Loading...
HomeMy WebLinkAbout10216 HILLRIDGE NEW BASKETBALL COURT_13-2023___________10216 HILLRIDGE SKETBALL COURT OJECT PREPARED 7/15/14, 8:11:51 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: DENNIS FITCH DATE 7/15/14 ------------------------------------------------------------------------------------------------ CADDRES9 102,16_H,I.L.LR.I.DGE—RD—U,B SUBDIV: ABST 482 W JONES CONTRACTOR FOLLIS CONSTRUCTION PHONE (281( 471-6881 OWNER CITY OF LAPORTE PHONE PARCEL 043-148-000-0272 GAPPL NUMBER-14-00000N6'8 SWI MMING�P,OOL ---------------------------------- ------ PERMIT: SW 00 BLDG PERMIT -POOL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ MISC 01 6/04/14 DF MISCELLANOUS INSPECTIONS TIME: 13:00 6/04/14 DA RECEIVED 6/4/14 ® 7:45 DAVID HEFNER 281-204-5392 DAVID HEFNER WOULD LIKE FOR YOU TO MEET THEM TODAY. THEY ARE DOING A WALK THRU AND NEEDS YOU TO BE THERE. COURTESY FAILED PER DENNIS FITCH. BLFI O1 6/09/14 DF FINAL, BUILDING TIME: 13:00 6/09/14 DA final pool inspection marcos 713-204-6629 FINAL FAILED PER DENNIS FITCH. INSPECTOR NOTE: OK FOR 30 DAY TCO TIL 7/9/14 BLFI 02 7/10/14 DF FINAL, BUILDING TIME: 13:00 7/10/14 DA FINAL PULLED FROM SUSPENSE FINAL INSP FAILED PER DENNIS FITCH. INSPECTOR NOTE: DENNIS FITCH CALLED AND SPOKE (PARKS/REC(. DAVID SAID WILL HAVE ENERGY INSP CERT BY 7/14/14. SUSPENSE TIL 7/15/14 BLFI 03 7-/-1,5,/_74_D.F FINAL, BUILDING --TIME: 08:00 FINAL - PULLED FROM S�U.S.P.ENS-E—P.ER—D.ENNZS FITC __________ ---------------------- __ _ __ //�pp .--_ - -------- COMMENTS AND NOTES-alolok©-u - WITH DAVID AND BACKFLOW 46 • PREPARED 6/04/14, 7:48:58 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: MARIO RAMOS DATE 6/04/14 ----------------- ADDRESS __________------- _____________________________________________________________ I LR.LDGGE—RD—U.B SUBDIV: ABST 482 W JONES ____,10,2,1,6_H CONTRACTOR PATRIOT COURT SYSTEMS PHONE (281) 890-1858 OWNER CITY OF LAPORTE PHONE PARCEL 043-148-000-0272ti4 l APPL NUMBER`T3-O'0.002023 NEW, AMUSEMENT,--SO@I-AL—AND—RECR'EATIONA'L"1 _____________________________ __________ _______________________________________________ PERMIT: CB 00 BLDG PERMIT -NEW COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS .. ________________________________________________________________________________________________ PRCO O1 1/30/14 MR BLDG, PRE -POUR CONCRETE TIME: 08:00 1/30/14 AP Benjamin Brooks, P.E. 713-822-5554� PRE POUR INSP PASSED PER MARIO RAMOS. SLAB O1 3/20/14 MR BLDG, SLAB/FOUNDATION/PIERS TIME: 08:00 3/20/14 AP RECEIVED 3/20/14 0 7:44 BELL FOOTING MARCOS 713-204-6629 . BELL FOOTING INSP PASSED PER MARIO RAMOS. GRPL O1 3/24/14 MR PLBG, PLUMBING, GROUND TIME: 08:00 3/24/14 AP GROUND INSPECTION TONY 281-850-5769 PLUMBING GROUND INSP PASSED PER MARIO RAMOS. INSPECTOR NOTE: THIS INSP IS FOR GROUND AND SEWER. SLAB 02 4/01/14 DF BLDG, SLAB/FOUNDATION/PIERS TIME: 13:00 4/01/14 DA RECEIVED 4/1/14 0 12:50 MARCOS 713 204 6629 PRE POUR POOL BLDG FOUNDATION FAILED PER DENNIS FITCH. INSPECTOR NOTE: WRONG PERMIT. SLAB 03 4/04/14 DM BLDG, SLAB/FOUNDATION/PIERS TIME: 13:00 4/04/14 AP CONCRETE PAD FOR POOL concrete pad insp passed per mario ramos. inspector note: this is for the pool pump pad. ELFI 01 5/22/14 MR FINAL, ELECTRICAL TIME: 13:00 5/23/14 AP MARCOS 713-204-6629 approved per MR. this inspection is for a TCI M3� SC I 6-/'04./-14—MRi---MISCEL ANOUS -INS PECTI'ONS TIME,:_13 :00'7 RECEIVED 6/4/14 0 7:45 DAVID HEFNER 281-204-5392 ARE DAVID HEFNER WOULD LIKE FOR YOU TO MEET THEM DOING A WALK THRU AND NEEDS YOU TO BE THERE. TODAY. THEY C o V _lQ5 /�� y • x_"�---------------- COMMENTS AND NOTES ---------------------- -- -y-- f"r ps PREPARED 4/01/14, 13:O7:28 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: DNAYNE MENAGER DATE 4/01/14 ---------------------------------------- ________________________________________________________ ADDRESS 10216 HILLRIDGE RD US SUBDIV: REST 482 N JONES CONTRACTOR PATRIOT COURT SYSTEMS PHONE (281) 890-1858 OWNER CITY OF LAPORTE PHONE . PARCEL 043-148-000-0272 APPL NUMBER: 13-00002023 NEW. AMUSEMENT, SOCIAL, AND RECREATIONAL ________________________________________________________________________________________________ PERMIT: CB 00 BLDG PERMIT -NEW COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ________________________________________________________________________________________________ PRCO O1 1/30/14 MR BLDG, PRE -POUR CONCRETE TIME: 08:00 1/30/14 AP Benjamin Brooke. P.E. 7 1 3 - 8 2 2 - 5 5 5 4 SLAB 01 3/20/14 3 /20/14 G R P L 01 3/24/14 3 /24/14 SLAB 02 4/01/14 PRE POUR INSP PASSED PER MARIO RAMOS. MR BLDG, SLAB/FOUNDATION/PIERS TIME: 08:00 AP RECEIVED 3/20/14 O 7:44 BELL FOOTING MARCOS 713-204-6629 BELL FOOTING INSP PASSED PER MARIO RAMOS. MR PLBG. PLUMBING, GROUND TIME: 08:00 AP GROUND