HomeMy WebLinkAbout05-11-20 Drainage and Flooding Committee Meeting
JAY MARTIN CHUCK ENGELKEN
Chairman Member
STEVE GILLETT
DANNY EARP
Alternate Member
Vice-Chairman
MINUTES OF THE DRAINAGE AND FLOODING COMMITTEE MEETING
MARCH 9, 2020
The Drainage and Flooding Committee of the City of La Porte met on Monday, March 9, 2020, at
the City Hall Council Chambers, 604 West Fairmont Parkway, La Porte, Texas, at 5:30 p.m. to
consider the following items of business:
Committee Members present: Jay Martin, Chuck Engelken, Danny Earp, (Alternate Gillett available if
needed)
Committee Members absent: None
Council-appointed officers present: Jason Weeks, Assistant City Manager; Lee Woodward, City
Secretary
1. CALL TO ORDER - Chairman Martin called the meeting to order at 5:29 p.m.
2. CITIZEN COMMENT (Generally limited to five minutes per person, in accordance with state law, the
time may be reduced if there is a high number of speakers or other considerations.)
There were no citizen comments.
3. STATUTORY AGENDA
(a) Approve minutes of the meeting held on January 13, 2020. \[Chairman Martin\]
Committee member Engelken moved to approve the minutes; the motion was adopted, 3-0.
(b) Presentation, discussion, and possible in connection with receipt of a report regarding the
Harris County Flood Control District’s (HCFCD) and Harris County Precinct 2’s current and
future plans relating to flooding in the City of La Porte. \[Lorenzo Wingate, Assistant
Director of Public Works\]
Jeremy Ratcliff of the Harris County Flood Control District provided updates on Harris County
bond projects and which have been approved by the Commissioners Court or are scheduled for
consideration.
(c) Presentation, discussion, and possible action regarding the Bayside Terrace Subdivision
Improvements Project. \[Lorenzo Wingate, Assistant Director of Public Works\]
Mr. Wingate provided updates on improvements.
(d) Presentation, discussion, and possible action regarding the status of current drainage
projects. \[Lorenzo Wingate, Assistant Director of Public Works\]
Mr. Wingate provided updates on drainage projects.
(e) Presentation, discussion, and possible action to provide staff with direction, if necessary,
regarding additional drainage concerns. \[Lorenzo Wingate, Assistant Director of Public
Works\]
March 9, 2020 - Drainage and Flooding Committee Minutes
There were no additional comments.
4. Set next meeting - The next meeting date was set for April 13, 2020.
5. Committee Member Comments – There were no comments.
ADJOURN – The meeting was adjourned without objection at 5:58 p.m.
____________________________________
Lee Woodward, City Secretary
March 9, 2020 - Drainage and Flooding Committee Minutes
REQUEST FOR DRAINAGE & FLOODING COMMITEE AGENDA ITEM
Appropriation
Agenda Date Requested: May 11, 2020
Requested By: Lorenzo Wingate, P.E., C.F.M. Source of Funds:
Department: Public Works
Account Number:
Amount Budgeted:
Report Resolution Ordinance
Amount Requested:
Exhibits: HCFCD Drainage Network Map; HCFCD Owned
Budgeted Item: Yes No
Properties
SUMMARY
Receive report regarding Harris County Flood Control District (HCFCD) and Harris County
current and future plans relating to flooding in the City of La Porte.
Brookglen Subdivision HCFCD has acquired all properties within 8800 block of Gladwyne
Court (ref. HCFCD Owned Properties exhibit) and is continuing to move forward with plans the
utilize NRCS grant funds received to mitigate flooding within the Brookglen Subdivision.
F101-06-00 HCFCD has authorized consultants to proceed to efforts towards preparation of
preliminary engineering report. Geotechnical and surveying efforts initiated on April 17, 2020.
Little Cedar Bayou (F216-00-00) Phase III COLP staff is coordinating with HCFCD staff to
establish scopes of work for consultants and avoid duplication of effort. COLP Public Works
has removed high spots within channel segment between Sens Rd. and the railroad tracks.
COLP Public Works staff began mobilizing equipment to begin additional clearing efforts within
F Street ROW, adjacent to F216, on April 27, 2020.
RECOMMENDED MOTION
Approved for Drainage Committee Agenda
Corby D. Alexander, City Manager Date
REQUEST FOR DRAINAGE & FLOODING COMMITEE AGENDA ITEM
Appropriation
Agenda Date Requested: May 11, 2020
Requested By: Lorenzo Wingate, P.E., C.F.M. Source of Funds:
Department: Public Works
Account Number:
Amount Budgeted:
Report Resolution Ordinance
Amount Requested:
Exhibits: Project map
Budgeted Item: Yes No
Project update chart
Harris County Drainage Network Map
Airport Drainage Improvements
SUMMARY
Refer to attached exhibit(s) for updates on various drainage projects throughout the
City.
