HomeMy WebLinkAbout920 W. MAIN ST_10-0295___________1 :f MINOR DEVELOPMENT SITE PLANS BUILDING PERMIT RELEASE FORM Caw ? Development Name: Address: 9a b W Nlq�✓I liu�1 !v/ CLP Project No. 09- da Oa Date Project Reproducible Received: //— oZS- 0 9 Date Reproducible is Forwarded to Director for Signature: /02 Date Reproducible is Filed in Drafting Div.: /02 — O,Z — 01 Date Release Form Provided to Inspection Services Div.: %Z — 0,2 --d The site plan for the proposed project has been approved and released by the Planning Department. The project is now eligible for the issuance of construction permits once all applicable code, regulations, and fees have been satisfied. PLACE COMPLETED RELEASE FORM IN CONSTRUCTION JOB FILE S:\CPShare\Inspections\SITE PLAN RELEASE FORM.doc 01-2000 Rev. -Inn - �. Contractor: RAM Design+Build .I Contact: Richard Makeover — President t Bashar Aburubia — Project manager 4 Phone: 713.952.7224 .I i I Office Location: 2650 Fountainview Suite 211 Houston, TX 77057 713.952.7224 office 800.952.0503 toll free 832.201.0718 fax I ` http://www.ramdesilmbuild.com/ n u t d s- crris rncbride O project manager n .. 9 Zo W. rnn,H mein 713.463.8290 8588 ketY treeweY direct 713.932.4011 suite 441 cmcbrlde@knudsonservk-s.c°m houston, tx 77024 r chi -is mcbride project manager F4) KMMWAM 8599 Katy suite 41 freeway, 24 n houston, Wife u d S main 713.463.8200 O & direct 713.932.4011 n knudsonservice0.com RAM DESIGN+BUILD ARCHITECTS BUILDERS RAM DESIGN+BUILD j ARCHITECTS BUILDERS i I r Huber, (Mark From: Capstin, Krystle Sent: Monday, November 01, 2010 10:16 AM To,: Huber, Mark Cc: Jennings, Sherry Subject: RE: City of La Porte - HGAC - 920 W Main St Mark, I spoke with Cassandra at Center Point this AM and it was determined that the fax I sent on 10/20/2010 was actually received and processed by Center Point, but they did not have 920 W Main St as an address in their system, so they made the order for 920 E Main Street. I had them cancel the order for E Main St while I was on the phone with her and correct the order for W Main St as well as re -fax Center Point both 1. The original fax & 2. The original confirmation page. I have put copies of this information in your tray on your desk, noted the job fie it was re -faxed, noted the original fax with the new fax information and filed it with October 2010's faxes, & made a copy of everything and filed it with November 2010's faxes. Please let me know if you have further questions. Krystle From: Huber, Mark Sent: Monday, November 01, 2010 9:59 AM To: McPhail, Reagan; 'alanhaney@cgp-solutions.com' Cc: Huber, Mark; Menager, Dwayne; Jennings, Sherry; Capstin, Krystle; Lee, Peggy; Cream, Susan Subject: FW: City of La Porte - HGAC - 920 W Main St Mark W. Huber Deputy Building Official City of La Porte Office: (281) 470-5067 Fax: (281) 470-5005 huberm@laportetx.Qov From: Lee, Peggy Sent: Friday, October 29, 2010 2:37 PM To: Huber, Mark Subject: FW: City of La Porte - HGAC - 920 W Main St Mark, Reagan asked me to forward this to you. See attached message from Alan Haney to Susan Cream. If you have quL?stionsNee Reagan. Permit was previously provided to Center Point via fax on 10-20-10 @ 12:41 p.m. ( Permit # 10-295 ). We have contacted Center Point again today ( 11-1-10 )@ 9:55 a.m. , spoke with them on the phone, and also re -faxed the permit paperwork. Hope this will take care of it. Regards Mark Huber From: Cream, Susan Sent: Friday, October 29, 2010 2:20 PM To: Lee, Peggy Subject: FW: City of La Porte - HGAC - 920 W Main St << Message: FW: City of La Porte - HGAC - 920 W Main St >> Please forward attached e-mail to Reagan. Thanks, Susan From: System Administrator Sent: Friday, October 29, 2010 2:18 PM To: Cream, Susan Subject: Undeliverable: FW: City of La Porte - HGAC - 920 W Main St Your message did not reach some or all of the intended recipients. Subject: FW: City of La Porte - HGAC - 920 W Main St Sent: 10/29/2010 2:18 PM The following recipient(s) cannot be reached: McPhail, Reagan on 10/29/2010 2:18 PM The message could not be delivered because the recipient's mailbox is full. <Exchange03.laporte.local #5.2.2> 2 ST 00 1 CITY OF LA PORTE RECORD OF PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT 713-207-9780 October 20, 2010 10-295 m Uo a;k r )N ti•.s'% A D9()() 4Y6 qqo 1110 Kc s _ -il 1\/j /!0 (2 9'4q,4rn- wl Cal\.kT po;-)4- perrrk`+S de3k� Ctr�cr pork rce,`d (c�l'\'rncl.) tey�e�4�)W- d^r1k 'Pit i�- cis .. mGcn UV & G2o 0 N1crin TTTTTTTTTTTTTTTTTTTTT TTTTTTTm Tmmn.mmn.n..nmmn.n.... n..rn..rn..rn.....rn.n..rn.n.......................................................................................... ..... . . . . . . . . . P. 01 TRANSACTION REPORT OCT-20-2010 WED 12:42 PM ' DATE"START RECEIVER TX TIME(L)PAGES TYPE NOTE M# DP X OCT-20 12:41 PM 97132079780 44"(1) 1 SEND OK 096 TOTAL 44S PAGES: 1 XXtcX<tcXXXX<YXXXX<��IKXXX<XXXXXX�YIK���XXX1cYJKYYY�XXXXXXXXY.c�iXXX<XXXtl1�KlKlK�XXMc�C#���McXXX�Y���X�K�X�XX�X<XX�XXXI<�� CITY OF LA PORTE RECORD Ole PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT 713-207.9780 October 20, 2010 N TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT P. 01 TRANSACTION REPORT r< zr 1 NOV-01-2010 MON 09:53 AM X DATE START RECEIVER TX TIME(L)PAGES TYPE NOTE M# DP x .NOV-01 09:52 AM 97132079780 59"(1) 2 SEND OK 135 TOTAL 59S PAGES: 2 1<���1;1;ziztl;rr�zrztl;zztaz�ztxtztztztztl;rtz<xxx�1;l;�xxxx<1;xxzizrx�xzr�M1<1;Xiz1;t�1;l;xxx>kxxl;lrxlrlrlrlr1r1;1<z<ztrr�xr��xzr�zr�z<����z<z<x�zr��zt� 920 CITY OF LA PORTE RECORD OF PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT r-' 713-207-9780 October 20, 2010 0-295 NEW ...v. •w wnauu. PRi- `TADDRESS' //G RE' . - 'S: YES =p _ NO PERM; , ,VIBER: SPECIAL NOTES: INSPECTOR'S SIGNATURE: li DAUXINSPECTIONLOG 0 5 3 015 DATE: TIME: j CONTRACTOR/HOMEOWNE ----- _ _ TYPE OF INTISPECN: ) REINSPECMN PHONE NUMBER � S�1 Oa-.-Y PROJECTADD S: 1� RESULTS: NO PERMTTNUMBER: - CD,a 45 / INSPECTOR'S r I :1 `1 4 -re c CITY OF LA PORTE RECORD OF PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT 713-207-9780 October 20, 2010 F,E.[R,F.1.,.{..(.F.I.F.F.I.TAd.R.ATTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTT-•r •r•n•r P, 01 zt TRANSACTION REPORT OCT-20-2010 WED 12:.42 PM # GATE" START RECEIVER TX TIME(L)PAGES.TYPE NOTE M# DP z< OCT-20 12i41 PM 97132079780 44"(1) 1 SEND OK x 096 � X< z< � TOTAL 44S PAGES: 1 x<z<x:zrxz<x<x<r<z<z<xxz<1<x<z<>Yx<l;xz<z<z<z<xz<z<xx�c���x�ctx�xz<z<��xz<#�x<r,;z<xl;z<���z<z<xxz<z<z<z<z<z<z<��z<xxxz<z<x<x<t�z<z<x<�z<I<z<x<�xz<t�z<x<x<z<z<z< CITY OF LA PORTE RECORD OF PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H I. & P ATTN: PERMIT DEPARTMENT 713-207.9780 October 20, 2010 N sit AIfl # #Itfl& I . 9 I - ' it - V IJi , I i ' *7] ' .!7 qi' I 1 _t !J a INSPECTION SERVICES MINOR DEVELOPMENT SITE PLAN CHECKLIST Job Address: Development Name: Type of Business/Dev CLP Project No.: # C i — ocorvac 7 9090 LaTe xcv a. m inspecaons: 7- a 1 -y 1 Legal Description: Zoning: 5 - 0{r -14 SIC No.: #g P & Z and/or C.C. Action? Ord./Permit #s: t / LL Street/Alley Closing Action? Ord. #s:%f FORMAT Engineer or Surveyor Sealed (Dev. Ord #1444; App. E) Development Name Shown (Dev. Ord #1444; App. E) Development Type Shown (Dev. Ord #1444; App. E) Legal Description Shown (Dev. Ord #1444,-App. E) Job Address Shown (Dev. Ord #1444; App. E) Building Footprint Shown (Dev. Ord #1444; App. E) Scale of Plat Shown (Dev. Ord #1444; App.E) North Arrow Shown (Dev. Ord #1444; App. E) Utility Easements/Alleys —Shown? (Dev. Ord #1444; App. E) QfApplicable) Flood Zone - - Shown? (Dev. Ord #1444; App. E) o Flood Plain Development Permit Required? Recei-v Yes or No Yes or No Ye or No Yes or Yes or No' or No or No Yes or IM Inspection Division Site Plan Cbeelrtist Page 2 SPECIAL PERMITS Ak Driveway/Culvert Permit Required? (State or County or City) (Obtain Copy) M UTILITIES Utility Verification Completed? Results: a) Water Available w/o Extension es or No b) Sewer Available w/o Extension Yes or No c) Utility Extension Agreement Needed? Yes or o d) Utility Easement Agreement Needed? Yes or Water Development Fees - (Ord #759 F) $ - / Water Tap Size 4 (Ord #759 E) $ Irrigation Size - ( 2' ) (Ord # 759E) $ A n/ Sewer Development Fees - (Ord # 759F) Sewer Tap Size — ( rj /lei" 1 (Ord' #759 F) *includes sewer inspecdon fee charge On & Off -Site Utilities Shown: a) Water Line Size/Routing b) Sewer Line Size/Routing c) Gas Line Size/Routing d) Electric Line Routing (O.H. or Undgd.) a 8/ S or No yes NO JS��q �7 or No �! Yes or No — /Ov .A Inspections Division Site Plan Checklist Page 3 ZONING (Chapter 106 of the City's Code of Ordinances) 4se0Maximum Lot Coverage Confirmed? o 0 6443, Table B (Commercial) and Sect. 106-522, Table B (Industrial) VuiBuil'tbacks d uateASe es c N 43, able (C :mer 'al)10 522ableIrontR / dl* Parking Regulations: Surface is Dust -Free? (Sect. 106-835[[J) Yes or No i� ... .,�...�., , "m Curbing/Curbstops Okay? (Sect. 106-835[i]) (!�i) or Size of Spaces & Aisles - Adequate? Yes or (Sect. 106-835 a c-4j and[dj) Regul X18', Accessible—14'X20'; Parallel — 10'X22' Cir n 28'(90-degree parking) 18' (60 & 45-degree) . Ratio of Spaces Adequate? YJes or (T. 1106.1 Of 2003 Ed oflnt'1. Bldg. Code) Regular Vs. A S:\CPShare\INSPECnON DMSIONUnspectionsUns Services Site Plan Cklistdoc No No No Rev. 11-29-04 dsw Print Details Page 1 of 1 HARRIS COUNTY APPRAISAL DISTRICT Tax Year: 2009 REAL PROPERTY ACCOUNT INFORMATION 0231850000031 Owner and Property Information Owner Name & CITY OF LA PORTE Legal Description: TR 11 BILK 52 Mailing Address: PO BOX 1115 LA PORTE LA PORTE TX 77572-5115 Property Address: 908 W MAIN ST LA PORTE TX 77571 State Class Code Land Use Code Building Total Land Building Net Neighborhood Map Key Class Units Area Area Rentable Facet Map@ Area XS -- 4300 -- General 0 562 0 0 9703.04 6254C 540X Governmental Commercial Vacant SF Exempt Value Status Information Capped Account Value Status Notice Date Shared CAD No Noticed 5/1/2009 No . Exemotions and Jurisdictions Exemption Type Districts Jurisdictions ARB Status 2008 Rate 2009 Rate Total 020 LA PORTE ISD Certified: 08/21/2009 1.325000 040 HARRIS COUNTY Certified: 08/21/2009 0.389230 041 HARRIS CO FLOOD CNTRL Certified: 08/21/2009 0.030860 042 PORT OF HOUS ION AU141Y Certified: 08/21/2009 0.017730 043 HARRIS CO HOSP DIST Certified: 08/21/2009 0.192160 044 HARRIS CO EDUC DEPT Certified: 08/21/2009 0.005840 047 1SAIJ JACINTO coil COL D 1 Certified: 08/21/2009 0.163411 071 CITY OF LAPORTE Certified: 08/21/2009 0.710000 Valuations 2008 Value 2009 Value Market Appraised Market Appraised Land 01 Land 0 Improvement 01 Improvement 0 Total 01 0 Total 01 0 Land Market Value Land Site Unit Size Site Appr O/R Appr O/R Total Unit Adj Unit Value Line Description Code Type Units Factor Factor Factor Reason Adj Price Price 1 4300 -- General Commercial Vacant SFS SF 562 1.00 1.00 1.00 -- 1.00 0 0 0 Bu http://www. hcad.org/records/print.asp?crypt=°/o94%9A%BO%94%BFg`/o84%8F%82%7B... 9/21 /2009 Print Details Pagel of 2 HARRIS COUNTY APPRAISAL DISTRICT Tax Year: 2009 REAL PRaffRTY A CQUnTjREQfljil Owner and Property Information Owner Name & CITY OF LA PORTE Legal Description: S2 .-. Mailing Address: PO BOX 1115 LA PORTE LA PORTE TX 77572-1115 Property Address: 908 W MAIN ST LA PORTE TX 77571 State Class Code Land Use Code Building Total Land I Building Net Neighborhood Key Class Units Area Area Rentable FacMap et Map® Area X1-- 4371-- E 0 12,000 5,088 0 9703.04 6254C 540X Governmental Downtown SF Exempt ROW Value Status Information Capped Account Value Status Notice Date Shared CAD No Noticed 5/1/2009 No Exemptions and Jurisdictions Exemption Type Districts Jurisdictions ARB Status 2008 Rate 2009 Rate Total 020 LA PORTE ISO Certified: 08/21/2009 1.325000 040 HARRIS COUNTY Certified: 08/21/2009 0.389230 041 HARRIS CO FLOOD CNTRL Certified: 08/21/2009 0.030860 042 PORT OF HOUSTON AUTHY Certified: 08/21/2009 0.017730 043 HARRIS CO HOSP DIST Certified: 08/21/2009 0.192160 044 HARRIS CO EDUC DEP1 Certified: 08/21/2009 0.005840 047 SAN JACINTO COM Coi Certified: OS/21/2009 0.163411 071 ICITY OF LAPORTE Certified: 08/21/2009 1 0.710000 Valuations 2008 Value 2009 Value Market Appraised Market nppraisud Land 01 Land 0 Improvement 01 Improvement 0 Total 01 0 Total 01 0 Land Market Value Land Line Description Site Unit Units Size Site Appr O/R Appr O/R Total Unit Adj Unit Value Code Type Factor Factor Factor Reason Adj Price Price 1 14371 -- Downtown ROW I SF1 I SF 112,0001 1.00 1 1.00 1 1.00 1 Corner or Alley 1.00 0 0 0 Building Building Year Built Type I Style I Quality Impr Sci Ft Building Details 1 1940 Downtown Row I Mixed Retail w/ Office Units I Average 5,088 Displayed Building Details (1) No sketch is avails Building Data Element Detail Cooling Type Central/ Forced Construction Type Wood / Steel Joist Functional Utility Avg/Normal Heating Type Hot Air ble for this property. Building Areas Description Area BASE AREA PRI 1 5,088 http://www.hcad.org/records/print. asp?crypt=%94%9A%BO%94%BFg%84%8F%82%7B... 9/21 /2009 Print Details Page I of I HARRIS COUNTY APPRAISAL DISTRICT Tax Year: 2009 REAL PROPERTY ACCOUNT INFORMATION 0231850000011 Owner and Property Information Owner Name & CITY OF LA PORTE Legal Description: TRS 12 & 13 BLK S2 Mailing Address: PO BOX 1315 LA PORTE LA PORTE TX 77572-1115 Property Address: 908 W MAIN ST LA PORTE TX 77571 State Class Code Land Use Code Building I Total Land Building Net Neighborhood Map Key Class Units Area Area Rentable Facet Map(& Area X1 -- 4339 -- Parking E 0 4,548 0 0 9703.04 6254C 540X Governmental Miscellaneous SF Exempt Value Status Information Capped Account Value Status Notice Date Shared CAD No Noticed 5/1/2009 No Exemptions and Jurisdictions Exemption Type Districts Jurisdictions AIRS Status 2008 Rate 2009 Rate Total 020 LA PORTE ISO Certified: 08/21/2009 1.325000 040 HARRIS COUNT Certified: 08/21/2009 0.389230 041 HARRIS CO FLOtr 'ITRL Certified: 08/21/2009 0.036860 042 PORT OF HOUSIc -,. JTHY Certified: 08/21/2009 0.017730 043 HARRIS CO HOST, T Certified: 08/21/2009 0.192160 044 HARRIS CO EDUc 11i Certified: OS/21/2009 0.005840 047 SAN JACINTO Cc� `,I_ D Certified: OS/21/2009 0.163411 071 jCrrY OF LAPORTE Certified: 08/21/2009 1 0.710000 Valuations 2008 Value 2009 Value Market Appraised Market Appraised Land 01 Land 0 Improvement 01 Improvement 0 Total 01 0 Total 01 0 Land Market Value Land Line Description Site Unit Units Size Site Appr O/R Appr O/R Total Unit Adj Unit Value Code Type Factor Factor Factor Reason Adj Price Price 1 14339 -- Parking Misceflaneousl SF1 I SF 14,5481 1.00 1 1.00 1 1.00 ICornerorAlleyll.001 0 1 0 0 Build Vacant (No Buildino Data http://www. hcad.org/records/print.asp?crypt=%94%9A%BO%94%BFg%84%8F%82%7B... 9/21 /2009 Print Details Page 1 of 1 HARRIS COUNTY APPRAISAL DISTRICT Tax Year: 2009 REAL PROPERTY ACCOUNT INFORMATION 02318S0000009 Owner and Property Information Owner Name & CITY OF LA PORTE Legal Description: LT 9 BILK 52 Mailing Address: PO BOX 1115 LA PORTE LA PORTE TX 77572-1115 Property Address: 0 STATE HIGHWAY 146 LA PORTE TX 77571 State Class Code Land Use Code Building Total Land Building Net Neighborhood Map Key Class Units Area Area Rentable Facet Map® Area X1 -- 4300 -- General 0 4,250 0 0 9700.02 6254C 540X Governmental Commercial Vacant SF Exempt Value Status Information Capped Account Value Status Notice Date Shared CAD No Noticed 5/1/2009 No Exemptions and Jurisdictions Exemption Type Districts IM isdictions ARB Status 2008 Rate 2009 Rate Total 020 LA PORTS ISD Certified: 08/21/2009 1.325000 040 HARRIS COUNTY Certified: 08/21/2009 0.389230 041 HARRIS CO FLOOD CNIRI. Certified: 08/21/2009 0.030860 042 PORT OF HOUSTON AIITHY Certified: 08/21/2009 0.017730 043 HARRIS CO HOSP DIST Certified: 08/21/2009 0.192160 044 HARRIS CO EDUC DEPT Certified: 08/21/2009 0.005840 047 1SAN JACINTO CON COL D Certified: 08/21/2009 1 0.163411 071 ICITY OF LAPORTE Certified: 08/21/2009 1 0.710000 Valuations 2008 Value 2009 Value Market Appraised Market Appraised Land 01 Land 0 Improvement 01 Improvement 0 Total 01 0 Total 01 0 Land Market Value Land Site Unit Size Site Appr O/R Appr O/R Total Unit Adj Unit Value Line Description Code Type Units Factor Factor Factor Reason Adj Price Price 1 1 14300 -- General Commercial Vacantl SFS I SF 14,2501 1.00 1 1.00 1 1.00 1 -- 11.001 0 1 0 0 Build http://www.head.org/records/print.asp?crypt=%94°/u9A%BO%94°/uBFg%84°/u8F°/u82%7B... 9/21 /2009 30 _29 » 27_ n » 26 a x x 2 -- � 2o N-_A R 121 ---`9 ' R _22_�-�2 01--F _31 F 55 R -27 77 R -26 A ---A 25 m F' 23__-W72. R m R --- is p 5 _"-""--_ R 6 A Rife-_---R ------- R -. ______A A25______ F 9-------x ,a x24 ,m x 51'2137141N15.7N6O;192621 2im2 2 - 3-'-�1 4_.00�1- x 229 2107 G a 27 7 g-.