Loading...
HomeMy WebLinkAbout2007-IDA-52 NRG Texas Power LLC- SR BertonORDINANCE NO. 2007-IDA-52 AN ORDINANCE AUTHORIZING THE EXECUTION BY THE CITY OF LA PORTE OF AN INDUSTRIAL DISTRICT AGREEMENT WITH NRG TEXAS POWER LLC — S.R. BERTRON, A DELAWARE LIMITED LIABILITY COMPANY FOR THE TERM COMMENCING JANUARY 1, 2008, AND ENDING DECEMBER 31, 2019, MAKING VARIOUS FINDINGS AND PROVISIONS RELATING TO THE SUBJECT, FINDING COMPLIANCE WITH THE OPEN MEETINGS LAW, AND PROVIDING AN EFFECTIVE DATE HEROF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE: Section 1. NRG Texas Power LLC — S.R. Bertron, a Delaware Limited Liability Company has executed an industrial district agreement with the City of La Porte, for the term commencing January 1, 2008, and ending December 31, 2019, a copy of which is attached hereto, incorporated by reference herein, and made a part hereof for all purposes. Section 2. The Mayor, the Assistant City Manager, the City Secretary, and the City attorney of the City of La Porte, be and they are hereby, authorized and empowered to execute and deliver on behalf of the City of La Porte, the industrial district agreement with the corporation named in Section 1 hereof. Section 3. The City Council officially finds, determines, recites, and declares that a sufficient written notice of the date, hour, place and subject of this meeting of the City Council was posted at a place convenient to the public at the City Hall of the city for the time required by law preceding this meeting, as required by the Open Meetings Law, Chapter 551, Texas Government Code; and that this meeting has been open to the public as required by law at all times during which this ordinance and the subject matter thereof has been discussed, considered and formally acted upon. The City Council further ratifies, approves and confirms such written notice and the contents and posting thereof. Section 4. This Ordinance shall be effective from and after its passage and approval, and it is so ordered. 1 PASSED and APPROVED, this 171h day of December, 2007. CITY OF LA PORTE Alton Porter, Mayor ATTEST: LAIM'h' All)'I Mart a Gillett, dity Secretary APPROVED: Knox Askins, City Attorney '�L- RECEIVED NO. 2007-IDA-J § NOV 2 6 2007 STATE OF TEXAS § §La Pone Tax Office COUNTY OF HARRIS § INDUSTRIAL DISTRICT AGREEMENT This AGREEMENT made and entered into by and between the CITY OF LA PORTE, TEXAS, a municipal corporation of Harris County, Texas, hereinafter called "CITYa � anal eX S v- a hereinafter called "COMPANY" , W I T N E S S E T H: WHEREAS, it is the established policy of the City Council of the City of La Porte, Texas, to adopt such reasonable measures from time to time as are permitted by law and which will tend to enhance the economic stability and growth of the City and its environs by attracting the location of new and the expansion of existing industries therein, and such policy is hereby reaffirmed and adopted by this City Council as being in the best interest of the City and its citizens; and WHEREAS, pursuant to its policy, City has enacted Ordinance No. 729, designating portions of the area located in its extraterritorial jurisdiction as the "Battleground Industrial District of La Porte, Texas", and Ordinance No. 842A, designating portions of the area located in its extraterritorial jurisdiction as the "Bayport Industrial District of LaPorte, Texas", hereinafter collectively called "District", such Ordinances -being in compliance with the Municipal Annexation Act of Texas, codified as Section 42,044, Texas Local Government Code; and WHEREAS, Company is the owner of land within a designated industrial. District of the City of La Porte, said land being legally described on the attached Exhibit "A" (hereinafter "Land"); and said Land being more particularly shown on a plat attached as Exhibit '"g", which plat describes the ownership boundary lines; a site layout, showing all improvements, including pipelines and railroads, and also showing areas of the Land previously annexed by the City of La Porte; and WHEREAS, City desires to encourage the expansion and growth of industrial plants within said Districts and for such purpose desires to enter into this Agreement with company pursuant to Ordinance adopted by the City Council of said City and recorded in the official minutes of said City: FINAL DRAFT: November 1, 2007 1 NOW, THEREFORE, in consideration of the premises and the mutual agreements of the parties contained herein and pursuant to the authority granted under the Municipal Annexation Act and the Ordinances of City referred to above, City and Company hereby agree with each other as follows: 1. City covenants, agrees and guarantees that during the term of this Agreement, provided below, and subject to the terms and provisions of this Agreement, said District shall continue to retain its extraterritorial status as an .industrial district, at least to the extent that the same covers the Land belonging to Company and its assigns, unless and until the status of said Land, or a portion or portions thereof, as an industrial district may be changed pursuant to the terms of this Agreement. Subject to the foregoing and to the later provisions of this Agreement, City does further covenant, agree and guarantee that such industrial district, to the extent that it covers said Land lying within said District and not now within the corporate limits of City, shall be immune from annexation by City during the term hereof (except as hereinafter provided) and shall .have no right to have extended to it any services by City, and that all Land, including that which has been heretofore annexed, shall not have extended to it by ordinance any rules and regulations (a) governing plats and subdivisions of land, (b) prescribing any building, electrical, plumbing or inspection code or codes, or (c) attempting to exercise in any manner whatever control over the conduct of business thereon; provided, however, any portion of Land constituting a strip of land 100' wide and contiguous to either Fairmont Parkway, State Highway 225, or state Highway 1.46, shall be subject to the rules and regulations attached hereto as Exhibit '"C'" and made a part hereof; and provided, however, it is agreed that City shall have the right to institute or intervene in any administrative and/or judicial proceeding authorized by the Texas Water Code, the Texas Clean Air Act, the Texas Health & Safety Code, or other federal or state environmental laws, rules or regulations, to the same extent and to the same intent and effect as if all Land covered by this Agreement were not subject to the Agreement. I1. In the event that any portion of the Land has heretofore been annexed by City, Company agrees to render and pay full City ad valorem taxes on such annexed Land and improvements, and tangible personal. property. Under the terms of the Texas Property Tax Code (S.B. 621, Acts of the 65th Texas Legislature, Regular session, 1979, as amended), the appraised value for tax purposes of the annexed portion of Land, improvements, and tangible personal property shall, be determined by the Harris County Appraisal District. The parties hereto recognize that said Appraisal. District has no authority to appraise the Land, improvements, and tangible personal property in the unannexed area for the purpose of computing the ;"in lieu,, Ka payments hereunder. Therefore, the parties agree that the appraisal of the Land, improvements, and tangible personal property in the unannexed area shall be conducted by City, at City's expense, by an independent appraiser of City's selection. The parties recognize that in making such appraisal for "in lieu" payment purposes, such appraiser must of necessity appraise the entire (annexed and unannexed) Land, improvements, and tangible personal property. Nothing herein contained shall ever be interpreted as lessening the authority of the Harris County Appraisal District to establish the appraised value of Land, improvements, and tangible personal property in the annexed portion, for ad valorem tax purposes. A. The properties upon which the '"in lieu of" taxes are assessed are more fully described in subsections 1, 2, and 3 of subsection C, of this Paragraph III (sometimes collectively called the "Property"); provided, however, pollution control equipment installed on the Land which is exempt from ad valorem taxation pursuant to the provisions of Sec. 11.31 of the Texas Property Tax Code is exempt from ad valorem taxation and "in lieu of taxes„ hereunder. Property included in this Agreement shall not be entitled to an agricultural use exemption for purposes of computing "in lieu of taxes" hereunder. B. on or before the later of December 31, 2008, or 30 days from mailing of tax bill and in like manner on or before each December 31st thereafter, through and including December 31, 2019, Company shall pay to City an amount of "in lieu of taxes" on Company's Property as of January Ist of the current Calendar year ("Value Year"). C. Company and City agree that the following percentages ("Percentage Amount") shall apply during each of the Value Years: Value Year 2008: 62% Value Year 2009: 621s Value Year 2010: 62% Value Year 2011: 62% Value Year 2012: 62% Value Year 2013: 62% Value Year 2014: 63% Value Year 2015: 63% Value Year 2016: 63% Value Year 2017: 63% Value Year 2018: 63% Value Year 2019: 63% Company agrees to pay to City an amount of "in lieu of taxes" on Company's land, improvements and tangible personal property in the unannexed area equal to the sum of: Percentage Amount of the amount of ad valorem taxes which would be payable to City if all of the Company's Land and improvements which existed on January 1, 2008, and each January 1 thereafter of the applicable Value Year during the term of this Agreement, (excluding amounts which would be so payable with respect to any Substantial Increase in value of such Land and improvements to which subparagraph 2, below applies), had been within the corporate limits of City and appraised each year by City's independent appraiser, in accordance with the applicable provisions of the Texas Property Tax Code; and (a) On any Substantial Increase in value of the Land, improvements, and tangible personal property (excluding inventory) dedicated to new construction, in excess of the appraised value of same on January 1, 2007, resulting from new construction (exclusive of construction in progress, which shall be exempt from taxation), for each Value Years following completion of construction in progress, an amount equal to Twenty-five percent (250), if construction is completed in Value years 2008 through 2013; and Twenty percent (200), if construction is completed in Value years 2014 through 2019, of the amount of ad valorem taxes which would be payable to City if all of said new construction had been within the corporate limits of City and appraised by City's independent appraiser, in accordance with the applicable provisions of the Texas Property Tax Code. in the case of new construction which is completed in Value. Year 2016 or later, and provided, further, that City and Company enter into an industrial District Agreement after the expiration of this Industrial District Agreement, then, and in such events, such new construction shall be entitled to additional Value Years under the new Agreement at a Twenty percent (20t) .valuation under this subparagraph (a), for a total of six (6) Value Years, but not extending beyond Value Year 2022. (b) A Substantial Increase in value of the Land, improvements, and tangible personal property (excluding inventory) as used in subparagraph 2(a) above, is defined as an increase in value that is the lesser of either: i. at least Five percent (56) of the total appraised value of Land and improvements, on January 1, 2007; or ii. a cumulative value of at least $3,500,000.00. 4 For the purposes of this Agreement, multiple projects that are completed in a Value year can be cumulated to arrive at the amount for the increase in value. (c) if existing Property values have depreciated below the Property value established on January 1, 2007, an amount equal to the amount of the depreciation will be removed from the calculation under this subparagraph 2 to restore the value to the January 1, 2007, value; and 3. Percentage Amount of the amount of ad valorem taxes which would be payable to City on all of the Company's tangible personal property of every description, located in an industrial district of City, including, without limitation, inventory, (including inventory in a .federal Foreign Trade Zone and including Freeport exempted inventory), oil, gas, and mineral interests, items of leased equipment, railroads, pipelines, and products in storage located on the .Land, if all of said tangible personal property which existed on January 1, 2008, and each January 1 thereafter of the applicable value Year during the term of this Agreement, (excluding amounts which would be so payable with respect to any Substantial increase in value of such tangible personal property to which subparagraph 2, above applies), had been within the corporate limits of City and appraised each year by the City's independent appraiser, in accordance with the applicable provisions of the Texas Property Tax Code. with the sum of 1, 2 and 3 reduced by the amount of City's ad valorem taxes on the annexed portion thereof as determined by appraisal by the Harris County Appraisal District. 4. Notwithstanding the above, should City elect to grant the Freeport inventory exemption authorized by Article VIII, Section 1-j of the Texas Constitution and Section. 11.251 of the Texas Property Tax Code to taxpayers within the City limits, then the freeport inventory exemption shall apply to parties to this Agreement. Further, should inventory or any other class or type of property become exempt from taxation by constitutional amendment or act of the Texas Legislature (including, but not limited to, Article VIII, Section 1-n, of the Texas Constitution and Section 11.253 of the Texas Property Tax Code), such class or type of property shall be exempt for purposes of this Agreement, unless the City Council of the City of La Porte shall by ordinance provide for the continued taxation of such property under the authority of any applicable provisions of the Texas Constitution and Texas Statutes. 