My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Final_Report-dated_06-16-2008
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Final_Report-dated_06-16-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:51:08 AM
Creation date
3/21/2025 2:29:05 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
6/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
klotz��lf associates <br />1 160 Dairy Ashford, Suite 500 <br />Houston, Texas 77079 <br />T 281 .589-72' 7 F 281 589.7309 <br />Jane 16, 2008 houston.officeC3k1otz.com <br />Mr. Ron Bottoms <br />City Manager <br />City of La Forte <br />604 W. Fairmont Parkway <br />LaPorte, Texas 77571 <br />City of La Porte, Texas <br />City -Wide Drainage Study <br />Creekniont Park Drainage and Overflow Path Short Tenn Project 2 <br />Klotz Associates Project No. 0127.008.000 <br />Klotz Associates was authorizedto proceed with the analysis of r <br />and overflow path f!I" Short Tenn Project Associates, <br />!recommendations.r • cost estimates <br />I. Purpose <br />northernThe purpose of this project is to mitigate flood problems occurring through <br />of !nt Subdivision Section 2 during a high frequency <br />storm event by ! + an extreme event conveyance s • rtp <br />The study area is the Creckniont Park in the Creekmont• / <br />located east of Underwood Road and north of Spencer Highway. (see Exhibit 1). <br />The Creekii-tont Park and Creckmont!• ! also of s <br />pipeline easement and west of Big Island Slough (see Exhibit 2). Creekmont Park <br />is elevated in comparison !nt Subdivision Sectionphotos <br />Appendix t and is a restriction to the sheet flow from the northern part o <br />Creekmont Subdivision Section <br />III�117WWIramI <br />The rcollected were the plans and profiles of drainage area <br />map of North H Street, the hydraulic model for Big Island Slough (13106-00-00), <br />and LiDAR based contours, The information was used to develop different <br />alternatives to size the appropriate stonn sewer pipe system to provide extreme <br />
The URL can be used to link to this page
Your browser does not support the video tag.