INSPECTION TONY 281-850-5769 PLUMBING GROUND INSP PXSS'ED PER MARIO RAMOS. INSPECTOR I ,. THIS INSP IS FOR GROUND AND SEWER. DM G. SL /FOUNDATION/.PIERS TIME: 13:00 RECE 1/14 O 12<:50 MAR S 713 _772 .PIpePOUR -------------------------------------- COMMENTS AND NOTES rool n a-� �, o�re� V,eV-� . To Icy I�r l� a It�- `ov ur/� use fe naf perms ►'� e� j o��y ,� f 6� `/ co ur4 ect)s I if do's, • PREPARED 3/20/14, 7:59:42 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: DNAYNE MENAGER DATE 3/20/14 --------------------------------------------------------------- -------------------------------- ADDRESS 10216 HILLRIDGE RD US SUBDIV: ABST 482 W JONES CONTRACTOR PATRIOT COURT SYSTEMS PHONE (281) 890-1858 OWNER CITY OF LAPORTE PHONE . PARCEL 043-148-000-0272 APPL NUMBER: 13-00002023 NEW, AMUSEMENT, SOCIAL, AND RECREATIONAL ------------------------------------------------------------------------------------------------ PERMIT: CB 00 BLDG PERMIT -NEW COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------- ---------------------------------------------------------------------------- PRCO 01 1/30/14 MR BLDG, PRE -POUR CONCRETE TIME: 08:00 1/30/14 AP Benjamin Brooke, P.E. 713-822-5554 PRE POUR INSP PASSED PER MARIO RAMOS. SLAB O1 3/20/14 DM^BLDG, SLAB/FOUNDATION/PIERS TIME: OB:OO RECEIVED 3/20/14 • 749 / BELL FOOTING M ARCOS 713-204-6629 -------------------------------------- COMMENTS AND NOTES ---------.--.-------------------..---- • • PREPARED 1/29/14, 17:42:53 INSPECTION TICKET PAGE 4 CITY OF LA PORTE INSPECTOR: DWAYNE MENAGER DATE 1/30/14 ---------- ------------------------------------------------------------------------------------- ADDRESS 10216 HILLRIDGE RD US SUBDIV: ABET 482 W .ZONES CONTRACTOR PATRIOT COURT SYSTEMS PHONE (281( 890-1858 OWNER CITY OF LAPORTE PHONE . PARCEL 043-148-000-0272 APPL NUMBER: 33-00002023 NEW, AMUSEMENT, SOCIAL, AND RECREATIONAL ------------------------------------------------------------------'_'___------------------------ PERMIT: CB 00 BLDG PERMIT -NEW COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ SLAB O1--1/30/19-LDG. SLAB/FOUNDATION/PIERS TIME: 08:00 qy 014CRETE POUR BEN - 713-822-5554 CONCRETE AT I1:00 ______________________________________ COMMENTS AND NOTES - --"---n--r-----------__-________-______ • OT i AO CITY OF LA PORTE �► 604 W FAIRMONT PARKWAY E+ LA PORTE, TEXAS m LA PORTE TX 77571 CERTIFICATE OF OCCUPANCY PERMANENT TEXAS /- U Issue Date ......................... 7/15/2014 Parcel Number .................. 043-148-000-0272 Property Address ............... 10216 HILLRIDGE RD LA PORTE, TEXAS 77571 Subdivision Name ............. ABST 482 W JONES Legal Description .............. TR 30 E Property Zoning ................ RES - LOW DENSITY Owner ............................. CITY OF LA PORTE Contractor ....................... PATRIOT COURT SYSTEMS Application Number......... 13-2023 Description of Work ........ NEW COMMERCIAL Construction Type .......... WOOD FRAME Occupancy Type .............. UTILITY & MISCELLANEOUS Flood Zone ...................... AE Approved ....................... --t-A wa Building Official T VOID UNLESS SIGNED BY BUILDING OFFICIAL 0 4 INSPECTION DATE RESULT INSPECTOR REMARKS FAXED: T POLE CONST ELEV CERT recv'd (if in AEIVE zone) FORM SURVEY (If applicable) GROUND PLUMBING PIERS dvocRprir PA P P6 � r..... SLASIFOUNDATION WATER SERVICE LINE SEWER 3-2 u.LJ ELEC UNDERGROUND (if applicable) COVER-UP LEAD TEST BRICK TIE DRIVEWAY SIDEWALKS FINAL DRAINAGEIGRADING FINAL ELEV CERTIFICATE RECEIVED: ELEVATION SHOWN FOR TOP OF FINISHED FLOOR IS: REQUIRED BFE: IS THE ELEVATION SHOWN 12" OR MORE ABOVE BFE: (YES) OR (NO) FAXED: GAS FINAL FAXED: ELECTRIC FINAL s�-Iy Yr5 ^^f` eMaP 3:aa r.,, s•1�-�y OTHER (patio, lawn sprinklers, etc.) FINAL 14 COMMERCIAL W & S WORK ORDER# DATE N- U-1 L( NEW ADDITION ADDRESS IDa 1 b H tt.LIU nl; F Xt>. LEGAL DESCRIPTION OWNER r-rr�I or- L*'�- Po(L1-E. CONTRACTOR . F'o t - t S CON ST7-�-.c:T I orJ DATE WATER FRONT FT. FEES SEWER FRONT FT FEES WATER TAP SEWER TAP BUILDING PERMIT PLAN REVIEW FEE ELECTRICAL PERMIT TEMPORARY POWER POLE PLUNIBING PERMIT MECHANICAL PERMIT S:\CPSharc\InspccBons\COM➢4ERCIALINSP SHE• ET.doc PH# PH# ADDRESS REQUEST (COPY REC/D FROM ENGR.) ZONING CLASSIFICATION FLOOD ZONE (PER ENGINEERING) 'BLDG. PLANS SUBMITTED UTILITY EXT. AGRMT REC'D Y OR N BLDG. PERMIT RELEASED FOR ISSUANCE PERMIT # FEES PAID 14- Lib,? f PREPARED 3/24/14, 8:03:49 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: DNAYNE MENAGER DATE 3/24/14 ________________________________________________________________________________________________ ADDRESS 10216 NILLRIDGE RD US SUBDIV: ABET 482 W JONES CONTRACTOR PATRIOT COURT SYSTEMS PHONE (281) 890-1858 OWNER CITY OF LAPORTE PHONE . PARCEL 043-148-000-0222 APPL NUMBER: 