--x 26-0025_» R ?5 « x 9_-0p B R 24----. -- tll �n 23_____. t 22--9D3921 Z12 R13 ____ 20 __ _____' R28_Q3 2 5 A6x 2u8 R2; 6Qa 7_- Hard _______ ]x 26__-____ 25 8 262 25 9Coun ty8 q 24 99 10 -- "24d023-- 27 R ------- _I„I23 ,2°2_ -- --- lAppraisal 221_-0IS F1 District 13-_--_- u014716f7- 19 P S---0a -^ A 19 _18 7__ a 171n _5 44 IS I-0014 6IS_--'--- s 1 o 220 a _ -0005 o �f i N N ' N a PSPP 126-595 2 4a 631_WfW _ 3 a 930 ,m 4 29-00a29 6 27_,m a 92�9p __6 .7-00D5___a 25 - - '9 ro:�ill" F24 MBA _. �10_ _ R 923 01_-�1-R ;q.Dw-. 112 rse F 21 ,m c14_ _e re20 F---- MIS 6 ' 5 4'3�2 �1 31 ''30 5 4 3 2 1 31 30 292827 ug 0 100 200 PUBLICATION DATE 7/28/2009 N U W E m S MAP LOCATION FACET 6254C u©©u ©umn OmJ'%® _ . Huber, Mark From: Chris McBride [CMcBride@knudsonservices.com] Sent: Wednesday, September 29, 2010 10:56 AM To: Huber, Mark Cc: McPhail, Reagan; Menager, Dwayne; Ramos, Mario; Fitch, Dennis Subject: RE: La Porte - Architectural Gateway Mark, Per our phone conversation, this e-mail is to serve as further correspondence and direction in regards to the Irrigation Drawings (Sheet L4.00 and L6.00) signed and sealed by Chas J. Puccio, dated 10.29.2009. There will be one (1) irrigation Mini-Clik II rain sensor installed on -site, adjacent to the proposed controller location per Construction Detail 7/L6.00, at a location approved by the Landscape Architect and Owner. Please let me know if you need any additional information or drawings in order to for the irrigation contractor to receive his irrigation permit for the La Porte — Architectural Gateway project. Thanks, chris mcbride project manager 858a katy freeway, suite 441 houston, tx 77024 main 713.463.8200 direct 713.932.4011 knudsonservices.com From: Huber, Mark [mailto:HuberM n,laportetx.gov] Sent: Wednesday, September 29, 2010 10:39 AM To: Chris McBride Cc: McPhail, Reagan; Menager, Dwayne; Ramos, Mario; Fitch, Dennis; Huber, Mark Subject: RE: La Porte - Architectural Gateway Chris, the original plan review was for the project building permit. The issue is that the irrigation drawings do not comply with "state" requirements for an irrigation permit. Licensed irrigators are aware of these requirements. To assist in this matter, I have attached a document that will serve as a check list for what must be included on the plans. Hope this helps. i We requested contractor to resubmit two copies of revised drawings for irrigation permit purposes. Regards, Mark W. Huber Deputy Building Official City of La Porte Office: (281) 470-5067 Fax: (281) 470-5005 huberrn(@,Iar)ortetx.gov From: Chris McBride[maiIto: CMcBrideQknudsonservices.com] Sent: Wednesday, September 29, 2010 8:46 AM To: Huber, Mark Cc: McPhail, Reagan Subject: La Porte - Architectural Gateway Mark, I received word yesterday that there are issues with the irrigation plan for the Gateway project and that they do not meet City Code. Can you please provide some insight on the issue, as I had understood that when we submitted the plans previously, that there were no further issues with the drawings and that everything was approved and ready to go for construction. Thanks, chris mcbride projedt manager K' 8588 lfreeway, suite 441 ho D hous[on, tX rioza u d S main 713.463.8200 O direct 713.932.4011 in knudsonservices.com DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. COMMERCIAL W&S WORK ORDER# DATE NEW ADDITION — ADDRESS Q j-O uJ >/YI &A4- LEGAL DESCRIPTION OWNER C i rl daonl�G PH# ���F7/—Sb a a CONTRACTOR Lpl±� DATE ADDRESS REQUEST Vn Sy� Q a V ZONING CLASSIFICATION r FLOOD ZONE j •' I BLDG PLANS SUBMITTED BLDG PLANS REVIEWED FEES PAID WATERFRONT FT FEES SEWER FRONT FT FEES WATER TAP SEWER TAP N/A PERMIT # BUILDING PERMIT l.O = .x95 PLAN REVIEW FEE ELECTRICAL PERMIT TEMPORARYPOWERPOLL PLUMBINGPERMYI� S.-\CPSham\Tnspecdons\RLSIDE 7ML INSP SEaMT ny 06.doc Mmm'Qg N M 01, "g- mv m m"m mmv, w g Ig ,.g FAXED: T POLE CONST ELEV CERT recv'd If In AEIVE zone) FORM SURVEY If applicable) GROUND PLUMBING PIERS 'UNCAN? S� 'rY\4t- WATER SERVICE LINE —3(xtajjo zjzj D-t_kr -7 SEWER a 4AJ T PaiLt- aiLor3 ELEC UNDERGROUND -_ou, (if applicable) COVER-UP LEAD TEST BRICK TIE DRIVEWAY SIDEWALKS FINAL DRAINAGE/GRADING FINAL ELEV CERTIFICATE RECEIVED: ELEVATION SHOWN FOR TOP 01�,WISHED FLOOR IS: RECIUM ' IS THE ELEVATION SHOWN 12" OXVOIlivF ep,E ,...� SYGR4 0 FAXED: GAS FINAL 11 tic, 0'11'tN F ELECTRIC FINAL /mctu, OTHER (patId,'lawn sprinklers, tc.) AWL- FINAL J,4h, ✓ 11 - 16 -10 q _Q,YV---'A— S:kCPSHARBINSPECTIONSDIVISION/INSPECTIONSXRES-COML INSP SHEETmt05.XLS Menaber, Dwayne From: Menager, Dwayne Sent: Wednesday, June 15, 2011 8:54 AM To: McPhail, Reagan Cc: Huber, Mark Subject: 920 West Main St. La Porte Gateway Project Reagan, We are going thru the La Porte Gateway project file this morning in order to close the open permit in our system and will need something from you in order to do so. • Are there any outstanding issues with this project? • Has the project been completed according to the approved plans and specifications? Respectfully, Dwayne Menager Chief Inspector City of La Porte Inspections Division 281-470-5070 menagerd 0 laoortetx.Rov Menager, Dwayne From: McPhail, Reagan Sent: Wednesday, June 15, 2011 1:49 PM To: Menager, Dwayne Subject: RE: 920 West Main St. La Porte Gateway Project Close-out From: Menager, Dwayne Sent: Wednesday, June 15, 2011 1:09 PM To: McPhail, Reagan Subject: RE: 920 West Main St. La Porte Gateway Project Is there any reason to keep the job file active? Or is it ok to close it out? Thanks From: McPhail, Reagan Sent: Wednesday, June 15, 2011 11:39 AM To: Menager, Dwayne Subject: RE: 920 West Main St. La Porte Gateway Project All complete except for the tower lighting, still trying to resolve. From: Menager, Dwayne Sent: Wednesday, June 15, To: McPhail, Reagan Cc: Huber, Mark Subject: 920 West Main St. Reagan, 2011 8:54 AM La Porte Gateway Project We are going thru the La Porte Gateway project file this morning in order to close the open permit in our system and will need something from you in order to do so. • Are there any outstanding issues with this project? • Has the project been completed according to the approved plans and specifications? Respectfully, Dwayne Menager Chief Inspector City of La Porte Inspections Division 281-470-5070 menagerd@laportetx.gov po rtetxgovla po rtetxgov Menager, Dwayne From: Menager, Dwayne Sent: Wednesday, June 15, 2011 1:09 PM To: McPhail, Reagan Subject: RE: 920 West Main St. La Porte Gateway Project Is there any reason to keep the job file active? Or is it ok to close it out? Thanks From: McPhail, Reagan Sent: Wednesday, June 15, 2011 11:39 AM To: Menager, Dwayne Subject: RE: 920 West Main St. La Porte Gateway Project All complete except for the tower lighting, still trying to resolve. From: Menager, Dwayne Sent: Wednesday, June 15, 2011 8:54 AM To: McPhail, Reagan Cc: Huber, Mark Subject: 920 West Main St. La Porte Gateway Project Reagan, We are going thru the La Porte Gateway project file this morning in order to close the open permit in our system and will need something from you in order to do so. • Are there any outstanding issues with this project? • Has the project been completed according to the approved plans and specifications? Respectfully, Dwayne Menager Chief Inspector City of La Porte Inspections Division 281-470-5070 m e n a ae rd C@ l a po rtetx.gov I "o+ 9 (2 - - Fvw� -WiImore, Debbie From: McPhail, Reagan Sent: Wednesday, October 20, 2010 9:03 AM twat 1 ( Z To: Wilmore, Debbie t Subject: Gateway ==91 - est'Main— Attachments: EtectdcitylnforRequired_for�Setvice:doc— Deb, can you folks answer the last half of question #57 Reagan of 1,41''50 f /n, (or \� 6f" V _ q,20 . W. MaA;V.. R"'4'w"- - .-I-- UMW efog a,/ U v I I I ELECTRICITY DATA FORM Meter # no meter Easy ID# NOT AT THIS TIME 1. Location address: Street, City, Zip 912 West Main Street, La Porte, 77571 2. Start and End Dates: w A. Permanent power start date? 11/2110 B. Temporary service removal date? C. Will you have separate permanent and temporary meters? PERMANENT 3. Load and Service Related Questions: A. Overhead or underground service? OVERHEAD B. Total HP or wattage of the connected load 2.8 KVA C. Voltage rating and Single or three phase service 3 PHASE D. Anticipated utilization rate or load factor UNKNOWN E. Estimate of the load growth rate 0 4. Project Coordinators contact information Office phone: 281-470-5065 Office fax: 281-470-0005 Cell Phone: 713-898-0784 Secondary contact information: Office phone: Office fax: Cell Phone: Billing address information required: Account Name: City of La Porte Street Address: 604 W. Fairmont Pkwy City/St/Zip: La Porte, TX 77571 Attn: Accounts Payable Nam` lO-1 0/,3/'O �K 5. Has the city inspection/permit been obtained and reported to the TDSP? YES rrI J�L C� 6. Please provide any other information that we should be aware of in regard to this project. Director Approval Date Complete and'retum to Purchasing DAILY INSPECTION LOG 0' 4 0 TIME: DATE: CONTRACTORIHOMEOVRXR: --7-- Z LZ �cj — ( )RaNsPEciiON TYPE OF INSPECTION. PHONENUMBER: T3 :S: pROJECTADDRE;' NO PERmrTrTUMBEI RESULTS: YES sPECIALNOTES: INSPECTOR'S SIG - --- --------- LOG 053015 DAILY INSPECTION DATE: 7 ) -- /�� TIME: 4R &z CONTRACTOR/HOMEOWNER: )REINSPECT ION TYPE OF INSPECTION- PHONENUMBER:_ PROJECT ADDRESS J� RESULTS: YES NO PERMITNU 4BER: bd*� SPECIAL NOTES: tlNSPEl �OWSSIG4"E: TF :4 I -77 tj Z6' CITY OF LA PORTE RECORD OF PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT 713-207-9780 October 20, 2010 ����zz���x�xx�x����x��xxxx�xl;x������xzx��x<xx��x��xxx�xx���xxx��x�xxx�z<�xx���z<x�x�xxx�xxxrxx��xxx�xx�r< P. 01 j TRANSACTION REPORT OCT-20-2010 WED 12:42 PM DATE START RECEIVER TX TIME(L)PAGES TYPE NOTE M# DP W t OCT-20 12:41 PM 97132079780 441(1) 1 SEND OK 096 TOTAL 44S PAGES: 1 XXX1;�XI;YXX�1;xX��XXXXXXXXXXXX�CXXXXXXXXX�XXXXXXXXXr;XY.cYYYX�XX�X1;1;Y��XXXX�1;1;tCxYXXXXxXX1;XXYXXXY�CI;X�I;XX1;Xz< CITY OF LA PORTE RE, CORD 01; PERMITS FOR ELECTRICAL SERVICE RELIANT ENERGY H L & P ATTN: PERMIT DEPARTMENT 713-207.9780 October 20, 2010 ADDIZESS PERMIT NO TYPE OF INSPFCTION 920 W MAIN ST 10.295 NEW SERVICE City of La Porte Architectural Gateway Project Personnel OWNER City of La Porte 604 Fairmont PKWY La Porte, Texas 77571 Contact: Reagan Mc Phail Public improvement Coordinator Planning Department Office: 281-470-5065 Fax: 281-470-5005 Email: mcphailr@laportebc.4ov Contact: Ron Bottoms City Manager City Manager's Office Office: 281-470-5012 Fax: 281-842-1259 Email: bottomsrC(blanortebc.aov Contact: John Joerns Assistant City Manager City Manager's Office Office: 281-470-5012 Fax: 281-842-1259 Email:assistantcitvmanager@laportebc.aov 0 (0) City of La Porte Architectural Gateway ARCHITECT Knudson 8588 Katy Freeway Suite 441 Houston, Texas 77063 Contact: Chris Mc Bride Main: 713-463-8200 Direct: 713-932-4011 Fax: 713-463-8011 Email: cmcbride@knudsonservice.com CIVIL ENGINEER Klotz Associates 1160 Dairy Ashford Suite 500 Houston, Texas 77079 Office: 281-589-7257 Fax: 281-589-7309 STRUCTURAL ENGINEER Paul Engineering, Inc. 6261/z Barringer Lane, Suite A Webster, Texas 77598 Office: 281-280-9972 Fax: 281-280-0250 ELECTRICAL ENGINEERING Jordan & Skala Engineering, Inc. 11231 Richmond Ave. Suite 104 Houston, Texas 77082 Office: 281-617-3200 City of La Porte Architectural Gateway GENERAL CONTRACTOR RAM Design+Build Corporation 2650 Fountainview, Suite 211 Houston, Texas 77057 Contact: Richard Makover, AIA Project Executive Office: 713-952-7224 Cell: 281-330-5483 Fax: 832-201-0718 Email: rmakover0swbell.net Contact: Bashar Aburubia Project Manager Office: 713-952-7224 Cell: 281-330-3107 Fax: 832-201-0718 Email: bashar.aburubia()gmail.com Contact: Bhavika Shah Project Manager Office: 713-952-7224 Fax: 832-201-0718 Email: bshah(a)ramdesianbuild.com Contact: Sharon Lloyd Project Administriator Office: 713-952-7224 Fax: 832-201-0718 Email: sharonCDramdesianbuild.com Contact: Moe Momayezi Superintendent Office: 713-952-7224 Cell: 832-267-2924 Fax: 832-201-0718 City of La Porte Architectural Gateway PROPOSED SUBCONTRACTORS CONCRETE KSB Construction 425 Creekpoint Court Dickson, TX 77539 Contact: MASONRY Lozano Brick & Tile 274 Harkness Street Houston TX 77076 Contact: ELECTRICAL Norris Electric 15407 Montwood Drive Houston, Texas 77062 Contact: PLUMBING A.V. Plumbing 9807 Brilliant Lake Drive Humble, Texas 77396 Contact: Kayvon Chehersa Office: 281-808-3362 Fax: 281-534-0453 Jesse Lozano Office: 281-216-2100 Frank Norris Cell: 713-823-0119 Fax: 281-280-8823 Victor Perez Office: 713-962-6990 Fax: 281-312-1133 City of La Porte Architectural Gateway PROPOSED SUPPLIERS CONCRETE R.S. Concrete 14508 Chrisman Road Houston, TX 77039 CAST STONE Continental Cast Stone 101 East Shady Grove Road Grand Prairie, TX 75050-6645 STEEL Triple S Steel Supply 6000 Jensen Drive Houston, TX 77061 EQUIPMENT RENTAL Aztec Rental Services 2001 West 34th Street Houston, TX 77018 Champion Rental 6903 North Shepherd Drive, Houston, TX 77091 Office: 281449-8521 Office: 972 871-7866 Office: 713 697-0271 Office: 713 681-1383 Office: 713 694-0133 City of La Porte Architectural Gateway RAM Design + Build Pre -Construction Meeting February 26, 2010 I. Introduction of Participants a. Owner's Representative b. Design Principals c. RAM Design+Build II. Project Document a. Directory of Responsible Personnel b. List of Proposed Sub Contractors and Suppliers c. Tentative Construction Schedule/Critical Path d. Lab Testing Agreement —The Murillo Company e. Schedule of Values III. Procedures and Processing a. Field Decisions i. Surveying columns, corners, towers, etc. ii. Scheduling lab testing and sampling b. Proposal Requests i. Canopy Substitute ii. Removal of Grease Interceptor from Scope of work c. Submittals i. Anticipated timelines for submittals/shop drawings ii. Samples and Mock-up requirements d. Color Coordination I. Masonry Mortar Samples ii. Cast stone sample e. Change Orders i. Request For Proposal #1 with Drawings, as provided by Knudson ii. Anticipated timelines/requirements f. Applications for Payment i. Schedule of Values ii. Retainage amount Ill. Items Stored On -Site IV. Construction a. Parapet Wall Construction i. Flashing detail of 4" x 2" HSST diagonal into roof needed ii. Pipe column and base plate position iii. Pipe column point load not founded iv. Review of Hilty %" bolts in clay block v. Proposed revision by RAM Design+Build b. Roof Framing and Membrane i. No exist roof warranty ii. Roof presently has little to no slope and standing water iii. Roof is towards end of life cycle iv. Proposed revision by RAM Design+Build c. Masonry and Finishes i. Main Street building facade marked "Existing Stucco" ii. Proposed revision by RAM Design+Build V. Temporary Facilities and Utilities a. Office, storage, staging area, etc. b. Temporary water, electricity, etc. c. First Aid and Safety procedures d. Security procedures e. Housekeeping procedures City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****PLUMBING PERMIT**** ---------------------------------------------------------------------------- Application Number . . . . . 10-00000295 Date 3/24/10 Property Address . . . . . . 920 W MAIN ST HCAD Number: 023-185-000-0011 Alternate Search Method: Application type description Subdivision Name . . . . . Property Use . . . . . . . Property Zoning . . . . . . Owner NEW, OTHER NONRESIDENTIAL BLDG. LA PORTE REAL COMMERCIAL MAIN STREET DIST OVERLAY CITY OF LA PORTE PO BOX 1115 LA PORTE TX 775721115 ------------------------------------------ Permit . . . . . . PLUMBING PERMIT Additional desc STRM SWR & WATER Sub Contractor A V PLUMBING Permit Fee . . . . .00 Issue Date . . . . 3/24/10 Expiration Date . . 9/20/10 Contractor ------------------------ RAM DESIGN + BUILD 2650 FOUNTAIN VIEW DR STE 211 HOUSTON TX 77067 (713) 952-7224 IaNNIMWM1Dan, ►FILIA Valuation . . . . 0 Qty Unit Charge Per Extension 1.00 .0000 EA PL - WATER PIPE/TREATING EQUIP .00 --------------------------------------------------- Special Notes and Comments February 22, 2010 3:49:56 PM lapovfl. 1. CALL FOR INSPECTIONS. 2. COMPLY WITH COMMERCIAL PLAN REVIEW NOTES ATTACHED. 3. THIS PERMIT SHALL INCLUDE TOWERS, PARKING LOT/ALLEY PAVING, BUILDING FACADE IMPROVEMENTS AND ASSOCIATED SITE IMPROVEMENTS/LANDSCAPING. 4. PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TEXAS ACCESSIBILITY STANDARDS. S. SUB -CONTRACTORS SHALL OBTAIN PERMITS PRIOR TO COMMENCING WORK AND MUST ALSO OBTAIN THEIR OWN INSPECTIONS PRIOR TO COVER UP. 6. MUST CONSTRUCT AND COMPLY WITH APPROVED CERTIFIED SITE PLAN AND RED LINED CONSTRUCTION DRAWINGS/SPECS, ALONG WITH ALL APPLICABLE CITY ADOPTED CONSTRUCTION CODES. Pjcj&,�,'n -------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 EnD PF Wr APPLICATION City ®f La Porte 281-470-5073 Mechanical *Electrical *(See beck of for. Established 1892 *Plumbing -- / Street Cm Lip Contractar. / V �� U �"�� Phone: Love, c-.