Loading...
HomeMy WebLinkAbout10937 SPENCER HWY_11-1220___________1 �{ '�•#- 9 k-� at?��¢ v � � � �ip� r. ^ ' tii•��'R "E d -r"5- Zti `.y�- .r"-Sn h' � R �•'"�� ^.. i� ;'m r.irk y �,�.��� �i:�.K"'.%'�3y WCO y, + 5 t� < i tva+-4.`T " t� �(,� s..i -[;''4 �° ` �•-�t�8:�y������;'.r s"�z �p 1. �iy�� a « �,���.. ''''�.+R` e +,yam. i+t'z ' ry h.„r \ \ } � a-. _"3+.s� r �♦'�¢p5.r.-F� y � w -i'�,.�: �3`v � ��L$'.�- S..,g:' c Ly��,"y ._.}q,�' ti ,{.'c j i 'JY k' 15.E .w .i.�.. t a ♦n ; '{.}ayY `` l ,(,. n'F- f mac" "�`�.`+: �' � �•.�r\-ff��A"���• � 1�" '�' `'�. ��'i. �x � x t e e .s_ ��-fs,.� a �'G t' � 'l"`� x v itf _..3 yw+<��r'F' k') .a i 3y ':t n 5=i r,�p`�i' 1.� �� ,y'��� -.t :•$ �k! i \ .1. �, .4� 'M„�wi'i,; ' f 4•�a c.'z,.'*N �[•FaS�?�s'' �\ Y Pt "-° qyw' Sq't — to Y i iP r'.g..] \ a Ve 1e e. 'r t`w T+:• �>SRyi P A'y1„ _ 1 : _ � � s • � 7 4�'rt fi�`� } .,G�- . ""' } g l�• .Z.1 Ar- ^y� •_-� t .{;,'� a7! ';' 'f� .i � i ...� .> �+��,yq�s� rY.t 1`>y��.: `Y.' / ,7ty�,,rt.. Wilmore, Debbie From: Mick, David Sent: Tuesday, August 30, 2011 11:30 AM To: Wilmore, Debbie Subject: RE: AP Hanger thanks From: Wilmore, Debbie Sent: Tuesday, August 30, 2011 11:28 AM To: Mick, David Cc: Clark, James; Tietjens, Tim; Huber, Mark; Menager, Dwayne Subject: RE: AP Hanger David, State advised that since the demo was completed within the dates stated on our form, no additional submittal form is needed. Change in dates would have triggered a required amended submittal form. State invoice ($57) will go to you within 60-days after the 08/26`h demo completion date. Once site clean-up is complete, please have James coordinate with us so we can perform a "final inspection" to close the demo permit. Thanks, Debbie #5066 From: Mick, David Sent: Monday, August 29, 2011 10:48 AM To: Wilmore, Debbie Cc: Clark, James Subject: AP Hanger Debbie - we're done but for incidental clean up. What coordination is needed with the state? Thanks. Dave *** • TEXAS Department of State Health Services TYPE OF NOTIFICATION: (Select one and f l In the requested information) ® ORIGINAL ❑ AMENDMENT No._ ❑ CANCELLATION ❑ EMERGENCY •Was emergency request made to the Regional Office or Environmental Health Notifications Group (EHNG) by phone? 1—]Yes ❑No •If yes, the DSHS reference #: and name of the Regional or EHNG representative with whom you spoke? Date: / / Time: _ ❑a.m. ❑p.m. •Describe the reason for Emergency: ❑ ORDERED: (For structurally unsound facilities, attach copy of demolition order and ident fy Governmental 001clall Name:_ Registration No. Title: W Below If Amended Date of order (MM/DDNY): / / Date order to begin (b1M/DD/YY): / / AMENDMENTS: You must complee the entire form and ar the appropriate check box(a) along the felt-handsW of this form to indicate. amended lnformadom TYPE OF WORK ❑ Asbestos Abatement ® Demolition ❑ Annual Consolidated O&M ❑ Abatement/Demolition Is this a phased project? ❑ Yes ® No FACILITY INFORMATION 1. Facility Location ❑....... Description or Facility Name: Metal Hanger - Municipal Airport ❑....... Physical Address: 10937 Spencer Highway ❑....... County: Harris City: Tx Zip: 77571 ❑....... Facility Contact: David Mick Phone #: (281) 470-5103 2. Type of Facility (Select one) ❑ Public ® Federal ❑ Industrial/Manufacturing ❑ NESHAP-Only ❑ Public School K-12 . 