HomeMy WebLinkAbout10051 PORTER RD_08-0497___________10051 PORTER RD \
�
�
�A
.
;.
00� i,
\
\
. . w.
.
.
Commercial
Date: .3 3 / 0
Proj ect
Contractor
Project Name:
File Review Ws 1-9
6.
7.
8.
9.
Pe c I S'
Final Flood Plain Elevation Certificate (if
applicable) in file
Form Survey (if applicable) in file
Zoning Permit in file — t11voc -vo, �z ,9�11 4ZS 7Lim-e
Customer Service Inspection Certificate in file
Back Flow Prevention Device Test Certificates (bldg
& irrigation) in file
Energy Code final certificate in file
Fire Marshal building release in file
All required permits in file
All inspections on log complete
Field Review Ws 10-17
_10. Address # visible from street
I I- Sign Permit in file & in compliance (if applicable)
/A- 12. Sidewalk construction (if applicable) as per site
plan
3. Drainage as per site plan
4. T-Pole removed
5. Fence (if applicable) in compliance
6. Landscaping as per site plan
17. Inspection ticket to identify if full or temp 30-day
CO is authorized
Inspector Signature
Date
SACPShatcUNSPECTION DIVISIONUnapcctiom\Final Inspection Check SheetComNov04.doc
Page 1 of 1
Hubei, Mark
From:
Mark Hayes [mhayes@claydevelopment.comj
Sent:
Friday, April 11, 2008 2:02 PM,
To:
Huber, Mark
Cc: 'Bryan Christ'; 'Carla Haramboure';'Charlie Christ
Subject: Spec. #15 10051 Porter Road
4/11 /08
Mark,
As a follow-up to our telephone conversation, Clay Development wishes to obtain the permit for the West
Restrooms in addition to the permit for the East Restrooms. We understand the permits will expire six months
after issuance.
Thanks for your help in this matterl
Mark Hayes
Clay Development & Construction, Inc.
1726 Augusta Dr., Suite 100
Houston, TX 77057
(P) 713-789-2529 x119
(F) 713-782-3755
4/11 /2008
r�
City of La Porte
Accounts Payable
Check Requisition
Due Date:
Vendor
CLAY DEVELOPMENT
800 GESSNER STE. 850
HOUSTON, TEXAS 77024
You are required
to attach receipts with all check requisitions.
Description REFUND FOR OVERAGE ON 10051 PORTER RD. PERMIT 08-497
Account #
Project #
Invoice #
Commodity
Code
Date
Amount $$
0010000202001
275-120
OS-07-08
$112.50
Total Amount Due: $
$112.50
Remarks: SEE ATTACHED DETAIL
Prepared By VICKIE LAWRENCE
DateS/8/O8
Approved By:
Date: y.
a� U /o
Plan Che e f47.50
Valuat' \I 10100
a� Extension
20.00
10.00 7.5000 THOU -, BLDG - 001 - 50,000 0
------------------ ---------------- -------------- - --
Special Notes and Comments
1. THIS PERMIT WILL ONLY E FOR ADDIN R
ESTROOM TO WEST SIDE OF HELL BUILDING.
City of La Porte
604 W Fairmont Pkwy
La Porte, Tx 77571
(281)470-5073 INSPECTION LINE:(281) 470-5130
****BUILDING PERMIT****
---------------------------------------------------------------------------
Application Number . . . . . 08-00000497 Date 4/30/08
Property Address . . . . . . 10051 PORTER RD
HCAD Number . . . . . . . . . 040-174-000-0006
Application type description ADDN, OFFICE
Subdivision Name . . . . . . ABST 5 E BRINSON
Property Use . . . . . . . .
Property Zonin PLANNED UNIT DEVELOPMENT
Application va�uation . . . . 10100
Owner
---------------
C-2 REAL ESTATE
800 GESSNER RD
HOUSTON
logo"
TX 770244492
StrActure Inf
Construction Type
NI
Occupancy Type
SZ
Other struct info .
. F1
------------------------------
Permit . . . . . .
----
BLDG RM
Additional desc
ADD RR
Permit Fee . . . .
95. 0
Issue Date . . . .