5 S. City and Company acknowledge circumstances might require the City to provide emergency services to Company's Property described on Exhibit "A" attached hereto. Emergency services are limited to fire, police, and public works emergency services. If Company is not a member of Channel Industries Mutual Aid Association (CIMA), Company agrees to reimburse City for its costs arising out of any emergency response requested by Company to Company's property, and to which City agrees to respond. If Company is a member of CIMA, the obligations of Company and City shall be governed by the CIMA agreement, to which agreement City is a party. IV. This Agreement shall extend for a period beginning on the 1st day of January, 2008, and continuing thereafter until December 31, 2019, unless extended for an additional period or periods of time upon mutual consent of Company and City as provided by the Municipal Annexation Act; provided, however, that in the event this Agreement is not so extended for an additional period or periods of time on or before August 31, 2019, the agreement of City not to annex property of Company within the District shall terminate. In that event, City shall have the right to commence immediate annexation proceedings as to all of Company's property covered by this Agreement, notwithstanding any of the terms and provisions of this Agreement. Company agrees that if the Texas Municipal Act, Section 42.044, Texas Local Government Code, is amended after January 1, 1994, or any new legislation is thereafter enacted by the Legislature of the State of Texas which imposes greater restrictions on the right of City to annex land belonging to Company or imposes further obligations on City in connection therewith after the annexation of such land, Company will waive the right to require City to comply with any such additional restrictions or obligations and the rights of the parties shall be then determined in accordance with the provisions of said Texas Municipal Annexation Act as the same existed January 1, 1994. V. This Agreement may be extended for an additional period or periods by agreement between City and Company and/or its assigns even though it is not extended by agreement between City and all of the owners of all land within the District of which it is a part. VI. A. In the event Company elects to protest the valuation for tax purposes set on its said properties by City or by the Harris County Appraisal District for any year or years during the terms hereof, nothing in this Agreement shall preclude such protest and 6 Company shall have the right to take all legal steps desired by it to reduce the same. Notwithstanding such protest by Company, and except as otherwise provided in Article VI(B), Company agrees to pay to City on or before the date therefor hereinabove provided, at least the total of (a) the total amount of ad valorem taxes on the annexed portions, plus (b) the total amount of the "in lieu of taxes'" on the unannexed portions of Company's hereinabove described property which would be due to City in accordance with the foregoing provisions of this Agreement on the basis of renditions which shall be filed by Company. When the City or Harris County Appraisal District (as the case may be) valuation on said property of Company has been so finally determined, either as the result of final judgment of a court of competent jurisdiction or as the result of other final conclusion of the controversy, then within thirty (30) days thereafter Company shall make payment to City of any additional payment due hereunder, or City shall make payment to Company of any refund due, as the case may be, based on such final valuation, together with applicable penalties, interests, and costs. B. Should Company disagree with any appraisal made by the independent appraiser selected by City pursuant to Article II above (which shall be given in writing to Company), Company shall, within twenty (20) calendar days of receiving City's invoice, give written notice to the City of such disagreement. In the event Company does not give such written notice of disagreement within such time period, the appraisal made by said independent appraiser shall be final and controlling for purposes of the determination of "in lieu of taxes" payments to be made under this Agreement. Should Company give such notice of disagreement, Company shall also submit to the City with such notice a written statement setting forth what Company believes to be the market value of Company's hereinabove described property. Both parties agree to thereupon enter into good faith negotiations in an attempt to reach an agreement as to the market value of Company's property for ,in lieu" purposes hereunder. if, after the expiration of thirty (30) days from the date the notice of disagreement was received by City, the parties have not reached agreement as to such market value, the parties agree to submit the dispute to final arbitration as provided in subparagraph I of this Article V'I M . Notwithstanding any such disagreement by Company, Company agrees to pay to City on or before December 31 of each year during the term hereof, at least the total of (a) the ad valorem taxes on the annexed portions, plus (b) the total amount of the "in lieu" payments which would be due hereunder on the basis of Company's written valuation -a statement submitted to City by Company hereunder, or the total assessment and "in lieu of taxes" thereon for the last preceding year, whichever is higher. 7 1. A Board of Arbitrators shall be created composed of one person named by Company, one by City, and a third to be named by those two. In case of no agreement on this arbitrator in 10 days, the parties will join in a written, request that the Chief Judge of the U.S. District Court for the Southern District of Texas appoint the third arbitrator who, (as the "Impartial Arbitrator") shall preside over the arbitration proceeding. The sole issue to be determined in the arbitration shall be resolution of the difference between the parties as to the fair market value of Company's property for calculation of the "in lieu" payment and total payment hereunder for the year in question. The Board shall hear and consider all relevant and material evidence on that issue including expert opinion, and shall render its written decision as promptly as practicable. That decision shall then be final and binding upon the parties, subject only to judicial review as may be available under the Texas General. Arbitration Act (Chapter 171, ."General Arbitration", Texas Civil Practice and Remedies Code). Costs of the arbitration shall be shared equally by the Company and the city, provided that each party shall bear its own attorneys fees. VIZ. City shall be entitled to a tax lien on Company's above described property, all improvements thereon, and all tangible personal property thereon, in the event of default in payment of "in lieu of taxes" payments hereunder, which shall accrue penalty and interest in like manner as delinquent taxes, and which shall be collectible by City in the same manner as provided by law for delinquent taxes. VIII. This Agreement shall inure to the benefit of and be binding upon City and Company, and upon Company's successors and assigns, affiliates and subsidiaries, and shall remain in force whether Company sells, assigns, or in any other manner disposes of, either voluntarily or by operation of law, all or any part of the property belonging to it within the territory hereinabove described, and the agreements herein contained shall be held to be covenants running with the land owned by Company situated within said territory, for so long as this Agreement or any extension thereof remains in force. Company shall give City written notice within ninety (go) days, with full particulars as to property assigned and identity of assignee, of any disposition of the Land, and assignment of this Agreement. Ix. If City enters into an Agreement with any other landowner with respect to an industrial district or enters into a renewal of any existing industrial district agreements after the effective date hereof and while this Agreement is in effect, which contains terms and provisions more favorable to the landowner than those in this Agreement, Company and its assigns shall have the right to amend this Agreement and City agrees to amend same to embrace the more favorable terms of such agreement or renewal agreement. X. The parties agree that this Agreement complies with existing ,lays pertaining to the subject and that all terms, considerations and conditions set forth herein are lawful, reasonable, appropriate, and not unduly restrictive of Company's business activities. Without such agreement neither party hereto would enter into this Agreement. In the event any one or more words, phrases, clauses, sentences, paragraphs, sections, articles or other parts of this Agreement or the application thereof to any person., firm, corporation or circumstances shall be held by any court of competent jurisdiction to be invalid or unconstitutional fox any reason, then the application, invalidity or unconstitutionality of such words, phrase, clause, sentence, paragraph, section, article or other part of the Agreement shall be deemed to be independent of and separable from the remainder of this Agreement and the validity of the remaining parts of this Agreement shall not be affected thereby. X1. Upon the commencement of the term of this Agreement, all other previously existing industrial district agreements with respect to said Land shall terminate. X11. Notices by a party to the other party hereto, shall be mailed or delivered as follows: To the City of La Porte: City Manager City of La Porte 504 West Fairmont Parkway La Porte, TX 77571 To Company- e?cf� s _ 'i"0 U) {L -�- C— (COMPANY) Attention: TftK Department 13ol "CL K, n11 1 5 11- e_ a3aa DU s�N ,�` X 1—t-1© 10 Company shall promptly notify City of any change of ownership of Property, any assignment of this Agreement, and of any change of billing address. Company shall notify City annually, on or before June 1, of any changes to the following information.: 9 Plant Manager Name: 'D AV 1 s Address: grC Cud -1 Phase : -1 l3 - 4 0 Fax: �j 1 -3 - q09y, Email: �QAV► L P—AVIS a) N Tax Agent/Billing Contact Name; Address: p® TI AJ -T'O1 Phone: �� Fax: 5C7- E m a i 1 : ta�0- )9LL A ENTERED INTO effective the 1st day of January, 2008. By: Title: Address: ATTEST: CnV,� OF LA PO mort-d 0-41 11 City Secretary Alto E. Porter / 16AX ram" ox W. Askins City Attorney City of La Porte P.O. Box 1.218 La Porte, TX 77572-1218 281.471,1886 281..471.2047 fax knoxaskins@comcast.net By: IL 0o & Y-hv ds City Manager CITY OF LA PORTE 604 West Fairmont Parkway La Porte, TX 77571. a3 oe 10 STATE OF TEXAS COUNTY OF HARRIS This instrument was acknowledged before me on the 02L day of ° jpV aft && 2 o ti � , by ,�D�? "3 G � fQ- ?� i:3ce45 ,I Cr-- corporation, a c WRXG m TE LIMA - of a on Behalf of said entity. orA A4A) �1'*T►bA: HERLiNDA CARRANCO Notary Public, State of Texas Notary Public, State of texas My Commission Expires September 07, 2011 STATE OF TEXAS § COUNTY OF HARRIS § This instrument was acknowledged before me on the ) / ilay of 2 0 ar, by Alton E . Porter, Mayor of the C ti y of ha Porte, a municipol corporation, on behalf of said entity. Notary Public, State of Texas Y MAR€HA GILEii My Commission Expires August 22, 2DD9 11 OEXHIBIT An (Metes and Bounds Description of Land) 12 S.R. Bertron Power Plant Jobl3G15020H Ref. Map P308 A, B, C EXHIBIT "A1! Page 1 of 32 TRACT 1 575.628 Gross Acres TRACT 2 Less 6.080 Acres CENTERPOINT ENERGY TRACT 3 Less 11.746 Acres CENTERPOINT ENERGY TRACT 6 Less 83.212 Acres TG PIPELINE, L.P. TRACT 7 Less 9.536 Acres TG PIPELINE L.P. TRACT 1 465.054 Net Acres Description of 575.628 gross acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being the same property of tracts of land conveyed to Texas Genco comprising of 462.852 acres, 7.382 acres, 4.141 acres recorded in Harris County Clerk's File Number W 048257 and 92.344 acres, 8.909 acres recorded in Harris County Clerk's File dumber W 048259 of the Official Public Records of Real Property of Harris County, Texas. Less and Except (Tract 2) 6.080 acres and (Tract 3)11.746 acres conveyed to CenterPoint Energy recorded in Harris County Clerk's File Number W 048257, (Tract 6) 83.212 acres and (Tract 7) 9.536 acres conveyed to T G Pipeline, L.P. recorded in Harris County Clerk's File Number Y 690074 of the Official Public Records of Real Property of Harris County, Texas and being the S.R. Bertron Power Plant Property described in deeds to Houston Lighting and Power Company as follows: K:1SdskSurvlProjects1030248021031985_2006_bndYl01 UliegallTRACT 1 REVISED GROSS.doc EXHIBIT "A" Page 2 of 32 462.852 Acres S.R. Bertron Power Plant Job 13015020H Ref. Map P508 A, B, C (1) The residue of a 400 acre tract recorded in Volume 2643, Page 148 of the Deed Records of Harris County, Texas (H.C.D.R); (2) The residue of a 61.951 acre tract recorded in Volume 2609, Page 623 of the H.C.D.R.; (3) The residue of a 61.726 acre tract recorded in Volume 2609, Page 625 of H.C.D.R.; (4) The residue of a 2.143 acre tract recorded in Volume 2751, Page 623 of the H.C.D.R.; (5) The residue of a 25.00 acre tract recorded in Volume 2680, Page 573, and Volume 2682, Page 72, of the H.C.D.R.; (6) The residue of a 25.051 acre tract recorded in Volume 2609, Page 628 of the H.C.D.R.; All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21,et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (y) _ 1058E r.35 and Eas€ing (x) = 3248200.59 found at an angle point on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of said 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut -Off Road having a value of Northing K:`.SdskSurv\Projectsk03O24802103l9g5 '7006_bndy1010\1cgaI1TR_ACT 1 REVISED GROSS.doc S.R. Bertron Power Plant .fob 13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 3 of 32 (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy HL&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 462.852 acre tract is described by metes and bounds as follows: COMMENCING at said found 3/4-inch iron pipe having coordinates of X = 3248200.59 and Y = 705877.35 at an angle point on the northeasterly right-of-way line of Miller Cut - Off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet and a found brass disk in concrete being plant baseline monument N 0.00' W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; Thence, North 38 degrees 06 minutes 34 seconds West with the northeasterly line of Miller Cut -Off Road, a distance of 427.92 feet to the POINT OF BEGINNING of the herein described tract having coordinates of X = 3247936.53 and Y = 706214.01 from which a found 5/8-inch iron rod bears South 16 degrees 38 minutes 11 seconds West, a distance of 0.43 feet, also being the northwesterly corner of a called 42.0877 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File No. C347984; THENCE, North 38 degrees 06 minutes 34 seconds West continuing with the northeasterly fine of Miller Cut -Off Road and the southwesterly line of the herein described tract, a distance of 2116.64 feet to a 3/4-inch iron pipe found for an angle point; THENCE, North 65 degrees 19 minutes 30 seconds West, a distance of 150.67 feet to Y,inch iron pipe found for the westerly corner of the herein described tract and the southeasterly corner of a 4.849 acre tract recorded in Volume 5269, Page 583 of the H.C.D.R., from which a 1-inch iron pipe found bears South 64 degrees 49 minutes K:1Sdsk5urvTrojects1030248021031985_2006_bndy101011ega]URACT I REVISED GROSS-doc S.R. Bertron Power Plant ,lob 13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 4 of 32 04 seconds East, a distance of 2.02 feet, and a found Y2-inch iron rod bears North 65 degrees 43 minutes 05 seconds West, a distance of 60.00 feet; THENCE, North 24 degrees 17 minutes 34 seconds East, with the common line of the herein described tract and said 4.849 acre tract, at 389.20 feet passing a found 3/4-inch iron rod with aluminum cap, at 2709.63 feet passing a found 3/4-inch iron rod with aluminum cap, for a total distance of 2759.53 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for a common comer, of the herein described tract and a 0.783 acre tract recorded in Harris County Clerk's File No. L483877 from which a found 1-inch iron pipe bears North 23 degrees 53 minutes 48 seconds East, a distance of 1.09 feet; THENCE, with the common line of the herein described tract and said 0.783 acre tract, the following courses and distances: South 76 degrees 00 minutes 23 seconds East, 20.36 feet South 12 degrees 53 minutes 33 seconds East, 55.26 feet South 38 degrees 17 minutes 07 seconds East, 72.02 feet North 15 degrees 08 minutes 48 seconds West, 92.68 feet North 12 degrees 14 minutes 34 seconds East, 172.12 feet North 63 degrees 55 minutes 23 seconds East, 116.69 feet THENCE, North 39 degrees 35 minutes 55 seconds East, at 110.24 feet passing a common corner of PS08-004 and PS08-011, a distance of 125.66 feet to a point on the southwesterly right-of-way line of a 100 foot wide Transmission Tower corridor; THENCE, North 29 degrees 05 minutes 46 seconds Vilest, with said right-of-way line, a distance of 162.14 feet to a 3/4-inch iron rod with plastic cap stamped `Reliant Energy HL&P" found for corner on the southeasterly line of said 4,849 acre tract; THENCE, North 24 degrees 17 minutes 34 seconds East, with said line, a distance of 286.04 feet to a 3/4-'inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for corner, on the southerly line of a 4.474 acre tract recorded in Volume 5269, Page 583 of the H.C.D.R., from which a found 1-inch iron pipe hears North 65 degrees 46 minutes 18 seconds West, 60.00 feet, said 1-inch iron pipe being the common corner of said 4.849 acre tract and said 4.474 acre tract; THENCE, South 65 degrees 46 minutes 18 seconds East, with the southerly line of said 4.474 acre tract, at a distance of 34.14 feet passing a found a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" on line, for a total distance of 278.60 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for a common K:1SdskSurvTrojects1030248021031985_2006bndy10101Iega11TRACT I REVISFD GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 5 of 32 corner on the northerly line of a 19.744 acre tract recorded in Harris County Cleric's File No. L 483877; THENCE, with the common line of the herein described tract and said 19.744 acre tract the following courses and distances: South 22 degrees 07 minutes 41 seconds West, 29.44 feet South 89 degrees 47 minutes 35 seconds West, 20.55 feet North 68 degrees 29 minutes 38 seconds West, 13.62 feet North 83 degrees 07 minutes 08 seconds West, 25.54 feet South 24 degrees 28 minutes 19 seconds West, 22.45 feet South 61 degrees 07 minutes 23 seconds West, 47.04 feet North 88 degrees 12 minutes 50 seconds West, 18.55 feet North 23 degrees 11 minutes 38 seconds West, 47.53 feet South 14 degrees 36 minutes 04 seconds West, 47.60 feet South 62 degrees 24 minutes 27 seconds West, 10.34 feet South 69 degrees 46 minutes 31 seconds West, 31.18 feet North 68 degrees 12 minutes 52 seconds West, 49.21 feet South 74 degrees 18 minutes 29 seconds West, 46.20 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found on the common line of a 100 foot wide transmission tower corridor, PS08-CO4 and PS08-011; THENCE, South 29 degrees 05 minutes 32 seconds East, with said common line, a distance of 143.83 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for corner; THENCE, with the common line of the herein described tract and said 19.744 acre tract, the following courses and distances: South 76 degrees 50 minutes 04 seconds East, 83.06 feet North 40 degrees 23 minutes 50 seconds East, 38.75 feet North 76 degrees 39 minutes 07 seconds East, 54.67 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for corner; THENCE, South 29 degrees 06 minutes 41 seconds East, a distance of 1170.42 feet to a 1-inch iron rod found for corner; THENCE, North 60 degrees 54 minutes 17 seconds East, a distance of 474.61 feet to a 1-inch iron rod found for corner; K:1Sd.5kSurvTrojects1o3024802103I985_200b_bndvWIVegaATRACT I REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT «A„ Page 6 of 32 THENCE, North 29 degrees 05 minutes 56 seconds West, a distance of 97.02 feet to a 1-inch iron rod found for corner; THENCE, North 30 degrees 55 minutes 03 seconds East, a distance of 266.99 feet to a 518 -inch iron rod found for corner; THENCE, along the following courses and distances: South 60 degrees 16 minutes 07 seconds East, 92.88 feet South 64 degrees 16 minutes 54 seconds East, 99.54 feet South 66 degrees 39 minutes 43 seconds East, 100.04 feet South 64 degrees 35 minutes 09 seconds East, 101.98 feet South 77 degrees 27 minutes 25 seconds East, 100.36 feet South 87 degrees 17 minutes 18 seconds East, 33.57 feet South 14 degrees 26 minutes 43 seconds East, 46.23 feet South 83 degrees 59 minutes 47 seconds East, 28.77 feet North 23 degrees 07 minutes 46 seconds East, 24.46 feet South 88 degrees 39 minutes 27 seconds East, 67.15 feet North 84 degrees 06 minutes 25 seconds East, 95.75 feet to a point on the deed line of PS08-004; THENCE, along the deed line of PS08-004 the following courses and distances: South 75 degrees 10 minutes 52 seconds East, 95.80 feet South 78 degrees 21 minutes 52 seconds East, 100.10 feet South 86 degrees 01 minutes 52 seconds East, 46.30 feet South 73 degrees 27 minutes 52 seconds East, 59.60 feet South 47 degrees 23 minutes 52 seconds East, 46.10 feet South 74 degrees 26 minutes 52 seconds East, 40.00 feet South 50 degrees 43 minutes 52 seconds East, 11.20 feet South 88 degrees 36 minutes 52 seconds East, 35.70 feet North 64 degrees 54 minutes 08 seconds East, 62.00 feet South 85 degrees 35 minutes 52 seconds East, 41.40 feet South 68 degrees 08 minutes 52 seconds East, 12.60 feet South 37 degrees 10 minutes 52 seconds East, 61.60 feet South 76 degrees 18 minutes 52 seconds East, 53.00 feet South 77 degrees 31 minutes 52 seconds East, 100.10 feet South 76 degrees 19 minutes 52 seconds East, 52.00 feet South 66 degrees 56 minutes 52 seconds East, 48.50 feet South 83 degrees 50 minutes 52 seconds East, 86.90 feet South 88 degrees 05 minutes 52 seconds East, 80.90 feet K:1SdskSurvlProjects1030248021031995_2006_bndy101011egatlTRACT I REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map P308 A, B, G EXHIBIT "A" Page 7 of 32 South 75 degrees 35 minutes 52 seconds East, 15.50 feet South 84 degrees 24 minutes 52 seconds East, 37.60 feet North 68 degrees 54 minutes 08 seconds East, 35.50 feet South 49 degrees 09 minutes 52 seconds East, 23.10 feet South 33 degrees 39 minutes 52 seconds East, 88.60 feet South 47 degrees 28 minutes 52 seconds East, 77.50 feet South 64 degrees 32 minutes 52 seconds East, 49.80 feet South 66 degrees 39 minutes 52 seconds East, 18.40 feet South 40 degrees 53 minutes 52 seconds East, 17.50 feet South 10 degrees 13 minutes 08 seconds West, 83.20 feet to a point for corner on the north line of a of a called 9.536 acre tract described in a deed to TG Pipeline, L.P. recorded in Harris County Clerk's File No. Y 690074; THENCE, along the north line of said 9.536 acre tract the following courses and distances; North 40 degrees 26 minutes 08 seconds East, 75.20 feet South 81 degrees 03 minutes 52 seconds East, 200.00 feet North 72 degrees 29 minutes 08 seconds East, 106.50 feet North 29 degrees 51 minutes 08 seconds East, 75.10 feet South 83 degrees 39 minutes 52 seconds East, 34.70 feet North 67 degrees 17 minutes 08 seconds East, 70.50 feet North 68 degrees 25 minutes 08 seconds East, 96.50 feet South 13 degrees 32 minutes 52 seconds East, 42.10 feet South 79 degrees 56 minutes 52 seconds East, 112.20 feet South 85 degrees 32 minutes 52 seconds East, 39.80 feet South 73 degrees 07 minutes 52 seconds East,46.33 feet to the northeast corner of said 9.536 acre tract; THENCE, along the deed line of PS08-004 the following courses and distances South 73 degrees 07 minutes 52 seconds East, 29.67 feet South 74 degrees 43 minutes 52 seconds East, 125.20 feet South 83 degrees 06 minutes 52 seconds East, 75.70 feet South 23 degrees 56 minutes 52 seconds East, 81.60 feet South 45 degrees 44 minutes 52 seconds East, 23.00 feet South 43 degrees 50 minutes 52 seconds East, 100.00 feet South 63 degrees 10 minutes 52 seconds East, 29.40 feet South 54 degrees 25 minutes 52 seconds East, 97.50 feet South 54 degrees 15 minutes 52 seconds East, 125.10 feet K:1SdskSurv\Projects1030248021031985T2006bndy101011egaI1TRACT I REVISED GRQSS.doc S.R. Bertron Power Pfant Job 13015020H Ref. Map PS08 A, B. C EXHIBIT "A" Page 8 of 32 South 67 degrees 17 minutes 52 seconds East, 90.60 feet South 65 degrees 21 minutes 52 seconds East, 24.20 feet South 60 degrees 38 minutes 52 seconds East, 101.90 feet South 61 degrees 52 minutes 52 seconds East, 71.40 feet South 60 degrees 06 minutes 52 seconds East, 102.40 feet South 63 degrees 02 minutes 52 seconds East, 55.60 feet South 62 degrees 56 minutes 52 seconds East, 90.90 feet South 62 degrees 03 minutes 52 seconds East, 100.50 feet South 71 degrees 35 minutes 52 seconds. East, 45.00 feet South 86 degrees 25 minutes 57 seconds East, 66.72 feet to a point on the southerly line of the 8.663 acre tract recorded in Cause No. 71493 County Court of Law, Harris County, Texas and the northwesterly line of a 42.0877 acre tract conveyed to Humble Pipeline Company recorded in Harris County Clerk's File No. C347984; THENCE, South 21 degrees 09 minutes 09 seconds West with said northwesterly line of said 42.0877 acre, a distance of 733.72 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" set for corner; THENCE, South 34 degrees 24 minutes 09 seconds West, continuing with said northwesterly line and the southerly line of the herein described tract, a distance of 783.43 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for the northeast corner of a called 83.212 acre tract described in a deed to TG Pipeline, L.P. recorded in Harris County Clerk's File No. `r 690074; THENCE, South 34 degrees 24 minutes 09 seconds West, with the easterly line of said 83.212 acre tract and the common line of said 42.0877 acre tract, a distance of 1,688.91 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for the southeast corner of said 83.212 acre tract, from which a found 5/8-inch iron rod in concrete bears South 49 degrees 20 minutes 13 seconds West, a distance of 1.28 feet; THENCE, South 87 degrees 00 minutes, 39 seconds West, with the south line of said 83.212 acre tract a distance of 2,130.78 feel to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for the southwest corner of said 83.212 acre tract; THENCE, South 87 degrees 00 minutes, 39 seconds West, continuing along the deed line of PS08-004, a distance of 1,414.98 feet to the POINT OF BEGINNING and containing 462.852 acres of land, of which 23.744 acres were located within the discharge canal, of which 4.248 acres and 1.700 acres were located below the vegetation line at the date of the survey. K:1SdskSurv\Projects1030248021031985_2006_h4d 01011egaRTRACT 1 REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Nap PS08 A, B, C EXHIBIT "A" Page 9 of 32 7.382 Acres Description of 7.382 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being a portion of the S.R. Bertron Power Plant property out of the residue of a 400 acre tract conveyed to Houston Lighting and Power Company recorded in Volume 2643, Page 148 of the Deed Records of Harris County, Texas (H.C.D.R). All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21, et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W) recorded in Volume 181, Page 514, H.C.D.R_ and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of said 