
fiedintheDrainageStudyarecon-performed during Hurricane Harvey and
#10
tinuallyevaluatedandupdated.updateDrainageStudybasedonimpacts.
Drainage projects and improve-
Continuetodevelopfloodcontrolprojects
Priority
źƓ ƦƩƚŭƩĻƭƭ
mentsareongoingthroughoutthe as community enhancements.
Ranking
Continue to explore additional potential
City.
2018
fundingsourcessuchasPre-DisasterMiti-
gation,HazardMitigationGrantProgram,
#1
and FEMAgrants.
Key implementation Department(s): Public Works
Types offutureactions:Capitalinvestments
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Continue to implement the recommendations identified in the Citywide Drainage
Y
Study.
Designandconstructallfuture/redevelopedfloodcontrolandon-sitedrainageproj-
ectsascommunityenhancementsand/orrecreationalamenities;
Encourage vegetative buffers along stream and other drainageways
32|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Coordinated Tourism StrategyDevelop a coordinated tourism strategy that goes beyond trying to attract visitors.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
LaPorteisactivelyinvolvedwiththe UtilizetheRetailAnalysisandMerchan-
Heritage society, supporting their disingPlanasastartingpointtodevel-
#11
monthlyevents,fundinganyrepairs opacoordinatedtourismplan.
and funding theirdocent.
Worktomorecloselytiemarketingand
TheCityrecentlyaddedanother economic development efforts.
smallbuildingnexttothedepot.Trackimpactofmarketingefforts.
ƓƚƷ ǤĻƷ ƭƷğƩƷĻķ
Priority
ConsiderdevelopingTask-
Multipletourismadsareusedin
Ranking
composedoflocalbusinesses
different mediums.
2018
Multiple events are held to try to get and other areapartners.
#9
Key implementation Department(s): Economic Development/EDC
Types offutureactions:Targetedplanning/studies,Partnerships andcoordination
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Developacoordinatedtourismstrategythatgoesbeyondtryingtoattractvisitors.
Rather,thetourismstrategyshouldbefocusedoncapturingdollarsbylocal
N
businesses, so that the full economic benefit can be realized by the City and area
businesses.
Incoordinationwithareapartners(e.g.,theLaPorteBayAreaHeritageSociety),the
Cityshouldcreateatourismplanthatfocusesondevelopingtourismthat
attractvisitors,aretailstrategythatprovidesoutletsforvisitorstospendmoney,and
N
a marketing plan that effectively targets those groups who are likely to come to La
Porte.
LaPorteTX2018ComprehensivePlanProgressReport|33
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Business ParksProactively zone and market areas for higher quality business parks for those areas
identified on Map 2.6, Future Land Use Plan
Implementation Priority
Status SummaryFuture Actions
StatusRanking 2012
Designguidelinesdeveloped Coordinate planning and development
forBusinessIndustrialalong effortswitheconomicdevelopmentand
#12
majorcorridors.marketingeffortstoensurehigherquali-
ty standards areachieved.
Priority
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
Continue to evaluate developments to
Ranking 2018
determineifmodificationstonewguide-
Remove from
lines need to bemade.
high priority
Key implementation Department(s): Planning and Development and Economic Development/EDC
Types offutureactions:Partnershipsandcoordination,Regulation andstandards
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Updatethezoninganddevelopmentcodestoensurehigherqualitystandards
areachievedforthoseusesthatwouldbeallowedinBusinessParkandAu-
to-Urban Industrial areas. Additionally, provisions need to be strengthened
Y
to improve compatibility between areas of differing character and to achieve
bettercommunitylivability(see/ŷğƦƷĻƩЋͲ\[ğƓķ
ƭĻğƓķ5ĻǝĻƌƚƦƒĻƓƷ,foraddi-
tionalinformationonneededregulatoryimprovements).
34|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Business IncubatorEstablish a small business incubator site within the City in coordination with San
JacintoCollegeSmallBusinessDevelopmentCenter(SJCSBDC).Priorityconsideration
shouldbegiventolocatingthe
site in Downtown or near San Jacinto College.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Not yetstarted.New economic development staff should evalu-
atepotentialformovingforwardwiththispriority
#13
and begin discussions with SJCSBDC.
Considerre-startingsmallbusinessworkshops.