13-00002023 NEW, AMUSEMENT, SOCIAL, AND RECREATIONAL ------------------------------------------------------------------------------------------------ PERMIT: CB 00 BLDG PERMIT -NEW COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ________________________________________________________________________________________________ PRCO O1 1/30/14 MR BLDG. PRE -POUR CONCRETE TIME: 08:00 1/30/14 AP Benjamin Brooke, P.E. 7 1 3 - 8 2 2 - 5 5 5 4 PRE POUR INSP PASSED PER MARIO RAMOS. SLAB 01 3/20/14 MR BLDG, SLAB/FOUNDATION/PIERS TIME: 08:00 3/20/14 AP RECEIVED 3/20/14 0 9:44 BELL FOOTING MARCOS 713-204-6629 C RPL O3 BELL FOOTING INSP PASSED PER MARIO RAMOS. PLUMBING, ROUND TIME 08:00 GROUNDINSPECTION /LGv Y _-3/24/14- -D--- TONY 281-850-5469 'AVJ�fJn�' ----------------------- /-/_/------------- COMMENTS AND NOTES ----------- is City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****PLUMBING PERMIT**** ---------------------------------------------------------------------------- Application Number . . . . . 13-00002023 Date 3/21/14 Property Address . . . . . . 10216 HILLRIDGE RD UB HCAD Number: 043-146-000-0272 Alternate Search Method: Application type description NEW, AMUSEMENT, SOCIAL, AND RECREATIONAL Subdivision Name . . . . . . ABST 482 W JONES Property Use . . . . . . . . Property Zoning . . . . . . . RES - LOW DENSITY ---------------------------------------------------------------------------- Type of work CONCRETE SLAB W/ BASKETBALL SURFACE ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ CITY OF LAPORTE PATRIOT COURT SYSTEMS PO BOX 1115 6926 PENNY COURT LA PORTE TX 775721115 HOUSTON TX 77069 (281) 890-1858 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . PLBG FOR REST ROOMS Permit pin number 455725 Sub Contractor DYNAMIC PLUMBING Permit Fee . . . . .00 Issue Date . . . . 3/21/14 Valuation . . . . 0 Expiration .Date . . 9/17/14 Qty Unit Charge Per Extension 9.00 .0000 EA PL - FIXTURES/DRAINS/TRAPS .00 1.00 .0000 EA PL - SEWER-NEW,REPAIR,REPLACE .00 1.00 .0000 EA PL - WATER HEATER .00 1.00 .0000 EA PL - WATER PIPE/TREATING EQUIP .00 ---------------------------------------------------------------------------- Special Notes and Comments December 12, 2013 2:25:54 PM LAPOVFL. 1. AS PER CITY SPECS, APPROVED PLANS AND INSPECTIONS. 2. CALL FOR INSPECTIONS BEFORE FOUNDATION IS POURED AND ANY WORK IS COVERED. 3. CONTRACTOR TO CLEAN UP ALL TRASH AND DEBRIS AND HAUL OFF FROM SITE. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited ---------- ---------- ---------- Due --------------------------- Permit Fee Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 City of La Porte 604 W. Fairmont Pkwy. La Porte, TX 77571 1. PROJECT INFORMATION: PROJECT ADORES: DESCRIBE WORK: Planning & Development Department PLUMBING PERMIT APPLICATION DATE OF Phone: 281.470.5073 Fax: 281.470.5005 www.laportetx.gov STANDALONE PERMIT?: ® YES Mw6(PROVIDE BUILDING PERMIT NUMBER): { Jj�'-� ZU PERMIT ISSUE FEE - $15.00 1 $15.00 Fixtures, Drains & Traps $3.75/Ea. Sewer (New, Repair, or Replacement) $7.50/Ea. Septic Tank, Seepage Pit, Drain Field $15.00/Ea. Water Heater $3.75/Ea. Gas Piping System (1 to 4 Outlets = Flat Fee) $7.50 Gas Piping System (Over 4 Outlets) $1.50/Ea. Water Piping and/or Water Treating Equipment (Installation, Alteration, or Repair) $7.50/Ea. I Drain or Vent Repair/Alteration $7.50/Ea. 'Vacuum-Breaker/BackflowProtection-(4-5)---------------------'--:�.------$3:75{Ea. ---•-----------._-.--..-.... Vacuum Breaker/Backflow Protection (over 5) $2.25/Ea. 2. PROPERTY OVJ(NE-RRCONT CT INFORMATION: OWNER'S NAME: L '4 /y1 MAILING ADDRESS: EMAIL: PHONE: 3. CONTRACTOR/AGENT: ®'HOMEOWNER IS CONTRACTOR AGENT/ CONTRACTOR COMPANY: jZY r✓4.,...", o ✓•� PHONE I: Jam-] l� f ZZ-o PHONE 2: d E-MAIL: u 54 )' S roa t-- ® (T !] R e-9w nn FAX^R: MAILING ADDRESS:/ t7 C (2aw d -' A � 1-to- /mil S / `Q.;;( 7 SRO 4 CONTACT PERSON'S NAME: J)L4� ���� PHONE: 4. APPLICATION CHECKLIST & SUPPORTING DOCUMENTATION (Check applicable boxes): *If Homeowner is Contractor, 13COMPLETE ITEMS 1 THRU 4 OF PERMIT APPLICATION must furnish notarized NOTES TO APPLICANT: Homestead Affidavit • NOT A VAUD PERMIT UNTIL OWNER/CONTRACTOR IS NOTIFIED OF APPROVAL AND ALL APPLICABLE FEES ARE PAID IN FULL • MASTER LICENSE & INSURANCE REQUIREMENTS MUST BE CURRENT WITH STATE OF TEXAS & CITY OF LA PORTE • TO REGISTER, SUBMIT CURRENT MASTER LICENSE & INSURANCE (WITH CITY NAME & ADDRESS AS CERTIFICATE HOLDER). NO FEE REQUIRED. • REINSPECrION FEE = $35.00 %J c � APPLICANT PRINTED NAME: � OLAI S' (( Q�t H) GQ /L APPLICANT SIGNATURE: -4"," (FOR STAFF USE ONLYI: Approvedfor Issuance By: .C.Liu-R� r "�^"7-'' Date: PERMIT NO.: ` 3-ZCvZ 3 _ Total Permit • a City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****BUILDING PERMIT**** ---------------------------------------------------------------------------- Application Number . . . . . 