4/30/
Expiration Date
10/27/0
Qty Unit Charge Per
Contractor
------------------------
CLAY DEVELOPMENT & CONST
800 GESSKRE 850
HOUSTON TX 77024
(713) 78mation 000 00------------------
COMBUSTIBLE ()
T-CO
E OF
NLY. 2. CALL FOR INSPECT ONS. 3. NO TEN
NTS ALLOWED AND NO USE BUILDING UNTIL
A NEW ZONING PERMIT IS ISSUED. 4. ALL W
ORK TO COMLY WITH TAS/ A. 5. NO MECHANI
CAL AT THIS TIME.
---------------------------- ---------------------- ----------------
Fee summary Char ed Paid Cre
----------------- ---- ----- -----
Permit Fee Total 95.00 95.00
Plan Check Total 47.50 47.50
Grand Total 142.50 142.50
--- -- - - --- ---------------------------------------------------
3u�
ited Due
- --------------
.00 .00
00 .00
0 .00
(SIGNYTURF�COiNtRACTOR OR AUTHORIZED AGENT) )�
(APPROVED BY BUILDING OFFICIAL OR AUTHORIZED A
E O
DATE
DATE
CITY C_ LA PORTE, TX ,
*** CUSS SR RECEIPT ***
Batch ID: UB FRANCES 4/30/08 01 Receipt no: 89254
2008
10051 PORTER
Trans number:
Tender detail
Type SvcCd Description Amount
497 BP PERMITS
Qty 1.00 $142.50
1708500
CK Ref#: 29051 $255.00
Total tendered: $255.00
Total payment: $142.50
Change: 112.50
Trans date: 4/30/08 Time: 15:12:56
THANK YOU FOR YOUR PROMPT PAYMENT
THE FROST NATIONAL BFNK 30-9 29051
CLAY DEVELOPMENT CONSTRUCTION, INC. PMSTON U"W w
1726 AUGUSTA DRIVE SUITE 100
HOUSTON, TX 77057
(713) 789.2529
Pay,: :**r***•**********************
Y� Two hundred fifty-five dollars and no cents
DATE CHECK NO. AMOUNT -
April 30, 2008 29051 $********255.00
CITY OF'LAPORTE
PAY. 604 W. FAIRMONT PKWY
TOTHE. LAPORTE, TX 77571
ORDER.
OF..:_
11.0 290511I' 1: L L40000934
1p
5600 1 L 28 2110
City of La Porte
604 W Fairmont Pkwy,—�
La Porte, Tx 77571 ^..1
(281)470-5073 INSPECTION LINE:(281) 470-5130
****BUILDING PERMIT****
---------------------------------------------------------------------------
Application Number . . . . . 08-00000497 Date 4/30/08
Property Address . . . . . . 10051 PORTER RD
HCAD Number 04040-1-174-000-0006
Application type description ADDN, OFFICE
Subdivision Name . . . . . . ABST 5 E BRINSON
Property Use . . . . . . . .
Property Zoning . . . . . . . PLANNED UNIT DEVELOPMENT
Application valuation . . . . 10100
Owner
------------------------
C-2 REAL ESTATE HOLDINGS LTD
800 GESSNER RD STE 850
HOUSTON TX 1'7 444
--------------------- Structure Inf
Construction Type . . NO
Occupancy Type ST
Other struct info t�
Contractor
I
CLAY DEVELOPMENT & CONST
800 GESSNER STE 850
HOUSTON TX 77024
(713) 789-2529
mation 000 000 ----------------------
COMBUSTIBLE (TY.I,II)
ZONE
X
---------------------------
- - -----------------------------------------
Permit
B
DG ERMIT-COMMERCIAL
ADD ON
Additional
desc D RR SIDE
OF SHELL BLDG.
Permit Fee
95.00
1 n Check Fee
47.50
Issue Date
4/30/08
1 ation . . .
. 10100
Expiration
to 10/27/08
Qty
lq.0�
it ha ge Per
BAS
7.5000 THOU
(�
FEl,CA ,000
Extension
20.00
75.00
Speci 1 of
T IS
ESTR OM TO
LY. 2. CA
and Commen
T WZ ONL
PEST S OF
FOR I CT
AND NO E
fG PERMI IS IS
COMLY WITH
THIS TIME.