Priority
ƓƚƷ ǤĻƷ ƭƷğƩƷĻķ
Ranking
2018
#4
Key implementation Department(s): Economic Development/EDC
Types offutureactions:Partnershipsandcoordination,Programs andinitiatives
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
ConsiderbecomingamemberoftheNationalBusinessIncubatorAssociation(NBIA)
andestablishingasmallbusinessincubatorsitewithintheCityincoordinationwith
the San Jacinto College Small Business Development Center (SJC SBDC). Priority
consideration should be given to already-owned property located in the Down-
town area or in an area near San Jacinto College. The jointly sponsored incubator
couldincludefullyequippedofficespaceatlowcost(Cityprovided)withinitialand
N
follow-along counseling at no cost (SJC SBDC provided) for entrepreneurs of small
andemergingcompanies.Criteriawouldneedtobedevelopedforadmissiontothe
business incubator for start-up companies. In addition, the site could be cross-uti-
lized as a temporary headquarters on a short term, temporary basis (i.e., one to
three months) for new arrivals of established, major companies relocating to La
Porte.
LaPorteTX2018ComprehensivePlanProgressReport|35
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Safe Sidewalks ProgramPrepareasafesidewalksprogramtoidentifyandcorrectunsafeandpoorlymain-
tainedsidewalksegmentsatkeylocationsthroughoutthecommunity.
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Although not formalized in a Safe UtilizeGISmappingtomappriority
Sidewalks Program, annualsidewalk sidewalk investmentareas.
repairs areperformed.WorkwithGISDept.tocreateanAppto
#14
AnewsidewalkonParkSt.isunder track sidewalkrepairs.
construction in coordination with Considerformalizingsidewalkrepairs/
HarrisCounty(partialfundingfrom construction into a formal Safe Side-
Harris County Safe Sidewalks Pro-walksProgram.
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
gram).Continuetopursuepotentialfunding
Priority
Sidewalksthatareconstructedun-forsidewalks.
Ranking
dergoinspections.Evaluatethepotentialforutilizing
2018
H-freePedestrianEvaluationTool
toengagecitizensinperformingassess-
ments of sidewalk conditions and edu-
cating about sidewalkmaintenance.
#5
Key implementation Department(s): Planning and Development and Public Works
Types offutureactions:Capitalinvestments,Programs andinitiatives
Completed or in progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
PrepareaSafeSidewalksProgramtoidentifythoselocationswhereunsafeconditions
and/orpoorlymaintainedsidewalksexistparticularlyaround,adjacentto,andleading
to/away from schools; near and adjacent to public buildings and spaces; and other
areaspronetoheavyutilizationofthesidewalks.Duetothesignificantcostsofinitial
Y
construction, maintenance of the existing sidewalk system should be a priority and
shouldbeadequatelyfundedintheannualoperatingbudget.Additionalgrantfund-
ingshouldalsobepursuedfromsuchsourcesasFederal,State,privateentities.
Inthesepriorityareas,conductregularinspectionsofsafetyconditionstoensurethe
Y
walkingsurfaceisfreefromhazardsanddangerousobstructions.
OrganizeapubliceducationprogramtonotifythecommunityoftheSafeSidewalks
Program,theprioritypedestrianareas,andtheindividualresponsibilitiesforcareand
N
maintenance.
36|LaPorteTX2018ComprehensivePlanProgressReport
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Increasing Sustainability
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
The City is working toward water Designate a City Sustainability point
reductiontargetswitheffortssuch person who will work across depart-
asutilizinggreywateronParksand mentstotrackandevaluatethe
GolfCourse.sustainabilityefforts.
#15
Anewwaterreductiontargetwillbe Track metrics annually so the City can
establishedintheupdatedWCP.evaluateprogressoncomponentssuch
Newmunicipalprojectssuchasthe asenergyusageandwaterreduction.
ğƌƒƚƭƷ ĭƚƒƦƌĻƷĻ
RFQfornewfitnesscenterhighlight Evaluate potential for increasing
desireformoresustainablemunici-recycling options. Survey neighboring
Priority
palfacilities.citieswithcurbsiderecyclingandeval-
Ranking
The City utilizes drought resistant uatecostsandpotentialgrantfunding
2018
landscapingforpublicimprovement sources such as H-Solid Waste
projects.Grantsprogram.
#8
Key implementation Department(s): Economic Development/EDC, Parks and Recreation, Planning and
Development, Public Works
Types offutureactions:Programsandinitiatives,Partnerships andcoordination
Complete or In Progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
N
Reach the identified per capita water reduction targets
Y
Offer tax abatement incentives for private-sector development registered with LEED or
Y
other similar sustainable design and construction programs;
through Harris County
Pursue third-party certification (e.g., LEED-NC®) for design and construction of all new
Y
municipal projects;
Utilizedroughtresistantlandscapingforpublicimprovementprojectsandprovideincen-
Y
tives for private sectorprojects;
Establish community drop-off recycling locations in each park in the short-term and
N
curbside recycling in the long-term.