13-00002023 Date 12/12/13 Property Address . . . . . . 10216 HILLRIDGE RD UB HCAD Number: 043-148-000-0272 Alternate Search Method: Application type description NEW, AMUSEMENT, SOCIAL, AND RECREATIONAL Subdivision Name . . . . . . ABST 482 W JONES Property Use . . . . . . . . Property Zoning . . . . . . . RES - LOW DENSITY Application valuation . . . . 55800 ---------------------------------------------------------------------------- Type of Work CONCRETE SLAB W/ BASKETBALL SURFACE ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ CITY OF LAPORTE PATRIOT COURT SYSTEMS PO BOX 1115 6926 PENNY COURT LA PORTE TX 775721115 HOUSTON TX 77069 (281) 890-1858 --------------------- Structure Information 000 000 ---------------------- Construction Type . . . . . WOOD FRAME Occupancy Type . . . . . . UTILITY & MISCELLANEOUS Other struct info . . . . . FLOOD ZONE AE ---------------------------------------------------------------------------- Permit . . . . . . BLDG PERMIT -NEW COMMERCIAL Additional desc . . SLAB W/BASKETBALL SURFACE Permit pin number . 449785 Permit Fee . . . . .00 Plan Check Fee .00 Issue Date . . . . 12/12/13 Valuation . . . . 55800 Expiration Date . . 6/10/14 ---------------------------------------------------------------------------- Special Notes and Comments December 12, 2013 2:25:54 PM LAPOVFL. 1. AS PER CITY SPECS, APPROVED PLANS AND INSPECTIONS. 2. CALL FOR INSPECTIONS BEFORE FOUNDATION IS POURED AND ANY WORK IS COVERED. 3. CONTRACTOR TO CLEAN UP ALL TRASH AND DEBRIS AND HAUL OFF FROM SITE. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited ---------- ---------- Due ---------- --------------------------- Permit Fee Total .00 .00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 (SIGNATURE OF CONTROK'TOR OR (APPROVED BY BUILDING OFFIC /-So -4 pt Po uh.- Y-e&v - MK PC ----------------------------- i2 o6c, 2�i3 AGENT Rg.�GENT) DATE GEIV off' @ IEC 1 12013 -l$kRNIIT APPLICATION - City of La Porte 281-470-5073 • Established 1892 :al *Electrical *Plumbing *(See back of form) Project Address: 2/4p N /Z_L_X-) 4Q4 E Lot: %n2' 3 0 E. Subdivision: b-%Block: Owner's Name:- C/TY OF 44 POSE Phone: Address: 1004- 4U• fi 1A-'1 A; 1-7xtay t " A�QTE � Tj( 775-7j Street City Zip Contractor: ew?_A/O% 40VA-r S Y57f /lq5 7 /IV n Phone: 2$1-89d-1858 Address: 92/5 Soc oN, �(¢ 64 , NVv57o/v1 7X 7-706¢. Street City Zip p c-Er; a4courtsy s{em sogF.y+a�l.co�2Fs/-580.6663 BEN 8 Contractor Email address: Fax: Contact Person: /�GGrS Engineer. B?'om��✓ BaCo0,�5� PE- 52�f3 Building Use:OUT000.0 BASac&%B,QL[- COUle-j Jr s� Sq. Footage: #Stories Valuation: �55, $ O a Describe Work: C04,C44F7%E 5"6 W)7-14 APPLICANTS SIGNATURE i� �� DATE: APPLICANTS PRINTED NAME For City Use Only Occupancy Type Flood Zone A rL Class Work Sq. Ft. N ~ Construction Type > Use Zone ( # Stories _I�J A- Parkin/g Req (Ir Last use of Building Date use ceased: I Commercial Buildings Plans Only -Fire Marshal Approval AJ [.,(7 Date Al n Checked/Approved for Issuance By: O • - Date / 1 Residential driveway tie-in fee:_ N A Parkland(New Res. Only): Zone # ^ram Fee:_ iv Ik, Permit No. I J - a D� 3 Permit Fee f�.c Plan Check Fee: -0- < I l y`"�S- I 7 1 1 `LNBenjamin Broow`� P.E. ��. 10110961BSB mm www.p,tnot,ounsy5tems.com ASBA 2011 DIstin9ulstled Residential Tennis Facll" Award COMPLETE THIS SECTION FOR ELECTRICAL PERMITS:: NOTE: MINIMUM CHARGE ON PERMIT(S) IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE $7.50 Outlets, Fixtures, Lights & Switches (115 - Flat fee) $ 3.00 Above Items (All Others) $ 0.60 each Clothes Washer/ Dryer $ 2.00 each Range Receptacle $ 3.00 each Cook Top or Oven $ 1.50 each A/C, Window Unit Receptacle $ 3.00 each Water Heater $ 3.75 each Dishwasher/Garbage Disposal $ 1.50 each Meter Loop & Service (includes Temporary cut -in) $15.00 each Temporary Saw Pole (T Pole) $15.00 each Reconnection of Service $15.00 each Reinspection Fee $35.00 each MOTORS: Up to but not including %, hp $ 1.50 each hp and less than 10 hp $ 2.50 each 10 hp & up to 50 hp $ 3.50 each 50 hp and up $ 4.50 each Total Fee $7.50 COMPLETE THIS SECTION FOR PLUMBING PERMITS NOTE: MINIMUM CHARGE ON PERMITS) IS $20.00 Description Charges Quantity Fees PERMIT _ISSUE FEE. _._._...--..._.-..-.$15.0p .._..- -.... $15.00-....-.....__._.