WOR
--------------------------- I G R
ELL B G 0
NS. 3 TENA
BUIL UNTIL V\\`
S D. ALL W
CHANI
----------- - -
Fee summ--y------ Charged
Permit Fee Total 95.00
Plan Check Total 47.50
Grand Total 142.50
(SI
(APPROVED BY
- ---- ---- - - ----- - -- ------
Pa ---------- ------ ue
00 .00 (� 00
7. 0 .00 .00
0 .00 1� .00
--------------------------- - ---------
'3a-o
OR AUTHORIZED AGENT)
OFFICIAL OR AUTHORIZED
A )
DATE
DATE
a
F E3 1 9 2008 PERMIT APPLICATION
t City of La Porte
r 281-470-5 73 1
rot -
Building
Building Mechanical \�11 •Electrical
rrtiles+ Y12 (Seeback
Project
Established 1892
U P Derr ,4 ��yl
Subdivision: Mst S b: 4" &--j. Block: w PT 7 P- t--9
Owner's Name: �l AT iAUF E.dT �. CAh: s l . Phone:
City
City
Jet
Engineer. bEaAA\t 1"I004M -1
Building Use: QFFte.%'- �w 1�wi� Sq.Footage: 44t05 #Stories_1_
P 1 D /o o 44>0 RhsTx-o1or,
Valuation Descnbe Work: WLS-r 5 1
o t.l.
INSPECTION.
Z.
For City Use Only
ocraipanoy Type S -1 Svlisc�ood Zone K
Construction Type_JV— 6 Use Zone P tJ D)
Lim
Commercial Buildings Plans Only -Fire Marshal
Residential driveway tie-in fee:
Parkland(New Res. Zone #
Permit No. ( W - 4 9 1 Permit Fee 4 9S oo lan Check
vS
91
c1
COMMERCIAL
Pl,,'i REVIEW COVER SHE
'(I(,)2til
15-
ADDRESS:
L�I1�7tdia-
PROJECTTYPE: 1 1
HCA
1 I 1 I
FLOOD ZONE:' , 7
SUBMATE 1• 1
n•: ./Y • /
I
(Applicable on Demo, Addn, or Remodel)
__ __••• •• I•�,IYY (Applicable • Comm Or Ind.)
1 _ permit11• be e•
HI_ I I• I. .IY I
i
r ••I. _ DIY .I
figure
• fees.
_ • • 1 to
explain • 1 1"areI•
TAXES UP TO DATE?: 0 j4'_
DATE OF REVIEW: a - RI - 08 INSPECTOR: A v6t�
nTMS NEEDED FOR ISSUANCE OF PERMM
• ('ippi WCl V ill CiTQ AWf W !'CDT %=•a--1:••ahjfi\ ALA
OWNER OR CONTRACTOR NOTIFICATION
DATE THE NAME OF PERSON CONTACTED
al
313/1O 8 / /s//fM — u Lj/ A"- -
S:1CPShareWSPE=0N 3MSIONVnspN�UM\COMI.PLAN VUW'COVERSHEEf.do Pn'..4# 3 & a
1 /
INSPECTION SERVICES
' BUILDING PERMIT CHECKLIST
1 p (CONOdERC
Job Address: 100S / P rTt r Ol t? HCAD#: O y0 — "� % y — 000 — 100
Owner Name: C I A y Flood Zone iK
Type of Work: New Remodel Addition
Date Received in Inspections: 3" a6 G8CD
Legal Description:
Zoning: Allowable U ? Y OR N
Street/Alley Closing Action? Ord #s•
Complete and accurate construction drawings (all phases) are one of the most important steps in
completing your project. They will be used to cost out the job, get estimates from any
subcontractors, show details in legal documents, and to obtain necessary permits.
FORMAT
Furnish two sets of construction documents including the following items:
11
of Property (SBC 10 . 5) Yes r
d Site P to Scale indite (Dev Ordinanc 1444)Yes or
(If r ired by Planning Dep ent) (Appendix E)
th ow (Dev Ordinance 1 )Y s or
(Appendix E)
building setback
Alleys,
./ Distance k proposed
coon (DevVE
1 Yes or
(A)
i eve ) s or
s
(Deve 1444)) Yes r
()to property lines (Dee 1444) Yes or
()
,No
No
No
No
No
No
No
Inspections Division Building Permit ChecU st Page 2
(City Ord 106-142)
Yes
or
No
e
(State Law)
Yes
or
No
(State Law)
Yes
or
No
(State Law)
Yes
or
No
(CLP Resolution)
Yes
or
No
(CLP Resolution)
Yes
or
No
ca on
(City Ord 106-141)
Yes
or
No
s eque
(City Ord 106-141)
Yes
or
No
(City Ord 106-141)
Yes
or
No
•
Yes
or
No
• Hams C —1
ans evlew Iwormation Report"
Yes
or
No
om s County?
