Loading...
HomeMy WebLinkAbout06-27-80 Cablevision/Harte-Hanks progress/development of cable TV system=Cablevision T t Mayor J. J. Meza Members of LaPorte City Council P. 0. Box 1115 LaPorte, Texas 775711 RE: Cable Television System Progress Report Ladies and Gentlemen: Deer Park • La Porte • Pasadena a South Houston A Harte-Hanks Communications Company June 27, 1980 The following is a brief outline and report as to the progress and development of the Cable Television System in LaPorte, by Kip -Lee CATV, Inc. 1. Strand mapping, the first step in system design and construc- tion is completed as previously reported. The strand maps have been forwarded to Mark Russel & Associates, CATV System Designers, for completion of checking and system design. To date, 5 of 23 maps have been processed and returned to us for checking and review. Roger Helgerson, Consulting Engineer for Telefacs, has been hired to complete the remeasuring and checking process. 2. It is estimated that system design should be completed and available by late summer. As soon as this process is complete, a final order will be placed with respective suppliers for electronics, cable and other materials. Also, pole applications will be submitted to Southwestern Bell and Houston Lighting and Power. This process cannot be accomplished until design maps are available. 3. An order for 70 miles of cable, electronics and other materials has already been placed with suppliers to insure that construc- tion can start at the earliest possible time. The first ship- ments are scheduled for delivery late summer or early fall. 4. The system transmitter has already been delivered and is in storage in the warehouse. We have been informed by Scientific Atlanta that the construction of the 7 meter Earth Station (satellite dish) is nearing completion and will be ready for shipment sometime in late July or early August. 2223 Strawberry • Suite C-35 9 Pasadena, Texas 77502 • 713/477-2581 Mayor J. J. Meza Members of LaPorte City Council June 27, 1980 Page 2 5. Two pieces of real estate are under consideration as possible transmitter sites. We expect to conclude negotiations on one of these two pieces of property within the next 30 or 60 days, at which time construction will start on the transmitter site. All of the material and equipment referenced in this progress report are available for inspection at your convenience. I thank you for the opportunity to send along this report. Please call me at your convenience if there are further questions or concerns. Best personal regards, Richard H. Clester President RHC: j jf cc: Knox Askins - LaPorte City Attorney John McDonough Donna Grantom Jim Schindeldecker RICHARD H. CLESTER PRESIDENT PASADENA CATV, LTo. hARTE-hANkS COMMUNICATIONS, INC. PASADENA CATV, LTD. 2223 STRAWBERRY RD., PASADENA, TX. 77SO2 March 31, 1980 Mayor J. J. Meza LaPorte City Hall P. 0. Box 1115 LaPorte, Texas 77571 RE: Construction Progress Report LaPorte Cable TV Project Dear Mayor Meza: 713-477-2581 For purposes of keeping all appropriate parties informed, I thought a brief written Periodic progress report as to the events that have taken place to date in `the LaPorte Cable TV project would be in order. 1. The strand mapping process was completed last week. This is a major step in constructing a cable TV system and makes it possible for us to progress to the design stage. 2. Desig0. n of the system is underway at the moment and should be completed by May 15 unless there are unexpected delays. As soon as the design is completed we will be able to commence electronics and other necessary materials. 3. A tenative site has been selected for the transmitter and communications operations. At the moment we are in the process of completing Microwave Path Profile Studies, Compucon Microwave Studies, site borings and obtaining FCC clearances, etc. Assuming that the location "passes muster" we hope to conclude this issue within the next few weeks. 4. A number of contracts are under negotiation for construction of building, microwave equipment, transmitting equipment, cable and other requirements that are necessary to build a system. Everything appears to be on schedule or ahead of schedule at the moment. 5. All franchise requirements concerning insurance, permits, etc. required to date have been forwarded to the City Clerk. To the best of my knowledge, all franchise obligations required at this point have been fulfilled. Generally the project is on schedule or ahead of schedule in all areas at this time. RHC:jjf cc: John McDonough George Yeiter Gail Horany Best personal regards, 1 , Cz�-4 U-P-* Richard H. Clester Donna Grantom Jim Schindeldecker Knox Askins