--- Fixtures/Drains/fraps $ 3.75 each Sewer (New, Repair, or Replacement) $ 7.50 each Septic Tank/Seepage Pit/Drain Field $15.00 each Water Heater $ 3.75 each Gas Piping System (1-4 outlets, flat fee) $ 7.50 Gas Piping System (over 4 outlets -each) $ 1.50 each Installation, Alteration or Repair of Water Piping and/or Water Treating Equipment $ 7.50 each Repair/Alteration - Drain or Vent $ 7.50 each Each Vacuum BreakerBackilow Protection Each One (/-5) $ 3.75 each Each One (Over 5) $ 2.25 each Reinspection Fee $35.00 each Total S:\City Planning Shm\ALPHA-1\01-INSPECTIONS DIVISIOMInspeclionAPennit Applica6ons\13ldg Permit App.doc © De< 11, M134 MQ3. PM - c MEL- ei . Fell Flarlrl0alV, OY)v Help Nm_ � Properly Description Inquiry Location 1D: HCAD Number: Alternate Search Herbed: Location address: Primary related parry: ve DN Y l cancel Address R¢lered._ 32632 043-146000-W2 19216 HNIRIDGE RD UB Cl CITY OF LAPORTE 0 COMMERCIAL PLAN REVIEW NOTES 1. Minimum six-inch (6") stud walls shall be required where drain, waste, & vent (DW V- horizontal and/or vertical) plumbing is installed. The use of 2 x 6 studs (wood or metal) shall be required for new construction and additions (additions of square footage) for both residential and non-residential construction where DWV plumbing is installed. 2. Call for City inspections - 281470-5130. 3. Unload and keep materials on private property, not City right of way. 4. If a fence is proposed, verify with City regarding maximum height limitations. 5. Call for utility line locates at 1-800-669-8344 and also City of La Porte at 281-471-9650 6 Fire Marshal will need to review/ inspect prior to opening business. 7. Must obtain zoning permit prior to occupancy of lease space/building. 8. Separate permit required for all signage. 9. Sanitation facilities required on -site prior to fast inspection and must remain available until completion of sanitation facilities within the lease space and/or building. 10. Silt fencing required for duration of project. 11. See notes (red lined) on contractor copy of construction drawings. 12. Fill dirt permits are required prior to placement of fill dirt. 13. Grading/drainage must be maintained throughout entire projpel�,q,gp�ure eligibility for inspections and utility release. 44�� II II �i'' 14. Provide energy code compliance certification from "certifi�'@fky ode provider, prior to issuance of the Certificate of Occupancy. 15. Any changes to the project after building permit is issued, must be submitted in writing and approved by the City prior to changes being made 16. Provide Sample Well in accordance with "SamWe Well Detail" handout. (Available upon request) THE APPROVED PLANE ARE M Of t fi�teSWaff tioutlets and 17. Effective March 10, 2007, all electrical device q t switches) shall be installed with the screw-wrae RR ation. Back or quick stab installation is prohibited. COURR NQ 18. Building operations shall be limited to 7:00am-9:00pm and shall not exceed maximum, permitted sound levels as described in Chapter 34 of the Code of Ordinances. 19. Commercial projects with detention pond requirements must be inspected and approved by city Engineer and Inspection personnel prior to final inspection request. Contact City Engineer at 281-470-5060. 20. Contractor/owner shall be responsible for ensuring all construction materials/debris remains on the construction site. Failure to do so shall result in stoppage of inspections and/or code enforcement action. 21. Owner/developer of commercial driveways in concrete shall be constructed 12" from the adjacent asphalt street. The contractor shall clean the area between the driveway and the street to a depth of at least 6". It is the responsibility of the owner/developer/contractor to install the asphalt transition. S:\CPSh=\INSPECTION DMSION\L-P-dWW\COMMERCIAL PLAN REVIEW NOTESA.o 52011 le IVo APPLICABLE CODES Adopted May 13, 2013; Effective July 15, 2013: 2012 INTERNATIONAL BUILDING CODE (IBC) 2012 INTERNATIONAL RESIDENTIAL CODE (IRC) - - - - 2012INTERNATIONAL- ENERGY- CONSERVATION- CODE (IECC) 2012 UNIFORM MECHANICAL CODE (UMC) 2012 UNIFORM PLUMBING CODE (UPC) Adopted October 24, 2011; Effective December 1, 2011: 2011 NATIONAL ELECTRICAL CODE (NEC) WITH LOCAL AMENDMENTS . (COMMERCIAL & RESIDENTIAL) 2003 INTERNATIONAL FIRE CODE (IFC) WITH ADOPTED AMENDMENTS TO FIRE CODE SACPSh=\INSPECn0N DIVISIONVnspectiom\Rmidential Cons=tion PecketAPPLICP.BLE CODES.dm Rev. 07-2013 E CITY COPY of IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR i Octobert6,20tO THE CHANGE OCCURRING. SCOTT BRADLEY CITY OF LA PORTE 604 W. FAIRMONT PKWY. LA PORTE, TEXAS 77571 RE: PRELIMINARY Construction Budget for the BASKETBALL COURT As requested, Patriot Court Systems, Inc. (herein after referred as "PatdoeD has prepared this PRELIMINARY Construction Budget for the Basketball Court Construction at Fairmont Park, for the City of La Porte. Patriot has assumed that the selected location will be sufficient, and that adequate access is available for the necessary equipment, machinery, and materials for proper construction and installation. As of this date, Patriot makes these assumptions and/or exceptions: 1. No Geo-technical information has been provided to date, which can alter the subsurface preparation of this project 2. Patriot has not allowed for permitting and its related costs of this project, if applicable 3. Patriot has not allowed for any temporary fencing and its related costs for this project 4. Patriot has not allowed for Concrete flatwork including sidewalks, access steps or ramps, and driveways that are connected to the new basketball court 5. Patriot has not allowed for any landscaping and irrigation thereof. 