(City Ord 1444-A)
Yes
or
No
(City Ord 1501-R5)
Yes
or
No
Flood elmlt
^
(City Ord 194-63)
Yes
or
No
(Ord 759-F)
Yes
or
No
• COmDleted P�tthOn-to ie ^n to
Existing Water/Sewer Mains
(Ord 759-F)
Yes
or
No
• Sam Proprosed
(City Ord 74-121(c)
Yes
or
No
o ance
(CityOrd 82-35)
or
No
• Construction Drawings with Engineer's
Seal (if applicable)
(State Law)
Yes
r
No
•:• Foundation Plans
(State Law)
Yesr
No
❖ Structural Framing Plan
(State Law)
Yesr
No
❖ Exterior Elevation Plan
(State Law)
Yesr
No
•:• Electrical Drawings
(State Law)
Yesr
)cr
No
•:• Plumbing Drawings
(State Law)
Yesr
No
•:• Mechanical Drawings
(State Law)
Yesr
No
•;• Drainage Plan
(State Law)
Yesr
No
❖ Slab Elevation (if applicable)
(State Law)
Yes
No
S:\CPShvcT4SPEC'n0N DIVISIONUnspedio \BIdB P Checkliri ComlNovW6
Page I of I
Huber, Mark
From: Mark Hayes [mhayes@claydevelopment.com)
Sent: Friday, April 11, 2008 2:02 PM
To: Huber, Mark
Cc: 'Bryan Christ'; 'Carla Haramboure'; 'Charlie Christ'
Subject: Spec. #15 10051 Porter Road
4/11 /08
Mark,
As a follow-up to our telephone conversation, Clay Development wishes to obtain the permit for the West
Restrooms in addition to the permit for the East Restrooms. We understand the permits will expire six months
after issuance.
Thanks for your help in this matter!
Mark Hayes
Clay Development & Construction, Inc.
1726 Augusta Dr., Suite 100
Houston, TX 77057
(P) 713-789-2529 x119
(F)713-782-3755
4/11/2008
11. Page 1 of 1
Huber, Mark
From: Huber, Mark
Sent: Tuesday, October 07, 2008 1:23 PM
To: 'Mark Hayes'
Cc: 'Danny Martin'; Huber, Mark
Subject: RE: Spec. #15- 10051 Porter Road
I left you a voice mail to call me, but it seems after reviewing the files, that we need to have a sit down meeting to
discuss.
From: Mark Hayes[mailto:mhayes@claydevelopment.com]
Sent: Wednesday, October 01, 2008 4:33 PM
To: Huber, Mark
Cc: 'Danny Martin'
Subject: Spec. #15- 10051 Porter Road
Mark,
We have a potential tenant for part of the building referenced above. This is the building that we have a
restroom permit for the West and East ends. Is there anything that I need to do to commence
construction? I will be happy to meet with you at your convenience.
Thanks,
Mark Hayes
Clay Development & Construction, Inc.
1726 Augusta Dr., Suite 100
Houston, TX 77057
(P) 713-789-2529 x119
(F)713-782-3755
10/7/2008
a
J
�1. 4
�1
=113KIII
HCAD Number . . . . . . .
Property address . . . .
Application, str, pmt nbr
Application type . . . .
Permit type . . . . . . .
Permit status, date . . .
Issue date by . . . . . .
Expiration date . . . . .
Reissue date by . . . . .
Permit value . . . . . .
Permit square footage . .
Property owner . . . . .
Contractor . . . . . . .
Additional permit desc
Phone interface number
Permit pin number . . . .
Last maintained by . . .