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut -Off Road having a value of Northing (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided K:1SdskSurv\Projects1030248021031985_'00G_bndy\010\legal\'fRACT t REVISED GROSS.doc S.R. Bertram Power Plant Job13015020H Ref. Map PS08 A, B, G EXHIBIT "A" Page 10 of 32 by Reliant Energy HL&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 7.382 acre tract is described by metes and bounds as follows: BEGINNING at said 3/4-inch iron pipe having coordinates of X = 3248200.59 and Y = 705877.35 found on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being a plant baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being a plant baseline monument N 0.00, W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 38 degrees 06 minutes 34 seconds West with the northeasterly line of Miller Cut -Off Road, a distance of 183.39 feet to a point for the common corner of PS08- 005 and a called 42.0877 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File No. C347984, from which a found 5/8-inch iron rod bears North 03 degrees 47 minutes 20 seconds West, a distance of 0.36 feet; THENCE, North 87 degrees 00 minutes 39 seconds East, with the common line of PS08-CO5 and said 42.0877 acre tract, a distance of 2196.41 feet to a fence corner found for corner on the west line of a 1.033 acre tract recorded in Volume 6449, Page 568 (H.C.D.R.); THENCE, South 02 degrees 59 minutes 21 seconds East, with the common line of PS08-005 and said 1.033 acre tract, a distance of 150.00 feet to a point for corner on the common line of the Arthur McCormick Survey and the W.J. Harris Survey and on the north line of a 6.7203 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File No. C106688 from which a found 5/8-inch iron rod bears North 09 degrees 58 minutes 24 seconds East, a distance of 0.25 feet; THENCE, South 87 degrees 00 minutes 39 seconds West, with the said line, and along the north line of said 6.7203 acre tract, the north line of a 5.25 acre tract conveyed to Coastal Industrial Water recorded in Harris County Clerk's File No. F597518, the north line of a 46.4006 acre tract conveyed to National Distillers and Chemical Corporation Authority recorded in Harris County Clerk's File No. C632918 and U065076, a distance of 2090.90 feet to the POINT OF BEGINNING and containing 7.382 acres of land. K;1SdskSurvTrojectsN030249021031985_2000_bndy\010\legal\TRACT i REVISED GROSS.doc EXHIBIT "A" Page 11 of 32 4.141 Acres S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, 8, C Description of 4.141 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being a portion of the S.R. Bertron Power Plant property out of the residue of a 400 acre tract conveyed to Houston Lighting and Power Company recorded in Volume 2643, Page 148 of the Deed Records of Harris County, Texas (H.C.D.R). All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21,et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the northeasterly right-of-way line of Miller Cut-off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.j. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of said 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut-off Road having a value of Northing (Y) = 707879.27 and tasting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided K:15dsk5urv\Projects\030248021031985_2006_bndy14i011egalk3RACT i REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 12 of 32 by Reliant Energy HL&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 4.141 acre tract is described by metes and bounds as follows: COMMENCING at said 3/4-inch iron pipe having coordinates of X = 3248200.59 and Y = 705877.35 found on the northeasterly right-of-way line of Miller Cut-off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 87 degrees 00 minutes 39 seconds East, along said common survey line and the north line of a 46.4006 acre tract recorded in Harris County Clerk's File No. C632918 and U065076, the north line of a 5.25 acre tract recorded in Harris County Clerk's File No. F597518, the north line of a 6.7203 acre tract recorded in Harris. County Clerk's File No. C106688, the south line of a 1.033 acre tract recorded in Volume 6449, Page 568, (H.C.D.R.), and the north line of a 1.1202 acre tract recorded in Harris County Clerk's File No. C632918, a distance of 2390.90 feet to a found 5/8-inch iron rod for the POINT OF BEGINNING having coordinates of X = 3250587,97, Y = 706002.02 of the herein described tract and also being the southeast corner of a 1.033 acre tract recorded in Volume 6449, Page 568, (H.C.D.R.); THENCE, North 02 degrees 59 minutes 21 seconds West, with the common line of PS08-006 and said 1.033 acre tract, a distance of 150.00 feet to a point for corner on the south line of a 42.0877 acre tract recorded in Harris County Clerk's File No. C347984, from which a found 5/8-inch iron rod bears South 60 degrees 41 minutes 15 seconds East, a distance of 0.16 feet; THENCE, North 87 degrees 00 minutes 39 seconds East, with the common line of PS08-CO5 and said 42.0877 acre tract, at 1044.07 feet passing a 3/4-inch rod found for a reference point, for a total distance of 1224.07 feet to a point for corner in San Jacinto Bay; THENCE, South 12 degrees 59 minutes 54 seconds West, a distance of 156.04 feet to a point for corner on the common survey line of the Arthur McCormick and W.J. Harris Survey; K;ISdskSurVTTOjectSl030248021031985_2006_bndy1OINegaATRACTI REVISED GROSS.doe S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A„ Page 13 of 32 THENCE, South 87 degrees 00 minutes 39 seconds West, at 244.97 feet passing a 5/8- inch iron rod with plastic cap stamped "Carter & Burgess" set for a reference point, on said survey line, also being the north line of a 15.00 acre tract recorded in Harris County Clerk's File NO. C935818 and continuing along the north line of a 21.9491 acre tract recorded in Clerk's File No.'s C632918 and U065076, the north line of a 10.43 acre tract recorded in Harris County Clerk's File No. F014216, the north line of a 1.202 acre tract recorded in Harris County Clerk's File No. C632918, for a total distance of 1181.10 feet to the POINT OF BEGINNING and containing 4.141 acres of land of which 0.646 acres lies below the vegetation line at the date of the survey, 92.344 Acres Description of 92.344 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being out of the residue of a 125.308 acre tract (known as Barnes Island) conveyed to Houston Lighting and Power Company recorded in Volume 2624, Page 530 of the Deed Records of Harris County, Texas (H.C.D.R); All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21, et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut -Off Road having a value of Northing (Y) = 707879.27 and K:1SdskSurvlPrajects1fl30248021031985_2006_bndy10101iega11TRACT 1 REVISED GAOSS.doc S.R. Bertron Power Plant Job 130150201-1 Ref. Map PS08 A, B, C EXHIBIT "A" Page 14 of 32 Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy H.L.&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 92.344 acre tract is described by metes and bounds as follows. COMMENCING at said 3/4-inch iron pipe having coordinates of X = 3248200.59 and Y = 705877.35 found on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 56 degrees 08 minutes 36 seconds East, a distance of 5991.46 feet to a point for the POINT OF BEGINNING having coordinates of X = 3253175.53 and Y = 709214.93 on the west line of a 0.0035 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File No. C 347984 and on the north line of a 8.663 acre tract recorded under Cause No. 71493, County Court of Law, Harris County, Texas; THENCE, North 66 degrees 51 minutes 22 seconds West, with the common deed line between PS08-007 and PS08-009, a distance of 168.95 feet to a point for corner; THENCE, North 45 degrees 10 minutes 22 seconds West, a distance of 147.80 feet to a point for corner; THENCE, North 63 degrees 27 minutes 22 seconds West, a distance of 153.70 feet to a point for corner; THENCE, North 53 degrees 27 minutes 22 seconds West, a distance of 112.50 feet to a point for corner; K:\SdskSurv\Projects\03024802103i985_2006_bndy101011eca}1TRACTI REVISED GROSS.doc S.R. Bertron Rower Plant Job13015020H Ref. Map PS08 A, 3, C EXHIBIT "A" Page 15 of 32 THENCE, North 32 degrees 34 minutes 22 seconds West, a distance of 314.60 feet to a point for corner; THENCE, North 39 degrees 31 minutes 22 seconds West, a distance of 132.00 feet to a point for corner; THENCE, North 73 degrees 20 minutes 22 seconds West, a distance of 115.00 feet to a point for corner; THENCE, South 69 degrees 02 minutes 38 seconds West, a distance of 53.80 feet to a point for corner; THENCE, South 46 degrees 24 minutes 22 seconds East, a distance of 86.00 feet to a point for corner; THENCE, South 26 degrees 36 minutes 22 seconds East, a distance of 181.80 feet to a point for corner; THENCE, South 62 degrees 53 minutes 38 seconds West, a distance of 36.00 feet to a point for corner; THENCE, North 39 degrees 13 minutes 22 seconds West, a distance of 140.60 feet to a point for corner; THENCE, North 36 degrees 04 minutes 22 seconds West, a distance of 153.70 feet to a point for corner; THENCE, North 01 degrees 18 minutes 22 seconds West, a distance of 54.80 feet to a point for corner; THENCE, North 50 degrees 17 minutes 22 seconds West, a distance of 45.10 feet to a point for corner; THENCE, North 04 degrees 31 minutes 22 seconds West, a distance of 166.80 feet to a point for corner; THENCE, North 68 degrees 42 minutes 38 seconds East, a distance of 80.40 feet to a point for corner; THENCE, North 17 degrees 28 minutes 38 seconds East, a distance of 86.10 feet to a point for corner; K:1SdskSurvlProjects1030248021031985_2006_bndy10101iegai\TRACT 1 REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B. C EXHIBIT "A" Page 16 of 32 THENCE, North 59 degrees 49 minutes 38 seconds East, a distance of 75.70 feet to a point for corner; THENCE, North 16 degrees 34 minutes 38 seconds East, a distance of 62.40 feet to a point for corner; THENCE, North 43 degrees 06 minutes 22 seconds West, a distance of 109.90 feet to a point for corner; THENCE, North 25 degrees 37 minutes 22 seconds West, a distance of 158.50 feet to a point for corner; THENCE, North 18 degrees 29 minutes 22 seconds West, a distance of 174.90 feet to a point for corner; THENCE, North 49 degrees 03 minutes 22 seconds West, a distance of 161.30 feet to a point for corner; THENCE, North 26 degrees 03 minutes 22 seconds West, a distance of 161.40 feet to a point for corner; THENCE, continuing with the boundary line of PS08-007 the following deed line courses and distances: North 22 degrees 06 minutes 38 seconds East, 127.00 feet North 01 degrees 01 minutes 22 seconds West, 120.20 feet North 02 degrees 09 minutes 22 seconds West, 100.20 feet North 04 degrees 40 minutes 22 seconds West, 103.70 feet North 71 degrees 03 minutes 22 seconds West, 224.90 feet North 34 degrees 41 minutes 22 seconds West, 103.70 feet North 10 degrees 51 minutes 22 seconds West, 214.40 feet North 39 degrees 48 minutes 38 seconds East, 85.40 feet North 24 degrees 24 minutes 38 seconds East, 104.50 feet South 79 degrees 47 minutes 22 seconds East, 144.60 feet North 52 degrees 08 minutes 38 seconds East, 70.90 feet North 41 degrees 06 minutes 38 seconds East, 32.10 feet North 28 degrees 37 minutes 38 seconds East, 40.30 feet North 05 degrees 52 minutes 22 seconds West, 24.10 feet North 80 degrees 45 minutes 38 seconds East, 32.47 feet South 50 degrees 27 minutes 22 seconds East, 114.78 feet North 88 degrees 53 minutes 38 seconds East, 241.80 feet K:1SSdskSurv\Projects1030248021031985_2006 hndy101011ega11TRACT 1 REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 17 of 32 South 64 degrees 55 minutes 22 seconds East, 185.40 feet South 50 degrees 55 minutes 22 seconds East, 267.30 feet South 65 degrees 14 minutes 22 seconds East, 20.00 feet South 37 degrees 35 minutes 22 seconds East, 71.60 feet South 64 degrees 49 minutes 22 seconds East, 70.10 feet South 86 degrees 17 minutes 22 seconds East, 125.80 feet North 49 degrees 25 minutes 38 seconds East, 53.90 feet South 78 degrees 47 minutes 22 seconds East, 99.00 feet South 44 degrees 24 minutes 22 seconds East, 38.90 feet South 09 degrees 47 minutes 22 seconds East, 144.80 feet South 05 degrees 32 minutes 22 seconds East, 91.70 feet South 64 degrees 47 minutes 22 seconds East, 141.40 feet South 89 degrees 10 minutes 22 seconds East, 68.60 feet South 68 degrees 11 minutes 22 seconds East, 100.10 feet South 69 degrees 38 minutes 22 seconds East, 205.00 feet South 56 degrees 52 minutes 22 seconds East, 97.70 feet South 74 degrees 07 minutes 22 seconds East, 47.10 feet North 61 degrees 13 minutes 38 seconds East, 61.60 feet South 68 degrees 11 minutes 22 seconds East, 50.00 feet South 46 degrees 23 minutes 22 seconds East, 379.80 feet South 61 degrees 06 minutes 22 seconds East, 116.60 feet South 65 degrees 20 minutes 22 seconds East, 100.40 feet South 76 degrees 45 minutes 22 seconds East, 78.39 feet to a point on the westerly line of a 24.042 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File No. C 347984; THENCE, South 26 degrees 54 minutes 09 seconds West, with the common deed line of PS08-CO7 and said 24.042 acre tract, a distance of 749.19 feet to a point for corner; THENCE, South 60 degrees 26 minutes 09 seconds West, with said common deed line a distance of 845.47 feet to a point for corner; THENCE, South 21 degrees 09 minutes 09 seconds West, with said common deed line a distance of 484.02 feet to a point for corner on the northeasterly fine of said 8.663 acre tract and the southwesterly line of said 24.042 acre tract; THENCE, North 79 degrees 26 minutes 22 seconds West, with the northwesterly fine of said 8.663 acre tract, a distance of 5.52 feet to a point for corner; THENCE, North 81 degrees 40 minutes 22 seconds West, a distance of 110.00 feet to a point for corner; K:4SdskSurv\Projects1031)24802\031985_2006bndy10101ie8al\TRACT 1 REVISED GROSS.doe S.R. Bertron Power Plant Jab 13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 18 of 32 THENCE, South 57 degrees 24 minutes 22 seconds East, a distance of 97.90 feet to a point for corner; THENCE, South 53 degrees 53 minutes 22 seconds East, a distance of 17.18 feet to a point for corner, being the north corner of said 0.0035 acre tract recorded in Harris County Clerk's File No. C347984; THENCE, South 21 degrees 09 minutes 09 seconds West, a distance of 8.54 feet to the POINT OF BEGINNING and containing 92.344 acres of land of which 63.092 acres lies below the vegetation line at the date of the survey. 