6. PATRIOT COURT SYSTEMS INC., IS AN APPROVED BUYBOARD CONTRACTOR (March 1, 2012 to February 28, 2015) FOR INDOOR/OUTDOOR FLOORING PRODUCTS, SPORTS SURFACES, ETC. #391-12 9215 SOLON ROAD, SUITE. BI • HOUSTON. TEXAS • 77064 PHONES: 713-822-5534 • VOICL•' MAIL 251-890-1859 • FAX: 281.580.6663 • OUTY COPY New Basketball Court Construction, continued WORK TO BE PERFORMED: IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL 1. Walk the site with you and/or your designated 'FPft{g lIbfRwork to be performed (any adrystmmts will be declarfAD (P"g"te fat]8 M&tw upon here, and signed Change Orders generated, if necessary) 2- Prepare the site (approximately 60' by 110) by leveling, bringing in final commercial fill, compaction, and sand as needed. 3. Form the axes of the proposed basketball court (total size is 55' by 105� and final grade the subsurface with commercial stabilized fill. Existing drainage will not be altered. 4. Set one layer of 10-trail poly moisture barrier over the formed basketball court area, and install metal Key -way expansion joint at the mid -court line. 5. Establish perimeter beam (minimum 12"wide x 12"depth), and reinforce with three pieces of schedule 60 #4 rebar. 6. Dig and set the two Basketball Goal Foundations 7. Set Post Tension cables on 3'6" spacing in both directions 8. Ftve sack concrete will be pumped in place (3000psi after 28 days, 5" slump), establishing a minimum 5" continuous slab with reinforced perimeter beam. This job will be completed in a single pour. The pour will be continuous and monolithic for the courts, by design. 9. Concrete will be properly spread, consolidated, screeded, bull -floated, and finished to an acceptable level- Cue will take place m proper curing of the new slab. 10. Cables will be "pre -stressed" after 24 hours by a qualified technician using calibrated equipment. 11. Final stressing of the cables will occur after seven days. When approved, the cable ends will be cut, covered, and the anchor openings grouted flush with the slab edge. 12. After fourteen days, the Basketball Goals will be installed 13. After 28 days curing, the court will be surfaced per Basketball court specifications using a four -coat system Acrylic playing surface. See Addendum 1 14. Finish all work and dean area Total Budget cost of the Proposed Basketball Court is ........................... $55,800.00 plus taxes New Basketball Court Construction, continued Prices do not include State Sales Tax. Applicable Sales Tax will be added to the invoices unless provided a Texas State Sales Tax Exemption Certificate. This bid includes items I through 14, and Addendum 1. This price remains valid for 30 days. PAYMENT SCHEDULE: This job requires your 109/6 reservation payment on signature of contract, 20% after forms are set, 40% after concrete is poured, 20% after the surface is installed, and the remaining 10% becomes due on completion of the job. The job will take 45-60 days to complete, weather permitting. WARRANTY: Two years from date of completion on 100% paid jobs. The warranty does not include normal wear and tear, deliberate abuse, and acts of nature. Please see attached warranty information with a full description of coverage and limitations. Ao Please sign your acceptance and return by fax to 281-580-6663. Sincerely yours, CITY C(A py IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR TO THE CHANGE OCCURRING. NOTE: This proposal remains the exclusive property of Patriot Court Systems Inc Its intended use is for specifically this project and represents the capabilities of Patriot Court Systems Inc and may not be used as your specifications or requirements to solicit other bids. In that event, you will be invoiced for the technical expertise provided and responsible for payment therein. Surfacing of the PROPOSED BASKETBALL COURT for La Porte, TX.. WORK TO BE PERFORMED: 1. On site review/inspection with the owner, as needed 2. Acid etch the court with one application of Concrete Preparer (diluted Phosphoric Acid) 3. Power wash (3,500psi) with tap water and remove all dirt and debris from the court. 