CITY OF LA PORTE 8/31/09
Permit Inquiry 09:20:51
129-636-000-0004
10051 PORTER RD CLP
06 00001468 000 000 ZN 00
ZONING PERMIT
ZONING PERMIT
PERMIT PRINTED 9/27/06
9/27/06 PE TEMP
3/26/07
2/10/09 PE_VICKIE
0
0
THE ST JOE COMPANY
CLAY DEVELOPMENT &CONSTRUCTION
SIC # 10,000-SHELL BUILDING
--2:5 914 3
259143
PE VICKIE 2/10/09 14:18:32
F3=Exit FS=Land inq F6=Sub-contractors FB=Permit fees F9=Req'd insp
F12=Cancel
COMMERCIAL DESIGN -BUILDERS
1726 Augusta Drive . Suite 100 • Houston, Texas 77057 • 713.789.2529 • Fax 713.782.3755
March 25, 2008
Mr. Mark Huber
La Porte City Hall — Department of Building Planning
504 West Fairmont Parkway
La Porte, TX 77571
Re: Spec 15, 10051 Porter Rd., La Porte, TX 77571
Mr. Huber,
We are submitting a revised set of drawings for the Spec 15 shell building. To
eliminate any confusion I have deleted references to suite numbers and instead now
refer to the East and West halves of the building. As discussed in our previous meeting,
we have no tenants for this building yet, therefore the suite numbers would not be
applicable.
All other comments have been addressed and are included in this revised set,
which includes architectural, electrical and plumbing sheets. We are also including a
revised energy code review for lighting as requested.
Please feel free to contact me or Mark Hayes (P.M.) with any questions.
Sincerely,
Carla Haramboure
IR:ECEIVP.n
MAR 2 6 2008
DEVELOPERS/DESIGN-BUILDERS OF INDUSTRIAL BUILD -TO -SUIT FACILITIES FOR SALE OR LEASE
www.claydevelopment.com
800 Gessner, Suite 850
Houston, Texas 77024
713.789.2529
` Fax 713.782.37553755
RECEIVFn
FEB 1 9 2008
February 14, 2008
Mr. Mark Huber —
L orte City Hall — Department of Building
504 est Fairmont Parkway
La Po TX 77571
Re: Spec 1k10051 Porter Rd. Suite
Mr. Huber,
We are submitting a II set of
for plan review and peNnifting.
occupancy
Please feel free to contact
Sincerely,
Carla Haramboure
Porte, TX 77571
for a build -out at Spec 15 shell building
any questions.
M
Nw
J
DEVELOPERS/DESIGN-BUILDERS OF INDUSTRIAL BUILD -TO -SUIT FACILITIES
._
r1 DF V FIO PM F III S CONS• CII C
TRANSMITTAL LETTER
TO:
City of La Porte
504 West Fairmont Parkway
La Porte, T-X, 77571
X ATTACHED
❑ PRINTS
❑ REPRODUCIBLE
ATE:
March 26, 2008
TI'N:
MARK HUBER
JOB NAME:
Spec. #15-10051 Porter Rd.
F:
❑ UNDER SEPARATE COVER
❑ SPECIFICATIONS
❑ SHOP DRAWING
QUANTITY I DESCRIPTION
2 EA. Permit drawings for 10051 Porter Road
❑ COPY OF LETTER
❑ CHANGE ORDER
❑ -----
ITEMS TRANSMITTED AS CHECKED BELOW:
SENT VIA:
❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED 2-MESSENGER
❑ FOR YOUR USE ❑ APPROVED AS NOTED ❑ FEDERAL EXPRESS
❑ FOR REVIEW & COMMENT ❑ RETURNED FOR Co ^— : ❑ FAX
❑ AS REQUESTED1 ❑ MAIL
REMARKS:
FROM: Marc Hayes ` ./ COPY:
1726 Augusta Dr., Suite 100 • Houston, Texas 77057 9 TeL 713/789-2529 9 Fax 713/782-3755
r-
COST CODE
RIVED or'GTED By
COMcheck Software Version 3.5.2
MAR 1 7 2008
Interior Lighting Compliance
Certificate
/ E nPPftO�Al•
2006 IECC
Report Date: 03/13/08
Data filename: C:\ Program Files\ Check\ COMcheck5\ Spect SCOC-031208.cck
Section 1: Project Information
Project Type: New Construction
Project Tide: Spec Building #15
Construction Site: Owner/Agent:
Designer/Contractor.