-, 6-ice � Street City m Contractor Email address: Fez Contact Person: Engineer: Building Use: Sq. Footage: P # Stories Valuation: _ Des3n15 i"�C�Sf[dC C WATf�° L ✓` Occupancy Type Flood Zone Class Work 5q• Nt Const ucton Type Use Zone # Stories Parking Req_ Last use of Buildm DatE use ceased: •uur .ux'.n •� - a �• Checke&Approved for Issuance CE: Special Permit No. I Ci — a 4 s Permit Check Fee: C PLETE THIS SECTION FOR ELECI AL PERM T S:: NOTE: AMOIIQM CHARGE ON PERIN r(S) IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE $750 Oadets, Fbmaes, Lights & Switches (1' 5 — Flat fee) $ 3.00 Above Items (All Others) $ 0.60 each Clothes Washer/ Dryer $ 2.00 each Range Receptacle $ 3.00each Cook Top or Oven $ 1.50 each A/C, Window Unit Receptacle $ 3.00 each Water Heater $ 3.75 each DishwashedGarbage Disposal $ 150 each Meter Loop & Service (includes Temporary ad-bi) $15.00 each Temporary Saw Pole (T Pole) $15.00 each Reconnection of Service $15.00 each Reinspection Fee $35.00 each MOTORS: Up to but not including '/= by $ 1.50 each /z hp and less than 10 hp $ 2.50 each 10 lip & up to 50 hp $ 3 SO each 50 hp and up $ 4.50 each Total Fee $7.50 COMTL=:1SEMONFORPLUYJ31NGPERMIN NOTE:n : • ON a+• : i i 3 Description C.. Quantity PERMIT ISSUE FEE $15.00 Fhtx-c ains Traps $ 3.75 each Sewer (New, Repair, or Replacement) $ 7.50 each Septic Tank/Seepage Pit/Drain Field $15.00 each Water Heater $ 3.75 each Gas Piping System (111 outlets, flat fee) $ 7.50 Gas Piping System (over 4 outlets -each) $ 1.50 each Installation, ANeration or Repair of Water Piping and/or Water Treating Equipment $ 7.50 each Repair/Alteration — Dram or Vent $ 7.50 each Each Vacuum Break=Backflow Protection Each One (1-5) $ 3.75 each Each One (Over 5) $ 225 each Reinspection Fee $35.00 each Total 15.00 S'.Uty Punning Mmd04-ALSPEC.TIOI SDrVMJON1SaT-tons�MgP=kAoLd- City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****ELECTRICAL PERMIT**** ---------------------------------------------------------------------------- Application Number . . . 10-00000295 Date 3/19/10 Property Address . . . . . . 920 W MAIN ST HCAD Number: 023-185-000-0011 Alternate Search Method: Application type description NEW, OTHER NONRESIDENTIAL BLDG. Subdivision Name . . . . . . LA PORTE Property Use . . . . . . . . REAL COMMERCIAL Property Zoning . . . . . . . MAIN STREET DIST OVERLAY Owner Contractor CITY OF LA PORTE RAM DESIGN + BUILD PO BOX 1115 2650 FOUNTAIN VIEW DR LA PORTE TX 775721115 STE 211 HOUSTON TX 77067 (713) 952-7224 ---------------------------------------------------------------------------- Permit . . . . . . ELECTRICAL PERMIT Additional desc PARKING LOT POLES Sub Contractor ALVAREZ ELECTRIC JUST POWER Permit Fee . . . . .00 Issue Date . . . . 3/19/10 Valuation . . . . 0 Expiration Date . . 9/15/10 Qty Unit Charge Per Extension 1.00 .0000 EA EL - OUTLETS,SWITCHES (1ST 5) .00 1.00 .0000 EA EL - OUTLETS, SWITCHES (OTHER) .00 1.00 .0000 EA EL - METER LOOP & SERVICE/TCI .00 3.00 .0000 EA EL - TEMPORAY SAW POLE(T-POLE) .00 ---------------------------------------------------------------------------- Special Notes and Comments February 22, 2010 3:49:56 PM lapovfl. 1. CALL FOR INSPECTIONS. 2. COMPLY WITH COMMERCIAL PLAN REVIEW NOTES ATTACHED. 3. THIS PERMIT SHALL INCLUDE TOWERS, PARKING LOT/ALLEY PAVING, BUILDING FACADE IMPROVEMENTS AND ASSOCIATED SITE IMPROVEMENTS/LANDSCAPING. 4. PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TEXAS ACCESSIBILITY STANDARDS. 5. SUB -CONTRACTORS SHALL OBTAIN PERMITS ' PRIOR TO COMMENCING WORK AND MUST ALSO OBTAIN THEIR OWN INSPECTIONS PRIOR TO COVER UP. 6. MUST CONSTRUCT AND COMPLY WITH APPROVED CERTIFIED SITE PLAN AND RED LINED CONSTRUCTION DRAWINGS/SPECS, ALONG City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 r (281)470-5073 INSPECTION LINE:(281) 470-5130 ****ELECTRICAL PERMIT**** i ------------------------------------------------------------Page-------- 2 Application Number . . . . . 10-00000295 Date 3/19/10 ---------------------------------------------------------------------------- Special Notes and Comments WITH ALL APPLICABLE CITY ADOPTED CONSTRUCTION CODES. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 -------- --- A- �Q 2� 2 ------ A1;ZiMZ-: --------------------------------- Si at rp of ?fttractor or Authorized Agent ilding Official or Authorized Agent Da e 0 Dat PERWr APPLICATION of City of La Porte Established 1892 p 281,470-5073 s, Building Mechanical Q *Electrical V *Plumbmg *(See beck of form) Project Address: 120 W C5f 0 S C Lot Owner's Street Street Contractor Email 3 �r Zip -IF Person: Sq. Footage: # Stories Describe Work —PAC �j hot L T 5 W Arf k(, Occupancy Type Flood Zone Class Work Sq. Ft Construction Type Use Zone # Stories Parking Req Lest use of Building Date use ceased. Commercial Buildings Plans Only -Fire Marshal Approval Date Checked/Approved for Lssuance By. Date— CE: Special Conditions: Residential driveway tie-in fee: O Peridan j Red, ?dl�): Zone # Permit No. Permit Fee // /y Plan Check Fee: CI LETE THE SECTION FOR ELECTF L PERMITS:: r.i1TE: M gBIUM CHARGE ONPERNuiIa� IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE Outlets, Fires, Lights & Switches (1° 5 -Flat fee) Above Items (All Others) Clothes Washer/Dryer Range Receptacle Cook Top or Oven A/C, Window Unit Receptacle Water Heater Dishwasher/Garbage Disposal Meter Loop & Service (includes Temporary cud -in) Temporary Saw Pole (T Pole) Reconnection of Service Remspection Fee u • MMS Up to but not including ''/z hp /z hp and less than 10 hp 10hp&up to50hp 50 hp and up $7.50 $7.50 $ 3.00 $ 0.60 each ' $ 2.00 each $ 3.00 each $ 1.50 each $ 3.00 each $ 3.75 each $ 1.50 each $15.00 each $15.00 each $15.00 each $35.00 each $ 1.50 each $ 2.50 each $3.50 each $ 4.50 each Total Fee COMPLETE THIS SECTION FOR PLUMBING PERMITS NOTE: MINIMUM CHARGE ON PERMIT(S) IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE' - $15.00 Fbau es/Diams/Tiaps $ 3.75 each Sewer (New, Repair, or Replacement) $ 7.50 each Septic Tank/Seepage Pit/Drain Field $15.00 each Water Heater $ 3.75 each' Gas Piping System (1-4 outlets, fiat fee) $ 7.50 Gas Piping System (over 4 outlets -each) $ 1.50 each Installation, Alteration or Repair of Water Piping and/or Water Treating Equipment $ 7.50 each Repair/Alteration - Drain or Vent $ 7.50 each Each Vacuum BreakerBackflow Protection Each One (1-5) $ 3.75 each Each One (Over 5) $ 225 each Remspection Fee $35.00 each _ Total S.-City Fkwig S6mdD4-1NSPfZn0NS DrMONV¢spx8o SIcig Pry Apptdw $15.00 City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) 470-5130 ****BUILDING PERMIT**** --------- ----------------- Application Number . . . . . 10-00000295 Date 3/02/10 Property Address . . . . . . 920 W MAIN ST HCAD Number: 023-185-000-0011 Application type description NEW, OTHER NONRESIDENTIAL BLDG. Subdivision Name . . . . . . LA PORTE Property Use . . . . . . . . REAL COMMERCIAL Property Zoning . . . . . . . MAIN STREET DIST OVERLAY Application valuation . . . . 649453 Owner ------------------------ CITY OF LA PORTE PO BOX 1115 LA PORTE TX Contractor RAM DESIGN + BUILD 2650 FOUNTAIN VIEW DR 775721115 STE 211 --------------------- Structure Construction Type . . . . . Occupancy Type . . . . . . Other struct info . . . . . HOUSTON TX 77067 (713) 952-7224 Information 000 000 ------------------ NON COMBUSTIBLE (TY.I,II) UTILITY & MISCELLANEOUS FLOOD ZONE X ---------------------------------------------------------------------------- Permit . . . . . . BLDG PERMIT -NEW COMMERCIAL Additional desc . . LP ARCH. GATEWAY PROJECT Permit Fee . . . . .00 Plan Check Fee .00 Issue Date . . . . 3/02/10 Valuation . . . . 649453 Expiration Date . . 8/29/10 ---------------------------------------------------------------------------- Special Notes and Comments February 22, 2010 3:49:56 PM lapovfl. 1. CALL FOR INSPECTIONS. 2. COMPLY WITH COMMERCIAL PLAN REVIEW NOTES ATTACHED. 3. THIS PERMIT SHALL INCLUDE TOWERS, PARKING LOT/ALLEY PAVING, BUILDING FACADE IMPROVEMENTS AND ASSOCIATED SITE IMPROVEMENTS/LANDSCAPING. 4. PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TEXAS ACCESSIBILITY STANDARDS. 5. SUB -CONTRACTORS SHALL OBTAIN PERMITS PRIOR TO COMMENCING WORK AND MUST ALSO OBTAIN THEIR OWN INSPECTIONS PRIOR TO COVER UP. 6. MUST CONSTRUCT AND COMPLY WITH APPROVED CERTIFIED SITE PLAN AND RED LINED CONSTRUCTION DRAWINGS/SPECS, ALONG WITH ALL APPLICABLE CITY ADOPTED CONSTRUCTION CODES. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due City of La Porte 604 W Fairmont Pkwy La Porte, Tx 77571 (281)470-5073 INSPECTION LINE:(281) ****BUILDING PERMIT**** ----------------------------------------------------------- Application Number ----------------- Permit Fee Total Plan Check Total Grand Total .00 .00 .00 10-00000295 CONTRACTOR OR AUTHORIZED AGENT) 11 11 470-5130 -------------- Page 2 Date 3/02/10 .00 .00 .00 ---------------- 3 DATE/ v p TE APPROVED BY BUILDING OFFICIAL OR AUTHORIZED AG DATE 0 PERMIT APPLICATION City of La Porte Established 1892 281-470-5073 Building_ Mechanical *Electrical *Plumbing *(See back of form) t4 PI —IC� Proj ect Address: I d. V W 1 � r' v Subdivsion Touj,l (( vT L C"noAe� Block: S 2- Address: CO o -/ WI oWt Poiq WNW/ L & Vg4t, Tit 4 75 91 Street City zip Building Use: — Valuation: ___# 6 y 9 Occupancy Type_ Construction Typ Last use ys Sq. Footage: d #Stories ea 11 11 11 Describe Work:I.ANrr e_- rcUe .TuraL. CZ'ra-f e_Waa P4-0'. a c.`t-' T E7 00 { lb, 12 For City Use Only Flood Zone Y_ Class Work Sq. Ft—d/,4_ Use Zone m S - oVtcl.a� # Stories_A Parking Req_Q� Commercial Buildings Plans QWy-Fire Marshal Date use N//4- -ti ti ss, Q �Ffn s " �'^ Checked/Approved for Issuance By: rffidAL, Date Permit No. d 1 J 04.4, _ 0& ctr% wA< HCAD 0 23 — / 8,5- oa'� f9 Residential driveway tie-in fee: ar �. -r c e. n, c :.. 6 . 9 wr A Parkland(New Res. 0� : Zone # Fee: nQu� a Plan Check Fee: � C1 'LETE THIS SECTION FOR ELECTI .L PERMITS:: JTE: MINEYIUM CHARGE ON PERN__,.3) IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE $7.50 Outlets, Fixtures, Lights & Switches (1" 5 —Flat fee) $ 3.00 Above Items (All Others) $ 0.60 each Clothes Washer/ Dryer $ 2.00 each Range Receptacle $ 3.00 each Cook Top or Oven $ 1.50 each A/C, Window Unit Receptacle $ 3.00 each Water Heater $ 3.75 each Dishwasher/Garbage Disposal $ 150 each Meter Loop & Service (includes Temporary cz&-in) $15.00 each Temporary Saw Pole (T Pole) $15.00 each Reconnection of Service $15.00 each Reinspection.Fee $35.00 each MOTORS: Up to but not including'/ hp $ 1.50 each /2 hp and less than 10 hp $ 2.50 each 10 hp & up to 50 hp $ 350 each 50 hp and up $ 4.50 each Total Fee $7.50 COMPLETE TffiS SECTION FOR PLUMBING PERM-tTC NOTE: MINDdUM CHARGE ONPERMIT(S) IS $20.00 Description Charges Quantity Fees PERMIT ISSUE FEE $15.00 Fadtues,Dcains/Traps $ 3.75 each Sewer (New, Repair, or Replaceme&) $ 7.50 each Septic Tank/Seepage PiuDrain Field $15.00 each Water Heater $ 3.75 each Gas Piping System (1-4 cadets, flat fee) $ 750 Gras Piping System (over 4 outlets -each) $ 1.50 each Installation, Alteration or Repair of Water Piping and/or Water Treating Equipment $ 7.50 each Repair/Alteration—Drain or Vent $ 750 each Each Vacuum Breaker/Backgow Protection Each One (1-5) $ 3.75 each Each One (Over 5) $ 225 each Reiasl=tion Fee $35.00 each Total $15.00 COMI"ERCLA L ► i H, ADDRESS: 9 D OWNER'S NAME: C PROJECT TYPE: ADDN: HCAD#: 0 .23 -/.?s- 000 - oo-'HTE LOC#: FLOOD ZONE:_ Z oW G ' r)IS- oV-C«AY Y/N SUB /DATE YY / ^Y _; • I4 I • DIY *RBESTOS SURVE-Y�Wy (Applicable on Demo, Addn, or Remodel) '\• - :ftia^ -vas.. •plicable to Comm.I yes, permit cannot be issued.) (If yes, permit cannot be issued.) (If yes, figure fees. If no, use w/s form to explain why they are not) Qr�a.c�C DATE OF REVIEW: / m - z (o -og INSPECTOR: r+N�M ITEMS NEEDED FOR ISSUANCE OF PERMIT: _ a I I—_ .� ONLY - OWNER OR CONTRACTOR NOTIFICATION DATE TIME NAME OF PERSON CONTACTED /0-26— CA 4Y:V1 Awl f�aoio It"k �Ai S:NMhmdOJSPECnON DNIS10NUnspectiom'CONE PLAN REVIEW COVER SHEET.doc Rev. MAR08 J Inspections Division Building Permit Checklist Page 2 Yes or No f (City Ord 106-142) Yes or No (State Law) Yes or No (State Law) Yes or No (State Law) Yes or No (CLP Resolution) Yes or No (CLP Resolution) Yes or No r _ rT.-•I•., v •� r ,.TQPP(IPAJ_LLT).;v�17e, (City Ord106-141) Yes or No _.. . **--_-, (City Ord 106-141) Yes or No (City Ord 106-141) Yes or No NOpYes or No fazdsEbmrty�-� Yes or No ,re�eivedfivrn� > TI rrrr n nc^ _t;ee3 TPA (City Ord 1444-A) Yes or No (City Ord 1501-R5) Yes or No .—. men e (City Ord 194-63) Yes or No (Ord 759-F) Yes or No (Ord 759-F) Yes or No (City Ord 74-121(c) Yes or No (City Ord 82-35) Yes or No (State Law) Yes or No ons -wl ngin 3EarTT ieable) Plans (State Law) Yes or No �:• Foundation 1: -^ ^^ DI'^ (State Law) Yes or No .•=.t`fiTral - (State Law) Yes or No (State Law) Yes or No e (State Law) Yes or No (State Law) Yes or No (State Law) Yes or No (State Law) Yes or No SACPSha iVNSPECfION DIVISIONWspectionstBldg P Checklist ComlMaTOSdoc o* a-C E 0J2W9-- CITY OF LA PORTE PLANNING DEPARTMENT • °s., 604 West Fairmont Parkway, La Porte, TX 77571 JUL 0 B�10: 281.471.5020, Fax 26i.470.5005wwwlapa tetcgov AP ATION foSS, UTILITY VERIFICATION & DRIVEWAY CULVERT . (Note: Complete info, in dashed box only. Partial or incomplete information Will delay processing of your application) --————————————————————————————————————————————————— I PROPERTY OWNER: �.. OWNER'SAGENT: I I Nam/ Name: Phone#: Phone# Fax #7. Fax tt I I I I E-Mail: E-Mad: I PROPERTY INFORMATION: I Current Property Address (if existing): 9.— a I HCAD AccL No. of Property (13 dlgits): t Legal Description of Property I I *SfTE PLAN INFORMATION ifor site plan submittal onIV): Development Name: 1. sr !�� (ao`<�t/ �✓d�e�/ I Description of Project: New Budding or Expansion?' I *Note: Applicant must submit 6 coples of site plan to City + $+ 10� Fee for up to 5 Acres + $5. 00 for each additional acre I I I MY PROJE6 WILL REQUIRE check applicable): ADDRESS (Include Survey, Sketch Plan or Sfle Plan illustrating subject property w/ existing & proposed improvements) I EY/ I UTILITY VERIFICATION (Include Survey, Sketch Plan or Site Plan illustrating subject prop!rrty w/ existing & proposed improvements) I I I V LVERT SIZE (Include Survey, Sketch Plan or Site Plan illustrating subject property w/ existing & proposed improvements) l 1 I `Note: For Driveway Culvert on Hams County Roads, calla 281.452.7598 I For Driveway Culvert on TXDOTRoads, Call. 281.464.5503) I I I RESSASSIGNMENT City): Street It d St. Prefix: St. Name: l71a; r, St Suffix:.` li.. Loc ID # �r Council Dist Li Ply Planning Sector... Zoning Dist /71 _f 0 0 UTILITY VERIFICATION (by City)• . Water Available to Property?: Location of Nearest Water Main:_/ Sanitary Sewer Available to Propert Location of Nearest Sewer Main: /). *DRIVEWAY CULVERT SIZE (by City): LF. of " RCP *Upon purchase and delivery of driveway culvert, contact the C)Vs Public Works Department at (261) 471-9650 to schedule residential installa6ai on City -maintained Roe& only. .. ❑ No ❑ No till k PLAN RECEIPT INFORMATION for Uy Use OnN): Site Plan Number b 2.: Receipt Number. Fee Amt Codecled: Cashier'.. Date Received I Huber, Mark From: Chris McBride [CMcBride@knudsonservices.com] Sent: Thursday, February 11, 2010 11:36 AM To: Huber, Mark Subject: La Porte - Gateway Contractor: RAM Design+Build Contact: Richard Makeover — President Bashar Aburubia — Project manager Phone: 713.952.7224 Office Location: 2650 Fountainview Suite 211 Houston, TX 77057 713.952.7224 office 800.952.0503 toll free 832.201.0718 fax htti)://www.ramdesipnbuild.com/ Let me know if you need anything else. chris mcbride project manager (( 8588 katy freeway, suite 441 A' houston, tx 77024 N d S. main 713.932.8200 4011 O direct 713.932.4011 n knudsonservices.com DISCWMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. ColvegERCIAL PLAN REVIEW ENV TES 1. Minimum six-inch (6") stud walls shall be required where drain, waste, & vent (DWV- horizontal and/or vertical) plumbing is installed. The use of 2 x 6 studs (wood or metal) shall be required for new construction and additions (additions of square footage) for both residential and non-residential construction where DWV plumbing is installed. 2. Call for City inspections - 281=470=5-I30. 3. Unload and keep materials on private property, not City right of way. 4. If a fence is proposed, verify with City regarding maximum height limitations. 5. Call for utility line locates at 1-800-669-8344 and also City of La Porte at 281-471-9650 6 Fire Marshal will need to review/ inspect prior to opening business. 7. Must obtain zoning permit prior to occupancy of lease spacelbuilding. 8. Separate permit required for all signage. 