3. Facility Details ❑...... Description of Area/Room Number: ❑...... Age of Building: _ Size: 6,000 sq R Number of Floors: 1 ❑...... Is this building occupied? ❑ Yes ® No ❑...... Prior Use: Airport Hanger ❑...... Future Use: n/a ❑...... Date of Asbestos Survey/NESHAP Inspection: 08/09/11 ❑...... DSHS Inspector License #: 10-5140 ❑...... Analytical Method: ❑ PLM ❑ TEM ❑ Assumed Asbestos ® No Suspect Material ❑...... DSHS Laboratory License #: 30-0031 WORK SCHEDULE/ASBESTOS AMOUNTS (Note:lIfthe start date(s) entered below cannot beme,the DSMRegional orLocal Program office must be nodf ed prior.to the scheduled slarr data Fallum to do so is a violadon of TAHPA Secdon 295.61) 1. Asbestos Abatement Work Schedule: ❑...... Start date: / / and End date: / / ❑...... Work days: ❑Mon. ❑Tues. Owed. ❑Thurs. ❑Fri. []Sat. []Sun. ❑...... Working hours:_ ❑ a.m. [-]p.m. to _ ❑a.m. ❑p:m. 2. Demolition Work Schedule: ❑...... Start date: 08/24/11 and End date: 08/26/11 ❑...... Workdays: ❑Mon. ❑Tues. ®Wed. ®Thurs. ®Fri. ❑Sat. ❑Sun. ❑...... Working hours: 8:00 ® a.m. ❑ p.m. to 3:00 ❑a.m. ®p.m. FORM APB #5, REV 5107 BdM If Amended C. ASBESTOS AMOUNTS ❑...... Is Asbestos Present? ❑ Yes ® No (Complete the table below ijasbestos is present) Asbestos -Containing Building Material Type Approximate amount of Asbestos *Only mark the boxes below on this chart if they are being amended Pipes Ln Ft Ln M Surface Area SQ Ft SQ M Cu Ft RACM to be removed RACM left in lace duringdemolition El Interior Category I non -friable removed El Exterior Category Inon-friable removed Cat o I non -friable left in lace duringdemolition Interior Category 11 non -friable removed Exterior Category H non -friable removed Cat o H non -friable left in place during demolition RACM Off -Facility Component DESCRIPTION OF WORK PRACTICES AND PROCEDURES ❑...... 1. Description of procedures to be followed in the event that unexpected asbestos is found or previously non -friable asbestos material becomes crumbled, pulverized, or reduced to powder:. Survey found no ACM; stop work & contact DSHS ❑...... 2. Description of planned demolition or abatement work, type of material, and method(s) to be used: Heavy Machinery C] ....... 3. Description of work practices and engineering controls to be used to prevent emissions of asbestos at the demolition site: Survey found no ACM; wet demolition PROJECT INFORMATION ❑...... A. FACILITY OWNER Facility Owner Name: City of La Porte by Deed from U.S. Govm't provided land remains an airport Phone #: (281) 470-5103 Attention: David Mick Mailing Address: 2963 N. 23 " Street City: LaPorte State: Tx Zip: 77571 ❑...... B. ASBESTOS ABATEMENT CONTRACTOR #I DSHS Asbestos Contractor License #: n/a Contractor Name: _ Address: _ City: _ State: _ Zip: Office Phone #: ( 1 Job -Site Phone.