Underwood Business Park
CDC
La Porte, TX
8D0 Gessner Rd., Suite 850
Houston, TX 77024
Section 2: General Information
Building Use Description by: Activity Type
Activity Tvoe(sl Floor Area
Warehouse 225000
Section 3: Requirements Checklist
Interior Lighting:
❑ 1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Watts Proposed Watts Complies
180000 179M YES
Controls, Switching, and tiring:
O 2. Independent controls for each space (switch/occupancy sensor).
Exceptions:
Areas designated as security or emergency areas that must be continuously illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
❑ 3. Master switch at entry to hotel/motel guest room.
❑ 4. Individual dwelling units separately metered.
❑ 5. Each space provided with a manual control to provide uniform light reduction by at least 50%.
Exceptions:
Only one luminaire in space;
An occupant -sensing device controls the area;
The area is a corridor, storeroom, restroom, public lobby or sleeping unit.
Areas that use less than 0.6 Watts/sq.ft.
❑ 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security.
❑ 7. Photocell/astronomical time switch on exterior lights.
Exceptions:
Lighting intended for 24 hour use.
O 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts).
Exceptions:
Project Tide: Spec Building 015 Report date: 03/13/08 ; ;Ei�`Eq�UIEiQ
Data filename: C:\ Program Files\ Check\ COMcheck5\ Specl SCOC-031208.cck Page 3
MAR 2. 6 2008
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair.
Section 4. Compliance S: \ .ment 0
•� Compliance Statement: The proposed lighting design represented In this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed lighting system has desig ed to meet the 2008 IECC
requirements in COMchack Version 3.5.2 and to comply with the mandatory regyirefne n the Re9drements Checklist.
Ernest Taylor III, [CC Commercial Energy
Plans Examiner #5214467-78
MAR 2 6 2008
Project Title: Spec Building #15 Report date: 03/13/08
Data filename: CA Program Files\ Check\ COMcheck5\ Specl5-CDC-031208.cck Page 4
COMcheck Software Version 3.5.2
Interior Lighting Application
Worksheet
2006 IECC
Report Date:
Data'filename: C:1 Program Files\ Check\ COMcheck5\ Spec1SCDC-031208.cck
Section 1: Allowed Lighting Power Calculation
Area Category
B C o
Floor Area Allowed Allowed Watts
D Watts I112 (BxC)
Warehouse 225000 0.8 180000
Total Allowed Watts = 180000
Section 2: Proposed Lighting Power Calculation
A
Fixture ID: Description I Lamp I Wattage Per Lamp I Ballast
B C D
Lamps/ p o1 Fixture
Fixture Fixtures Watt.
E
(C X D)
Warehouse (225000 sq.11.)
Linear Fluorescent 1: A: 2 x 4 Fluorescent / 48' TS 32W / Electronic
4 12 120
1440
HID 1: B: High bay Lighting I Metal Halide 75M / Electronic
1 222 800
177600
Total Proposed Watts -
179040
Section 3: Compliance Calculation
11 the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies.
Total Allowed Watts =
180000
Total Proposed Watts=
179040
Project Compliance =
960
Interiortiohting, PASSES DesignI%'.better. than
celviltn
Project Title: Spec Building #15 Report date: 03/13/08 ts
Data filename: C:\ Program Files\ Check\ COMcheck5\ Specl5-CDC-0312W.cck Page 5 AR 4. 8 2008
• jam. / COST CODE
Rg�giVED oncTED Bf
COMcheck Software Version 3.5.2
MAR 1 7 2008
Interior Lighting Compliance
Certificate �£# `'I nQPR9�AL
2006 IECC
Report Date: 03/13/08
Data filename: CA Program Files\ Check\ COMcheck5\ Specl5-COC-031208.cck
Section 1: Project Information
Project Type: New Construction
Project Title : Spec Building #15
Construction Site: Owner/Agent: Designer/Contractor.
Underwood Business Park CDC
La Porte, TX 800 Gessner Rd., Suite 850
Houston, TX 77024
Section 2: General Information
Building Use Description by: Activity Type
Activity Tyoefsl Floor Are
Warehouse 225000
Section 3: Requirements Checklist
Interior Lighting:
❑ 1. Total proposed wafts must be less than or equal to total allowed wafts.