9. Sanitation facilities required on -site prior to first inspection and must remain available until completion of sanitation facilities within the lease space and/or building. 10. Silt fencing required for duration of project. 11. See notes (red lined) on contractor copy of construction drawings. 2/71te 12. Fill dirt permits are required prior to placement of fill dirt.13. Grading/drainage must be maintained throughout entire project to ensure e9�4r inspections and utility release. JJ�� 14. Provide energy code compliance certification from "certified" energy code provider, prior to issuance of the Certificate of Occupancy. 15. Any changes to the project after building permit is issued, must be submitted in writing and approved by the City prior to changes being made 16. Provide Sample Well in accordance with "Sample Well Detail" handout. (Available upon request) 17. Effective March 10, 2007, all electrical devices (including but not limited to outlets and switches) shall be installed with the screw -wrap or approved screw clamp installation. Back or quick stab installation is prohibited. 18. Building operations shall be limited to 7:00am-10:00pm and shall not exceed maximum, permitted sound. levels as described in Chapter 34 of the Code of Ordinances. 19. Commercial projects with detention pond requirements must be inspected and approved by city Engineer and Inspection personnel prior to final inspection request. Contact City Engineer at 281-470-5060. 20. Contractor/owner shall be responsible for ensuring all constructals/debris remains on the construction site. Failure to do so shall result in4 spections and/or code enforcement action. 0110 21. Owner/developer of commercial driveways in concrete shall be cjhe adjacent asphalt street. The contractor shall clean the area between ththe street to a s' bility owner/developer/contractor pth of at to st 6installlthe asphalt trs the ansition. onf the OCCG�A�/�99� P Minimum six-inch (T) stud C� walls shall be r SA&ShneUNSPEC770N DNlS10NVnspc0iX"iOtVW e u w'N0,7'FS 8/08dx �O plumbiQng'is installed, I p%� No APPLICABLE CODES Adopted November 17 2007• Effective January O 22008: 2006 INTERNATIONAL BUILDING CODE (IBC) 2006 INTERNATIONAL PLUMBING CODE (IPC) 2006 INTERNATIONAL MECHANICAL CODE ('MQ 2006 INTERNATIONAL FUEL GAS CODE (IFGC) 2006 INTERNATIONAL RESIDENTIAL CODE (IRC) 2006 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) Adopted March 24 2008• Effective April E, 2008: 2008 NATIONAL ELECTRICAL CODE (NEC) WITH LOCAL AMENDMENTS (COMMERCIAL & RESIDENTIAL) 2003 INTERNATIONAL FIRE CODE (IFC) WITH ADOPTED AMENDMENTS TO FIRE CODE S:\CPSbwc\AISPECI'ION DIVISION\Inspections\Residential ConsVoction puketWPPUCAHLE CODES.doc Rev. 3-08 r CA . C4-�� FOR CITY COUNCIL AGENDA ITEM Agenda Date Requested: January 25, 2010 Requested By: John Joerns, Asst. City Manager Department: Administration Report: Resolution: Ordinance: Exhibits: Conceptual Drawings Exhibits: Consultant's Recommendation Exhibits: Bid Tahniatinn Exhibits: Proiect Stars Information Aoorooriation Source of Funds: LPDC Account Number: 015-9892-960-1100 Amount Budgeted: 994800n i Amount Requested: 5714,403 Budgeted Item: X�a No ' includes Economic Alliance Contribution SUMMARY & RECOMMENDATION La Porte Development Corp. and City Council previously received presentations from the Economic Alliance regarding the "Gateway Project" which is an element of"Project Stars and the City's Comprehensive Plan recommendations on Beautification." Several conceptual drawings were reviewed and the enclosed pictures represent Council's approval. Additionally, the Economic Alliance is providing $98,000 in grant money for the project. Subsequently, in December 2008, the La Porte Development Corp. and City Council approved the contract with Knudson, LP for design of the towers, parking lotlalley paving, building fagade improvements and associated site improvements/landscaping. At the December 14, 2009 City Council Meeting there were questions raised regarding placement of the grease trap. After further review we are recommending the following approach: • Delete grease trap and associated piping from the award ($8,077.00) • Extend the city's main in the alley (City forces) by approximately 1511; placing a stub out and cap leading to a sidewalk area at the northwest corner of the building. This will provide a location for a future grease trap and leave the other existing tap available for domestic waste. Bids were opened on December 3, 2009. Ten contractors submitted bids. The low bid of $657,530 was submitted by RAM Design -Build. The bid tabulation and Knudson's recommendation is enclosed. The recommendation is to award the contract with change order no.l deleting the grease trap. The estimated expenditures for this construction contract are: • Construction contract with RAM Design -Build $649,453.00 • Contingency (101/a of Construction) 64,950.00 TOTAL $714,403.00 Action Required by Council: Consider approval of a construction contract and change order no.l with RAM Design -Build in the amount of $649,453 aad' ithorize a contingency of $64,950 for a total authorization of $714,403.00. Ron Manager 4/� /0 Date ik� PAP —Inds W-pagapo I d; •..J: `i � � .. �:, K J n u d s n December 8, 2009 City of Le Porte 604 W. Fairmont Parkway La Porte, TX 77571 Attention: Mr. John Joerns Assistant City Manager City of La Porte Reference: La Porte - Architectural Gateway Subject: Contract Award Dear Mr. Joerns: 8588 Katy freeway Suite 441 Houston, TX T7024 713.463-8200 Informadon©budsonservices.com Competitive bids for the La Porte - Architectural Gateway project, Bid No.10007, were received and opened at 2:00 pm on December 8, 2009. Ten bids were received with Total Bid Prices ranging from $657,530.00 to $846,000.00. RAM Design Build Corporation submitted the low bid price of $657.630.00. Knudson, LP has reviewed all of the bids submitted and bid tabulations. No discrepancies were found In the bids submitted. The following Is a list of bids for the above referenced project. The Grand Total Bid Amount is listed below. They are listed from low to high in respect to total bid amount. Subtotal Base Bid Price: RAM Design Build Corporation $657,530.00 JC Stonewall $662,113.00 Cox Commercial Construction $665,000.01 Millis Development and Construction $708,599.00 Hull & Hull, Inc. $761,172.00 D.L Meacham $765,172.00 Civil Concepts $779,661.00 Jerdon Enterprises $798,798.00 Comex Corporation $806,000.00 Four Seasons Development $846,000.00 Upon review of these bids, phone conversations with references, and past project experience, we recommend that the City of La Porte accept the Total Bid Price from RAM Design Build Corporation, In the amount of $657,530.00. Attached is a list of the bids for the above reference project. Please call me at 713.832.8011 if you have any questions or comments. Sincerely, Knudson,LP Chris McBride Project Manager DID rABLILA770M SEALED erD #ICW7• LA PORTEARUMEMRAL GATEWAYPROJECT f17t1 ra OTT LUT DESCRI rm SptlML LP m� RAN .M1LA .fc slwi Cox ww�mlOnL kmta oqv. eamrn MOLLAKULL o.L >�uo Cm CONCEPTS j9AWM OCT. COMEX CORP. FOUR SEASONS 1 LS 1 LbWftft la Taaaa7FalsM,kal6q ssumw URIUM SL7oz H7A5121 223AMM 3271E OAR s11412Mm gnjnm soomiLm S12.WDM mimm ,Wft OwedL NrSMimb � mpabmema Wormer. 2 LS 1 Bmvb"k aara, mtph% npbnbr. moue $Sim$ S20.47LM SlUM72 SiSA= 52M GAR 370.42LM sm - silmloo Sso.oMAo 12DAMM S Ls 1 DwAld n-EkawaL ebnpbw bphwbr. s]LMIm "mm SUAKM SoRIWM 52M OAS p3m7A0 &dU=M 92UM o $1004m00 S27�=m a Ls 1 Mn11Mw1-&ddl¢kaShcgbo*"br MAMA $k2t= A S4157Ap $kM= L26%GAR skw oo M524AG vmL sloAmm r aI . R bMdva mL{Mt Woomw.. 6 M 1 EhfawManl FaswaL kaemOYldsanbI S20000.0o Smlam swWbo SAA10.a6 S2"WW 6.W% GAR vmmw Emumm &W=W smumm 044aA aPpabmps, mLSlwa N oo tT. L Ls 1 PaASLkzkA Nd. . W 317L473Ao SwAftoo SM.23 w SMOLM Ms.SYM 571%GAR MBAd SiDAM 5150A= mow= s1nAm. gvwbwmr, no.uror. 7 Ls 1 7.lalnl)dnoa, kalNgYaSbrsW aM tawo sm M7 "Umm 836.2sm A CLAR sn=m SMAWAo 990LM. $250" SCLDDOAD gpabvro. aanplW bpwa W. L Ls 1 Cmoab PwRq-41 MEL ka24dkq S MLM SRTMM SL2T7 $17,21 $11 525%nAL ImAnz MWOLW sikoomm LIDA o SUAMOD bdderds and top�alamfaL 1aL10ma W pots: S LS 1 Lbbad Owvta PaWq rT3wwas PaML 11 SlAmm MAmm & MGAL Sossl $now= SIDAWM mowm VM. M+6V wYeo ad gWlamly aaashY N aa for. in p /o LS 1 Mmnrrl um Ptetp ktlus'p a&* flema 91723= m SM177Ao ISUM70 951,14LM 5.M GAL $43.,M&W M.111M GLMom $32AM NMKfthadappabmas; -, W pbba br. 11 Ls 1 "am"Be - N kxlro ldLeMa sk 07AB4jm 215.?"m sl7,i67.W slomm 62MOAL S12. 2400E 2MAmm slunm % wwftw 1, Dwomki po Ir. 12 Ls 1 EWlftdSWWma SbLW4kV6laLsp ssMM.00 S37ASlAo sxmmoo ScASLm &Z%QAR faoen.m s46Amo0 saL. MM SCLMM h"r. ttl ypu%rmLwLaoP'pbLaN pma er. A Ls 1 ShLOLomw"d WWTub Yslumllp momm &Ala = S/4a "D S1S,S/4.38 322.SM. 3M%GAL 82Lo24Ao NLM/m 320AMM 315=m m9ftoo kdSYasI adappubmraa, aanpWN po br. to Ls 1 MInM SrRwL NlApbtlmrwb W S71$AAo 84113Ao SUMMI 11L1 L25%GAS. slammm 902am Slo=W 81"moo SWUM ads ypswmCw,eGnpW mpam br. 16 Id 1 amb Towan fboaL ndu*o snaLOYbL s/0477o. 610MAMA S111SSLm $117.2" S13T &W%GAL S12La3sAo S7472MAo 610.726 SIODMOD StWrLM akleJaN Anal k W �O NddwllS mC @PPWwnv ,wwFm N pbw far. to L6 1 Aw. Pnapd Was Waft b2usq bin S33.2MM W=m numoo MLMS.00 IMMUIM 620%GAL ML120.00 sMAMA SNIA" 364./LL Wuduw budr - aM bml kckm*q Nddwb6 am smwft aoa ®Ohb N plan for. 17 LS 1 Lbtatd NTWm.bAmglmllrL 823= 826AM.M 3742513o S27.611Lis L"S GAR S3004m laoB10. MLM000 Ms, WawalI trd q{pwLrima, aonp%b Wp mbr. " LB 1 mm Doft"fb Pow "sma Mib*Q Web, $10A= SLtt 81220L00 $U=M L264 GAR sizwkco Sk731A SIUMM SWAMM 2/4. Ndumq Yddwsahansappabvaar, emphb mph"SY. K Ls 1 MON A—*Q ftrBuadks ksLAq MSASLAo t=16. $SkMAD 645= s SMITM L26%GAR sQAMM SSBAIILM som m smfl0000 056Am.00 sldtbtla bdappammcK mL- N phnta: TOTAL AWX" SWA3LM SMZI" S UA~N s7 pxw snclrxpb s"%ulM sn,.T o SM66MM MY.00LM ktb:% ldL - ga27awlwfw, owdtO . aft Ln owumn pR0•aL yc r. r�ilY C>F� MAGNOLIA GARDENS ,GARLAND A R O R A T l V E EFFORT A C O L L REGION NOMIC ALLIANCE HOUSTON PORT T H E ECOSFABROOK BAYTOW N SHELDON CHANNELVIEW SOUTH HOUSTON DEER PARK NORTH SHORE EAST END - HARRISBURG LA FORTE GALENA PARK PASADENA )ACINTO CITY PEARLANO MORGAN'S POINT SHOREACRES SOUTH BELT - ELLINGTON p N D SyLVIA C O M M I S S I O N E R P RE C I N CT 2 HARRIS COUNTY Project StarsYm is a collaborative effort 0- brings together the port region com- munities of East Harris County (Precinc D). This effort resulted in a Master Plan utilizing tools such as innovative urban tanascaping, unique image enhancement techniques, and strategic economic development focusing on untapped historical resources. This Master Plan was created over a two year period and currently targets enhancements for 26 historic sites on major corridors. Precinct Two represents nearly one million people living in the most populous county in Texas, and is represented by Commissioner Sylvia R. Garcia. Generally located between Houston's I-45 on the west, Interstate 10 on the north, Galveston Bay on the east, and Clear Lake on the south, the precinct is larger than five states. Commis- sioner Garcia was elected in 2002 after having served Houston as its City Controller and also Chief Judge of its Municipal Courts. In her first term as Commissioner, she coordinated an Economic Summit to capitalize on the strength of East Hams County's strong business environment and its people. As a result, The Economic Alliance Port Houston Region was charged with devel- oping a quality of life strategic plan that would encourage growth, spur economic development, and bring history related tourism to the area. This vision became the centerpiece of Commissioner Garcia's Master Plan for Precinct Two, with a partnering approach that provided a foundation of powerful collaboration. "A Commissioner's role is like that of any other executive; the key to success is not only in planning, but in identifying expertise, then delegating. Project Stars was no exception." The Economic Alliance was well equipped to accept the challenge. Originally founded as the Southeast Hams County Economic Development Council (SEED) in 1985, the organization was revamped in early 2004 under the current name. Today, it is armed with the mission to market and grow a vibrant regional economy by uniting talents, exerting influence, and creating synergies. The Economic Alliance is funded by private business and chamber of commerce memberships, and contracts with 15 cities, the Port of Houston, and Hams County. The Project Stars Master Plan emerged after conducting analysis, research, bench - marking and gathering community feedback over a two year period. Among the plan's first goals was the creation of the San Jacinto Texas Historic District. Mission accomplished: it is now the newest and the 5th largest historic district in the state of Texas. An Economic Alliance volunteer task force shepherded the process that benefited from the expertise of approximately 50 leaders and numerous agencies; and the num- ber continues to' grow. Our leaders have identified quality of life issues that capture attention and the imagination. They strongly believe — and appreciate — that the ship channel industries and international trade are recognized worldwide as comprising the " Iergy capital of Texas and are the economic heartbeat of Precinct Two. es by the group indicated that the ship channel region was not known for its pace, when in reality, many hundreds of acres of parks are located within the is borders, and many more parks projects are in active planning. Historic sites Wown discovered as amenities unique to the area. These "stars" — as they became in the Master Plan — do not exist anywhere else on the planet. Some have fall - disrepair and will re-emerge. These and other findings of the two year study were bundled into the Master Plan which calls for action, consistency, and governance standards agreed upon by all the communities in the area. Implementation of the 2006 goals — with the help of many stakeholders — include eco- nomic research, the submission of three grant applications to the Texas Department of Transportation, and the planting of more than 4,000 trees. All this is just the tip of the j iceberg. Or as we say in Precinct Two, the tip of the Stars. "I am proud to have grown up in the ; - "ow of the monument's star, a 220-tor. 1^"e star that points the way to our region. Fro... _.e Battle of San Jacinto to the playgre of early Houstonians, the Houston Port Region is steeped in history important to the development of Texas and the gulf coast. Our region welcomes old-timers and nexr-comers alike to, come and re -discover the gems and charm of the great golden plains of the Southeast region.i .. Keep your eye on the rising star in the East of Hams County Texas. " 1s Commissioner Jimmy Burke — Port of Houston Authority i "When I came into office I knew I wanted to create a "Recognizable Parks System'.'; or East Harris County with all our connecting waterways and Green Space. Accordingly, one of the focus areas at our Economic Summits focused on Quality of Life. By working together, the Project Stars master plan emerged to integrate and align multiple initiatives.. After significant planning and research, we see the San Jacinto Texas Historic District as an "asset" within our Precinct where we can "grow" the tourist economy at much higher levels that ever before, while simultaneously improving our precinct's quality of life and image. I am honored to help fund the initial endowment." Commissioner Sylvia R. Garcia — Harris County Precinct 2 "The San Jacinto Texas Historical District contains the physical expression of the heritage 1+.. that every student of Texas history cherishes. Simultaneously within the same space is the vibrant industrial setting that will preserve the future economic destiny of the Texas Gulf" coast. I am excited about the mission of this group who will marry these two great desti- nies together for the collective benefit of the entire region." s. Mayor Richard B. Ballanfant — City of West University V. President of the Harris County Mayors and Councils Association Senior Counsel — Shell OR Company "In historic times, signs posting "G.T.T." or "Gone To Texas" hung in windows all across America advertising the flurry of migration to the promise out West. The Republic of Texas changed the course of events for the entire United States. As Governor, I salute the newly created "San Jacinto Texas Historic District" and the communities and county leadership who collaborated to build the economic development Project Stars master plan. Let's keep people gravitating to this great state in pursuit of the undeniably unique spirit hat can only belong to Texas." Governor Rick Perry — State of Texas A 501(c) 3 non-profit foundation is established to manage this effort and