4. Flood the court, [nark the "birdbaths"(1 /8"depth standing water after one hour), and patch with Acrylic Court Patch 5. Repair and fill any surface deformities with Acrylic Court Patch and grind smooth 6. Apply one (1) coat of Ti-Coat two-part Epoxy Primer, as a bonding agent 7. Apply two (2) coats of Acrylic Resurfacer with sand, one as a Primer Coat, and one as a filler/leveling coat 8. Scrape and clean the court with power blower between each coat 9. Apply two (2) Finish coats of Plexipave Fortified Acrylic Color (Colors to be selected) 10. Line/Stripe the Basketball court with Plcxipave Acrylic Textured White Line Paint per Basketball specifications 11. Finish and clean area 10ol'rHpl@f) A ROVEDro 7-He ArEW plANg 7o HL=CI" "'sfaUSURMI77ACE -- -- -- -- - �hgNOP . RED pRino New Basketball Court Construction, continued Project ONE NEW POST TENSION CONCRETE BASKETBALL COURT TIMEFRAME: Weather permitting: 45 to 60 days (this includes 28 days for curing of the concrete) WARRANTY: Patriot Court Systems, Inc., warrants its workmanship and materials used in the post tension concrete construction of the basketball court to be done at U Porte, Texas, for two (2) years from the date of the invoice indicating that the job is completed. This warranty is valid only on 100% paid invoices relating to the work performed in completing this job. Cracks that may occur in the concrete should be minimised due to the design of the slab. Ibis warranty includes repairs to cracks of width greater than 2mm. Please inspect your slab on a regular basis so that these issues can be addressed, if needed. Not coveted under this warranty includes but not limited to: 1. Damages due to weather such as heavy storms, tornadoes, hurricanes, etc. 2. Damages due to vandalism and/or improper use of the basketball court, such as any non - Basketball Activity on the courts, spray paint graffiti, bicycle racing, skateboard abuses, roller blade abuses, deliberate destruction, etc.. 3. Damages due to acts of violence, insurrection, terrorism, police actions, etc 4. Damages as a result of geologic activity not known or provided to Patriot Court Systems, Inc. S. Normal wear and tear will be taken into consideration. Normal discoloration due to weather and sun is expected throughout the course of the years. As per manufacturer's recommendation hard surface courts need to be resurfaced every 3 to 6 years. Resurfacing of the basketball court due to expected discoloration and wear during the course of two years is not part of this warranty. 6. Work performed by others not in the employ of Patriot Court Systems InICIT ` PATRIOT COURT SYSTEMS, INC. �i1 �� Benjamin A Brool r., P.F President IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR TO THE CHANGE OCCURRING. P*logl*rlq �-j 170-2013 Gmglo Basketba 2013 Google ALL PLAYING LINES ARE 2" IN WIDTH 'EXTURED SAME ,S SURFACE ?" WIDTH PLAYING _INE, TYPICAL KEYED CONSTRUCTION JOINT MID COURT OST—TENSIONED CONC. SLAB c a N 1/2"0 CABLE OMPACTED STRUCTURAL FILL °o a N OUBLE VAPOR BARRIER 10'-0" MIN. RUSH CONCRETE MOTAR ATCH ALL CABLE ANCHORS AFTER FINAL TIGHTENING ICABLE (SPACING VARIES BASED ON SUB SIZE) BAR CONTINOOS. TIED / I W AT ANCHOR I 'ENSIONED CONC. SLAB VAPOR BARRIER 'TED STRUCTURAL FILL ABLE BARS CONT. HORIZ. -AR) +ED CONC. EDGE TYPICAL SECTIONS POST TENSIONED CONCRETE COURT PAVEMENT scale: 1" = 1'-0" PROJECT: FAIRMONT PARK BASKETBALL COURT CITY OF LA PORTE, TX. CONCRETE FOOTING TOP I i I i I ' I BASKETBALL POST O I SET IN FOOTING N I I I (_CONCRETE FOOTING BASE PLAN ASKETBALL POST IRECT BURIAL ONCRETE FOOTING ASE POUR TO TABLE UNDISTURBED OIL IITH 4 PCS. REBAR ON 6" PATTERN SECTION BASKETBALL POST FOOTING scale: 1" = 1'-0" CITY Corm-f IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR Q T TO THE CHANGE OCCURRING. �E QF r*: 3 SYSTEMS (713) 822-5554 DEC 112013 TYPICAL BASKETBALL COURT LAYOUT scale: 3/16" = 1'-0" TYPICAL DRAINAGE PATTERN FOR ONE BASKETBALL COURT scale: 1 /8" = 1'-0" NOTES: MAXIMUM 1 INCH IN 10 FT. DROP SLOPE. SLOPE DETERMINED ON SITE, IN CONJUNCTION WITH LOCAL CONDITIONS AND AVAILABLE DRAINAGE. PROJECT: FAIRMONT PARK BASKETBALL COURT CITY OF LA PORTE, TX. IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR TO THE CHANGE OCCURRING. -� g, i� a A txOT �- SYST MS (713) 822-5554 W- 48---- , I I 1 W- 47---- 1 1 i i W- 46---- I I 1 1 1 W- 45---- iI I W- 44---- 1 I I' I i 1 W- 43---- 1 , I' i W- 42---- 1 1 t I' 1 j W - 41------I-------,------,------,------ T-------i------- T-I------ -,------ ,- - - 1 ,{ I I I 1 I I I I V I 1 1 1 I i I 1 1 1 t 1 I 1 1 1 I 1 1 1 1 1 1 1 I 1 I 1 1 I i 1 1 1 1 I 1 i 1 I 1 I 1 1 1 W- 40---- I , 1 1 1 , 1 I , I 1 , t I I 1 I 1 1 I 1 I 1 1 1 I 1 1 1 1 1 I t 1 1 1 1 t 1 1 W- 3 g______1_______L______1_______L______1______J_______1_1_______L______1______J------- 1------ J------- 1______J_______L__ ( I I 1 1 I t 1 t I 1 IL I 1 1 1 I I l l I 1 1 I 1 1 I 1 I 1 1 I I 1 1 1 I I 1 I I 1 i 1 1 1 1 1 t 1 1 1 I I I V I 1 I 1 I I I I I I I I I 1 I 1 1 1 ! 