#: ( 1 ❑...... C. ASBESTOS ABATEMENT CONTRACTOR #2. (Only ijthere is more than one Contractor)' DSHS Asbestos Contractor License #: n/a Contractor Name: _ Address: _ City: _ State: _ Zip: — Office Phone #: ( ) Job -Site Phone D. ASBESTOS SUPERVISOR ❑...... DSHS Supervisor License #: n/a Site Supervisor: ❑.:.... DSHS Supervisor License #: _ Site Supervisor:'_ FORM APB #5, REV 5/07 (=r Below If Amended E. NESHAP TRAINED INDIVIDUAL ❑...... NESHAP Trained Individual: n/a Certification Date: / / ❑...... F. DEMOLITION CONTRACTOR Demolition Contractor: City of La Porte- Public Works Department Address: 2963 N. 23rd Street City: La Porte State: Tx Zip: 77571 Phone #: (281) 470-5103 ❑... ... G. PROJECT CONSULTANT OR OPERATOR DSHS License No.: n/a Project Consultant or Operator: Address: _ City: _ State: _ Zip: _ Phone #: ( ) ❑...... H. Waste Transporter DSHS Waste Transporter License #: n/a Waste Transporter: _ Address: _ City: _ State: _ Zip: Contact Person: Phone #: ( ) ❑... ... I. Waste Disposal Site TCEQ Permit #: n/a Waste Disposal Site: Address: _ City: _ State: _ Zip: Phone #: ( ) CERTIFICATION STATEMENT I hereby declare that I have examined this notification and, to the best of my knowledge and belief, all information provided is complete, true, and correct. I affirm that I am the owner, operator, or delegated, agent and that I am responsible for the fee'. associated with this notification. I also understand that the owner, operator, or delegated agent is responsible for notification:to the deortrpe00 i // Date: 08/09/11 of Ownef, Operator or Delegated Agent) David Mick, Director of Public Works .(Printed Name & Title) E-mail Address: mickdAlaportetx.eov Phone #: (281) 470-5103 IMPORTANT INFORMATION NOTIFICATION TMIELINESS REQUIREMENT:. Your Asbestos/Demolition Notification form must be postmarked no less than ten working days (not calendar days) prior to the start of any asbestos abatement or demolition. FILING FEE: An invoice will be mailed to the facility owner upon completion of the project. CALL FOR ASSISTANCE: (512) 834-6747 or (888) 778-9440 (toll free in Texas) MAIL FORM TO: ENVIRONMENTAL HEALTH NOTIFICATIONS GROUP TEXAS DEPARTMENT OF STATE HEALTH SERVICES PO BOX 143538 AUSTIN, TX 78714-3538 FORM APB #5, REV 5/07 PREPARED 9/01/11, 9:21:30 INSPECTION TICKET PAGE 1 CITY OF LA PORTE INSPECTOR: DWAYNE MENAGER DATE 9/01/11 __________________________________________________________________ _____--______--------- ADDRESS 10937 SPENCER HWY SUBDIV: PAYNE W J CONTRACTOR BUSINESSOWNER PHONE . OWNER CITY OF LA PORTE PHONE . PARCEL 038-234-001-0006 APPL NUMBER: 11-00001220 DEMOLITION, COMMERCIAL _______________________________________________ _-___-_--_-_-----_---___ PERMIT: DEMO 00 BLDG PERMIT -DEMOLITION REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ________________________________________________________________________________________________ DEMO 01 9/01/11 DM DEMOLITION, FINAL TIME: 08:00 DEMO FINAL -_\---------------------------------- COMMENTS AND NOTES -------___________-_--------__-______- w PREPARED 9/01/11 9:22:30 Automatic Preventive Maintenance Generation Report PROGRAM WFBN035 City Of La Porte Std Facility Work Reg J/0 Req Date Last Date Last Date Next Task ID Seg Number No Pty Scheduled Performed Scheduled Additional Remarks '• END OF REPORT " Page 1 r City of"La Porte 604 'W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****BUILDING PERMIT**** ---------------------------------------------------------------------------- Application Number . . . . . 11-00001220 Date 8/09/11 Property Address . . . . . . 10937 SPENCER HWY HCAD Number: 038-234-001-0006 Application type description DEMOLITION, COMMERCIAL Subdivision Name . . . . . . PAYNE W J Property Use . . . . . . . . Property Zoning . . . . . . . COMM - GENERAL Application valuation . . . . 