the funding. Tax deductible monetary ionations now being accepted by the foundation. Please make your personal or corporate donation checks payable to Alliance Project Stars "Our board has been updated, involved and excited since the Economic Alliance and east communities began working on the Project Stars Master Plan. Their efforts to bring consistent complimentary landscaping and sig- nage for freeways within the newly formed San Jacinto Texas Historic District will enhance the experience for those traveling through Houston to visit our local historical treasures." Sarita Hixon — "When driving through an should not be compromise workers want to work in n. outside looking in." Eric Lookofsky — Operi Chairman of the Board San Jacinto Museum Board of Trustees and environmental protection of the point that we as plant we place value on it from the Arkema Group, East Harris County Manufacturers Association "When first consulted about "Project Stars" I quickly recognized the energy of everyone involved. Project Stars compliments so many activities I have envisioned and worked for in our region for many years. I will continue to work with our constituents to preserve the heritage of our unique area." U.S. Congressman Gene Green — Texas District 29 Call The Economic Alliance at 832-9644020 for mote information or to kam how you cu become involved. Design and concept donated by John Manlove Marketing & Communications 0. Econom- ic"Alliance r Houston Port Region Economic Albsnce Educatiootl Foundation 3101 Nw Parkway, Sui¢ C Seabrook, ]kxas 77586 ph 832.864.4020 fx 832.864.4023 www.siliancepmpe8lon.cum AGREEMENT THIS AGREEMENT, made this 1ST day of February , 2010 by and between the CITY OF LA PORTE, hereinafter called "Owner', acting herein through its CITY MANAGER and RAM Design Build Corporation (Name of Contracting Firm) Strike out inapplicable terms: (a corporation) (a-partnemho) or (an,..iudwidaat•-doing business as:) of County of , and State of Texas, hereinafter called "Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the construction described as follows: La Porte — Architectural Gateway hereinafter called the project, for the Total Price of — Six Hundred Fifty Seven Thousand Five Hundred Thirty Dollars and no cents Dollars ($ 657,530.00 ) and all extra work in connection therewith, under the terms as stated in the General and Supplementary Conditions of the Contract; and Further, that the CONTRACTOR agrees, at his (its or their) own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with: A. The terms and conditions stated in the Proposal and in the General Conditions, and Supplementary Conditions of this Contract; Scope of Work B. The plans, which include all maps, plats, blue prints, and other drawings and printed or written explanatory matter thereof, and C. The Specifications and other contract documents therefore, as prepared by the City of La Porte, all of which are made a part hereof and collectively evidence and constitute the contract. 08-0990 00500 - 1 January 2010 The CONTRACTOR hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 180 calendar days thereafter. The CONTRACTOR further agrees to pay, as liquidated damages, the sum of 500 for each consecutive calendar day thereafter as hereinafter provided in Paragraph SC-6 of the Supplementary Conditions. IN WITNESS WHEREOF, the parties to these present have executed this contract, each of which shall be deemed an original, in the year and day first above mentioned. City Manager Title RAM Design Build Corporation Name of Contracting -Firm-' By: Signature. uth`oriied Person Presi ent Title of Authorized Person 2650 Fountainview, 77057 Address and Zip Code City of I a Porte Name of Owner SEAL / / 7 u-u- of City Secretary Title SEAL ��S\ Approved as to Form: City Attorney 08-0990 00500 - 2 January 2010 Huber, Mark From: Wilmore, Debbie Sent: Wednesday, November 18, 2009 5:53 PM To: Huber, Mark Subject: FW: ACI Project C090978 Attachments: Binder-c09O978.pdf Importance: High Let's discuss tomorrow. Deb From: Joerns, John Sent: Thursday, November 12, 2009 3:27 PM To: Tietjens, Tim; Wilmore, Debbie Subject: FW: ACI Project C090978 Importance: High Tim don't know who would look at this —I assume Debbie —we need to respond to Chris along with an ok for the first proposed addendum sent earlier 11 From: Chris McBride(mailto:CMcBride@knudsonservices.com) Sent: Wednesday, November 11, 2009 3:58 PM To: Stacy, Steve Cc: Joems, John; Tietjens, Tim Subject: FW: ACI Project C090978 Importance: High Steve, Please find attached the ACI report in regards to our accessibility review. Please take a look and let me know if anything needs to be changed by Addendum before we receive bids. Thy 'J r1119OV f1�19�09 (✓' 8'oo A� e � chris mcbride project manager 8588 katy treeway, SUITE 441 4011 in - houston, tX 77024 u 2 3a, g main 713.463.8200 IJ O direct 713.932.4011 �'� n knudsonnervices.com Dear Mr. Joems, Attached, you will find the TAS Plan Review Report for La Porte- Architectural Gateway. Please e-mail or call with any questions. Thank you, Jennifer Mathis, AIA, RAS ICC Certified Building Plans Examiner ACI American Construction Investigations, Ltd. 602 Sawyer St., Suite 200, Houston, Texas 77007-7510 (713) 864-8494 (888) 595-8500 (713) 864-8495 fax www.acico.com For answers to TAS and IBC questions, follow ACI on Twitter. DISCLAIMER: This avail (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email In error. 2 A.CI 11;;ii[eicnv:C�ySI'nacrio�7�Vts�icn71o�3;1.7b pN yAN'M3 Y I WAI: SU111i 4� IIlX"AX(7 IL'SN TINI41d1U f) JXI W:N W IY1ip9i1409'A \"It0' RIGS Mry'M1. AC(litiSIiJ1 ,AT SI4SPECI :G1.\LIS"IS' 0.leyiun SI TI:$Ati UI;IMNI XIGp'TIX'I,IMCIl<$IN(i R'NI Ii111..V10R AM('liflli[fUM.\I.IL\YRII:N.S November 11, 2009 John Joems City of La Porte 604 West Fairmont Parkway LaPorte, TX 77571 EABPRJ# B0802937 ACI# C090978 RE: LaPorte- Architectural Gateway 920 West Main Street. PLAN REVIEW - COMPLETED Dear John Joerns Enclosed are the results of the plan review completed on the referenced facility. Identified on the report are areas of nonconformance with accessibility standards adopted by the Texas Department of Licensing and Regulation for purposes of ensuring compliance with Texas Government Code, Chapter 469. Although deficiencies may have been noted, the referenced project may be eligible for inspection approval if constructed in accordance with the Texas Accessibility Standards. Items which are the responsibility of the owner should be referred to the appropriate person for action. The building or facility owner must request an inspection from the Department, (or a Department authorized provider of inspection services) no later than thirty (30) days after the completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in writing) of the revised completion date as soon as possible. This determination does not address the applicability of the Americans with Disabilities Act (ADA), (P.L. 101-336), or any other local, state or federal requirement. For information on the ADA, call the ADA Hotline at (800) 949-4232, or the United States Department of Justice at (202) 514-0301. Please reference the Department assigned project number in all future correspondence pertaining to this project. Questions concerning this matter should be directed to Jennifer Mathis at 713-864- 8494. Sincerely, AMERICAN CONSTRUCTION INVESTIGATIONS, LTD. qen 4�Mt if. $4gistered Accessibility Specialist Attachments Cc: Lloyd Lentz Knudson, LP ACI AMERICAN CONSTRUCTION INVESTIGATIONS, LTD 4W W2 SAWYER $ I RH 1, SIItI L M), I LLRJ1 RID', l EXAS 77W7-7510 1713RIM-9494 (888)595-8500 FAx(713)W-5195 httpNwwu.ucia,.can PLAN REVIEW REPORT Reviewer: Jennifer Mathis, RAS #1153 EABPRJ:B0802937 November 11, 2009 ACI Project Number: C090978 Revised: R=Reviewed NN=None Noted U=Unacceptable (resubmitial recommended) EC=Ensure Compliance NA=Not Applicable R#=Revision Project Name: La Porte- Architectural Gateway Project Description: Pedestrian paving architectural gateway construction, parking lot grading and building modifications. Identified on the report are areas of nonconformance with accessibility standards adopted by the Texas Department of Licensing (TDLR). Items not listed below have either been found acceptable or are not applicable to this project. .. . . , Building modifications consist of exterior door/window replacement, exterior wall finishes, 66 102(b)(2)(C) At diagonal curb ramps constructed and canopies only. Detectable warnings are required on curb within the public right-of-way, detectable warnings ramp at southwest corner of site. complying with TAS 4.29.2 at a minimum of 24" in depth (in the direction of pedestrian travel) and extending the full width of the curb ramp or landing, shall be provided where the pedestrian access route enters a crosswalk or other hazardous vehicular area. Additionally, the department will allow the detectable warning to be curved with the radius of the corner. The detectable warning shall be located so that the edge nearest the curb line is 6" minimum and 10" maximum from the curb line. 4.3.2 (1) At least one accessible route within the 1-1.00 - Site Plan: Unable to determine whether boundary of the site shall be provided from public an accessible route from public sidewalk, to an transportation stops, accessible parking and accessible building entrance, is provided. The accessible passenger loading zones, and public streets Architectural Gateway, at the southwest corner of or sidewalks to the accessible building entrance they the building, appears to have a curb, with no curb serve. The accessible route shall, to the maximum ramp, violating 4.7.1. The curb ramp located at extent feasible, coincide with the route for the general the southwest portion of the curved parking area public unless that route would violate 4.3.2(5). forces a user to travel within a traffic lane to reach the building entry, violating 4.3.2(5). 1 of 2 PLAN REVIEW REPORT EABPRJ:B0802937 ACI Proiect Number: C090978 EC=Ensure Compliance NA=Not Applicable Reviewer: Jennifer Mathis, RAS #1153 November 11, 2009 Revised: 4.3.2 (5) Accessible routes shall be located so that users are not required to wheel or walk behind parked vehicles (except the one they operate or in which they are a passenger) or in traffic lanes. 4.6.1 Minimum Number 26 to 50 spaces total = 2 accessible 4.1.7 Location. Curb ramps complying with 4.7 shall be provided wherever an accessible route crosses a curb. See 4.3.2(1) comments. See 4.3.2(1) comments. 40 spaces total, 2 Van Accessible spaces provided. i ` See 4.3.2(1) comments. 2of2 La Porte — Architectural La Porte — Architectural Gateway City of La Porte Addendum #1 KLP Job #: 08-0990 Date: November 9, 2009 ADDENDUM # 1 This addendum modifies the Bid Documents for the La Porte — Architectural Gateway project to serve the City of La Porte. Please note receipt of Addendum #1 on page 3 of the BID PROPOSAL — Section iDO300. failure to -acknowledge receipt of addenda on the bid proposal form may be cause for disoualification. 1. CONTRACT DOCUMENTS: 1.1 Specification Section 00600 — Forms, Bonds and Certificates does not include the following forms: Application for Payment and Certification of Bidder. Please find attached. 2. SPEFICATIONS: NIA 3. CONSTRUCTION DOCUMENTS: 3.1 3.2 3.3 3.4 Sheet C1.00 Water Main Notes — Item #8 should state that mechanical joint fittings are to be accompanied by sleeve restraints Sheet C3.00 — Water meters are to be set by the City of La Porte Public Works Department Sheet C6.01 — Mechanical joint fittings are to be accompanied by sleeve restraints (EBBA 1500 series or Mega Lug) Sheet C6.02 — Concrete sidewalk detail should of wire mesh. Refer to attached construction di 3.5 SheetE2.00—CircuitS=6 serves the South T E3.00. Please note this circuit Is to be routed contractor shall provide a %" conduit boring u this circuit. APPROVED lieu END OF ADDENDUM #1 Attachments: Addendum #1 — Concrete Sidewalk Detail Specification Section 00600 — Forms, Bonds and Certificate: Application for Payment, (1 Specification Section 00600 — Fors, Bonds and Certificate: Certification of Bidder ')ARE �rrAL PRIOR 08-0990 October 9, 2009 �d dVM OV-14. I 1 v 13 •off e I/r R 03OMIS Cy Y PRPNOD 9601MS I I T t � IMMO !WL R RM� A7 OICIOI ,r O-c -++•+-III F�— L OMMACOMI AKM OWL Ci ?ACID 01' MIDIYMS SnEMMX 1 CMMAI.'OOM m11N VAL ld 1/P O® AM COM WN �.p OAO•N O Ir OG cm A A1101 m OIC01010a. TO oO o1NPzn TO nt1oR a IN oawc:ON wmYL MMUMM M= /�lO ABUTAW MNNOIO (IFOOIOSR an 0010w MM mw% OAM CMM AV% OR on= OOmm 6 O?A1691 AMR 01NL M SPACED AT A YAfORY 0 Ttl a N e , , a MS MD M MIO OWL IS MAIM TO 1001 A MY= d 4� CCM= PIEP'ANFD O1MI�AR . ♦ ONCAQ AT LOG11C0 IN= PFAPQ D 1XIM MIM N 10 OOi010 _ _ __ _ 7. WNNW AOM MIN UK FOR CCIOSOI TOt.0WM IN M N a ALL 7LLOMAM AND RAM 9ML B AOA CMNUWT. ;;;: I/Y�C.pRTUSINAIE:x 31r QOAR OII NIDNOM OR m 4P0 m row rmPMR TIP[ OP OMNCICAI a f�mm�m nvMmMl �OPIr N1M LOAD' CONCRETE SIDEWALK mus au aoa A006 tlNollN CODAI k I o t z 4) a s s o c i a t e s R.wr�rY .....ono. tl /O6T C pl�Y PORTE-PRCHMTURALGATEWAY JCRYOFLAPORTE °� • E C EA V E CITY OF LA PORTE PLANNING DEPARTMENT °> 6D4 West Fairmont Parkway. La Porte, TX 77571 JUL 0 8 2009 fie' 281.471.5020, Fen 281.470.5005 wew.INkodebcgov Y AP ATION for ADOF SS, UTILITY VERIFICATION & DRIVEWAY CULVERT (Note: Complete info. in dashed box only. Partial or incomplete information will delay processing of your application) --————————————————————————————————————————————————— PROPERTMY OWNS • OWNER'S AGENT: I Name: Name: am LLvi1 I Phone#: Phone # Fax #: Fax #: I E-Maid: E-Mal: PROPERTY INFORMATION: _ p I Current Property Address (if existing): L / HCAD Acct. No. of Properly (13 digits) I Legal Description of Property. A Q- r ' I n I •SrrE PLAN INFORMATION (for site plan submittal only): n I J-- Development Description of New Building or Expansion?: uzl cYs i 'Note: Applicant must submit 6 copies of site plan to City + $100 Slte Plan Fee Vup to 5 Acres + $5.00 for each additional acre I I MY PROJE& WILL REQUIRE check applicable): 1 ADDRESS (Include Survey, Sketch Plan or She Plan illustrating subject property w/ existing & proposed improvements) B'/ I UTILITY VERIFICATION (Include Survey, Sketch Plan or Site %n illustrating subject proArty w/ existing & proposed improvements) I ❑ *DRIVEWAY CULVERT SIZE Include Survey, Sketch Plan or Site Plan illustrating subject property w/ existing 8 0 osed improvements) ( Y 9 1 P P Y A PrP W ) I I `Note: For Driveway Culvert on Harris County Roads, call: 281.452.7598 For Driveway Culvert on TXDOT Roads, Call., 281.464, 5503) 1 ADDRESS ASSIGNMENT (by City): M — Prefix: St. Name: the%')% St. Suffix:, - 3—A Council Dist Li City Planning Sector. Zoning DistAl S D D ID # UTILrrY VERIFICATION (by City): Water Available to Property?: n Yes ❑ No ❑ Exteneion Required �) Location of Nearest Water Main: / k,i� erf q Siie: Sanitary Sewer Available to Property?: ffYes ❑ No ❑ Extension Required ) t ra Location of Nearest Sewer Main': �n /Yin rj�j2 y.p a L7 i' i o T_ Size: lea 'DRIVEWAY CULVERT SIZE (by City): L.F. of " RCP 'Upon purchase and delivery of driveway cuArert contact the Cltys Pubic wades Depenment at (281) 471-9650 to schedule residential installation on Chv-maintained Roads onN. srrE PLAN RECEIPT INFORMATION (forCdyuee onwi: Site Plan Number: O 9- -2-20 ? Receipt Number. Fee Amt. Collected: Cashier: Date Received: r 0 11-16 -61 BP10OI01 CITY OF LA PORTE and Master File Inquiry 1 HCAD Number 0..� �%- to—, pQ-x- 023-1n5-000-? ? Alternate Search Method i / __ Location ID nbr . . � .444 a4- Street address . . �912 W MAIN ST CLP 11/16/09 09:21:59 LA P TX 77571 Subdivision . . . . . LA PORTE Current owner . . . . CITY OF LA PORTE Person/Company P PO BOX 1115 Phone LA PORTE Plat/Book/Page TX 775721115 Zoning . . . . . . . GC COMM - GENERAL Variance . . . . . . Fire zone . . . . . . Press Enter to continue. F3=Exit F4=Appl inq F10=Legal desc F13=Disp sections F15=Valuations More... F12=Cancel F17=User defined BP100I0I HCAD Number 023-A5-000-0011 Alternate Search Location ID nbr Street address Subdivision . Current owner Plat/Book/Page 11/16/09 09:46:52 Method 4324 --4 a-+-F ' Ir' T- L •^ 912 W MAIN ST va CLP L PORTE TX 77572 LA PORTE CITY OF LA PORTE Person/Company P PO BOX 1115 Phone LA PORTE TX 775721115 CITY OF LA PORTE and Master File Inquiry Zoning . . . . . . . MSDO MAIN STREET DIST OVERLAY Variance . . . . . . Fire zone . . . . . . Press Enter to continue. F3=Exit F4=Appl inq F10=Legal desc F13=Disp sections F15=Valuations More... F12=Cancel F17=User defined Huber`, Mark 1. From: Huber, Mark Sent: Monday, October 26, 2009 9:36 AM To: Malik, Masood Cc: Manager, Dwayne; Huber, Mark; Wilmore, Debbie; Slaton, Rodney Subject: FW: 920 W Main const plan review Attachments: 920 W MAIN STconst plan review.doc Masood, on Friday morning 10-23-09, Tim brought us the 100% Gateway project "construction" drawings for review. Inspection Division staff has completed its review, and attached you will find our comments. If Tx. Dot driveway permit is not needed or necessary, I will need an e-mail from our City Engineer prior to releasing a building permit. If you have any questions or comments, please let me know. Mark From: Jennings, Sherry Sent: Monday, October 26, 2009 8:09 AM To: Huber, Mark Subject: 920 W Main const plan review Sherry Jernurgs, Office COOixH iLitor City ojLa forte Tnspectiom &F6rmits Division (28) 470-5072 l (281) 470-5005 (fax) j=iings90aportetx.gov [ 920 W MAIN ST LA PORTE - ARCHITECTURAL GATEWAY CONSTRUCTION PLAN REVIEW_ 4 100%CONSTRUCTION DOCUMENTS 10-23-09 MARK HUBER/DWAYNE MENAGER I N� o v^ \2 �s FYI Main - electric meter �Jt�DINo� Pum`} SSSJar�G� Ft -i i ti e S:\City Planning Share\OG-INSPECTIONS DIVISION\Inspections\Plan Review Comments\920 W MAIN STwnst plan review.dm 920 W MAIN ST LA PORTE - ARCHITECTURAL GATEWAY CONSTRUCTION PLAN REVIEW 100%CONSTRUCTION DOCUMENTS 10-23-09 MARK HUBER/DWAYNE MENAGER 1. Drawing to be P. E. sealed. 