GENERAL NOTES'
1. FOR EXACT LOCATION OF EXISTING PAVING EDGE, INLET LOCATIONS
AND ELEVATIONS REFER TO TOPOGRAPHIC SURVEY.
2. GENERAL CONTRACTOR SHALL COORDINATE SITE UTILITIES WORK
WITH PLUMBING DRAWINGS.
EXISTING UTILITIES. FACILITIES & TREES
1. CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF ALL
EXISTING UTILITIES PRIOR TO CONSTRUCTION OF PROPOSED FACILITIES.
NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.
2. CONTRACTOR SHALL NOTIFY THE APPROPRIATE UTILITY COMPANY 4B
HOURS PRIOR TO EXCAVATING NEAR THEIR UTILITY.
3. CONTRACTOR SHALL TAKE ALL DUE PRECAUTIONS TO PROTECT EXISTING
FACILITIES FROM DAMAGE. ANY DAMAGE TO EXISTING FACILITIES INCURRED
AS A RESULT OF CONSTRUCTION OPERATIONS WILL BE REPAIRED BY THE
CONTRACTOR AT HIS OWN EXPENSE.
4. CONTRACTOR SHALL TAKE EXTRA CARE TO PROTECT TREES IN AREAS
ADJACENT TO CONSTRUCTION.
PROPOSED
BUILDING
GAS STATION
5,040 Sq.
Feet
F.F. 27.00
PROPOSED
CANOPY
4,160 Sq. Feet °"' fI
° °�-
SANITARY SEWER SYSTEM
1. PVC SANITARY SEWER PIPE SHALL BE SDR 25, AND SHALL HAVE
CLASS "AA" BEDDING.
2. SANITARY SEWER SHALL BE CONSTRUCTED IN ACCORDANCE WITH
AUTHORITY HAVING JURISDICTION (AHJ) SPECIFICATION AS CURRENTLY
AMENDED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR SAFELY SHORING ALL
TRENCHES IN EXCESS OF 6'-0" IN DEPTH IN COMPLIANCE W/ OSHA.
4. CONTRACTOR SHALL CONTACT AHJ AND FILE APPLICATION PRIOR TO
BEGINNNING CONSTRUCTION.
WATER SYSTEM
1. WATER LINE SHALL BE PVC PIPE.
2. WATER LINE SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE
WITH THE AHJ SPECIFICATION FOR WATER MAIN CONSTRUCTION AS
CURRENTLY AMENDED.
3. WATER LINE SHALL HAVE BANK SAND BEDDING AND BACKFILL.
4. PROVIDE THRUST BLOCKING ACCORDING TO AHJ STANDARDS &
SPECIFICATIONS,
5. PROVIDE A MINIMUM 6-INCHES OF CLEARANCE AT STORM SEWER AND
WATER LINE CROSSING.
LOT 7
1 \ \ LOT 9 I
LOT 8 \ I I
I I
46
S 03'35'15" E 294.12'
6' M,T08�
PROPOSED
BUILDING
FOR FUTU00 EASEo. SPACE
F.F. 27.00
2.4111 ACRES
105,026 SQUARE FEET
WAY
UNDERWOOD ROAD
(100 mae-or-wAYI
BOP ELF�l. 17.0
REA
S.F. >;II
o
RI
C
o��a
Too
--
£I
s
N
az'a
B
vmmL1
31
IN POND
i
ZCoF
m
I
~ �NA
>a
uN
1. WATER LINES, WASTEWATER COLLECTION SYSTEMS, AND STORM DRAINAGE
SYSTEMS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE
CITY OF HOUSTON. DEPARTMENT OF PUBLIC WORKS AND ENGINEERING 'DESIGN
MANUAL, STANDARD CONSTRUCTION SPECIFICATIONS, AND DETAILS FOR
WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE AND
STREET PAVING'.
2. ALL STORM SEWERS WILL BE REINFORCED CONCRETE (C76 CUSS III) AND
SHALL BE INSTALLED, BEDDED AND BACKFILLED IN ACCORDANCE WITH THE
CITY OF HOUSTON DRAWINGS 02317-02, 02317-03, 02317-05, 02317-06
AND 02317-07 AS APPLICABLE.