0 Owner ------------------------ CITY OF LA PORTE 604 W FAIRMONT PKWY LA PORTE TX 77571 Contractor BUSINESSOWNER LA PORTE TX 77571 ---------------------------------------------------------------------------- Permit . . . . . . BLDG PERMIT -DEMOLITION Additional desc . . DEMO HANGAR Permit pin number . 390625 Permit Fee . . . . .00 Plan Check Fee .00 Issue Date . . . . 8/09/11 Valuation . . . . 0 Expiration Date . . 10/08/11 ---------------------------------------------------------------------------- Special Notes and Comments August 9, 2011 2:43:25 PM laposrj. 1. U S GOVERNMENT PROPERTY DEEDED TO CITY PROVIDED LAND REMAINS AN AIRPORT. 2. LOFLIN ENVIRONMENTAL SERVICES INC ASBESTOS SURVEY DATED 8-9-11 IDENTIFIED NO SUSPECT ASBESTOS CONTAINING MATERIALS (ACM). 3. PUBLIC WORKS CREW TO PERFORM DEMOLITION OF 6,000 SQ FT AIRPORT HANGAR ' BLDG & REMOVE ALL DEMOLITION DEBRIS/MATERIALS. 4. ADD FILL AS NEEDED, PROPERTY TO BE LEFT IN LEVEL, MOWABLE CONDITION. 5. DEMOLITION SUPERVISOR IS RESPONSIBLE FOR ENSURING COMPLIANCE WITH APPLICABLE ASBESTOS RULES/REGULATIONS FOR ANY UNEXPECTED ACM FOUND DURING DEMOLITION. 6. ONCE DEMO & CLEAN UP IS COMPLETE, CALL FOR CITY FINAL 281 470 5130 FOR CLOSURE OF DEMOLITION PERMIT. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total .00 .00 .00 .00 Plan �+eck Total .00 .00 .00 .00 Gran//Totadii /% .00 .00 .00 .00 1 CIiiY COPY LOFLIN ENVIRONMENTAL. SERVICES, INC. August 9, 2011 City of La Porte 604 W. Fairmont Parkway LaPorte, Texas 77571 Attention: Ms. Debbie S. Wilmore Subject: Results of Limited Survey for Asbestos Containing Materials Vacant Hangar Building at 10937 Spencer Highway in LaPorte, Texas Loftin Environmental Services, Inc. Project Number 6461105 Dear Ms. Wilmore, Loftin Environmental Services, Inc. (LOFLIN) has completed a limited asbestos survey of a vacant hangar building in the southeast comer of the LaPorte Airport located at 10937 Spencer Highway in LaPorte, Texas. The purpose of this work was to identify possible asbestos containing materials which may have been used in the construction of the building and assess those materials which may become friable during building renovation.. This work was performed on August 9, 2011. The interior and exterior areas of the building were visually inspected to identify suspect asbestos containing materials. There were no suspect materials identified for sampling. The walls was observed to be corrugated metal siding on a metal frame. The floor was either a concrete stab or dirt. Therefore, no samples were collected for analysis. This 'survey was conducted in general accordance with the Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants (NESHAP) for the areas being demolished. Loftin Environmental Services, Inc. appreciates this opportunity to provide these testing services. Should you have any further questions regarding this matter, please do not hesitate to contact us. Sincerely, LOFLIN ENVIRONMENTAL SERVICES, INC. W. Joseph Loftin DSHS Licensed Consultant #10-5140 DSHS Lab 130-0031 2020 Montrose 0 Houston, Texas 77006 O (713)521-3300 0 FAX (713)523-0829 v a DEMOLITION PERMIT APPLICA'... N �C�® V 9A City of La Porte ataQY hey A F ; 281-470-5073 11 na" / 2I G �c/ o CP/�._ J/ Loist,'� 43 jf IRAcI; :qA aLk 1 Project Address: r I ot: l ¢ y �{ TRnct;S 13 L k 'A, Subdivision: PA I n c l �l J g c;�l -1 P S aaL.Y) Owner's Name: C t T y of L, 7\ Pa c« Phone: Z Y I -7 cJ 7 0- S/y 3 Address: �. i N, z R d L Per T� 7 i J 7 J Street city Zip Contractor: C t T y o f L tN i s Phone: Street City Zip Contractor Email address: Fax: Contact Person: Describe Work: Demolition of building (s) RESIDENITAL "NON-RESIDENTIAL V-111 "NOTE: ON "NON-RESIDENTIAL"BUILDINGS, SENATEBILL 509 (EFF. 01-01-02) REQUIRES MUNICIPALITIES VERIFYANASBESTOSSURVEYWAS CONDUCTED. COPY OFASBESTOS SURVEYMUST BE PROVIDED A'ITHTHE PERMITAPPLICATION. Last use of Building A I (l C R of 'r- HA AGA c Use Zone P" I) Flood Zone X Received Asbestos Survey (if applicable): Y or N or N/ Checked/Approved for Issuance By: EZ tj J'a-4yY 2A1 Date V3 C-1 _V -1 —1 1 CE: (If CE related, add additional comment that requires specific compliance period from permit issuance) Special Conditions / I. Fiemeerorser/Contrcc or rs nnec m u e u ,r //. Ji Rv.ci u(a ss 177e. rnl- A %^cRAf i 6IM15nr fit A,, 1r15 SP•nc a.t 1-I wy HCAD 03 8l 3 `I o0 1� O o o (a Permit No. Permit Fee C%i y S:\City Planing share\04-WWSPEGTIONS DMSIONUnspections\Demo Permit Appl.doc Rev. July2009 vac �•,w C�F 1) U.S. Government property deeded City provided land remains an airport; 2) Loflin Environmental Services, Inc. Asbestos Survey dated 08/09/11 identified no suspect asbestos containing materials (ACM); 3) Public Works crew to perform demolition of 6,000 sq. ft. airport hanger bldg. & remove all demolition debris/materials; 4) Add fill as needed, property to be left in level, mowable condition; 5) i Demolition supervisor is responsible for ensuring compliance with applicable asbestos rules/regulations for any unexpected ACM found during demolition; 6) Once demo & clean-up is complete, call for city f. final (#281`470_5130) for closure of demolition permit DEMOLTI'ION PERMIT APPLICA7 aJN a City of La Porte Esta JJ14I ?o"� na0 a 281-470-5073 are. O l 3/_ �+'Y" Nam✓ V Lori i s f; 6 3 it � A n c, l: y A G a l l 1 Project Address: ram`+—b - Lot:3 J"X.11 ¢ N d TRnc14S aLk'), Subdivision: PA %,l r_ L-.� J Rigel,: 1 M P S as u y, Owner's Name: C i TV o F- L, n Pa c T4t- Phone: Y l- 'I i O_$/ 01 Address: ,! N. rc L A PJ r Tom- % 7 J 7 I Street City Zip Contractor: C t T y O F L r! p a izi, Phone: Street City Zip Contractor Email address: Fax: Contact Person: Describe Work:_ Demolition of buildings () RESIDENTIAL "NON-RESIDENTIAL "NOTE: ON "NON-RESIDENTIAL"BUILDINGS, SENATE BILL 509 (EFF. 01-Ol-02) REQUIRES MUNICZPALITIESVERZFYANASBESTOSSURVEY WAS CONDUCTED. COPYOFASBESTOS SURVEYMUST BE PROVIDED WITETRE PERMTTAPPLICATIDN. 0 For City Use Last use of Building /� I (L C R F I- /f aG s C Use Zone P N 1) Flood Zone X Received Asbestos Survey (if applicable): Y or N or N/ r-1 .. Checked/Approved for Issuance By: ♦ \ r\ —11.