2. Need to show address on drawings. 3. Register project with TAS & provide copy to Inspections Department. 4. Provide copy of TXDOT driveway permit prior to permit issuance. 5. See City website for a list of all adopted codes that need to be listed on cover page. 6. FYI - Irrigation contractor must obtain separate irrigation permit. 7. Need to provide COM check energy code analysis (compliance worksheets) on store front windows & doors to be replaced. FYI - 920 West Main - electric meter FYI - 920 1/2 West Main - irrigation meter S:\City Planning Share\04•INSPECrIONS DIVISION\Inspections\Plan Review Comments\920 W MAIN STconst plan revlew.doc AB Project Reprint Confirmation Page f— Page 1 of 1 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Friday, November 06, 2009 EABPRJB0802937 PERSON FILING FORM Name: Claudia Ramos Phone: 713-864-8494 Person Address: 602 Sawyer Suite 200, Houston, TX 77007 Ras Number: 489 Project Name: La Porte- Architectural Gateway Project Address: La Porte- Architectural Gateway 920 West Main Street. LaPorte, TX 77571 County: Hams TENANT Contact Name: Phone: Contact Address: BUILDING/FACILITY Name: La Porte- Architectural Gateway FACILITY Owner: City of La Porte Phone: 281.470-5012 Owner Address: 604 West Fairmont Parkway, La Porte, TX 77571 Contact Name: John Joems Phone: 281-470-5012 Contact Address: 604 West Fairmont Parkway, La Porte, TX 77571 DESIGN FIRM Name: Knudson LP Phone: 713-463-8200 Firm Address: 8588 Katy Freeway, Suite 441, Houston, TX 77024 Designer Name: Lloyd Lentz Type of License: Landscape Architect License Number: 761 PROJECT DESCRIPTION _ Start Date: 01/2010 Completion date: 06/2010,Estimated Cost`$800,000AO Type of Work: New Construction '' Type of Funds: This project involves public funds, public land, or is a state lease. State Lease No. : Scope of Work: Pedestrian paving architectural gateway construction, parking lot grading and building modifications. Does this building(s) have more than one level? No Are there any elevators, escalators, or platform lifts In this building? No Are there any boiler in this building? No This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the Texas Administrative Code Chapter 68, Rule 68.51. If TDLR will be performing the review or inspection services, see Rule 68,80. If a RAS will be performing the review or inspection services, please contact the RAS as they set and collect their own fees, see Rule 68.75. In accordance with Rule 68.52, the owner of a building or facility must also obtain an inspection from the department or a registered accessibility specialist not later than the first anniversary of the completion of construction. Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction. RegisterQnother P.roji4ct PrintThis,Page t Toe of Pagel TDLR Home PagelAB Home Pace AB Proiect Registration Pagel Feedback Click BACK to go to Previous Page http://www.license.state.tx.uslABProj ectRegistrationOnlinelABProjectPrintConfirmation... 11 / 16/2009 Huber, Mark From: Chris McBride [CMcBride@knudsonservices.com] Sent: Monday, November 16, 2009 9:03 AM To: Huber, Mark Subject: FW: ACI Project C090978 Attachments: Binder-c090978.pdf Mark, Attached is a copy of the ACI plan review that was completed last week. Let me know if you have any comments or questions. Thanks, chris mcbridc project manager 8588 Katy lreeway, suite 441 A houston, tx 77024 u d 8 '' main 713.463.8200 O direct 713.932.4011 A knudsonservices.com From: Jennifer Mathis [mailto:jmathis@acico.com] Sent: Wednesday, November 11, 2009 2:18 PM To: assistantcitymanager@laportetx.gov Cc: Lloyd Lentz Subject: ACI Project C090978 Dear Mr. Joems, Attached, you will find the TAS Plan Review Report for La Porte- Architectural Gateway. Please e-mail or call with any questions. Thank you, Jennifer Mathis, AIA, RAS JCC Certified Building Plans Examiner ACI American Construction Investigations, Ltd. 602 Sawyer St., Suite 200, Houston, Texas 77007-7510 (713)864-8494 (888)595-8500 (713) 864-8495 fax k For answers to TAS and IBC questions, follow ACI on Twitter. DISCLAIMER: This email (and/or its attachments) may contain confkiental Information belonging to the sender and is intended solely for the use of the Individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, dishibudon or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. ACI ANf1?M4fA1N;C6.Nsi'uueri01vv¢$riGnTloNS,'LTo r (N ]AM'1'bH S INIiCI. SUIIIi JW.IIINIpIU$ IIiAAI TMI]-011U OIJ1M1iYW.iY1iJ1951Uq`I'AS(]I!IWIWNS ACCIiSSI111IJI:1' $Pli(:1.\LISTS' RryixnNshl. .. T:YAS p:%NJMIiMC I,N].1'ANRKN[GUIdTOK ANCIIITiI' ILAI:1IiM$ November 11, 2009 John Joerns City of La Porte 604 West Fairmont Parkway LaPorte, TX 77571 EABPRJ# B0802937 ACI# C090978 RE: LaPorte- Architectural Gateway 920 West Main Street. PLAN REVIEW - COMPLETED Dear John Joems Enclosed are the results of the plan review completed on the referenced facility. Identified on the report are areas of nonconformance with accessibility standards adopted by the Texas Department of Licensing and Regulation for purposes of ensuring compliance with Texas Government Code, Chapter 469. Although deficiencies may have been noted, the referenced project may be eligible for inspection approval if constructed in accordance with the Texas Accessibility Standards. Items which are the responsibility of the owner should be referred to the appropriate person for action. The building or facility owner must request an inspection from the Department, (or a Department authorized provider of inspection services) no later than thirty (30) days after the completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in writing) of the revised completion date as soon as possible. This determination does not address the applicability of the Americans with Disabilities Act (ADA), (P.L. 101-336), or any other local, state or federal requirement. For information on the ADA, call the ADA Hotline at (800) 9494232, or the United States Department of Justice at (202) 514-0301. Please reference the Department assigned project number in all future correspondence pertaining to this project. Questions concerning this matter should be directed to Jennifer Mathis at 713-864- 8494. Sincerely, AMERICAN CONSTRUCTION INVESTIGATIONS, LTD. de nifer M this y gistered Accessibility Specialist Attachments Cc: Lloyd Lentz Knudson, LP ACI AMERICAN CONSTRUCTION INVESTIGATIONS, LTD 4W hill SAW YLR S IRLLr, SL11I L M), IRM it FON,'I 1AAS 7 (K)7.7510 1]I3)WA-84" (888).595.95W FAXOM861-M95 IMp'//Nwx:OCIfU.CYIII PLAN REVIEW REPORT Reviewer: Jennifer Mathis, RAS #1153 EABPRJ: B0802937 November 11, 2009 ACI Project Number: C090978 Revised: R=Reviewed NN=None Noted U=Unacceptable (resubmittal recommended) EC=Ensure Compliance NA=Not Applicable R#=Revision Project Name: La Porte- Architectural Gateway Project Description: Pedestrian paving architectural gateway construction, parking lot grading and building modifications. Identified on the report are areas of nonconformance with accessibility standards adopted by the Texas Department of Licensing (TDLR). Items not listed below have either been found acceptable or are not applicable to this project. 68.102(b)(2)(C) At diagonal curb ramps constructed within the public right-of-way, detectable warnings complying with TAS 4.29.2 at a minimum of 24" in depth (in the direction of pedestrian travel) and extending the full width of the curb ramp or landing, shall be provided where the pedestrian access route enters a crosswalk or other hazardous vehicular area. Additionally, the department will allow the detectable warning to be curved with the radius of the corner. The detectable warning shall be located so that the edge nearest the curb line is 6" minimum and 10" maximum from the curb line. 4.3.2 (1) At least one accessible route within the boundary of the site shall be provided from public transportation stops, accessible parking and accessible passenger loading zones, and public stree or sidewalks to the accessible building entrance they serve. The accessible route shall, to the maximum extent feasible, coincide with the route for the general public unless that route would violate 4.3.2(5). 1 of 2 replacement, exterior wall finishes, Detectable warnings are required on curb ramp at southwest corner of site. 1-1.00 - Site Plan: Unable to determine whether an accessible route from public sidewalk, to an accessible building entrance, is provided. The Architectural Gateway, at the southwest corner of the building, appears to have a curb, with no curb ramp, violating 4.7.1. The curb ramp located at the southwest portion of the curved parking area forces a user to travel within a traffic lane to reach the building entry, violating 4.3.2(5). PLAN REVIEW REPORT EABPRJ: B0802937 EC=Ensure Compliance NA=Not Applicable Reviewer: Jennifer Mathis, RAS #1153 November 11, 2009 Revised: 4.3.2 (5) Accessible routes shall be located so that users are not required to wheel or walk behind parked vehicles (except the one they operate or in which they are a passenger) or in traffic lanes. See 4.3.2(1) comments. T'Ielunf F"reff,76yel• .. .. See 4.3.2(1) comments. 4.6.1 Minimum Number 26 to 50 spaces total = 2 accessible 4.7.1 Location. Curb ramps complying with 4.7 shall be provided wherever an accessible route crosses a curb. r .t 40 spaces total, 2 Van Accessible spaces provided. See 4.3.2(1) comments. 2 of 2 COMcheck Software Version 3.6.1 Envelope Compliance Certificate 2001 IECC Section 1: Project Information Project Type: New Construction Project Title : La Porte Gateway - Building Facade Improvements Construction Site: Owner/Agent: 920 W. Main Street John Joems La Porte, TX City of La Porte, Texas 604 W. Fairmont Parkway La Porte, TX 77571 281-470-5012 Roems@taportelx.gov Section 2: General Information Building Location (for weather data): La Porte, Texas Climate Zone: 4b Heating Degree Days (base 65 degrees F): 1550 Cooling Degree Days (base 65 degrees F): 2809 Vertical Glazing I Wall Area Pci 14% Building Type Floor Area Other 5300 Section 3: Requirements Checklist Climate -Specific Requirements: Designer/Contractor: Chris McBride Knudson, LP 8588 Katy Freeway Suite 441 Houston, TX 77024 713A63-8200 CMcbrlde@knudsonserviws.com Component NamelDescription Gross Area Cavity Cont. Proposed Budget or Perimeter R-Va1ue U-Factor U-Factor it PAS Exterior Wall 1: CMU <=8" with Empty Cells, Furring: None -R-Value 2250 --- 1.3 0.255 0.229 1 A Window 1: Metal Frame with Thermal Break:Single Pane, Tinted, 92 -- --- 0.340 1.230 t SHGC 0.39, PF 0.84 `tlVu'-J Window 2: Metal Frame:Single Pane, Tinted, SHGC 0.39, PF 0.84 147 --- --- 0.340 1.230 Door 1: Glass (> 50%glazing), Tinted, SHGC 0.39, PF 0.84 80 --- --- 0.340 1.230 (a) Budget Udactors are used for soltwaro baseline calculation ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: (] 1. All Joints and penetrations are caulked, gaskeled or covered with a moisture vapor -permeable wrapping material installed In accordance with the manufacturer's installation Instructions. U 2. Windows. doors, and skylights cartl8ed as meeting leakage requirements. U 3. Component R-values 8 U-faclors labeled as certified. U 4. Insulation installed according to manufacturers instructions, in substantial contact with the surface being insulated, and in a manner that aohleves the rated R-value without compressing the Insulation. U 5. Stair, elevator shaft vents, and other dampers integral to the building envelope am equipped with motorized dampers. ❑ 6. Cargo doom and loading dock doors are weather sealed. O 7. Recessed lighting fixtures are: (i) Type IC rated and sealed or gaskeled; or (it) installed inside an appropriate air -tight assembly with a 0.6 inch clearance from combustible materials and with 3 inches clearance from insulation material. Project Title: La Porte Gateway - Building Facade Improvements Report date: 10126I09 Data filename: C:\Program FIIes1ChecMCOMcheck\La Porte Architectural Gateway.cck Page 1 of 2 �9-edld- 4. ;Compliance -Statement i'rli�in*d ;a' M a on' S"O'uit7'cin'd-'w*o's't'(1a'-ws' pemen Huber, Mark From: Chris McBride [CMcBride@knudsonservices.com] Sent: Tuesday, October 27, 2009 9:14 AM To: Malik, Masood Cc: Tietjens, Tim; Huber, Mark; Slaton, Rodney; Joems, John Subject: RE: La Porte Gateway Project Attachments: 091027 Envelope Compliance .pdf Malik, Please find attached the COM — Envelope Compliance Certificate, as requested in your plan review. Let me know if you need anything else. Thanks, chi -is mcbride project manager K Me katy treeway, suite 441 n houston, tx 77024 u d 8 main 773.463.8200 O direct 713.932.4011 n knudsonservices.com From: Malik, Masood [mailto:Mal ikM@laportetx.gov] Sent: Monday, October 26, 2009 3:11 PM To: Chris McBride Cc: Tietjens, Tim; Huber, Mark; Slaton, Rodney; Malik, Masood; Joems, John Subject: RE: La Porte Gateway Project Chris, Staff has completed review of the La Porte Architectural Gateway Project, "100% Construction Drawings" and offers comments (see letter attached). Please disregard item #4, as our City Engineer will take care of the matter with TxDOT. Need two complete sets of finish (final) construction drawings prior to permit issuance. Site Plan — Sheets # L2.00, L2.01, L4.00, & C3.00 Please submit a mylar of these shi- From: Malik, Masood Sent: Thursday, October 15, 2009 11:44 AM To: 'Chris McBride' Cc: Tietjens, Tim; Slaton, Rodney Subject: RE: La Porte Gateway Project Chris, Staff reviewed your recent submittal and found that most of the site plan issues have been addressed except drainage, which is as follows: Why did the TP elevation at the face of the back door change from 18.67' on the 90% submittal to 18.50' on this one? That is a fixed elevation. Thanks-masood From: Chris McBride [mai Ito: CMcBride@knudsonservices.com] Sent: Wednesday, October 07, 2009 11:04 AM To: Malik, Masood Subject: RE: La Porte Gateway Project Masood, Just wanted to let you know that 3 sets of our Development Site Plan submittal should arrive at your office sometime this afternoon. Please let me know if you have any comments or questions in regards to the documents. Thanks, chris mcbride project manager K 85a8 katy IrWNay_. suite 441 0 houston, tx Tsoza Chris, Please note following responses to your questions on the review comments: (Site Plan Review) #4 show zoning &other info. on sheet L2.00 #5 yes #6 yes #7 yes, if no language was attached, how it appeared on sheet C2.00? #12 Our City Engineer has advised not to involve TXDOT. #18 Clarified by Public Works, corrected on the recent submittal. #20 Discussed during the meeting #22 Discussed and clarified the situation and logic of replacing the plants. Thanks-masood From: Chris McBride[maiIto: CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 3:37 PM To: Malik, Masood Cc: Joems, John Subject: FW: La Porte Gateway Project Masood, Please find attached the responses` _.',our original 70% Construction Docu t comments. Thanks, chris mcbridc project manager K 8588 katY heewaY, suite 441 A houston, tx r. o2a Subject: RE: La Porte Gateway Project Chris, The project review comments are attached for your convenience. For any drainage concerns, please call Rodney at (281) 470-5060. Thanks-masood From: Chris McBride[maiIto: CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 10:06 AM To: Malik, Masood Subject: RE: La Porte Gateway Project Masood, How many copies of the Development Site Plan are you requesting? Thanks, chris mcbride project manager 85a8 katy tremay, suite 441 O houston, tx 77024 u a main 713..8200 4011 direct 713.93932.4011 