8.909 Acres Description of 8.909 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being out of the residue of a 125.308 acre tract (known as Barnes Island) conveyed to Houston Lighting and Power Company recorded in Volume 2624, Page 530 of the Deed Records of Harris County, Texas (H.C.D.R); All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21, et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) 705877.35 and Easting (X) = 3248200.59 found at an angle point on the Northeasterly right-of-way line of Miller Cut-off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly K:1SdskSurv\Projects1030248021031985_2006_hiidy10101lega11TRACT I REVISED GROSS.dac S.R. Bertron Power Punt Job13015020H Ref_ Map PS03 A. B, C EXHIBIT "A" Page 19 of 32 right-of-way line of Miller Cut-off Road having a value of Northing (Y) = 707879.27 and Easting (X) _ 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value N 0.00, E 0.00 having coordinates of = 3251825.00 and Y = 708085.00 as provided by Reliant Energy H.L.&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 8.909 acre tract is described by metes and bounds as follows: COMMENCING at said 3/4-inch iron pipe having coordinates of = 3248200.59 and Y = 705877.35 found on the northeasterly right-of-way line of Miller Cut-off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant baseline monument N 0.00, W 205', bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being plant baseline monument N 0.00, W 3450' bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 54 degrees 57 minutes 58 seconds East, a distance of 8161.46 feet to the POINT OF BEGINNING having coordinates of X = 3254882.58 and Y = 710562.08 at the northeast corner of a 24.042 acre tract described to Humble Pipeline Company recorded in Harris County Clerk's File Number C347984; THENCE, the following deed line courses and distances: South 38 degrees 39 minutes 22 seconds East, 10.36 feet South 82 degrees 23 minutes 22 seconds East, 92.20 feet South 87 degrees 55 minutes 22 seconds East, 112.80 feet South 83 degrees 44 minutes 22 seconds East, 199.10 feet South 06 degrees 06 minutes 38 seconds West, 103.00 feet South 13 degrees 42 minutes 38 seconds West, 271.00 feet South 26 degrees 31 minutes 38 seconds West, 130.00 feet South 45 degrees 18 minutes 38 seconds West, 102.40 feet South 43 degrees 34 minutes 38 seconds West, 100.10 feet K:15dskSurvlProjects1030248021031985_2000_biidy\QI011egalNTRACT I REVISEDGROSS.doc S.R. Bertron Power Rant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 20 of 32 South 46 degrees 59 minutes 38 seconds West, 105.40 feet South 52 degrees 16 minutes 38 seconds West, 65.00 feet South 65 degrees 29 minutes 38 seconds West, 100.10 feet South 66 degrees 03 minutes 38 seconds West, 100.10 feet South 53 degrees 41 minutes 38 seconds West, 251.60 feet North 10 degrees 53 minutes 38 seconds East, 131.20 feet South 80 degrees 46 minutes 22 seconds East, 57.20 feet North 47 degrees 13 minutes 38 seconds East, 81.60 feet North 23 degrees 10 minutes 22 seconds West, 174.62 feet to a point on the easterly line of said 24.042 acre tract; THENCE, North 10 degrees 17 minutes 19 seconds East, with the common line of PS08-CO8 and said 24.0420 acre tract, a distance of 115.33 feet to a point for corner; THENCE, North 26 degrees 54 minutes 09 seconds East, continuing with said common line, a distance of 635.05 feet to the POINT OF BEGINNING and containing 8.909 acres of land of which 8.909 acres lies below the vegetation line at the date of survey. LESS AND EXCEPT (TRACT 2) 6.080 Acres Description of 6.080 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being out of a 462.852 acre tract referred to as PS08-004 attached hereto and being a part hereof. All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21, et, seq, with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the Northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the K:1SdskSurvYrojects1030248021031985_2006_bndy101011ega11TRACT l REVISED GROSS.doc S.R. Bertron Power Plant Job 13015020H Ref. M2P PS08 A, S, C EXHIBIT "A" Page 21 of 32 southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut -Off Road having a value of Northing (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy HUP. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 6.080 acre tract is described by metes and bounds as follows: COMMENCING at said 3/4-inch iron pipe having coordinates of X = 3248200.59 and Y = 705877.35 at an angle point on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 11 degrees 34 minutes 20 seconds East, a distance of 3005.32 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for the southeast corner of PS08-010 and PS08-011 and the POINT OF BEGINNING having coordinates of X = 3248803.41 and Y = 708821.24; THENCE, North 79 degrees 58 minutes 57 seconds West, with the common line of said PS08-010 AND PS08-011, a distance of 530.58 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; K:ISdskSurv\Projects1030248021031985_2006_bndy101011egal1TRACT I REVISER GROSS.doc S.R. Bertron Power Plant .lob 130150201-1 Ref. Map PS08 A. B, C EXHIBIT "A" Page 22 of 32 THENCE, North 00 degrees 22 minutes 43 seconds East, with said common line, a distance of 124.81 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for an angle point; THENCE, North 02 degrees 49 minutes 28 seconds East, with said common line, a distance of 140.69 feet to a 3/4-inch iron rod with plastic cap stamped"Reliant Energy HL&P" found for corner; THENCE, North 56 degrees 22 minutes 43 seconds East, with said common line, a distance of 176.75 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy H L&P" found for the beginning of a non -tangent curve to the right; THENCE, northeasterly with said non -tangent curve to the right, from which the radius point bears South 38 degrees 03 minutes 59 seconds East, having a radius of 705.20 feet, a delta angle of 10 degrees10 minutes 55 seconds, a chord bearing of North 57 degrees 01 minutes 29 seconds East, a chord distance of 125.16 feet, an arc length of 125.32 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P° found for a point of a non -tangent curve to the right; THENCE, northeasterly with said non -tangent curve to the right, from which the radius point bears South 30 degrees 12 minutes 24 seconds East, having a radius of 380.51 feet, a delta angle of 40 degrees 37 minutes 13 seconds, a chord bearing of North 80 degrees 06 minutes 13 seconds East, a chord distance of 264.16 feet, an arc length of 269.77 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for corner; THENCE, South 79 degrees 59 minutes 51 seconds East, a distance of 101.28 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" set for corner; THENCE, South 10 degrees 01 minutes 03 seconds West, a distance of 559.96 feet to the POINT OF BEGINNING and containing 6.080 acres of land. LESS AND EXCEPT (TRACT 3) 11.746 ACRES Description of 11.746 acres of land out of the Arthur McCormick Survey, Abstract Number 46, Harris County, Texas, being out of a 462.852 acre tract referred to as PS08-004 attached hereto and being a part hereof. K:1SdskSurvlProjects103024802103[985_200G bndy101011egal\TRACT I REMISED GR055.dac S.R. Sertron Power Plant Job 13015020H Ref_ Map PS08 A, B, C EXHIBIT "A" Page 23 of 32 All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21, et, seq. with the coordinates based on a 3/4-inch iron pipe having coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the Northeasterly right-of-way line of Miller Cut-off Road (60' R.D.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut-off Road having a value of Northing (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value'of N 0.00, E 0.00 having coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy HL&P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 11.746 acre tract is described by metes and bounds as follows: COMMENCING at said found 3/4-inch iron pipe having coordinates of X = 3248200,59 and Y = 705877.35 at an angle point on the northeasterly right-of-way line of Miller Cut- off Road (60' R.O.W.) in the common survey line of the Arthur McCormick Survey, Abstract 46 and the W.J. Harris Survey, Abstract 29, and also being the southwest corner of said 400 acre tract from which a found brass disk in concrete being plant K:1SdskSurv\Projects1030248021031985_2006 bndy101011ega11TRACT 1 REVISED GROSS.doe S.R. 3ertron Power Plant Jain 13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 24 of 32 baseline monument N 0.00, W 205, bears North 56 degrees 45 minutes 29 seconds East a distance of 4,092.66 feet, and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 04 degrees 37 minutes 37 seconds East, a distance of 2816.18 feet; THENCE, North 43 degrees 30 minutes 34 seconds East, a distance of 3,598.88 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for the POINT OF BEGINNING having coordinates of X = 3250678.05 and Y = 708487.17 for the southeast corner of PS08-009 and a common corner with PS08-011; THENCE, North 80 degrees 02 minutes 51 seconds West, with the common line between PS08-009 and PS08-011, a distance of 1,182.54 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for a common corner; THENCE, North 10 degrees 12 minutes 12 seconds East, at 4.24 feet passing a common corner of PS08-009 and PS08-011 for a total distance of 469.29 feet to a 3/4- inch iron rod with plastic cap stamped `Reliant Energy HL&P" found for a common corner of PS08-009 and PS08-011; THENCE, South 79 degrees 47 minutes 48 seconds East, with the common line of PS08-009 and PS08-011, at 389.16 feet passing a common corner of PS08-011, at 425.85 feet passing the southwest corner of PS08-012, at 512.64 feet passing the northwest corner of PS08-G107, at 527.02 feet passing the southeast corner of said PS08-012, at 539.88 feet passing the southwest comer of PS08-015, for a total distance of 549.82 feet to a W cut on a metal lid" found for corner on the common line of PS08- 009 and PS08-015; THENCE, South 10 degrees 12 minutes 12 seconds West, at 50.41 feet passing the northeast corner of PS08-G107, for a total distance of 79.70 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for angle point on the common line of PS08-009 and PS08-015; THENCE, South 79 degrees 59 minutes 38 seconds East, at 85.65 passing the southeast corner of PS08-015, for a total distance of 202.62 to an "V cut in concrete found for corner; THENCE, North 09 degrees 56 minutes 23 seconds East, a distance of 149.23 feet to an "X" cut in concrete found for corner; THENCE, South 79 degrees 44 minutes 38 seconds East, a distance of 140.18 feet to a 3/4-inch iron rod with plastic cap stamped "Reliant Energy HL&P" found for corner; K:1SdskSurvTrojects1030248021031985_2006_Undy101011ega11TRACT 1 REVISED GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, 8, C EXHIBIT "A" Page 25 of 32 THENCE, South 09 degrees 57 minutes 20 seconds West, at 44.44 feet passing the northeast corner of PS08-G105, at 68.49 feet passing the southeast corner of said PS08-G105, for a total distance of 186.72 feet to a p.k. nail with shiner found for corner; THENCE, South 79 degrees 53 minutes 22 seconds East, at 26.41 feet passing the northwest corner of PS08-G100, at 56.66 feet passing the northeast corner of said PS08-G100, at 86.69 feet passing the northwest corner of PS08-G102, at 116.66 feet passing the northeast corner of said PS08-G102, at 179.17 feet passing the northwest corner of P308-G 101, at 203.52 feet passing the northeast corner of said PS08-101, for a total distance of 288.40 feet to a 314-inch iron rod with plastic cap stamped "Reliant Energy HUP" found for the northeast corner of PS08-009 and also being a common comer of PS08-011; THENCE, South 09 degrees 58 minutes 31 seconds West, with said common line, a distance of 347.96 feet to the POINT OF BEGINNING and containing 11.746 acres LESS AND EXCEPT (TRACT 6) 83.212 Acres Description of 83.212 acres (3,624,700 square feet) located in the S.R. Bertron Power Plant situated in the A. McCormick Survey, A - 46, Harris County, Texas, being out of a called 462.852 acre tract described in a deed to Texas Genco recorded in Harris County Clerk's File Number W 048257 and also being the same property described in a deed to T G Pipeline, L.P. recorded in Harris County Clerk's File Number Y 690074 of the Official Public Records of Real Property of Harris County, Texas. All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21,et, seq. with the coordinates based on a 3/4-inch iron pipe having grid coordinates of Northing K:1SdskSurvTrojects1030248021031985_2006_bndy\Ol011egal\TRACT l REVISED GROSS.doc S.R. Bertron Power Plant Job13095020H Ref. Map PS08 A, B. C EXHIBIT "A" Page 26 of.32 (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the northeasterly right-of-way fine of Miller Cut -Off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the A. McCormick Survey, A - 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.56 feet on the northeasterly right-of-way line of Miller Cut -Off Road having agrid value of Northing (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having grid coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy H L& P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 83.212 acres is described by metes and bounds as follows: BEGINNING at said 3/4-inch iron rod with plastic cap stamped "Reliant Energy H L & P" having grid coordinates of X = 3251477.05 and Y = 706398.90 found at an angle point of a called 42.0877 