--I..a..J n.1J -J"'. F-nA_ 1) U.S. Government property deeded City provided land remains an airport; 2) Loflin Environmental Services, Inc. Asbestos Survey dated 08/09/11 identified no suspect asbestos containing materials (ACM); 3) Public Works crew to perform demolition of 6,000 sq. ft. airport hanger bldg. & remove all demolition debris/materials; 4) Add fill as needed, property to be left in level, mowable condition; 5) Demolition supervisor is responsible for ensuring compliance with applicable asbestos rules/regulations for any unexpected ACM found during demolition; 6) Once demo & clean-up is complete, call for city final (ti281-470-5130) for closure of demolition permit Cash C•r• ) • G•Il:r n" 11 Permit No. I (" / Z'�- () Permit Fee C ` F `/ P C ' T J, c t (' 1 c.3 c.,l N �y e lk SACity Planning Share\04-INSPECTIONS DMSIONUnspectionADemo Permit Appl.doc Rev. Jul Wilmore, Debbie From: Wilmore, Debbie Sent: Tuesday, August 09, 2011 3:08 PM To: Robinson, Jackie Cc: Mick, David; Pennell, Don Subject: FW: 10937 Spencer Hwy. - Hanger Demo Attachments: 20110809150307660. pdf Forgot to attach - here you go! From: Wilmore, Debbie Sent: Tuesday, August 09, 2011 IN PM To: Mick, David Cc: Pennell, Don; Robinson, Jackie; Bottoms, Ron; T!ebens, Tim Subject: 10937 Spencer Hwy. - Hanger Demo David, Attached is the $250 invoice for the survey - it can be paid by p-card. State form requires a $57 fee but that invoice comes in once the project is complete. That invoice will go directly to you as the contact person for the city. Demo permit has been issued but needs your signature. A copy of the survey & the state notice will be provided with your demo permit. The state notification is ready but needs your signature before we can mail it. It shows a start date of Wed, 08/24 & end date of Fri, 08/26 with hours of Sam to 3pm. The envelope needs to have a 08/10th postmark for the 08/24th start date. Let me know when you are coming over & we can go thru the notification form together. Thanks, Debbie From: Mick, David Sent: Tuesday, August 09, 20112:09 PM To: Wilmore, Debbie Cc: Pennell, Don; Robinson, Jackie Subject: AP fund Debbie - We'll take the $250 for environmental review out of the AP Fund, contingency line item. Forward the invoice to Jackie. Is there $57 fee still to the state? Thank you for coordinating all of this. Dave ECEIVE AUG 1 1 2011 By, ENVIRONMENTAL SERVI CMS, INC. August 9, 2011 City of La Porte 604 W. Fairmont Parkway LaPorte, Texas 77571 Attention: Ms. Debbie S. Wilmore Subject: Results of Limited Survey for Asbestos Containing Materials Vacant Hangar Building at 10937 Spencer Highway in LaPorte, Texas Loftin Environmental Services, Inc. Project Number 6461105 Dear Ms. Wilmore, Loflin Environmental Services, Inc. (LOFLIN) has completed a limited asbestos survey of a vacant hangar building in the southeast corner of the LaPorte Airport located at 10937 Spencer Highway in LaPorte, Texas. The purpose of this work was to identify possible asbestos containing materials which may have been used in the construction of the building and assess those materials which may become friable during building renovation. This work was performed on August 9, 2011. The interior and exterior areas of the building were visually inspected to identify suspect asbestos containing materials. There were no suspect materials identified for sampling. The walls was observed to be corrugated metal siding on a metal frame. The floor was either a concrete slab or dirt. Therefore, no samples were collected for analysis. This survey was conducted in general accordance with the Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants (NESHAP) for