n knudsonservices.com From: Malik, Masood [mailto:Mal ikM@laportetx.gov] Sent: Tuesday, September 22, 2009 4:48 PM To: Chris McBride Subject: La Porte Gateway Project Chris, Reference to our telephonic conversation, site plan requirement and checklist are attached for your convenience. If any questions, please call or e-mail. Thanks Masood Malik City Planner City of La Porte, Texas City Hall: 281-471-5020 Office: 281-470-5058 Fax: 281-470-5005 E-mail: malikmRlaoortetx.gov Website: www.laportetx.eov DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. Huber, Mark From: Chris McBride [CMcBride@knudsonservices.comj Sent: Tuesday, October 27, 2009 9:11 AM To: Malik, Masood Cc: Huber, Mark Subject: RE: La Porte Gateway Project Thank you, I will place Section IV Applicable Codes on the cover sheet. Also, do you require the requested COM Check Energy Code Analysis placed on the documents or as an attachment? And just to confirm, we need only bond prints and no mylars for the final submittal for permit? Thanks, Chris mcbride project manager 8598 kdly Ireeway, Suite 441 n houston, tx 7-7024 u d t3 main 713.463.8200 O direct 713.932.4011 t7 knudsonservlces.com From: Malik, Masood [maiIto: MalikM@laportetx.gov] Sent: Monday, October 26, 2009 3:59 PM To: Chris McBride Cc: Huber, Mark Subject: RE: La Porte Gateway Project Chris, You can find adopted codes on the City website www.lai)ortetx.gov >city departments > planning > Inspections > forms > applicable codes ... No mylars, just a fine print. Thanks-masood From: Chris McBride [mailto:0j— _ride@knudsonservices.com] Sent: Monday, October 26, 2009 3:46 PM To: Malik, Masood Subject: RE: La Porte Gateway Project Malik, Thank for you the comments. In regards to the adopted code information, can you please send me the exact link to where this information can be found on the City website? Also, the address should be found on the title block. In regards to the prints, do you need both sets to be mylar? Thanks, chris mcbride project manager K 8598 kaly freeway, Wh 441 tl houston, DC 77024 Cc: Tietjens, Tim; Huber, Mark; Slaton, Rodney; Malik, Masood; Joems, John Subject: RE: La Porte Gateway Project Chris, Staff has completed review of the La Porte Architectural Gateway Project, "100%Construction Drawings" and offers comments (see letter attached). Please disregard item #4, as our City Engineer will take care of the matter with TxDOT. Need two complete sets of finish (final) construction drawings prior to permit issuance. Site Plan —Sheets # L2.00, L2.01, L4.00, & C3.00 Please submit a mylar of these sheets From: Malik, Masood Sent: Thursday, October 15, 2009 11:44 AM To: 'Chris McBride' Cc: Tietjens, Tim; Slaton, Rodney Subject: RE: La Porte Gateway Project Chris, Staff reviewed your recent submittal and found that most of the site plan issues have been addressed except drainage, which is as follows: Why did the TP elevation at the face of the back door change from 18.67' on the 90% submittal to 18.50' on this one? That is a fixed elevation. Thanks-masood From: Chris McBride [maiIto: CMcBride@knudsonservices.com] Sent: Wednesday, October 07, 2009 11:04 AM To: Malik, Masood Subject: RE: La Porte Gateway Project Masood, Just wanted to let you know that 3 sets of our Development Site Plan submittal should arrive at your office sometime this afternoon. Please let me know if you have any comments or questions in regards to the documents. Thanks, chris mcbridc project manager 85M katy freeway, SUIte 441 fl houston, tx 77024 U d g main 713.453.8200 O direct 713.932.4011 A knudsonservices.com From: Malik, Masood [mailto:Mal ikM@laportetx.gov] Sent: Monday, September 28, 2009 4:51 PM To: Chris McBride Subject: RE: La Porte Gateway Project Chris, Please note following responses to your questions on the review comments: (Site Plan Review) #4 show zoning & other info. on sheet L2.00 #5 yes #6 yes #7 yes, if no language was attached, how it appeared on sheet C2.00? #12 Our City Engineer has advised not to involve TXDOT. #18 Clarified by Public Works, corrected on the recent submittal. #20 Discussed during the meeting #22 Discussed and clarified the situation and logic of replacing the plants. Thanks-masood From: Chris McBride [maiIto: CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 3:37 PM To: Malik, Masood Cc: Joems, John Subject: FW: La Porte Gateway Project Masood, Please find attached the responses to your original 70% Construction Document comments. Thanks, chris mcbride project manager K 8588 katy freeway, suite 441 !1t / houston, tx 77024 u rl�/ d S� malt 713.463.8200 O direct 713,932,932.4011 4D11 n knudsonservices.com From: Malik, Masood [maiIto: MalikM@laportetx.gov] Sent: Monday, September 28, 2009 12:23 PM To: Chris McBride Subject: RE: La Porte Gateway Project Chris, The project review comments are attached for your convenience. For any drainage concerns, please call Rodney at (281) 470-5060. Thanks-masood From: Chris McBride [maiIto: CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 10:06 AM To: Malik, Masood Subject: RE: La Porte Gateway Project Masood, How many copies of the Development Site Plan are you requesting? Thanks, chris mcbride project manager K 8588 katy treeway, suite 441 A houston, IX 77024 u Chris, Reference to our telephonic conversation, site plan requirement and checklist are attached for your convenience. If any questions, please call or e-mail. Thanks Masood Malik City Planner City of La Porte, Texas City Hall: 281-471-5020 Office: 281-470-5058 Fax: 281-470-5005 E-mail: malikm()laoortetx.gov Website: www.laportetx.¢ov DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the Intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. please contact the sender if you believe you have received this email in error. Huber, Mark From: :r ► Slaton, Rodney Sent: Monday, October 26, 2009 1:57 PM To: Malik, Masood; Huber, Mark Cc: Tietjens, Tim Subject: RE: 920 W Main const plan review Hi Mark: Wining the Gatew y project, since we are only laying a resurface on the driveway a driveway permit from TxDOt will be required. Hq ver, I will need a permit to work within their right-of-way. P.E., CFM From: Malik, Masood Sent: Monday, October 26, 2009 9:41 AM To: Slaton, Rodney Cc: Tietjens, Tim Subject: FW: 920 W Main const plan review Rod, Please respond to Mark accordingly.thx.m From: Huber, Mark Sent: Monday, October 26, 2009 9:36 AM To: Malik, Masood Cc: Menager, Dwayne; Huber, Mark; Wilmore, Debbie; Slaton, Rodney Subject: FW: 920 W Main const plan review Masood, on Friday morning 10-23-09, Tim brought us the 100%Gateway project "construction" drawings for review. Inspection Division staff has completed its review, and attached you will find our comments. If Tx. Dot driveway permit is not needed or necessary, I will need an e-mail from our City Engineer prior to releasing a building permit. If you have any questions or comments, please let me know. Mark From: Jennings, Sherry Sent: Monday, October 26, 2009 8:09 AM To: Huber, Mark Subject: 920 W Main const plan review Sler y Jernwgs, Office CoordhintDr City of La PoHe Inspecilaris & Permits DivisJai (281)47N5072 (281) 470 5005 (fax) j ernungssoaportetx. gawr 91 _76, %o0 90 dq b „sl T A-5 / CT- _ �. Wo , -Z2,- 4 C. -�2 , 2.> n v Z_�__0-9j ZL al A kr� , LjM.snT _JlJ'e-onv� h.� ��ef1lL� Al 2 RE: La Porte — Architectural Gateway, 90% Construction Documents 920 W. Main Street (CLP. Project #09-2202) Site Plan review, based on sheets 12.00, L2.01, L4.00, C3.00, is as follows: 1. Need Engineer's seal and signature on the site plan. 2. Show address — 920 West Main Street. 3. Show owner and developer not client as "City of La Porte". 4. Show zoning as Main Street District (MSD) & Overlay. 5. Add legal description as Lots 9, 11-15, Block 52, Town of La Porte, Johnson Hunter Survey, Abstract No. 35, LaPorte, Harris County, Texas. 6. Identify name or legal description of adjacent properties. 7. Add Site Plan Accuracy Certificate and City Approving Authority Certificate on the site plan sheet not on the construction drawings. 8. Show flood statement on the site plan. 9. Label parking space sizes, 9'x18' (standard), 14'x20' (HQ and circulation isle 25'wide. 10. Proposed 2" irrigation/landscape meter shown on sheet L5.00 is not shown on Utility Plan sheet C3.00. 11. Show sidewalks extended to lot 9 and onward along State Highway 146. 12. Drainage: a. We are not satisfied with elevations in the back alley. b. Need a minimum 6" drop from the low point to the top of pavement at the building. CONSTRUCTION PLAN REVIEW 1. Need to respond in writing to the original (16) items on the construction plan review notes. It appears that not all items are clarified and/or resolved on 90% construction documents. 2. Delete site plan accuracy and City approving authority certificates from all "construction" drawings. Need only on site plan sheet 3. Require Engineer's seal and signature on the structural drawings for proposed brick faced parapet and associated wall changes. 4. Clarify if parapet wall shown on sheet L8.04 is existing or proposed. 5. Need to determine if new beam is necessary for bracing of parapet. Huber, Mark From: Malik, Masood Sent: Monday, September 28, 2009 3:43 PM To: Huber, Mark Subject: FW: La Porte Gateway Project Attachments: Gateway(rev.).doc; 090730 70% Review Comments.xls FYI From: Chris McBride[mailto:CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 3:37 PM To: Malik, Masood Cc: Joerns, John Subject: FW: La Porte Gateway Project Masood, Please find attached the responses to your original 70% Construction Document comments. Thanks, Chris mcbride project manager a5aa Katy freeway. suite 441 11 houston, b( 77424 N moue 713.932-4011 O direct 713.9324b11 A knud so nsery ices. corn From: Malik, Masood [mailto:MalikM@laportetx.gov] Sent: Monday, September 28, 2009 12:23 PM To: Chris McBride Subject: RE: La Porte Gateway Project Chris, The project review comments are attached for your convenience. For any drainage concerns, please call Rodney at (281) 470-5060. Thanks-masood From: Chris McBride [mailto:CMcBride@knudsonservices.com] Sent: Monday, September 28, 2009 10:06 AM To: Malik, Masood Subject: RE: La Porte Gateway Project Masood, How many copies of the Development Site Plan are you requesting? Thanks, chris mcbride project manager 55a8 katy freeway, suite 441 n houston, tx 77024 u d 8 main 713.463.8200 O direct 713.932.4011 n knudsoncervices.com From: Malik, Masood [mailto:MalikM@laportetx.gov] Sent: Tuesday, September 22, 2009 4:48 PM To: Chris McBride Subject: La Porte Gateway Project Chris, Reference to our telephonic conversation, site plan requirement and checklist are attached for your convenience. If any questions, please call or e-mail. Thanks Masood Malik City Planner City of La Porte, Texas City Hall: 281-471-5020 Office: 281-470-5058 Fax: 281-470-5005 E-mail: rnalikm(@jaPortetx.gov Website: www.laportetx.gov DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error. DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information is unauthorized and strictly prohibited. Please contact the sender if you believe you have received this email in error, RE: La Porte — Architectural Gateway, 90% Construction Documents 920 W. Main Street (CLP. Project #09-2202) Site Plan review, based on sheets L2.00, L2.01, L4.00, C3.00, is as follows: 1. Need Engineer's seal and signature on the site plan. 2. Show address — 920 West Main Street. 3. Show owner and developer not client as "City of La Porte". 4. Show zoning as Main Street District (MSD) & Overlay. 5. Add legal description as Lots 9, 11-15, Block 52, Town of La Porte, Johnson Hunter Survey, Abstract No. 35, La Porte, Harris County, Texas. 6. Identify name or legal description of adjacent properties. 7. Add Site Plan Accuracy Certificate and City Approving Authority Certificate on the site plan sheet not on the construction drawings. 8. Show flood statement on the site plan. 9. Label parking space sizes, 9'x18' (standard), 14'x20' (HQ and circulation isle 25'wide. 10. Proposed 2" irrigation/landscape meter shown on sheet L5.00 is not shown on Utility Plan sheet C3.00. 11. Show sidewalks extended to lot 9 and onward along State Highway 146. 12. Drainage: a. We are not satisfied with elevations in the back alley. b. Need a minimum 6" drop from the low point to the top of pavement at the building. CONSTRUCTION PLAN REVIEW 1. Need to respond in writing to the original (16) items on the construction plan review notes. It appears that not all items are clarified and/or resolved on 90% construction documents. 2. Delete site plan accuracy and City approving authority certificates from all "construction" drawings. Need only on site plan sheet. 3. Require Engineer's seal and signature on the structural drawings for proposed brick faced parapet and associated wall changes. 4. Clarify if parapet wall shown on sheet L8.04 is existing or proposed. 5. Need to determine if new beam is necessary for bracing of parapet. La Porte - Architectural Gateway 70% Construction Documents - review comments Sheet No. lComment I Date of comment I Responsible Firm lAcfion Required Show flood statement on the site plan. Flood statement should reflect 8 TSARP data dated June 18, 2007. Show B.F.E. and limits of the floodpialn 7222009 Klotz This will be added to the sheeL on the site plan. 9 Indicate location, widths. and types of all easements, either exlsang or proposed within or Immediately adflacent to the property. 7/222009 KLP Will update plans on next submittal 10 Mabel parking space sizes, 9'x18' (standard), 14520' (HC) and dmutatlon isle 25' wide. 7/222009 KLP Will update plans on next submittal 11 Show width and radii for proposed driveways a" State Highway 146 and North 8th Street 7212009 KLP Will update plans on next submittal 12 TxDOT and Harris county driveway & drainage permits - staff advised only 7222009 Koh We have talked to TxOOT and have the fours. We will submit to TOOT 15 I IA 3- edsung waterline shoua be replaced. Edseng water service crossing I 722rzm I Koh IA new 3- seN is shown on our drawings. Replacement of the existing 3' alley, to the building should also be replaced. waterline was never discussed and would be out of our scope A grease Interceptor is shown suggesting some type of food establishment. The 3' service line should be sufficient unless a large water demand is 16 E)dsting waterline should be re-evaluated and sized to accommodate the 7222009 Klotz develomen) needed Separate water meter and sewer taps cold be considered for future use of 17 the buildings. 7222009 Koh Improvemens for other parts of the building were never discussed. 18 Reverse the direction of grease trap drain pipe toshow be4n downstream 7222009 Koh please dadly this question. a;. n La Porte - Architectural Gateway 70% Construction Documents - review comments Sheet No. JCormnent I Date of comment Responsible Firm jAction Required 20 1 1 Show sidewalks along SH 146 and W. Main Street 7222009 it KLP lNeed to discuss this III— I Drainage concems @ 908 S 912 discussed with Klotz Associates; 21 a. Redo the grading and paving plans 7222009 Klotz This will be done prior to next submittal. b. Lower proposed inlets in the rear c. Top of slab o(existing building should be the highest rnt Landscape Plan: a. Need to discuss reason for removing Maud b. a. Scratch one of the island (right side) shown in the middle of the parking lot Placement of a large shade tree next to the galew4y war lime will pose a 22 b. Move a Shumard Oak proposed near the building and tower b the 7222009 KLP sight line issue C. pedestrian entrance at W. Main and SH 146. Building landscape design is still in progress c. Add an ornamental tree or crape, mrytfe near the buiMi Show dumpsler location. Dumpster should be screened from public view 23 _ _ , ,_�, _.. _ 7222009 1 KLP IDumpter location is shown In Sheer L2.01 La Porte - Architectural Gateway 70% Construction Documents - review comments Sheet No: lConvnent I Date of comment I Responsible Finn jAction Required Separate permit required for Irrigation Installation. Need equipment schedule, ion plans will be devebpeO further once we have approval on pWnUng 6 layout, inigatlon plans. KLP design desig Where is separate water meter for Irrigation? La Porte - Architectural Gateway 70% Construction Documents - review comments La Porte - Architectural Gateway 70% Construction Documents - review comments Consuttanrs Response Date of res La Porte -Architectural Gateway 70% Construction Documents - review comments ARCHITECTURAL GATEWAY 70% LA PORTE CONSTRUCTION PLAN REVIEW 7-2 O MARK HUBER/DWAWAYNE MENAGER Is the ornamental iron fence going to be allowed in front yard? IM A 1 N� Need to register the project with Texas Accessibility Standards and provide proof of registration prior to building permit issuance. -to b�e d opal, / Need TX DOT driveway permit prior to building permit issuance. to Will existing utilities be.upgraded prior to alley renovation? Il I l'6�PT6Vi�e-(�111PSLEr"erl�iu�wc uc�au�.. . , F �y Separate permit required for irrigation installation. Need equipment schedule, layout, irrigation plans. Where is separate water meter for irrigation? v/ =6. Where-are-electric--meter-Ioop-Bcplarls�'oFlightirrg- ' Need all adopted City codes listed on cover page. T B. D . Need engineered drawings (sealed) on monument columns and footings (pier details) as,: L ' well as gateway towers. - l 14._ _- Provide energy code compliance on new glazing (window_ -s); G0 M - ONec-r- ? 