Allowed Wafts Proposed Watts Complies
180D00 179D40 YES
Controls, Switching, and Wiring:
❑ 2. Independent controls for each space (switch occupancy sensor).
Exceptions:
Areas designated as security or emergency areas that must be continuously illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
❑ 3. Master switch at entry to hoteUmotel guest room.
0 4. Individual dwelling units separately metered.
❑ 5. Each space provided with a manual control to provide uniform light reduction by at least 50%.
Exceptions:
Only one luminaire in space;
An occupant -sensing device controls the area;
The area is a corridor, storeroom, restroom, public lobby or sleeping unit.
Areas that use less than 0.6 Wafts/sq.ft.
❑ 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security.
❑ 7. Photocelliastronomical time switch on exterior lights.
Exceptions:
Lighting intended for 24 hour use.
❑ 8. Tandem wired one4amp and three4amp ballasted luminaires (No single4amp ballasts).
Exceptions:
Data filename: CA Program Files\ Check\ COMcheck5\ Specl5-CDC-031208.cck Page 3
n
MAR 2.6 2008
Electronic high -frequency ballasts; Luminaires on emergency circuits or with. no available pair.
Section 4: Compliance E. ment
Compliance Statement., The proposed lighting design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed lighting system has 49ef desig ed to meet the 20061ECC
requirements in COMcheck Version 3.5.2 and to comply with the mandatory reso"Menlyin the Re3tdirements Checklist.
Ernest Taylor III, ICC Commercial Energy
Plans Examiner #5214467-78
Project Title: Spec Building #15 Report date: 03/13/08
Data filename: CA Program Files\ Check\ COMcheck5\ Specl 5•CDC-031208.cck Page 4
MAR 2.8 2008
COMcheck Software Version 3.5.2
Interior Lighting Application
Worksheet
2006 IECC
Report Date:
Data filename: CA Program Files\ Check\ COMcheck5\ Spec15-CDC-031208.cck
Section 1: Allowed Lighting Power Calculation
A B C D
Area Category Floor Area Alloyed Allowed Watts
(112) Watts I ft2 (B x C)
Warehouse 225000 0.8 180D00
Total Allowed Watts = 180000
Section 2: Proposed Lighting Power Calculation
A B C D E
Fixture ID: Description I Lamp I Wattage Per Lamp I Ballast Lamps/ ff of Fixture (C X D)
Fixture Fixtures Watt.
Warehouse (225000 sq.RJ
Unear Fluorescent 1: A: 2 x 4 Fluorescent 148" T8 32W / Electronic 4 12 120 1440
HID 1: B: High bay Ughting / Metal Halide 75OW / Electronic 1 222 8D0 1776W
Total Proposed Watts - 179040
Section 3: Compliance Calculation
If the Total Allowed Watts minus the Total Proposed Wafts is greater than or equal to zero, the building complies.
Total Allowed Watts = 180000
Total Proposed Watts = 179040
Project Compliance = 960
Interior Lighting' PASSES3 Designtt%better than codeMn.P1 ..._- h"ro' :' i ,� '.- e +i �L I
RECEIVED
Project Title: Spec Building #15 Report date: 03/13/08
Data filename: CA Program Files\ Check\ COMcheck5\Spec1S-CDC-031208.cck Page 5 MAR 2. 6 2008
LA POk fE FIRE MARSHAL'S OFFICE
PLAN REVIEW
CDC Spec 15, yit 0 W
10051 Porter Road
Construction Plan Review
Date: 02/ 22 / 2008
Reviewed by: Clif Meekins, Fire Marshal
Approved: YES
The following items are identified by the Fire Marshal's Office during the plan review:
No comments at this time
7
604 West Fairniont Parkway La Porte,'rX 77571
Office:281-867-4603
Fax: 281-470-5005
Oil
I in
��y.� •�
V4LUq}to
��X_f_Sl /Ir��I�G(_M-l� '�Ol���,N �tC\o%BJ�1..D�i�i.u� {-r 4t-T.P\—SQ� 6.N.1 _/(—
C No -r2/J isl_Gi v NLl -dLJ_ insa..r