acre tract in a deed to Humble Pipeline Company recorded under Harris County Clerk's File Number C347984 of the Official Public Records of Real Property of Harris County, Texas, from which a found 5/8-inch iron rod in concrete bears South 49 degrees 20 minutes 13 seconds West, 1.28 feet and from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 04 degrees 31 minutes 10 seconds East a distance of 1628.19 feet and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 53 degrees 09 minutes 08 seconds West, a distance of 3810.96 feet; K:1,SdskSurvTrojects1030248021431985_2006_Undy1010\le,-2ATRACT I REVISED GRQSS.doc S.R. Berfron Power Plant Job 13015020H Ref, Map PS08 A, 8, C EXHIBIT "A" Page 27 of 32 THENCE, South 87 degrees 00 minutes 39 seconds West, with the north line of said 42.0877 acre tract, a distance of 2,130.78 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 26 degrees 37 minutes 36 seconds West, departing said north line, at a distance of 29.41 feet pass a found 5/8-inch iron rod with plastic cap stamped "Carter & Burgess", a distance of 700.07 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, South 63 degrees 23 minutes 30 seconds West, a distance of 19.63 feet passing a mag nail with washer stamped "Carter & Burgess" found for the northwest corner of SRB TANK-G07, in all a total distance of 276.19 feet to a chain fink fence corner; THENCE, North 26 degrees 28 minutes 59 seconds West, a distance of 295.70 feet to a chain link fence corner; THENCE, North 61 degrees 43 minutes 48 seconds East, a distance of 56.26 feet to a chain link fence corner; THENCE, North 67 degrees 34 minutes 37 seconds East, a distance of 515.08 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 81 degrees 01 minutes 30 seconds East, a distance of 283.12 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, South 08 degrees 58 minutes 30 seconds East, a distance of 63.42 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 87 degrees 59 minutes 28 seconds East, a distance of 549.25 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 66 degrees 30 minutes 59 seconds East, a distance of 1175.20 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 67 degrees 49 minutes 45 seconds East, a distance of 456.07 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 62 degrees 48 minutes 24 seconds East, a distance of 285.24 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; K:ISdskSurv\Projects1030248021031985_2006_biidy101011ega11TRACT 1 REVISED GRO SS.doc S.R. Berfron Power Plant Job13015020H Ref, Map PS08 A, B, C EXHIBIT "A" Page 28 of 32 THENCE, South 90 degrees 00 minutes 00 seconds East, a distance of 505.09 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, South 30 degrees 32 minutes 13 seconds East, a distance of 298.20 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner in the west fine of said 42.0877 acre tract; THENCE, South 34 degrees 24 minutes 09 seconds West, with the west line of said 42.0877 acre tract, a distance of 1688.91 feet to the POINT OF BEGINNING and containing. 83.212 acres of land. LESS AND EXCEPT (TRACT 7) 9.536 Acres Description of 9.536 acres (415,397square feet) located in the S.R. Bertron Power Plant situated in the A. McCormick Survey, A - 46, Harris County, Texas, being out of a called 462.852 acre tract described in a deed to Texas Genco recorded in Harris County Clerk's File Number W 048257 and also being the same property described in a deed to T G Pipeline, L.P. recorded in Harris County Clerk's File Number Y 690074 of the Official Public Records of Real Property of Harris County, Texas. All bearings herein refer to the Texas Coordinate System of 1927, South Central Zone, as defined in the Texas Natural Resources Code, Section 21,et, seq. with the coordinates based on a 3I4-inch iron pipe having grid coordinates of Northing (Y) = 705877.35 and Easting (X) = 3248200.59 found at an angle point on the northeasterly right-of-way line of Miller Cut -Off Road (60' R.O.W.) recorded in Volume 181, Page 514, H.C.D.R. and the common survey line of the A. McCormick Survey, A - 46 and the W.J. Harris Survey, Abstract 29 of Harris County, Texas and being the southwesterly corner of a 400 acre tract recorded in Volume 2643, Page 148 of the K:1Sdsk5urv\Projects1030248021031985_200G bndy101011ega11TPACT 1 REVISED GROSS.doc S.R. Sertron Power Plant Job 13015020H Ref. Map PS08 A, 8, C EXHIBIT "A" Page 29 of 32 H.C.D.R. and the position of a 3/4-inch iron pipe found having a bearing of North 38 degrees 06 minutes 34 seconds West, a distance of 2544.5E feet on the northeasterly right-of-way line of Miller Cut -Off Road having a grid value of Northing (Y) = 707879.27 and Easting (X) = 3246630.36. These values were determined from the S.R. Bertron Power Plant East-West baseline monument system with a Lambert bearing of North 80 degrees 00 minutes 00 seconds West and a plant coordinate value of N 0.00, E 0.00 having grid coordinates of X = 3251825.00 and Y = 708085.00 as provided by Reliant Energy H L& P. All distances shown hereon are surface. To convert to a grid distance multiply by the applied scale factor of 0.9998861. Said 9.536 acres is described by metes and bounds as follows: COMMENCING at said 3/4-inch iron rod with plastic cap stamped "Reliant Energy H L & P" having grid coordinates of X = 3251477.05 and Y = 706398.90 found at an angle point of a called 42.0877 acre tract in a deed to Humble Pipeline Company recorded under Harris County Clerk's File Number C347984 of the Official Public Records of Real Property of Harris County, Texas, from which a found 5/8-inch iron rod in concrete bears South 49 degrees 20 minutes 13 seconds West, 1.28 feet and from which a found brass disk in concrete being plant baseline monument N 0.00, W 205, bears North 04 degrees 31 minutes 10 seconds East a distance of 1628.19 feet and a found brass disk in concrete being plant baseline monument N 0.00, W 3450 bears North 53 degrees 09 minutes 08 seconds West, a distance of 3810,96 feet; THENCE, North 02 degrees 16 minutes 37 seconds East, a distance of 2798.18 feet to a chain link fence comer for the POINT OF BEGINNING of the herein described tract having grid coordinates of X= 3251575.22 and Y= 709208,33; THENCE, North 82 degrees 26 minutes 15 seconds West, a distance of 37.38 feet to an angle point on the centerline of a concrete wall; THENCE, South 10 degrees 11 minutes 15 seconds West, continuing with the centerline of a concrete wall, a distance of 9.69 feet to an angle point on the centerline of a concrete wall; K:1SdskSnrvlProjects10302480210319 85_200G_bndy%OIONiegaINTRACT I REVISED GROSS.doc S.R. 6ertron Power Plant Job 13015020H Ref. Map PS08 A, B. C EXHIBIT "A" Page 30 of 32 THENCE, South 53 degrees 11 minutes 54 seconds West, continuing with the centerline of a concrete wail, a distance of 18.83 feet to an angle point on the centerline of a concrete wall; THENCE, North 80 degrees 14 minutes 53 seconds West, continuing with the centerline of a concrete wall, a distance of 458.18 feet to an angle point on the centerline of a concrete wall; THENCE, North 50 degrees 17 minutes 00 seconds West, continuing with the centerline of a concrete wall, a distance of 18.91 feet to an angle point on the centerline of a concrete wall; THENCE, North 80 degrees 13 minutes 27 seconds West, continuing with the centerline of a concrete wall, a distance of 110.50 feet to an angle point on the centerline of a concrete wall; THENCE, North 09 degrees 54 minutes 44 seconds East, departing the centerline of a concrete wall, a distance of 155.24 feet to a 518-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 79 degrees 50 minutes 09 seconds West, a distance of 39.80 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 10 degrees 09 minutes 51 seconds East, a distance of48.88 feet passing a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for the beginning of SRB TANK — G08 Being the centerline of a 40' wide Ingress and Egress Easement, in all a total distance of 68.88 feet to pk nail with washer found for corner; THENCE, North 82 degrees 28 minutes 03 seconds West, a distance of 82.58 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 09 degrees 57 minutes 56 seconds East, a distance of 56.40 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 78 degrees 59 minutes 24 seconds West, a distance of 171.63 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 11 degrees 18 minutes 13 seconds East, a distance of 51.18 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; THENCE, North 57 degrees 08 minutes 53 seconds East, a distance of 94.24 feet to a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner; K:1SdskSurv\Projects1030248021031985_2006_bndy101011egallTRACT 1 REVISFD GROSS.doc S.R. Bertron Power Plant Job13015020H Ref. Map PS08 A, B, C EXHIBIT "A" Page 31 of 32 THENCE, North 81 degrees 17 minutes 30 seconds East, a distance of 42.82 feet to an angle point on the centerline of a concrete wall; THENCE, South 21 degrees 38 minutes 57 seconds East, continuing with the centerline of a concrete wall, a distance of 24.10 feet to an angle point on the centerline of a concrete wall; THENCE, South 79 degrees 52 minutes 12 seconds East, continuing with the centerline of a concrete wall, a distance of 286.98 feet to an angle point on the centerline of a concrete wall; THENCE, North 15 degrees 23 minutes 01 seconds East, departing the centerline of a concrete wall, a distance of 23.82 feet to an angle point on the north deed line of said 462.852 acre tract; THENCE, North 40 degrees 26 minutes 08 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 75.20 feet to an angle point in water, THENCE, South 81 degrees 03 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 200.00 feet to an angle point in water; THENCE, North 72 degrees 29 minutes 08 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 106.50 feet to an angle point in water; THENCE, North 29 degrees 51 minutes 08 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 75.10 feet to an angle point in water; THENCE, South 83 degrees 39 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 34.70 feet to an angle point in water; THENCE, North 67 degrees 17 minutes 08 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 70.50 feet to an angle point in water; THENCE, North 68 degrees 25 minutes 08 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 96.50 feet to an angle point in water; THENCE, South 13 degrees 32 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 42.10 feet to an angle point in water; THENCE, South 79 degrees 56 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 112.20 feet to an angle point in water; K:1SdskSurv\Projects103024802103 1985_2006_bndy101011egal\TP,ACT I REVISED GROSS.doe S.R. 8ertron Power Plant Job 13015020H Ref. Map P508 A, 8, C EXHIBIT "A" Page 32 of 32 THENCE, South 85 degrees 32 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 39.80 feet to an angle point; THENCE, South 73 degrees 07 minutes 52 seconds East, continuing with said north deed line of the 462.852 acre tract, a distance of 46.33 feet to an angle point; THENCE, South 39 degrees 48 minutes 09 seconds East, departing said north deed line of the 462.852 acre tract, a distance of 8.48 feet passing a 5/8-inch iron rod with plastic cap stamped "Carter & Burgess" found for corner of SRB TANK — G08 being the end of the centerline of a 40' wide Ingress and Egress Easement, in all a total distance of 28.48 feet to a chain link fence corner; THENCE, South 46 degrees 00 minutes 58 seconds West, continuing with said chain link fence line, a distance of 428.17 feet to a chain link fence corner; THENCE, South 10 degrees 27 minutes 05 seconds West, continuing with said chain link fence line, a distance of 267.74 feet to the POINT OF BEGINNING and containing 9.536 acres of land leaving a remainder of 465.054 Net Acres of Land. A Survey drawing was prepared by Carter & Burgess, Inc. in conjunction with this metes and bounds description. 44, Anthony R. P acock, R.P.L.S. °�� ssr� �1+ � �° Registered Professional Land Surveyor Texas Registration No. 5047 �.a���Y R. Pic..c�• 5447 I Date: January 26,2006 �� a O ss►©�s ; Carter & Burgess, Inc. u��� Ate` m„ Job No. 031985.010.001,0001 K:1Sdsk8urv\Projects1030248021031985_2006bndyl010Ueeal1TRACT I REVISED C;ROSS.dor "EXHIBIT BR Attach Plat reflecting the ownership boundary lines; a site layout, showing all improvements, including pipelines and railroads, and also showing areas of the Land previously annexed by the City of La Porte.) 13 "EXHIBIT C" Page 1 of 3 RULES AND REGULATIONS Any portion. of Land constituting a strip of land 100' wade and contiguous to either Fairmont Parkway, State Highway 225, or State Highway 146 shall be subject to the following rules and regulations pertaining to new signage, screening, driveways and median crossovers. These rules and regulations shall apply after the. effective date of this Agreement when Company develops or constructs improvements on vacant Land described in Exhibit "A', which'is adjacent to Fairmont Parkway, State Highway 225, or State Highway 146. 1. Any sign erected in said 100' strip of land shall be subject to the following provisions: ♦ one freestanding identification sign shall be permitted for each side of an industrial establishment that fronts on an improved public right-of-way. ♦ Freestanding identification signs for single tenant buildings shall not exceed 150 square feet in area. ♦ one freestanding identification sign for identifying multiple businesses is allowable at the intersection of improved public rights -of -way. ♦ Freestanding identification signs for multiple businesses shall not exceed 350 square feet. ♦ Freestanding identification signs shall not exceed 45 feet in height. ♦ Minimum setback ,for sign construction shall be ten (10) feet from property lines. 