1 1Ji ssigne . S:\City Planning Share\04-INSPECTIONS DIVISI0N\Inspeetions\P1= Review CommmAARCHITECTURAL GATEWAY 70.doc .� ARCHITECTURAL GATEWAY 70% LA PORTE CONSTRUCTION PLAN REVIEW 7-15-09 MARK HUBER/DWAYNE MENAGER 1, Is the ornamental iron fence going to be allowed in front yard? 2. Need to register the project with Texas Accessibility Standards and provide proof of registration prior to building permit issuance. 3. Need TX DOT driveway permit prior to building permit issuance. 4. Will existing utilities be upgraded prior to alley renovation? 5. Show size of proposed grease trap. 6. Provide dumpster enclosure details. Separate permit required for irrigation installation. Need equipment schedule, layout, irrigation plans. 8. Where is separate water meter for irrigation? 9. Where are electric meter loop & plans for lighting & irrigation time clock. 10. Need all adopted City codes listed on cover page. 11. Need engineered drawings (sealed) on monument columns and footings (pier details) as well as gateway towers. 12. Electrical plans - need @ fiber optic lighting in towers. 13. Need door & window schedule.. 14. Provide energy code compliance on new glazing (windows). 15. Water lines to have a minimum of 12" cover. (see page C1.00) 16. Page C3.00 is 3" domestic water meter for all proposed & existing tenants? 17. Need address assigned. S:\City Planning Share\04-INSPECTIONS DNISION\Inspections\Plan Review CommentAARCHITECTURAL GATEWAY 70.doc Huber,; Mark From: Huber, Mark Sent: Wednesday, July 15, 2009 12:03 PM To: Malik, Masood Cc: Tietjens, Tim; Manager, Dwayne; Huber, Mark Subject: FW: architectural gateway const plan review Attachments: ARCHITECTURAL GATEWAY 70.doc Masood, attached you will find our construction plan review comments based on the 70% drawings. If you have any ,,, questions, please let us know. Please have Keenan issue a formal address for this project so we can issue permits in the`:j future. If an address has already been issued for this project, please let me know asap so I can build a job file for this project. Thanks Mark H. From: Jennings, Sherry Sent: Wednesday, July 15, 2009 11:20 AM To: Huber, Mark Subject: architectural gateway const plan review Ti1.a n.ks, Sherry JenrbVs City of La. Porte Inspection. Services Coordatator 281-470-5072 Huber;Mark From: Malik, Masood Sent: Wednesday, July 15, 2009 1:48 PM To: Huber, Mark; Lawrence, Keenan Cc: Tietjens, Tim; Menager, Dwayne Subject: RE: architectural gateway const plan review Thanks gentlemen... Keenan — PI. provide a copy to Mark. From: Huber, Mark Sent: Wednesday, July 15, 2009 12:03 PM To: Malik, Masood Cc: Tietjens, Tim; Menager, Dwayne; Huber, Mark Subject: FW: architectural gateway const plan review Masood, attached you will find our construction plan review comments based on the 70% drawings. If you have any questions, please let us know. Please have Keenan issue a formal address for this project so we can issue permits in the future. If an address has already been issued for this project, please let me know asap so I can build a job file for this project. Thanks Mark H. From: Jennings, Sherry Sent: Wednesday, July 15, 2009 11:20 AM To: Huber, Mark Subject: architectural gateway const plan review ?hanks, Sherry Jen.n.ings City of La Torte Inspection Serri.ces Coordinator 281-470-5072 1 p, 1 Q°� AAAa_D . An GN r RE: La Porte — Architectural Gateway,70% drawings; 920 W. Main Street (CLP. Project #09-2202) Site Plan review based on sheets L2.00, L2.01, L4.00, C3.00 is as follows: —4. Need Surveyor's /Engineer's seal and signatures on the site plan. a 2. Show address — 920 West Main Street. _ : • 2 3. Add owner and developer as "City of LaPorte". 4. Show zoning as Main Street District (MSD) & Overlay. 5. Add legal description as Lots 9, 11-15, Block 52, Town of La Porte, Johnson Hunter Survey, Abstract No. 35, La Porte, Hams County, Texas. 6. Identify name br legal description of adjacent properties. 7. Add Site Plan Accuracy Certificate and City Approving Authority Certificate on the site plan (see language attached). 8. Show flood statement on the site plan. Flood statement should reflect TSARP data dated June 18, 2007. Show B.F.E. and limits of the floodplain on the site plan. 9. Indicate location, widths, and types of all easements, either existing or proposed within or immediately adjacent to the property. 10. Label parking space sizes, 9'x18' (standard), 14'x20' (HC) and circulation isle 25'wide. 11. ShoVw�idn rii fo osed i ways alo/State ghway 146 and North 8h Street 12. TxDHwJis unty dri catty & d naSe permits - taff advised only construction permit frommay be r uired. O ge,., /VN N a /Jt_ . + 1, W M z �9 13. Show the routing of on and off -site utilities (i.e. water, sewer, and electric). 14. Identify if the on -site electrical will be overhead or underground. 15. A 3" existing waterline should be replaced. Existing water service crossing alley to the building should also be replaced. ? 16. A grease interceptor is shown suggesting some type of food establishment. Existing waterline should be re-evaluated and sized to accommodate the development. 17. Separate water meter and sewer taps could be considered for future use of the buildings. 18. Reverse the direction of grease trap drain pipe to show tie-in downstream direction. 19. The water line may require a short extension to serve proposed irrigation service. Backflow devices are applicable 20. Show sidewalks along SH 146 and W. Main Street. 21. Drainage concerns @ 908 & 912 discussed with Klotz Associates; CLP. — Gateway Project Plan Review Page 2 of 2 a. Redo the grading and paving plans b. Lower proposed inlets in the rear c. Top of slab of existing building should be the highest point. 22. Landscape Plan: a. Scratch one of the island (right side) shown in the middle of the parking lot b. Move a Shumard Oak proposed near the building and tower to the pedestrian entrance at W. Main and SH 146. c. Add an ornamental tree or crape myrtle near the building. 23. Show dumpster location. Dumpster should be screened from public view and right-of-way. CONSTRUCTION PLAN REVIEW 1. Need to register the project with Texas Accessibility Standards and provide proof of registration prior to building permit issuance. 4. Show size of proposed grease trap. 6. Separate permit required for irrigation installation. Need equipment schedule, layout, irrigation plans. 7. Where is separate water meter for irrigation? 8. Where are electric meter loop & plans for lighting & irrigation time clock? 9. Need all adopted City codes listed on cover page. 10. Need engineered drawings (sealed) on monument columns and footings (pier details) as well as gateway towers. 11. Electrical plans - need @ fiber optic lighting in towers. 12. Need door & window schedule. 13. Provide energy code compliance on new glazing (windows). 14. Water lines to have a minimum of 12" cover. (see page C1.00) 15. Page C3.00 is 3" domestic water meter for all proposed & existing tenants? 16. Is the ornamental iron fence going to be allowed in front yard? .J FinalTaspection Checks1Zeet _ Commercial Projed Address:. File Review f's 1-9 0 o _ . -. _.. S. Back F1owreventio�r=L�e�ice Test �ericates - Lf-A tl� inigation)-ia. fide- 0/j.i/rJo R-fiorl 5y5'�-e^- Fir-�Zt�£-�r-sl�al-b�ildi�tg Fele�ase-in �Ie--- S. AI required perr j s in file 9. A1f inspections an log camplete Feld Review #`s Io-17 rn . 12.consfriictiorz (if applioable) as per site plan erol e�A W ��� \n s,a�W�l �� —15. Fence iu compliance 16. Landscaping as geI site plan . 17.1aspect on ticket to identify if foil or temp 3 Q day CO is authoiized Inspector -4 Vn mate 0 i � j ph y � ctixk6vmtCOzaL - _ � A - City of La Porte Backflow Prevention Assembly Certified Test and Maintenance Report Planning and Inspections Fax (281) 470-5005 Public Works Department Fax (281) 470-5129 PINS ID 0 1010018 NAME OF PROPERTY: INSTALLATION PROPERTY ADDRESS D GcJ NEW INSTALLATION MN ANNUAL RETEST ❑ REPLACEMENT ❑ Please check one MAILING ADDRESS: S'mL p` CONTACT PERSON: PHONE NO.: q — % ! The berJdbw prevention W*Wd ly detailed bebw nes been baled and mahrtahred as required by TNRCC reguladws and is oadned b be operating wbMn acceptable peremelers. TYPE OF ASSEMBLY O REDUCED PRESSURE PRINCIPLE (RP) O REDUCED PRESSURE PRINCIPLE - DETECTOR O�.,__,/ DOUBLE CHECK VALVE MCV) l� DOUBLE CHECK - DETECTOR W PRESSURE VACUUM BREAKER (PVB) % 0 SPILL -RESISTANT PRESSURE VACUUM BREAKER (SVB) MANUFACTURER � MODEL# L �. SERIAL NOW00 SIZ LOCATED AT: Irr I DATE INSTALLED REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER AND SVB DOUBLE CHECK VALVE ASSEMBLY RELIEF VALVE CHECK tit CHECK 02 AIR INLET CHECK VALVE INITIAL HELDAT_PSID HELD AT PSID OPENEDAT OPENED AT HELD AT TEST CLOSED TIGHT ❑ CLOSED TIGHT ❑ PSID PSID PSID LEAKED ❑ LEAKED ❑ DID NOT OPEN ❑ DID NOT OPEN ❑ LEAKED ❑ REPAIRS AND MATERIALS USED FINAL HELDAT PSID HELD AT PSID OPENEDAT OPENED AT HELD AT CLOSED TIGHT CLOSED TIGHT ❑ TEST PSID PSID PSID TEST GAUGE USED: MAKE I MODEL SERIAL NO. G'�D37 7 CALIBRATION DATE Is the assembly' Bed in aocordance with the manufacturer's recommendations and /or local codes? Iraa 1-Lrl'i CERTIFIED 7ESTERj0VV4CWFlED TESTER (pease prMV TESTING FIRM*SAD"M FM I9AO W # (72 CERTIFIED TESTER (algnaturd) Houston, TX 77069 CERTIFIED TESTER NO. PHONE NUMBER 281-8T5-7P75 Fax 281-895-7874c=ENGINEER "please eg art roan canpst* TEST DATE -lest reports must be retatlbd for at bast Urree years "'iasft is required upon Instaftdon.rapetr, or rebwtbn 'TESTING IS REQUIRED ANNUALLY FOR HIGH HEALTH HAZARD LOCATIONS I:LS T 1-16:4 0 lip i z Request for Information Project: La Porte - Architectural Gateway Date: 4/27/10 RAM Design+Build RFI No. 16 2650 Fountain View - Suite 211 Primary Responder Bhavika Shah Phone 713-952-7224 Office Fax 832-201-0718 CC From Subject: Window Frames on Main St Drawing No. L7.04 CSI Code: None Information Requested: Date Status Resolved Date Reason for Request Action Requested Probable Cost Effect Probable Time Effect Priority Due 4/27/10 OPEN Window frames on Main St. Clarification None None Normal Detail No. Other Ref. No. When the brick was demolished on the facade facing Main St, no structure remained to support the windows. The brick had served as the support for the exisiting windows. Recommendation: Build structure to support and frame the windows and finish accordingly: drywall the Interior and stucco the exterior. ponse anrormanon: intractor to build adequate structure to support and frame the windows. City of La Port review prior to contractor covering and completing in order to receive overall approval. Chris McBride - Project Manager K n is d Is 0 n RICHARD MAKOVER Printed Name 05.04.10 4/26/10 Date 8588 Katy Freeway Suite 441 Houston. TX 77024 713-463-8200 intoanation@knudsonse rvices.wm Huber, Mark From: McPhail, Reagan Sent: Tuesday, May 04, 2010 8:42 AM To: Huber, Mark Subject: FW: La Porte - Architectural Gateway RFI #16 Attachments: 100504 RFI No.16 Response.pdf fyi From: Chris McBride[mailto:CMcBride@knudsonservices.com] Sent: Tuesday, May 04, 2010 8:40 AM To: Bhavika Shah Cc: Thomas Rodriguez; McPhail, Reagan; Richard Makover, AIA Subject: La Porte - Architectural Gateway RFI #16 Bhavika, Please find attached our response to RFI #16. Please let me know if you have any further questions or comments. Thanks, Chris mcbride project manager 8sa8 Italy freeway, suite 441 n u houston, tz 77024 d 8 main 713,463.8200 O direct 713.932.4011 nl knudsonservices_com DISCLAIMER: This email (and/or its attachments) may contain confidential information belonging to the sender and Is intended solely for the use of the individual or entity named above. If you are not the intended recipient you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the content of this information Is unauthorized and strictly prohlbited. Please contact the sender if you believe you have received this email in error. Menager, Dwayne From: Menager, Dwayne Sent: Friday, April 09, 2010 3:17 PM To: McPhail, Reagan Subject: RE: 920 West Main Storm Sewer Electrical Underground Inspections Thanks Reagan, Mario is on his way to make the parking lot inspection. From: McPhail, Reagan Sent: Friday, April 09, 2010 3:16 PM To: Menager, Dwayne Subject: RE: 920 West Main Storm Sewer Electrical Underground Inspections I looked at it over Easter weekend, I saw no problems, authorized him to backfill. Reagan From: Menager, Dwayne Sent: Friday, April 09, 2010 3:00 PM To: McPhail, Reagan Cc: Huber, Mark Subject: RE: 920 West Main Storm Sewer Electrical Underground Inspections Importance: High 04/09/2010 Reagan, The contractor for the Gate Way project has not, called in any inspections except the 1" 73 feet of storm underground on 3 /26/2010 and came in this afternoon requesting a parking lot paving inspection with a pending concrete pour tomorrow. But we are unable to approve the placement of concrete without confirmation that the electrical underground the remainder of the storm piping and any plumbing underground onsite has been inspected and approved as per plan. Note: we will hold the inspection pending your response. Respectfully, Dwayne Menager Chief Inspector City of La Porte. Inspections Division 281-470-5070 menaaerdC@Iaportetx.gov From: McPhail, Reagan Sent: Monday, March 29, 2010 2:39 PM i Menager, Dwayne From: McPhail, Reagan Sent: Monday, March 29, 2010 2:39 PM To: Menager, Dwayne Subject: RE: 920 West Main Storm Sewer Electrical Underground Inspections u .. From: Menager, Dwayne Sent: Monday, March 29, 2010 12:28 PM To: McPhail, Reagan Cc: Huber, Mark; Ramos, Mario; Fitch, Dennis Subject: 920 West Main Storm Sewer Electrical Underground Inspections Reagan, I inspected 73 Feet of 24" RCP storm sewer for the Gateway project Friday 03/26/2010 that is all he had ready for inspection at that time. Mark talked with the contractor Moe this morning he stated that you inspected some additional Storm Sewer and Electrical underground over the weekend? I had an inspection ticket made for the inspections so when you get a chance stop by so you can sign off on the inspections and update the area on the plans. I have also copied the other inspectors so they will know you already inspected these areas when they go onsite. Thanks, Dwayne Menager Chief Inspector City of La Porte Inspections Division 281-470-5070 menaeerd@laportetx.eov DAILYINSPECI•IONLOG 049789 DATE: 3.ov-/y TIIAE: CO NTRACTOR/HOMEOWNER: ✓�� ''� TYPE OF INSPECTION: %�Q�' �� ton rrr (ykEINSPECITON PHONENUMBER: PROJECTADDRESS: RESULTS: YES NO PERMITNUMEER: SPECIAL NOTES: /1• (tat�J Ua 1r..1 a..� INSPECTOR'S SIGNATURE: / DAILYINSPECTIONLOG 049790 DATE: / 3/�T�� / /!� RQ..6�Ac' �7 CONTRACTORMOMEOWNE& TYPE OF INSPECTION: U��j` t A L () REINSPECTION PHONENUMEER: PROJECTADDRESS: W' RESULTS: YES NO PERMITNUMBER: SPECIALNOTES: A 6-1- n - u ak-,i o arj / INSPECTOR'S SIGNATURE: — CITYLA PORTE COCIAL/INDUS TRIAL APPLICATION FOR UTILITY SERVICE(S) (2.5 AC. & BELOW) PERSON MAKING REQUEST: STREET ADDRESS (WHERE W/S IS LEGAL DESCRIPTION: PROPERTY SIZE: *AREA DESIGNATED SHALL INCLUDE REQUIRED SETBACKS. "MUST BE AT OR BELOW 108,900 SQ. FT. TO USE TRES FORM. WATER DEVELOPMENT FEE - $8-42 PER 100 SQ. FT. s� ** $ lvl,4 G y Projean) C*J rr� 9 A Z r - TOTAL WATER CHARGES (a,. �k OW L 5.00 SEWER DEVELOPMENT FEE - $15.10 PER 100 SQ. FT. SEWER TAP - $315.00 (6" TAP*) $ S WA SEWER INSPECTION FEE�- TOTAL SEWER CHARGES $ /✓ TOTAL WATER & SE CHAR S $ X SI A OF PERSON MAKING REQUEST ( ) FOR LIVESTOCK USE ONLY - WATER FRONT F OT FEES NOT APPLICABLE AT THIS TIME. *MINB,lUM SIZE TAPS AS PERP. I. C. M. SANITARY SEWER DESIGN REQUIREMENTS, CHAPTER 4, SECTION 4.03-G. NOTE: FOR LARGER TAPS CONTACT WATER/SEWER SUPERINTENDENT. DATE OF-PA-YNffiNT: /+614 Q 0'0 a 3 " lO p ,5s"'s- ©�� � ��� RECEIPT NUMBER OF Qw FeGS U�a� r+nH— S:\CPSbaze\WSPECTTONDMI IONftspections\W ewertie on wm-prop.doc CLERK'S INITIALS: 5:' (2.5 Ao & below) . 11-1605 Rev. /VO Jew " AAVV : wIkIlls. Al. a /%Lv :9. b4m tk$S�V�CL "Q" -tr- 1 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.