the areas being demolished. Loftin Environmental Services, Inc. appreciates this opportunity to provide these testing services. Should you have any further questions regarding this matter, please do not hesitate to contact us. Sincerely, LOFLIN ENVIRONMENTAL SERVICES, INC. A5 �- - W Joseph Loftin DSHS Licensed Consultant #10-5140 DSHS Lab #30-0031 2020 Montrose ♦ Houston, Texas 77006 ♦ (713)521-3300 ♦ FAX (713)523-0829 'INVOICE LLIN ENVIRONMENTAL SERVICES INC. INVOICE NUMBER: 2020 MONTROSE BLVD., SUITE 100 • HOUSTON, TEXAS 15623 (713) 521-33M • Pox (713) 523-Oan �, � � j,Ift AUG 1 LUI) PAGE: 1 RYi _.... -- SOLD TO: City of LaPorte Attn: Debbie Wilmore 604 W. Fairmont Pkwy. La Porte, TX 77571 CUSTOMERID CUSTOMER PO SALES REP ID LAP001 Loflin, J. PAYMENT TERMS INVOICE DATE DUE DATE Net 30 Days 8/9/11 9/8/11 DESCRIPTION AMOUNT Limited Survey for Identification of Asbestos Containing Building Materials 250.00 SE Hanger 10937 Spencer Hwy. LaPorte, TX LES JOB#648-11-05 Subtotal 250.00 Sales Tax Total Invoice Amount $250.00 Check/Credit Memo No: Payment/Credit Applied TOTAL DUE $250.00 If you wish to pay with Mastercard or Visa, please call 7135213300. Thank you. MINUTEMAN PRESS MUSEUM & MEDICAL DISTRICT • 713-942.8889 • www.pfthou*lm.0 "JWOICE r_ LO ENVIRONMENTAL SERVICES INC 2020 MONTROSE BLVO, SUITE 100 • HOUSTON. TEXAS 77006 (713) 521-3= • FM (713) S23 0629 SOLD TO: City of LaPorte Attn: Debbie Wilmore 604 W. Fairmont Pkwy. LaPorte, TX 77571 INVOICE NUMBER: 15623 PAGE: 1 CUSTOMER ID CUSTOMER PO SALES REP ID LAP001 Loflin, J. PAYMENT TERMS INVOICE DATE DUE DATE Net 30 Days 8/9/11 9/8/11 DESCRIPTION AMOUNT Limited Survey for Identification of Asbestos Containing Building Materials 250.00 SE Hanger 10937 Spencer Hwy. LaPorte, TX LES JOB#646-11-05 Subtotal 250.00 Sales Tax Total Invoice Amount $250.00 Chedc/Credit Memo No: PaymentlCredit Applied TOTAL DUE $250.00 If you wish to pay with Mastercard or Visa, please call 713521-3300. Thank you. MINUTEMAN PRESS MUSEUM 3 MEDICAL DISTRICT • 713-942-SM - W P11nftUS1 .Mm LOFLIN ENVIRONMENTAL SERVICES, INC. August 9, 2011 City of La Porte 604 W. Fairmont Parkway LaPorte, Texas 77571 Attention: Ms. Debbie S. Wilmore Subject: Results of Limited Survey for Asbestos Containing Materials Vacant Hangar Building at 10937 Spencer Highway in LaPorte, Texas Loftin Environmental Services, Inc. Project Number 6461105 Dear Ms. Wilmore, Loftin Environmental Services, Inc. (LOFLIN) has completed a limited asbestos survey of a vacant hangar building in the southeast corner of the LaPorte Airport located at 10937 Spencer Highway in LaPorte, Texas. The purpose of this work was to identity possible asbestos containing materials which may have been used in the construction of the building and assess those materials which may become friable during building renovation. This work was performed on August 9, 2011. The interior and exterior areas of the building were visually inspected to identity suspect asbestos containing materials. There were no suspect materials identified for sampling. The walls was observed to be corrugated metal siding on a metal frame. The floor was either a concrete slab or dirt. Therefore, no samples were collected for analysis. This 'survey was conducted in general accordance with the Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants (NESHAP) for the areas being demolished. Lollin Environmental Services, Inc. appreciates this opportunity to provide these testing services. Should you have any further questions regarding this matter, please do not hesitate to contact us. Sincerely, LOFLIN ENVIRONMENTAL SERVICES, INC. A5 e- W. Joseph Lollin DSHS Licensed Consultant #10-5140 DSHS Lab #30-0031 2020 Montrose ♦ Houston, Texas 77006 • (713)521-3300 ♦ FAX (713)523-0829 Wilmore, Debbie From: Wilmore, Debbie Sent: Monday, August 08, 2011 4:00 PM To: 'jloflin@loflinenvironmental.com' Cc: Mick, David; Clark, James; Bottoms, Ron; Tietjens, Tim Subject: Airport Demo Project Joe, The municipal airport property is 300 acres and includes multiple addresses; however, the address we plan to utilize for the proposed hanger demolition is "10937 Spencer Highway". As discussed this afternoon, please contact Mr. James Clark (cell #281-594-1811) for access tomorrow. Following the inspection, please e-mail the subsequent report/invoice to me. Should the survey results come out as expected (no ACM), the state agreed we can complete the state notification form and set the demo start/finish date while eliminating a required NESHAP trained individual during the demo. If you have any questions, please let me know. Thanks for all your help. Respectfully, Debbie Debbie S. Wilmore, CBO, HCO Chief Building Official City of La Porte 604 W Fairmont Pkwy LaPorte, Tx 77571 #281-470-5066 iYt I ,�ss Yo 4 7-b N- E ? •l- . Nan _ .�o olR L°d` /O- wdFkl� /I c 0)z I? a 7y s7mj- e (2 o/ iA Q /A/,a,-s mo P D ��� cE hdoma S' a aJ & /D ------------ Al � 9� tom/ o � ►� — '� 13 - l- 06 ,3�5-d a , % 3 7S �rt CLP 1 e l LVZ r — - — /-A Nil) cT --4- -- lN' i C'a S a-p7,-(,Po_ t6lvcj U� Q 8/30 Orl a �cQ tyl cQ a7,es G1�itn� Memo To: Ron Bottoms, City Manager From: David Mick, Public Works Director Date: 8/05/11 Re: Scheduled demolition of Airport Hanger Status update for the city -owned airport hanger located east of the Air Guard facility and west of the fuel area along Spencer Highway. • The hanger is not leased and is now empty but for discarded trash and debris. 0 % ` l vrt Public works staff evaluated the structure and determined that the cost of necessary repair and resheeting would easily exceed $50,000 likely closer to $100,000. • The flooring is combination of earth and randomly poured concrete slabs. • As a courtesy, staff approached the three fixed based operator's that lease directly with the city. All reviewed the structure and concluded that taking on the repair and lease of the facility was not economically viable. It is functionally obsolete. • Staff received three quotes for contractor demolition of the hanger. $13,800, $15,000 and $30,400. One of our public works operators has fairly extensive site demolition experience and is competent to perform the work. Staff will rent an excavator with a thumb attachment for approximately $2,400. There is no charge for spotting roll off dumpsters on site and hauling off the metal siding. • The hanger is scheduled for demolition the week of August 15 by public works forces with an out of pocket expense of approximately $2,400 to be funded from the airport fund contingency line item. :.m 7� "�kss�e '.hoo eoe r�-