2_ When Land adjacent to said 100' strip is developed, the initial 50, of said strap beyond any existing pipeline easement contiguous to either Fairmont Parkway, State Highway 225, or State Highway 146 shall be screened by one of the following techniques: a) Leaving in place existing trees, vegetation, underbrush, etc. to provide a thorough and effective visual screening of the development. Existing trees shall, together with other vegetation and underbrush, create a continuous visual screen. 14 "EXHIBIT C° Page 2 of 3 b) The use of earthen berms with approximately 3:1 side slopes, 50, wide at the base and 8' high. The beans may be landscaped with a combination of trees, shrubs, and ground cover. All berms and landscaping will be maintained by the property owners. c) A screening plan, to be approved by the City, that includes a combination of trees, shrubs, and ground cover that after 5 years growth will, be at least 20 feet in height and shall, together with shrubs and ground cover, create a continuous visual screen. Provided, however, in public utility easements or rights -of --way, the vegetation shall be installed and maintained in a manner which is acceptable to the public utility company, and does not interfere with the operation and maintenance of the public utility facilities. For items b and c above, the actual length of required screening along the roadway will be equal to the length of the new development that is parallel to the roadway. Screening shall not be required for new development that is to the rear of or behind existing facilities. In all cases the 50' strip, along the entire roadway frontage, shall be dedicated as a landscape easement and shall be kept free from any improvements except for approved driveway access and identification signs. For cases of new development or improvements where a 50' landscape easement is not available or practical, Company shall meet with City to determine a suitable landscaping alternative. d) In the case of Land contiguous to Fairmont Parkway, in addition to the other requirements of these Rules and Regulations, Company shall dedicate to City by Plat a ten foot (101) wide pedestrian and bicycle easement, extending along Company's Fairmont Parkway boundary, within the fifty foot (501) landscape easement. The pedestrian easement shall not be within any pipeline facility, except for necessary crossings. 3. Driveways opening from said strip of land onto Stare Highway 225 or State Highway 146 shall be subject to the rules and regulations of the Texas Department of Transportation and provisions of the City's Code of Ordinances, whichever is more restrictive. Driveways opening from said strip of land onto Fairmont Parkway shall be subject to the rules and regulations of Harris County and provisions of the City's Code of Ordinances, whichever is more restrictive. 15 "EMBIT Cu Page 3 of 3 4. Driveways opening from said strip of land onto Fairmont Parkway shall be approved by the City and may require the installation of separate acceleration/deceleration lanes. 5. Installation of a median crossover on Fairmont Parkway shall be subject to the approval of both Harris County and City. 16 GRAPHIC SCALE ( IN FEET ) 1 Inch = 100 ft. FND BROKEN CONIC. MONUMEN LINE TABLE LINE LENGTH BEARING LI 60.40 L N86'15'30'W L21 100.72 N86'I5'30-W L3 22,33 N00-00'00'E L4 7,05 N90e00'00'W L5 87.50 NO3'02'05'W L6 157.75 S03'02'05'E L7 119.08 S03'02'05'E LB 52.41 N70-33'36'W L9 121.74 NO2'50'58'W LIO 50,62 N68-34'19'E LII 56.83 N86'53'39'E L12 96,00 S63'06'22'E L13 75,00 S03'02'05'E L14 130,00 S86'53'39'W L15 41.47 S03'04'28'E L16 51.36 87.12'27'E Y=13,820,895.82 X=3, 223, 298.68 FND 3/4" IRON PIPE N58'48'36"W 0.82' FND 3/4" IRON ROD N72'01'34"W 1.17' NOTES: 1)The Surveyor has relied on Reliant Energy to provide recorded deeds or plats of the subject property and adjoiners thereto. No additional research regarding the existence of easements, restrictions, or other matters of record has been performed by the Surveyor. 2)This survey was prepared without the benefit of a Title Commitment; therefore, easements, right-of-way or setbacks of record affecting the subject property, if any, may not be shown hereon. 3)The utility appurtenances (utility poles, inlets, etc.) shown hereon are those visible at the time of survey and may not be complete. The Surveyor did not locate underground utilities. 4) Field Note Descriptions have been prepared from this plat. 5)According to the Federal Emergency Management Agency Flood Insurance Rate Map No. 48201CO935 J revised dote November, 06, 1996, the subject property lies within ZONE X (unshaded), areas determined to be outside 500-year floodplain. 6)AII coordinates and bearings herein refer to the Texas Coordinate System OF 1983, South Central Zone, as defined in the Texas Natural Resources Code, and based on the position of H.G.C.S.D. 42(1986), having published coordinates of: (Y) = 13,823,622.030, and (X) = 3,216,990.899, U.S. survey foot with an applied scale factor of 0.9998839. 7)lnformation shown hereon is based on a field survey, and information shown on Map No. 14-H-5A furnished by Reliant Energy HL&P. LEGEND PP POWER POLE G� p MANHOLE P/ SIR • SET 3/4" IRON ROD WITH PLASTIC CAP STAMPED "RELIANT ENERGY HL&P" QG� VICINITY MAP pN • SET PK NAIL WITH SHINER N.T.S. STREET LIGHT �� STEAM SILENCER EASEMENT 0.057 ACRE CONIC. FOOTING FOR �� S86'53'39"W PIPERACK 2'X2' 4' q 5D.00 R05077775 H.C.D.R. V CHAINLINK FENCE PONT DE NEMOURS AND COMPANY (J' 8' PIPE RACK EASEMENT NO3'06'21"W 50.00 E.I. DUI 1J0 0.008 ACRE `VOL. 1318, PAGE 364 H.C.D.R. F.C. 500-96-2840 7aoo RESIDUE OF 822.154 ACRES 100 R050775 H.C. D.R. S L , s0e 00 CHAINLINK FENCE NOTE: TEXAS GENCO, LP, LLC.; TEXAS GENCO GP, LLC & 1 VAe rCA!Cn uninwr_c Wr CHnWN AS TEXAS GFNCO. CENTERLINE TENNECO NATURAL GAS LIQUIDS CORP. 10" PIPELINE SOUTHERN PACIFIC TRA07, SPG. RT HON o 40' ESM T. H.L.&P CO. 150' EASEMENT FND IRON ROD WITH (ABANDONED) VOL. PG. 50 ALUMINUM CAP H.C.D.R. STAMPED HL&P N86'53'39"E _ NOTE; Houston Lighting & Power Company was renamed Houston Industries Incorporated which was renamed Reliant Energy, Incorporated which become CenterPoInt Energy Houston Electric, LLC. PAR. PURCH. GRANTOR GRANTEE ACREAGE RECORDING FILE TITLE SCHED. REMARKS NO. DATE TRACT 1 08/31/02 DUPONT CENTER POINT ENERGY 2.685 555-89-1752 W048247 LEASE 1 PARTIAL TERMINATION OF F.C. 014-59-1718 TRACT 2 08 31 02 TEXAS GENCO CENTER POINT ENERGY 0.155 555-89-1794 W048250 EASEMENT 2.5 TRACT 3 08131102 DUPONT TEXAS GENCO 7.306 555-89-1759 W048248 LEASE TRACT 4 OB 31 02 RELIANT ENERGY INCORPORATED TEXAS GENCO 0.224 555-89-1794 W048250 EASEMENT 3.14 TEMPORARY STEAM GENERATOR TRACT 5 08 31 02 1 RELIANT ENERGY INCORPORATED TEXAS GENCO 1.174 555-89-1794 1 W048250 1 EASEMENT 3.15 PARKING 2067 12-H 12:48:43 'at'aneter List. _-_ .opy tab: output tab: Setup tab: eler/Raw: BON hat gins Printer: HP DJ 9OWS02 Scanner: Air 92onlp (1394) Type of original: Photo Top: O.r' windows diver: units of measure: Inches M thon: uraytone Bottom: 0. Sir, TIP Designjet BOWS 42_2 DROPS 42 by NP Load: Center Lightness: 0 Lett: 0.B, r,'Intel' profile: IN, Designjet Oilers About Saturation: 0 Night: 0. P' Unprintable Area Product nape: Designjet Scanner Systew Red: 0 Use Unpin. Area: No lop: 0.2" Product version: 6.2 Breen: D Print paper border: No Bottom: 0.T• Build: Build 13001 Blue: 0 quality: Ho'nal Left: 0.2'• component build: 13001 Black 1lvel: a Scan quality: Normal Right: 0.2" Scanner model: Ap 92 Split (1394) we it, level: 255 Print quality: Normal Write width: 42.0- Scanner Firmware version:091e 0 Scan Dri: 211 dpi viola profile: C1861A - Bright Mite Inkjet Scanner fL'nmm'e date: Sep 25 2006 13:29:59 Sharpen: B JUT: 0 Print BPI: 310 dpi Rail: Auto Input size: Auto Ink Printer Original: Yes Account: Total width: 35.6" Enhance Gray: No Scan jobs: 26 freight: 24.9" Rescreening: No Print jobs: 4 Auto Width: Yes Layout: Normal copy jobs: 12 Auto Length: Yes filing / Paneling Scan area: 216.1439 sq.rt lutput size: Auto Clue narks: No Print area: 194.1692 Sq.ft width: 35.6'1 width: 31.0' Paper area: 234.5496 sq.ft "eight: 24.9" Length: 51.61, Total Account: Total Auto Width: Yes overlap: 0.5" Scan jobs: 26 Auto Length: Yes Nesting Print jobs: a scale: left Optimized: No copy jobs: 12 Value: 1WR.9 t Spacing: 0.5" Scan area: 219.1431 sq.ft Print area: 194.1692 sq.ft Paper area: 234.5496 sq.ft TRACT 4 - 0.224 ACRES TEMPORARY STEAM GENERATOR SITE FO 9LP ALTER J. WjLgANKS q 4936 G � 'f/AR.ESstONr �Qril EDGE OF ASPHALT FND IRON ROD WITH ALUMINUM CAP STAMPED HL&P FND IRON ROD WITH ALUMINUM CAP STAMPED HL&P '-POO TRACT 1 FND FENCE POST Y=13,821,329.76 z X=3,225,760.69 01 I� N 9 if Iw ,I. 0.201 ACRES H.L.&P. CO. EASEMENT E791159 H.C.D.R. I hereby certify that this plat is based on a ground survey performed under my direction, and that the boundaries established by this survey are correctly shown. This service conforms to the current Texas Board of Professional Land Surveying Technical and Professional standards in effect at the date of the survey. Walter J. Wilbank R. .L.S. Texas Reaistratio No. 4936 Parameter List. Copy tab: output tab: _-.----___ - _ _Setup tab Color/BMW Color margins Printer: NP BU sows" Scanner: type of original: map lop: 0. W, vinous driver: units of measure: method: Lightness: Graphics 0 "Otto": Left: 6. W, 0. W, "P 9esignjet BOA'S Printer profile: 42 2 BOBPS 42 by "P MP Besigniet Beers Load: about O Saturation: a Right: e.v' unprintable area Product name: Red: Green: a a Use Unprn. area: Print paper border: No No lop: Batton: e_2" 0.2" Product uerslon: Build: n a Blue: 0 quality: Normal Left: 0.2" Component build: ✓` 1Z "lack level: /s Scan quality: Hornet Right e.2'• Scanner model: a Unite level: 235 Print quality: Hot met Media Width: 12.0" Scanner tlrmrare .ersie Sharpen: ,3 Scan DPI: 289 dpi Media profile: C1061A - Bright unite Ink et Scannerfirmrar'e date: DIU,"; a 1'r"int up 1: 309 dpi Roll: flute SHIP t ✓�4 Input size: Rut. Ink Printer Ur igdnal: Yes AccounC local 4, width: 24.6" Enhance Cray: N. Scan Jobs: 22 O height: 36.3'• Descreening: No Print Jobs: 4 O f� `N auto width: Yes Layout: Kornai Copy Jobs: 4 l Auto Length: Yes Tiling / Paneling Scan area: 141.6696 sq.ft output size: t auto Glue narks: Glue No Print area: 91.9226 sq.ft dth:size auto" 31.4 Paper area: 12B_226 sq.ft Height: 36.3• Length: 59.01 local account: Total Auto width: Yes Uuerlap: 0.51• Scan Jobs: 22 2 auto Length: Yes Hosting Print Jobs: 4 LIPPER BUSCf1 Scale: flak optimized: No copy Jobs: 4 rc value: 1eB.B; Spacing: e.s•• scan area: Scant 141.669 sq.ft Q DEED LINE W 5�O,1 p ISLAND area: Papas' area: 97.9226 sq.ft 12s.2P1] sq.R O .r BAY _ - _ ___.________..._.__. ____________. __-_._ .. ___ ____________ i U P STRAND p} kr�{Y t k ff `sAx tir ,6 GRAPHIC SCALE FiJ ( IN FEET ) 1 inch = 200 ft. DEED UNE Fuel Oil Tract 7 3roge Tank Diesel ZONE AETG PIPELINE L.P. Tank one, t ryrye,'.' GTO 63 �D{ W we Fuel Oil ,Storage Tank deal ONf'�l�,o 1 GT 62 ischarge not ZONE AE SR82-PS08-016 I Antenna i e 0. w o 686) U \ �E ti��� ZONE AE LEI 11 Z seal U F— tidy Q FOP aaeai n O E/Bctr] \ pN ran \. •, p s/h/8/an pa v, 6 ��!!a'ttiv' ` Ca�da / \ Access Road 2WI�,X(:haded) TO 62 �— ve Station Tract 1 Boo lVA a ZONE AE 0 Silo GTO E Access Rood TEXAS GENCO ;;Electric Building cro as a / o moo Valve: k Fuel Oil Storage Metering Tank No. 3 Oo Station Hose v° Building Valve Station Tract 6 TG PIPELINE L.P. of Fuel Oil Storage Tank No. 4 Saab e9 0 Fuel Oil Storage Tank No. 5 pia me666) ; �� *kVPS T a/ 9e + cba, P J�g�s606) U I V 7 ON1- �l i /.e+,l TfQEt+ S S GTO 4�1 / ZONE AE 0 a6e6) 0 TEXAS GENCO FOPL VICINITY MAP N.T.S. Y DEED LINE 1 2� V (VO I r•, a 24] Y. v R' o F;}t> o`�� TEXAS GENCO BARNES ISLAND ettrricalal TronsmislOn corridor ZONE AE ONE A f ..+:Ipls;�-•+14kwu :, '\ . � SRB2-PS 8-017 a R82fl­ a=b17 1 , t, 9•. ENCUMBRANCES -GRANTS "10LAI ERS(GRYS) SR82-PSOB-011 CenterPoint Energy Easement Transmission Exhibit "I" C.F. NO. N 048258 08-31-02 SRB2-PS08-012 CenterPoint Energy Easement Else. Service Exhibit "J" C.F. NO. M 048258 0.540 An. 08-31-02 SR132-PS08-013A i 8 CenterPoint Energy Easement Transmission Exhibit "I" C.F. NO. W 048258 08-31-02 SRB2-PS08-014 CenterPoint Energy Easement Elea. Service Exhibit "L" C.F. NO. W 048258 0.019 Ac. 08-31-02 SRB2-PSO8-015 CenterPoint Energy Easement Else. Service Exhibit "N" C.F. 90. W 048250 0.744 Ac. 08-31-02 SRB2-PSOB-016 CenterPoint Energy Easement Microwave Antenna Exhibit "M" C.F. NO. N 048258 1.121 Ac. 08-31-02 SRB2-PSO9-017A CenterPoint Energy Beetinent Rise. Service Exhibit "0" C.F. NO. W 048258 08-31-02 SRB2-PS08-017B CenterPoint Energy Easement Else. Service Exhibit "P" C.F. NO. N 048258 08-31-02 SRB2-PSOB-017C CenterPoint Energy Easement Elea. Service Exhibit "Q" C.S. NO. W 048258 08-31-02 SRB2-PS08-01713 CenterPoint Energy Raeement Klee. Service Exhibit "R" C.F. NO. N 048258 2.776 Ac. 08-31-02 SRB2-PS08-017E CenterPoint Energy Easement Else. Service Exhibit "S" C.F. NO. N 040258 0.481 Ac. 08-31-02 SRB2-PSo8-017F CenterPoint Energy Easement Else. Service Exhibit "I" C.F. NO. N 048258 0.133 Ac. 08-31-02 SR82-PSOB-017G CenterPoint Energy Easement Klee. Service Exhibit "U" C.F. NO. N 049258 08-31-02 N:ASdekSurWPmlecb,\0302430T031935_2006_bndy10101dwglGRIB BERT PSOBEFTO_SHEETSAW9, Model. 20120088:16 A6 AM. Houston HPIO55cIW44P--PS.PW ZONE AE O\ tllve \3NE OF-F'O _.