3. ALL STORM SEWERS CONSTRUCTED IN SIDE LOT EASEMENTS SHALL BE
R.C.P., MINIMUM TWENTY (20) FOOT WIDE EASEMENTS SHALL BE PROVIDED.
4. AN ALTERNATIVE TO CEMENT STABILIZED SAND MAY BE USED AS
BACKFILL FOR PIPES FIFTYFOUR (54) INCH AND LARGER, FROM 1-FOOT
ABOVE THE TOP OF THE PIPE TO THE BOTTOM OF THE SUBGRADE.
CONTRACTOR MAY BACKFILL WITH SUITABLE MATERIAL, PROVIDED THE
BACKFILL MATERIAL IS PLACED IN EIGHT (8) INCH LIFTS AND MECHANICALLY
COMPACTED TO NINETY-FIVE (95)% STANDARD PROCTOR DENSITY.
TESTS SHALL BE TAKEN AT ONE HUNDRED (10C) FOOT INTERVALS ON
EACH LIFT. BEDDING AND BACKFILL TO ONE (1) FOOT ABOVE THE
TOP OF THE PIPE SHALL BE CEMENT -STABILIZED SAND.
5. ALL PROPOSED PIPE STUB -OUTS FROM MANHOLES OR INLETS ARE TO BE
PLUGGED WITH EIGHT (8) INCH BRICK WALLS UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR(S) SHALL NOTIFY HARRIS COUNTY ENGINEERING
DEPARTMENT -PERMIT OFFICE TWENTYFOUR (24) HOURS IN ADVANCE OF
COMMENCING UTILITY AND/OR PAVING CONSTRUCTION AT (713) 274-3823
AND WRITTEN NOTIFICATION FORTYEIGHT (48) HOURS IN ADVANCE OF
COMMENCING CONSTRUCTION AT 10555 NORTHWEST FREEWAY, SUITE 144,
HOUSTON, TX 77092.
7. PAVING SHALL HE IN ACCORDANCE WITH THE 'REGULATIONS OF HARRIS
COUNTY, TEXAS FOR THE APPROVAL AND ACCEPTANCE OF INFRASTRUCTURE'
AND/OR AMENDMENTS OF THE SAME.
B. GUIDELINES SET FORTH IN THE "MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES' SHALL BE OBSERVED.
9. OWNER OR OWNER'S AGENT TO OBTAIN ALL PERMITS REQUIRED BY THE
'REGULATIONS OF HARRIS COUNTY, TEXAS FOR FLOOD PLAIN MANAGEMENT'
PRIOR TO STARTING CONSTRUCTION.
10. OWNER OR OWNER'S AGENT TO OBTAIN ALL NOTIFICATIONS REQUIRED BY
HARRIS COUNTY, TEXAS PRIOR TO STARTING CONSTRUCTION OF UTILITIES
AND/OR CULVERTS WITHIN HARRIS COUNTY AND HARRIS COUNTY FLOOD
CONTROL DISTRICT RIGHTS -OF -WAY.
NOTE:
A NOTIFICATION OF CONSTRUCTION IN RIGHT OF WAY PERMIT WILL BE REQUIRED
I FOR THE PROPOSED WORK WITHIN HARRIS COUNTY RIGHT-OF-WAY. CAN ONLY BE
PULLED AFTER THE PROJECT HAS BEEN APPROVED. SEE THIS LINK,
HTTP://HCPI D. DRG/PERMITS/P R_NOTIFICATION_C F_CONSTR UCTION. HTM L,
_.-- FOR INFORMATION ON HOW TO OBTAIN THE PERMIT. FOR THE W/L CONNECTION
NOTES:
1. INSTALL ALL EXPOSED P-TRAPS AND ANGLE SUPPLIES ON HANDICAPPED LAWS AND SINK
WITH TRUEBRO HANDI UV -GUARD OR EQUAL.
2. PROVIDE AND INSTALL 6" DRAIN SEAL P-TRAPS FOR ALL FLOOR DRAINS AND
FLOOR SINK, PROVIDE TRAP PRIMER AT FLOOR DRAINS.