LaPorteTX2018ComprehensivePlanProgressReport|37
HIGH PRIORITY IMPLEMENTATION ACTION STATUS SUMMARIES
Strategic Corridors ProgramCreate a Strategic Corridors Program
Priority
Implementation
Ranking Status SummaryFuture Actions
Status
2012
Although not formalized in a Strategic Consider developing a corridor
CorridorsProgram,corridorinvestments streetscapeplanorcorridordesign
and improvements have been made, standards to identify priority im-
#16
such as new Wharton Weems entry provements forcorridors.
landscaping, design for sound wall and Evaluatepotentialfordeveloping
sidewalkonSpencerHighwayandtheS. corridoroverlaysaspartofzoning
źƓ ƦƩƚŭƩĻƭƭ
Priority
Broadway MasterPlan.code.
Ranking
CoordinatewithTxDOTtodevelopan
2018
Advance Funding Agreement (AFA)
for TxDOT roadways which will es-
tablishstandardsforfutureimprove-
#6
ments on TxDOTroadways.
Key implementation Department(s): Planning and Development, Public Works
Types offutureactions:Targetedplanning/studies,Regulation andstandards.
Complete or In Progress?
Detailed components/action steps identified in 2012 Comprehensive Plan:
Create a Strategic Corridors Program by identifying strategic corridors within the
community and direct aesthetic and infrastructure improvements along those cor-
ridorsasapriority.Coordinatewiththestateandcounty,asnecessary,fornon-City
roadways.AsidentifiedinChapter2,Map2.2,BeautificationPlan,primarycorridors
Y
should include S.H. 225, Fairmont Parkway (in conjunction with the Harris County
wideningproject),UnderwoodRoad,andS.H.146frontageroads.Secondarycorridor
enhancements should be completed on Spencer Highway, Sens Road, San Jacinto
Drive, and BroadwayStreet.
A corridor streetscape plan should be prepared for these strategic corridors. The
plansshouldincludeadetailedinventoryandassessmentofexistingconditions,in-
cludinglanduseandzoning,buildingfootprints,numbersandlocationsofdriveways
andparkinglots,numbersandlocationsofsigns,trees,andvegetation,powerpoles
andoverheadlines,streetcrosssectionsandrights-of-way,sidewalksandpedestrian
N
improvements,perviousandimpervioussurfaces,andgeneralvisualcharacteristics.
Theenhancementanddesignplansshouldincludeanyregulatoryrecommendations
and identified improvements and estimated costs. An implementation plan should
identifypriorities,fundingoptionsandsources,andatimeline.
38|LaPorteTX2018ComprehensivePlanProgressReport
CONCLUSION
Next Steps
Another major amendment such as occurred in 2012 should be undertaken in the 2020-2021
timeframe,withtheaimofanadoptedupdatedComprehensivePlanby2022,tenyearsafterthe
lastsignificantupdate.Suchanupdateshouldincludesignificantpublicengagementtoensure
theupdatedvision,goals,andprioritiesreflectthedesiresofthecommunity.
Utilizing the framework established by this Comprehensive Plan Progress Report, an annual
evaluationofprogressshouldbeconducted,ledbythePlanningandDevelopmentDepartment.
The Annual Progress Report should include:
1)Significant actions and accomplishments during the past year, including
thestatusofimplementationforeachprogrammedtask.Aleaddepartment
shouldbeidentifiedforeachimplementationactions.Eachidentifiedlead
departmentshouldcoordinatewiththePlanningandDevelopmentDepart-
ment to provide a single City-point of contact for the Annual Progress Re-
port.
2)Implementationconstraints,includingthoseencounteredinadministering
the plan and itspolicies.
3)Proposedamendmentsthathavecomeforwardduringthecourseofthe
year,whichmayincluderevisionstotheplanmaps,orotherrecommenda-
tions, policies, or textchanges.
4)Recommendations for needed actions, programs, and procedures to be
developed and implemented in the forthcoming year, including a recom-
mendationofprojectstobeincludedintheCIP,programsandinitiativesto
befunded,andprioritycoordinationneedswithpublicandprivateimple-
mentationpartners.
5)Mid-toLongRangeactionlistshouldbeevaluatedtodetermineifanyofthe
actionsshouldbemovedtothehighprioritylistforprogramming.