1 I 1 1 1 1 I I 1 I I I I i 1 1 W- 38---- I t 1 I I I 1 1 1 1 1 i 1 , t 1 i 1 1 1 1------- L______1______J------- 1_1______J_------ 1______J------- 1______J------- L------ J____-__L t 1 1 I 1 1 t t I i I 1 I I I I i i II I I I I I 1 1 I I 1 I 1 1 1 I I i t 1 V 1 1 1 1 i I 1 I 1 1 I 1 1 1 I 1 1 I 1 1 t I I I I 1 t ! 1 1 1 I 1 I 1 1 I 1 { I I I 1 I 1 1 I 1 1 I 1 1 W-36---- I I I I , I I ,! I 1 i I i 1 ! 1 --T-------r------t-------r------t------ti-------r-t-------r------t-------�-------t-------r-------r-------t-------r - ---- 1 II 1 1 i 1 1 I 1 i I 1 I t I l 1 I I I I 1 t I I 1 1 I I i 1 1 I 1 I I 1 1 L { I I 1 I 1 I 1 t 1 I 1 I I 1 1 W- 3 �_____1------- L------ 1_______L______1______J------- 1_1___-.__�______1______J------- 1______J_------ 1______J------- L I i I i i I I 1 I 1 I 1 1 1 1 t 1 1 _ ____ METAL KEYWAY W 3 4--- 1 1 t I 1 1 __T_______r______T_______r.______T______.T______T_T______Y______T______Y______T______________T______,_______ 1 I i 1 I 1 1 1 I 1 1 1 i 1 i i 1 1 1 f I 1 t 1 1 1 1 1 1 I 1 I I I I I 1 1 t 1 1 1 1 I 1 1 i I 1 I I 1 I t 1 W-33---- 1 I I I I 1 i 1 1 I I 1 1 I I I I 1 1 I I I I I i I I I 1 I 1 1 1 I I 1 f 1 I 1 t I 1 I I I 1 1 i I 1 i I I 1 I iI r I 1 7 I I 1 1 1 1 1 1 1 I I l I I W- 3 2---- 1 I I i i I I I I----_ 1 I 1------1 1------- i --r------r------r------r------r------�-------r-r--r------r-------1- r------�- r------�-------r I I I 1 1 t I 1 I i 1 i 1 I i 1 I 1 I 1 1 1 1 I 1 11 I I 1 i 1 1 i I 1 I I I 1 I i I t i I I i i i 1 k I 1 1 W- 31 ---- 1 1 1 1 I 1 I 1 I 1 I I / 1 I 1 1 1 i W- 3 0---- I , 1------------' '------'------ '--1-'------------' --- r------' ----- '-------r------'-------r-- ---- --T r r-------r r-1----- r r r r--- -r r- � r � r 1 I i I 1 i 1 r I 1 1 1 1 1 I t 1 1 1 1 1 ! 1 1 1 I W- 29------+------------+-------------+-------------+-+------+------+------+------+-------------{--------------}�- ---- I I i 1 I t_----__ 1 I I , _ __-- - --- -- - - - - - - - - - - - ----- I I 1 I 1 I I I W 2 7---- W- --+-------------+-------------+-------------+-+------+------+------�------+------t-------+------j-------* - ---- 1 1 1 , I 26----�---� ------+---L---t-r----t---1---t----I -----�----1----1 1 1 1 I 1 ,- I I , I - 1 l 1 1 1 I 1 1 1 I 1 I I 1 i 1 I t I I 1 I I 1 1 I 1 I 1 I 1 1 , I 1 I I 1 1 i 1 1 I 1 1 1 I I I 1 ( W-24---1---L---r------1---L---1-I---1------- W-L---I---�---.L---L-_'J- -- I 1 1 1 1 I I 1 1 I 1 1 I 1 I 1 I 1 i 1 I 1 r 1 1 i i I 1 1 I i 1 1 23-- 11 I I I 1 t W-22-- 1 I V I 1 i 1 -1---L---1---�---J----1"'---1-I---.J---1.---L---I---"'1---.1---L.--J -- I 1 I 1 I I 1 I 1 I I I I I I 1 I 1 I 1 1 1 I 1 I i 1 1 1 I i 1 1 1 1 I W-21 I W-20- --------- --- --- -- --- --- --- -- I -- I W-19-- -- -- -- --- --- --- -- -- --- -- -- --- --- -- -- -- 1 I 1 I I 1 1 I 1 i i I i I 1 1 I 1 N r7 � � CO r- 00 �� N - CO f� 00 J - -J J J -J J J D I 1 1 I 1 1 1 I I 1 1 1 I I 1 1 1 1 1 1 I 1 1 1 1 t 1 1 I I I I 1 I 1 t I I I 1 1 I 1 I 1 1 1 1 1 1 L i t I t 1 i 1 1 I I 1 1 I 1 f I 1 1 1 I 1 1 1 t 1 I 1 1 1 1 I 1 I f 1 I i 1 1 i 1 I I 1 I 1 1 1 I I 1 { t I t 1 I 1 i 1 I i 1 1 i 1 1 1 I i I 1 1 I I I I 1 I 1 I 1 I 1 t I I 1 I 1 I 1 1 1 { 1 I 1 I 1 1 1 I 1 I I 1 1 I 1 I 1 I I { 1 i I 1 I I i I I 1 1 i I 1 1 i I 1 i i 1 t I 1 I , t 1 I t t 1 1 1 I t 1 1 1 1 I t I 1 I 1 i 1 1 1 1 t I t 1 t 1 I 1 1 t 1 I 1 1 t 1 I I I 1 I r f I 1 1 I 1 I I 1 I I 1 I I 1 I I 1 1 1 I 1 { 1 I i I I 1 I 1 1 I I 1 1 I I I I 1 I I 1 i I 1 1 i 1 1 I i 1 1 1 1 1 1 1 1 1 t 1 1 1 1 1 1 1 I 1 1 I 1 i 1 1 I i I I 1 I 1 I f 1 I I I t POST TENSION LAYOUT scale: 1 /8" = 1'-0" NOTES: SHALL BE SHEATED IN PLASTIC WELL GREASED PER INDUSTRY STANDARD (SEE CONTRACTOR FOR DETAILS.) 50' I 1 I 1 i 1 1 I I I t 1 1 1 ---J-------1-------------}------J-------1 - ---- I 1 1 1 i I 1 I 1 1 i i I I I I 1 1 i t 1 1 I I I i I 1 I 1 I 1 I 1 1 l 1 1 i j i i I 1 1 I i 1 I 1 I I 1 1 I t 1 1 i 1 I 1 1 1 I 1 I I I 1 1 1 1 1 1 I 1 I I 1 I I t 1 1 1 1 I 1 1 I I t I 1 1 1 1 I I 1 I I 1 I 1 1 I 1 1 1 i 1 1 1 i 1 i i 1 I i I I 1 1 1 i i i 1 I I ___J_______1 1 ______I I I� i 1 1 1 1 I i I 1 1 1 1 1 I I 1 I I I 1 1 I l 1 I I / 1 1 ! 1 ! I 1 1 1 1 1 1 1 1 1 1 1 ! 1 1 I 1 I 1 1 1 1 1 1_ ---J------1------J-------L------J-------L - ---- -4' a-x ' t� �p TYPICAL BASKETBALL COURT LAYOUT scale: 1 /8" = 1'-0" NOTES: SURFACE: (CALIFORNIA PRODUCTS, PLEXIPANE SPORT SURFACING SYSTEM) MINIMUM THREE COAT SYSTEM, MEDIUM SPEED PLAYING SURFACE: FLORIDA GREEN COURT, CALIFORNIA RED PLAYING AREA WHITE TEXTURED PAINT LINES, BASKETBALL DIMENSIONS. HEAVY DUTY BASKETBALL GOAL ASSEMBLIES, AS SPECIFIED BY CONCTRACTOR. (DOUGLAS A,5 FST #69441, 2 UNITS. IF THE APPROVED PLANS ARE MODIFIED, A NEW SUBMITTAL TO THE CITY IS REQUIRED PRIOR TO THE CHANGE OCCURRING, PROJECT:. FAIRMONT PARK BASKETBALL COURT CITY OF LA PO RTE, TX. o YSTEMS (713) 822-5554