#00 SAN JACINTO BAY ENCUMBRANCES -GRANTS TO OTHERS (GT(rm) .T7 GTO-1 Marren Petrolaun Corp. Easement 11/30/53 V.2698, P. 75 6" Pipeline GTO-2 United Gas Pipe Line Co. Easement 09/23/55 V.3045, P. 265 20" end 4" Pipelines GTO-3 Harris County hauston Ship Easement 11/02/55 V.3576, P. 683 10' Easement for railroad Channel Navigation District GTO-4 Harris County Houston Ship Easement 11/03/55 V.3576, P. 686 Railroad; 2 tracts Channel Navigation District GTO-5 Humble Oil 4 Refining Company Easement 07/20/54 V. 2804, P. 38 10" Pipeline Not Applicable GTO-7 Humble Oil i Refining Company Easement 07/10/64 UNRECODED Pipelines 6 metering stations GTO-8 Harris County Houston Ship Easement 09/01/64 V.6119, P. 568 Railroad; 2 tracts Channel Navigation District C.F. NO. C 186749 GTO-9 Bumble Oil i Refining Company Easement 07/10/64 UNRECOREDE Valve 6 heater site: GTO-11 Humble Pipe Line Co. Easement 07/02/69 V.7285, P. 425 Pipeline / M-12 United Gas Pipe Line Co. Easement 12/26/68 7462, P. 450 6" Pipeline N/A C.F. No. C 838898 GTO-13 Humble Pipe Line Co. Easement 02/09/70 V.7929, P. 484/ C.F. NO. D 070977 12" Pipeline GTO-17 Arco Pipe Line Co. 02/07/77 C.P. NO. F 044540 2 - 6" Pipelines am -is Shell Oil Co. Easement 11/03/77 C.F. NO. F 389455 8" 4: 10" Pipelines GM-19 Shell Oil Co. Easement 10/11/82 C.F. NO. G 358106 Conduit GTO-20 Cayuse Pipeline Inc. Easement 10/11/62 C.F. NO. H 664422 Pipelines c valve GTO-21 Shell Oil Co. Easement 09/28/82 Roadway letter agreement GM-22 Houston Pipe Line Cc Easement 06/02/83 C.P. NO. J 014430 Pipelines 4 metering stations M-23 Onion Carbide Corp. Easement 07/13/83 C.F. NO. J 051226 Pipelines 6 valve site GM-24 Seagull Products Pipeline Easement 11/28/83 C.F. NO, J 362731 Pipelines 6 launching site Company GTO-25 Houston Pipe Line Co. Easement 03/19/85 C.F. NO. J 950419 24" Pipeline 6 surface easement CM-26 Houston Pipeline Co. Easement 12/30/85 C.F. NO. E 352619 50'x100' Valve site C.F. NO. E 515198 Partial release of a 201xIODI valve site GTO-27 Exxon Gas System Inc. Easement 09/16/86 C.P. NO. R 767973 Pipeline hot tap site 6 metering site GM-32 LaPorte Chemicals Corp. Easement 09/01/87 C.F. NO. L 396672 8" pipeline GTO-33 Port of Houston Authority Easement 12/03/87 C.F. NO. L 463878 Borrow pit 4 fill area GTO-34 United Texas Trans - mission Company Easement 12/16/87 C.F. NO. L 498535 Metering site GTO-35 United Texas Trans - mission Company Resistant 03/14/88 C.F. NO. L 622302 20" Pipeline ' GM-36 United Taxes Trans - mission Compauny Easement 05/11/88 C.F. NO. L 696517 Pipeline i valve site M-37 Houston Pipe Line Co. Easement 04/24/89 C.F. NO. M 139905 12.750" Pipeline CM-39 Houston Pipe Line Co. Easement 05/16/89 C.F. NO. M 173961 Pipelines 4 scrubber station site GTO-39 Exxon Pipeline Co. Resonant 05/20/91 C.F. NO. N 132609 6" Pipeline GTO-41 Rinder Morgan Texas Pipeline LP Easement 02/23/02 C.F. NO. V 566173 12.75" Pipeline 4 10'x 10'Value Site GTO-42 Himont O.S.A. INC. Easement 06/26/88 C.F. NO. M 238502 8" Pipeline GTO-43 D-S Splitter Inc. Easement 06/24/92 C.F. NO. N 782230 / V 423280 4 - 8",3 - 10",2 - 12" Pipelines GM-44 Air Products L.P. Easement 10/15/01 C.F. NO, V 427157 / V 423280 1 - 16' ,3 - 10" ,2 - 12" Pipelines OTO-45 Air Products Manufacturing Corp. Easement 02/05/92 C.F. NO. H 531325 1 - 10.75" Pipeline GTO-46 Area Pipe Line Co. Easement 11/18/99 C.F. NO.0 151008 1 - 18" Pipeline 1 - 4" Pipeline GTO-47 Area Pipe Line Co. Easement 07/01/91 C.F. NO.N 449257 8.625" Pipelines GM-48 Coastal Industrial Water Authority basement 09/09/77 C.F. NO. F 289981 Trinity Water Conveyance System GTO-49 Big Three Industrial Gas Inc. Easement 06/07/90 C.F. NO. N 742527 6" Pipeline GTO-50 Teppco redefining 6" pipeline end a surface site - (proposed) GTO-51 Tappet, GP 04/25/03 C.F. NO. W 614254 6" Pipeline GM-52 CenterPoint Energy Easement 08-07-03 Not of Record Temporary 10' Easement Exe. M-53 Shell Pipeline Company 04/28/04 Pending 12.750" GM-54 Dow Hydrocarbons and Resources Inc. 04/29/04 Pending 0.087 Acre Access Road Tract GM-55 Houston Lighting i Power Easement 12/28/98 C.F. NO. T 456370 150' Sanitary Control Easement GTO-56 Houston Lighting 4 Power Easement 12/18/70 V. 8248, P. 256 AREIAL Easement GTO-57 Houston Lighting 4 Power sentiment 12/28/98 C.F. NO. D 809791 AREIAI, Easement M-58 Texaco Chemical Company Easement 09/09/92 C.F. NO. N 851737 6" Pipeline and 10' x 20' valve site GTO-59 TG Pipeline, L.P. Basement 09/15/05 C.F. NO. Y 690076 CENTERLINE of 18" Pipeline GM-60 TG Pipeline, L.P. Easement 08/15/05 C.F. NO. Y 690076 CENTERLINE of 12" Pipeline GW-61 TG Pipeline, L.P. Easement 08/15/05 C.F. NO. Y 690076 METER SITE GW-62 TO Pipeline, L.P. Basement 08/15/05 C.F. NO. Y 690076 CENTERLINE of 8' Aide Pipe Rack GTO-63 TG Pipeline, L.P. Easement 08/15/05 C.P. NO. Y 690074 Roadway Ingress and Egress Easements NOTE GTO 6,10,14-16,28-31, and 40 are no longer in use. I A L TA /A C S M LAND TITLE NOTE 1. The subject tract is subject to the terms, conditions and provisions of Ordinance No 85-1878 of the City of Houston, as recorded under Harris County Clerk's No. N253086, and amendments thereto, pertaining to the platting and replotting of real property and the establishment of building setback lines. 1• x ,t. y sy raA` i . ? • 1 r 1 -a I. �•i,kt,. • ♦ rq. , rt •�+ Y }' alb . u• . •ai 1>• IL�.,+. Y. �•[•.w ".. '.IS.' it 'd,al , ♦''�'f i t, ♦Rf p /' .� a•,, Y 3" .b,. 'ti,•tii_ I. YrJfd .. .51I ° Lr ' .iY I. mt�d•}. -f ` '..',. .Y. .� •,., r,� I<"1 a, � . ,;,`• MI,:+.'? ♦ - ^ `.�r �Xt i•./f+ : i L,l:'L'. � } 5 •h i:' ( i "- jF% °" JI •+ .r: A. +, a ,y r ,.'t .)r +.1. r� C !I/ r, t.• ,�,, .� a ,s � .at4 �L, 4:i: ' g9p '. 'v ►t"i r� 't+.x.':r Ar lf-j,i J.+• '.+1� .f ,•. ..IC .. v ems, ,;:,r s? .. y-r-•(/.,t �r yr A.: �• ^:.igfY, , , aiC',, z5 '. yy P t.. i+�,. \. '�^+ 5• iti `' ..� .?t,. tr .Y' ..F, F,.i • r !•` y� i-g'; +i �, :l "'J•,Tnm 1 ' r'.. '* �1 : t J t } \ vl, w, �i} ,i4 ,+Ie,�,,,, "•�4 yi ,a. /.ji t^�.}(jy.iy�ylaa? fN P.'„' vll tJ '1 I 1,1(a/YTv'14 1 - 'w lµ .., �Y�.. s Iw .gn �,. r aft �l.1 .' :� '/� t n P ! ' v'�,: 1�. ,'� ryt.� �a ,. •n 9'1f.. )}''s4, , 1J SC - C •R'. , 1 , M1. Rh ��rrr 1' ,. + ,e �.�^•�j, r af-MMilff�f.`L ('/ y•r Tl l�y? r y :! r�•�'• �•/• a +��15 _ ' �/, " I4 �k 'I , 4Y'p„+yi~•+f1,4r" ..IZF >, •,...�'viq t,:.. 'j: t1f , •' fo.. , ' r f� Y•9'k•.'. ' ` r ' l '.! 1 ,},P,et yt0'e R ` y i F►lm• tr -� •x9' +AV S �_� ea tt ;'_,. 1 x ^ .y.. II ,1 F� 1 `�•• , l ,. "- ''. /4L ♦\. ^i , y e^qr S. .:_► �'trRi.: „,.' ..i ,"j3,,t'•[kt a�„r c r 11 'J lye ` i 'e, ` �y. ► ,ry: , �. •''j �,y� �•j '-t '. r)S'l..` .1r r• %ay~ ,Y.r.V , '�.,i f , 1 - '~' -•." 'w T��( ��is- A7 1 1r Ati�pAy_•) Y `M: ..F., + hff j. �t f Ji ;4P 1• •"::..Y 1T •Txn'YM IN ,�, 1r"i1.• f �Y'�!1'w{.J r .{j,'r '' 1)'r Y�f ^1 },, fl:. r 1 % 17. }' t �''' .1. df+ �•' f1 { •1r• '1"'i�'•jr' i'' '�� 1`1'v + '�j W M. . r,+ • > Vti •.•l- 'a'r4\ I • .. •r e J_.1\, E,d t f . ,_ 9 +' N VICIN MAP i +er A y�'piw, 1 '�.,.`'.A}, ;�.• 14i , .t ,.N '! tireSlm j~:.Y: tr'•.. t 6 '+ _ rt `r l n�.' _ " , w g . �) i! . ITY y 0 N.T.S. ,.frtft' <r- r'•�/otJ�lrW, a ,f;9d +t >S�FYr., r• 1,i} <t „r .1 ..� F' h ' v 1.»� s J - K Yl•"t r d~f *w, l�'aY.� �:A6�`�+ ^�I!T{t i :+G: ^ � l„� �1 i ' �: � � 4 ,r1 i e0 rl }�' Jr� 'p 4�! .1� Y rf J' +M 7«Kit �4 r 31 jtJulrt Jl ,` r A 1 i A z.; r: �...' .1J` �. ;.�F k ,tt. 4 ,t:• F .} I , 'iy J t x r I i t v, ra t i •I1 .!• < .�p.-I �►,, [. f r e� �' 1 '. f d ; •�.,fr `,: ., F IC ..SCA , ,.Si !"�'.. ya♦k^4 in'1; r_`".S;yya l''�'i.i a. �;"�'�w'•, J'`7d}._ •'t 'i'•t+ ,� �•;. �_'., ^1.M I 2(q•' ..., • .a -tom �p�•.C�'f1` a ► r M „ C- •� • , (' r I' , ` { } • + X i _, 400 1. .oat r 98p *e Y'i. f .� `,�., �. _ �T•'Q''' aded) T r�'s' Ar; •e:... - ' .. ' , i1 } tr +. Jlr r ( pt FEET ) .3 : i , Y 11 A} 7'^,♦l� . �, f ,',r y ' .1100 +�`4\,•g9 - '? :. +'. �~ ? it. 'r y `Sh, ti.R 1 inch = 200 ft. -. • �,. C 4 ;•••• ♦ , } ' I 'Ia i r �� 7(W\\ .'\ q., . m ya,t, ...4 , r'e'/ItA.y• ..(+ y ' i-l-� < , m a*"w. S • 1• . µ 4 t rK f1yr•9 a �• n K r W ► r yigrt ti 1.y�r x j ttfiT NE x (frishaif8tl�t� ZONE AE )a `r + r •"!' a .a +, his , m v^ +i A•,.� i •,,f ,+ T . " ? �. , ',t ,4 '''fie •l e 1 ,I r 4 ,i.,�l qia •1 ) , f l 7. Li �' 1C t r a`:}'♦- r1i •-� S o ,,tt•_ .t. f1 P t 1. �; w f` ''; �'-,yt �r y , .iY'. ry ,i ttl• yµf +,. • •i"' 7t., o+�3+�, 1'; r: jr Y t. GTO 41 ,',; A`'fi GTO 24 : irr� st 2•ifR ` ; t� ; Pump alto TO 2• 4 qj' er i' r4! \ • .t „ / * ..' ' ���r1y,�Fa + Ay t .`. `� �I�• o�� •°Ix 'E ,r� - Tya i'w ;' • - -ONE X (unshaded) E AE `+tt{t"'} +lt �r 3 ap Co VINE, 'faD f }•• _ -r, . r. Fey' .Y Vdi•.t' •a _ ` ,4';~: ♦TJI J! IJ f �,-•„j. i .! 'te r -1 _a l ,' •:tr,-; •i,' a TO 3 . Fv. ,t•�:' A i�'ra_t"t !. E4l j..r.• _ , .I; `'r �^'� '•t,f •t"'.� . ( ' ' •« a� LOD Q� .fin .. , IA - . t; •;,i TO 7 Z F F { a i1J ' .+ a y I35.8 fr1 ' •.! . ,• Z7 f t '+ P '1 a �'' °, ;I '- ' r �.. ,r • ZOtvt'ii' (Oilhaded� 4 shaded) V Iv ° Oa I''. o a I oke Stara �7 ZONE r' < k � .. !�� • ,•r ,, ' r ,.. ,, s' r'f+4 TO 35 � e � � St ctUr Tonk A %A r :: • ' �• : ¢ , It a • • �+ , 1. ,t %. f <t", Y.., eter ZONE X I r.. t, t' }.. •.(.. i ' a"•..•ru . \ 6 House Waste shaded) j x In hI kt .1 n +Ary Storag A. ° TO 22.9 TO 22.5 t ruc ,I �1,•. 1 t'•:.. + „(,' .. 1; -/ f. #GTO 22. WareF1 ,.. GTO 59 ° '. ° `° TO 22.1 Met m re „N•. 1. tA, 1 jJ L °Gtj9 1t .>., TO 5 2 t• ° Tf, I Ar6a 6F . ' f r '.. Y /: a Pond;f GTO i;1 h TOW • t k 'I "` t tR ,.I Cr h �,�' . + ,. '.�gr,>° l Ara Pond 61 4 ' p 1 TO / TO 22 1 R rl Trpcks Pond 7 Stain q r; 2 TO 22.4 e' m 'f,. J y" • ..� N ;;y'"'•tt..-{, ` ..,,.f'/ t Rm7r ` or�4.< . Tronsrrtipsi" GTO 2 ' �,Ir^j',' ,11.t ) 9M.�rf. • w I r, odd Tro 3 ! fn •. '� •�. Burlt�Iho ,' gab,; 'rw x... 2. •^./v Jt t✓ �.^, 1 •.1. I r'Y. �aj1 . ^o- � f .''i v } � J !rr �'1Y?: y"•. 'R' , E'} <1 K. ',j , y .r 1+• , al,i`�{ 1. 0' I .' r a'"°p°a % ter- Treaatm t oS_ r rid Ccm essor' y i} ;:' • 'G } - a`a. •�, y - ": ,: o\<O° Sys "Witch .•• W Dc- .. •an .e E s EL e u O aeI o GTO 2¢ , . , tP .yii '. y r. S l i•. F ♦ x 4t ' yes` t P•G° + e. QUO a "on ger - Access Ca Z ( m Y •+ t �*�Y, Rop Alin "Cia41�1' ' �a�1d f f•' : ' f t I _ ~ t !a�.4"6�}.;, 4,14�� d ,ram p� f ,1. kt'� ..; / ` TrBCt' L SRB2-PS08-01 I ° + I, . .`..�. K1I". ` r >!i •} , fr� j..r, I ; f Y.t,. ,•�", . •t<`.!r s• ,¢..• Centgi0/ntIV ...Y'. `PF. \,, 1 •' 'j.' ���,•+' .ti:L''r'h•r :�, rILI r �` Eneftgy rt fit; I P ng or ZONE X{(unshaded) ,. l :. : f � � 'f,• " 4 ; f / . � xY. .a tb 'My\ ' •' ` ccess r, b fpi 6. Y41. •+ '; + L ' • t , J •t. i : s y r ' \r,`<, , e y SRB2-PS08-015 jIr d Pump y r+ / .• t1�, .y v Bolding -0 ' sa. •,.Y . +� • I ^09 • \ ► O 2-PSO$-0Sub 'rTransformer a OGW t ,r. a a'r r..:�f.,..l.a- *f+Y. •1 ,. food boo , A..£ nt oint ,•, k, .\ 0\1 ss � ^ Y • 1 1 d Oe ubs tion �Ir' R e •,� Z t' - i. ! r' y. , f Poc 3a! \ ctricpi SW t * f f y R82'=PSO - 17 / : °7 \ ,� tC" Hanger Go e t ,, ;gr ►�. Tract 3 CenterPoint Ena ZONE X (unshaded) Energy 06 �o ' E/arty �Y `•'.. I.., / cpj T I Gate Dirt Road 1 • .' Y ' / si SRB2-PS08-01 COj^dar ^ .f" / r ectrica/ �' •' � _ .,, . E) Trans )• I"T0 55 / elision Corridor �Lfo�°0Z Cod 70 45.B GTO 55 / us,O` rY wx^ � ►y r �t� f 1\1& `T :'' f •t ZONE X G70 B2 LLj Tract 1 (unshaded) LLJ y / 0 / 'r t � NCO I to To 4$.A -� a i G '' 0 r- LLJ / 150' Sanitary Control Esmt. 'r ~ I � r • ,, t + ,a' . 456370 H C,F. No. 7 v \ ' / .C.O.P.R.R.P.' 0 TO 37.2 r•^ i'1j1. Y ,�, Y I. f,.. tr: fa1�.. +•�,}.'FY{ '.T �^•''�.,•'4 '_'. w+'1y,i'� ;rr yt^1t. ` ' c. •_i -" - N 1 a. d.{i f f r. a.., !• B2-Ps08-017 Q Tract t, , i!x +�► ! :` Y, ` ,- To 46.H1 TEXAS GENGO �'si / * aY.,+� ` i A., r j •C ' ,y rB( ; n.A 2-PS08-013 +� a,(ke ZONE X t / 1 r i + r •^ 4R TO 41.1,� t" ., ; ,' , d I i Ho rM ion i - o r - ank GTO 42 � t �` 4.1 - a • , 9r c,. � r )t , ` t Lake 1 o�d \ TO 32. "B �. B2�oa�01 ; f ., '36 '? � ^ ,r• � �f,L. +.. (o, f h � c` Y•i GTO 60 • TO 48.8 t 1 O. 51 i': ' • GTO 59 1t^ h GjQ 50 FOPL "4 i; SO` Valve Station ' Vol a Station FOPL '' - �` \ 59 •,Y•' - APL r*� 010. fur - 3 a W cces Road �� r- �C.$� oc ra w r .x 0 c Po xo� �aNrp0�11:`rD Valve Station \ TO 46.H • OPL 00 �G� ,' J► Irv* a� of° te° _ . M. Y _ 0 \ TO 42 t SRO" RB2-PS08-017 'T71 44 \ Lake TO 37.2 10 GTO 2 F 2 1 moo. r,i A FJ Oil Storoe TO 45.8 GTO 22 ♦ gTank No. 6 + GTO 63 Tract 6 Y�r ro 3z. '. 4' ! TG PIPELINE r \ GTO 6 `• ro e L.P. TO 23.6 2 el'70 ,,. .8 a g• z GTO 1 GT TO GTO 26 •z.r Valve Station APh'y • T 31 ... TO 43,A TO 2. * . TOt17.1 .i '`• o rn * TO 49.B 0 45.A •,alto* r GO 5, P ��- - lip t• -- ' i 1p11,rt T� bIt'� r ± ' Ift!" •', ul La+'wJ.a 6 bndy1018W"%GRID BERT_PSDAaTO SMEETLdag,Moddl 26rmw,.an__. r- r- rrI C) C r Fu Oil Storage lank No. 7 G70 48,8 Dirt Road 1 ';- y, Iwo.* lia to .W TTTT* a I �F /�y• - �,.,rr.., ,vap GTO 4 1, [+p' GTO 48.0 =7{ i h r F.. , 4 .- - •:.. Y a T. •. 'a '. , ♦, '- a , t : ' , � ,. ,< :. Gi0 39 TO 27,_ GTO 56 GTO 56 G70 36. -_ D.D.D. eMBee ^•�r••'B Cartlgtbtlp„ D.D.D. ee.d ppareMo darn tA t ova. tank.. and d"bnUsd D.D.D. Changed text Colors. J.Z.C. REVISED TITLE & PARCEL BLOCKS D.D.D. ALTA/AGSM LAND TITLE SURVEY TEXAS GENCO S,R, BERTRON PLANT ENCUMBRANCE EXHIBIT I MAP NO. PSI Carter :: Blew Consultants in Planning, Engineering. Architecture, Construction Management and Related Services CARTER & BURGESS, INC. 2/06/06 55 Waugh od" Ndustam, Tbabs 77007 713-869-7900 1/26/06 10/25/04 SCALE: 1" = 200' PROJ. NO. 030248.011 11/15/02 DRAWN BY: D.D.D. •1.0002 11/05/01 CHK'D BY: ARP DATE SHEET APPROVED: ARP 07/09/01 4 OF 5 Parameter List. -----------------------------------_.____._-_._._--------------------------- copy tab: Output tap: Setup tab: ----. . _-------------------.-_--__--_--.---_.-_____ Color/BON Colo' Margins Printer: Or pi BBWSA2 Scanner: A type or original: Map lap 0.W' Windows driver: Units of measure: 1 Method. Graphics Bottom: 0.W' Or oesignjet BOWS 42 2 000PS 42 by Pip Load: t Lightness: a Left: 0.W Printer Profile: NP peslgnJet spars About Saturation: 0 Right: a.W Unprintable Area Product name: 0 Red: 0 Use Unpr'n. Area: No top: 0.2'• Product version: 6 Green: a Print paper border: No Bolton: 0.2•• Build: 0 Blue: q quality: Nur'nal Lett: 0.2•• Component build: 1 Black level: 70 Scan Quality: Nornal Right: 0.21, Scannermodel: h mile level' 235 Print Quality: Nornal Media width: 42.0' Scanner firnMare versibna Sharpen: •3 Scan DPI: 219 dpi Media profile: C1961P Bright White Inkjet Scanner firammre date: 5 Blur: 0 Print DPI: 380 dpi Roll: Auto Input size: auto Ink Printer original: Yes Account: total width: 24-4" Enhance Gvay: Ho Scan jobs: 22 Height: 36.3" Descreening: No Print jobs: 4 Auto uidth: Yes Layout: Normal Copy jobs: 6 Auto Length: Yes riling / Paneling Scan area: 160.0664 sq.ft output size: Auto Glue narks: No Print area: 110-3194 sq.ft width: 24.3" width: 30./" Paper ntea: total 61 sq.ft Height: 36.3" Length: U-S., total Account: loth Auto Leath: Yes Overlap : B.s•' scan jobs: 22 ,g Auto Length: Yes Melting print bs Scale: Ilostto. optimized: No Copy jaobs:: 6 6 Value: 100.8 % Spacing: 0.5" Scan area: 160.0664 sq.ft Print area: 110.319h ,q .ft Paper area: 1M 6561 . a R p 9 UPPER S MCINTO 1