3. HANDICAPPED PLUMBING FIXTURES SHALL BE SET TO "ADA" HEIGHT REQUIREMENTS.
4. ALL WATER HEATERS WITH 20 GAL. ELECTRICAL.
5. CONTRACTOR SHALL VERIFY THAT ALL WATER HEATERS SHALL FIT IN THE SPACE PROVIDED
AND THAT THE MANF. RECOMMENDED SERVICE CLEARANCES ARE MAINTAINED.
6. ALL INSIDE SANITARY SEWER WASTE AND VENT PIPING SHALL BE SCH. 40 PVC.
7. WATER PIPE TYPE PVC SCH 40.
B. ALL WATER PIPING ABOVE GROUND SHALL BE INSULATED WITH 1/2" ARMOFLE% PIPE INSULATION.
9. ALL WATER PIPE FITTINGS SHALL BE CPVC SOLVENT WELDING JOINT.
10. INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH UPC 2000 will CON AMENDMENTS.
21
A NOTIFICATION ISSUED BY HC INFRASTRUCTURE DEPARTMENT -PERMITS OFFICE- 15
---- REQUIRED FOR PROPOSED WORK WITHIN HARRIS COUNTY RIGHT-OF-WAY. THE
---- - PROJECT MUST BE APPROVED PRIOR TO OBTAINING THE REQUIRED NOTIFICATION. A
NOTIFICATION MUST BE OBTAINED SEPARATELY FROM A SITE DEVELOPMENT PERMIT
PACKAGE. FOR ADDITIONAL INFORMATION PLEASE VISIT:
HTTP://WWW.ENG.HCTX.NET/PERMITS/
PUBLIC-REVIEW-CODE/PUBLIC-PUN-REVIEW/
NOTIFICATION -OF -CONSTRUCTION -IN -THE -ROW OR CONTACT PUBLIC REVIEW
INSPECTIONS DEPARTMENT 0 (713)274-3931
NOTES.
1. THE INSTALLATION OF THE PROPOSED WATER METER, BORING AND JACKING,
AND CONNECTION TO THE EXISTING 12" WATER LINE WILL BE PERFORMED BY THE OPERATOR.
2. CONTRACTOR NEED TO VERIFY ALL THE EXISTING WATER AND SEWER LINES, MANHOLE AND
THEIR FLOW, PRIOR TO START OF THE CONSTRUCTION.
3. ALL CONNECTIONS TO DISTRICT FACILITIES SHALL BE MADE IN ACCORDANCE WITH
THE DISTRICT'S RATE ORDER.
4. A CLEANOUT NEEDS TO BE INSTALLED EVERY 100 FEET ALONG THE SANITARY SEWER
LINE AND OUTSIDE THE BUILDING BEFORE THE GREASE TRAP.
5. CONTRACTOR MUST MAINTAIN A 9 FEET SEPARATION BETWEEN
WATER LINE AND SANITARY SEWER LINE, BEFORE COMING TO THE BUILDING.
S. PROVIDE DROP CONNECTION AT THE TIE-IN TO THE EXISTING SANITARY SEWER
MANHOLE PER CITY OF HOUSTON SPECIFICATION.
FLOOD NOTE:
SUBJECT PROPERTY IS NOT LOCATED IN A FEDERAL
INSURANCE
ADMINISTRATION
DESIGNATED FLOOD HAZARD AREA
AND 15 IN ZONE
"X" MAP
# 48201C,
PANEL 0940M, DATED 01-06-17.
This information
is based an
graphic
platting only. We do not assume
responsibility for
exact determination.
i At
%• •tl
MAINUL H. KHAN
j,...j
It
LEACE-=r
The seal appearing on
this document was
authorized by
MAINUL H. KHAN
P.E. 93979, on
MAY BOTH, 2021
Q
O
y
W
C
J
o
e,
�NJ
m
m
C o
Z
.m m
++ O
o
IA
0
2ee
ej
sQ
LJ
OWNER
JIN LEE
PROJECT
LA
PLAZA
2459UNDERWOOD RD.
U PORTE, TX T571
TITLE
UTILITY
PLAN
akuECTNO SHEET
201919
07E01-19 C-4.0
sang
1"= 30'- 0"