RECOMMENDED MOTION
Approved for Drainage Committee Agenda
Corby D. Alexander, City Manager Date
The City of La Porte Drainage Projects 2019
´
3
!
(
9
!
(
4
!
(
8
!
(
5
!
(
10
!
(
7
!
(
6
!
(
1
!
(
2
!
(
NUMBERPROJECT
1Brookglen Flooding Mitigation Analysis
2Bayside Terrace Drainage Improvements
3Lomax/F101-03-00 Drainage Channel Feasibility Study
4Little Cedar Bayou F216 Phase III Improvement
56th Street Madison to Main Paving and Drainage
68th & D Storm Water Conveyance Improvements
7Bob's Gully
8Little Cedar Bayou F216 Phase II Improvements
00.512Miles
9Coupland Drive
10Airport On-site Drainage Improvements
Existing: 12"
Proposed: 24"
O
0400800
Existing: 12"
Feet
Proposed: 24"
Structure Type
Circular Pipe
Box Culvert
Existing: 24"
Existing: 18"
Proposed: 30"
Proposed: 2 X 18"
Ditch
Improved Culvert
Lowered Ditch
Linear Detention
Existing: 18"
Proposed: 36"
Widened Ditch
Existing: 16"
Proposed: 24"
City of La Porte
La Porte Municipal Airport
Existing: 18"
Storm Water Drainage Improvements
Proposed: 36"
Existing: 30"
Exhibit 9
Proposed: 2 X 42"
Proposed Drainage
Existing: 24"
Improvements
Proposed: 36"
Existing: 30"
Existing: 12"
Proposed: 2 X 42"
Proposed: 24"
0200400
Feet
LEGEND
EXISTING STORM WATER
INFRASTRUCTURE
EXISTING DITCH
EXISTING FLOW OF DITCH
EXISTING DITCH
NOTES
1.FOR SURVEY CONTROLS (SEE SHEET G-003)
2.THE CONTRACTOR MUST MAINTAIN POSITIVE
DRAINAGE AND AVOID ANY STANDING WATER
DURING CONSTRUCTIONS.
3.THE CONTRACTOR MUST MAINTAIN PORTABLE
STORMWATER PUMP AVAILABLE ON-SITE ALL TIME
TO REMOVE ANY STANDING WATER NOT DRAINED
BY GRAVITY.
4.THE CONTRACTOR MUST EXERCISE CAUTION
WHILE EXCAVATING AND NOT DAMAGE ANY
UNDERGROUND UTILITIES.
5. THE SIDE SLOPES SHOULD NOT BE STEEPER
THAN 3:1 SLOPES.
PROP DITCH
VARIES
Exist Natural Grade
3
1
VARIES
TYPICAL PROPOSED
SWALE
Existing
Ditch
PROP DITCH
Exist Natural Grade
VARIES
3
VARIES
1
CLEANOUT EXISTING CULVERT
TO RE-ESTABLISH POSITIVE
DRAINAGE INTO EXISTING DITCH
TYPICAL REGRADING
DITCH
REGRADING SOME DITCHES
AND SWALES IS NOT A PART
OF THIS CONTACT. IT WILL
BE A SEPARATE CONTRACT.
KEYMAP
REGRADING DITCHES AND
SWALES SHOWN ON THIS
SHEET ARE NOT A PART OF
THIS CONTACT. IT WILL BE A
SEPARATE CONTRACT.
KEYMAP
ALIGN-DITCH-11
ALIGN-DITCH-11
REGRADING DITCHES AND
SWALES SHOWN ON THIS
SHEET ARE NOT A PART OF
THIS CONTACT. IT WILL BE A
SEPARATE CONTRACT.
REQUEST FOR DRAINAGE & FLOODING COMMITEE AGENDA ITEM
Appropriation
Agenda Date Requested: May 11, 2020
Requested By: Lorenzo Wingate, P.E., C.F.M. Source of Funds:
Department: Public Works
Account Number:
Amount Budgeted:
Report Resolution Ordinance
Amount Requested:
Exhibits:
Budgeted Item: Yes No
SUMMARY
Opportunity to discuss any drainage concerns not covered by previous items.
RECOMMENDED MOTION
Approved for Drainage Committee Agenda
Corby D. Alexander, City Manager Date