MINUTES OFTHEDRAINAGE AND FLOODING COMMITTEEMEETING
AUGUST10,2020
The Drainage and Flooding Committeeof the City of La Portemet on Monday,August10,2020, at the
City Hall Council Chambers, 604 West Fairmont Parkway, La Porte, Texas, at 5:00p.m. to consider the
followingitems of business:
Committee Members present:Jay Martin, Chuck Engelken, Danny Earp
Committee Members attending remotely: None
Committee Members absent:None
Council-appointed officers present:Corby Alexander,City Manager; Lee Woodward, City Secretary
1. CALL TO ORDER-Chairman Martin called the meeting to order at 5:00p.m.
2. CITIZENCOMMENT (Generally limited to five minutes per person, in accordance with state law, the time
may be reduced if there is a high number of speakers or other considerations.)
There were no citizen comments.
3.STATUTORY AGENDA
(a)Presentation, discussion, and possible action to approve the July13, 2020, meeting minutes. \[Jay
Martin, Chair\]
Committee member Engelkenmoved to approve the minutes;Member Earp secondedthe motion and it
was adopted, 3-0.
(b)Presentation, discussion, and possible action regarding changes to drainage criteria
recommended by Harris County.\[Lorenzo Wingate, Assistant Director of Public Works\]
Mr. Wingatediscussedthe new Harris County requirements and their potential impact on the City (chart
from packet below). Alisa Max, P.E., Chief Operations Officer, Harris County Engineering Dept.,
answered questions from the Committee. Member Earp asked that the City requirement for detention for
the entire property size be brought back for consideration. Mr. Wingate noted that Harris County has
offered to have their consultantcome to La Porte to provide impactanalysisto show how the Harris
County proposed changescompare to current City requirements.
August10,2020-Drainage and Flooding Committee Minutes
IğƩƩźƭ /ƚǒƓƷǤ wĻƨǒźƩĻƒĻƓƷLƒƦğĭƷ Ʒƚ \[ğ tƚƩƷĻ
Minimal impact. Systems are
Atlas 14 rainfall rates to size storm water
designed using current rainfall
conveyance and detention systems
characteristics.
Increases detention volume
0.55 ac-ft/ac detention rate
requirement by 22%.
Prohibit detention design using hydrograph Minimal impact. Rarely used for
timingdesign in COLP.
No net fill in the current 500-yr floodplainTo be explained by HCFCD/EHRA.
Finished floor elevation established at or
To be explained by HCFCD/EHRA.
waterproofed to the 500-yr flood elevation
(c)Presentation, discussion, and possible action regarding prioritization of current and future
drainage projects.\[Lorenzo Wingate, Assistant Director of Public Works\]
Mr. Wingateprovided a list of current projects for the Committee to prioritize or add to. The current list is:
PriorityProject NameProject Phase (% Complete)Total %
Complete
1Brookglen Drainage ImprovementsFeasibility (0%)0%
Bayside Terrace Drainage
2Feasibility (85%)30%
Improvements
3F101-06-00 ImprovementsPreliminary Engineering (25%)25%
4Little Cedar Bayou (F216) Phase 3Preliminary Engineering (0%)10%
th
6Street (North Side Neighborhood
5Design (5%)5%
Drainage Improvement Project)
Southside Neighborhood Drainage
6Final Design (90%)60%
Improvements;
7Project Complete100%
Mr. Wingate noted Bay Colony has basically been dealt with since the list was put together and the
Committee agreed to flip the order of Mission Drive and Sylvan Beach on the remaining list(below),
thereby prioritizing additional drainage projects for future consideration.
Project NameProject Background
Priority
This would be a continuation of previously
completed drainage improvements along the
Battleground Estates F101-00-00 drainage channel to mitigate flooding
8
Phase IInorth of N P Street with the Battleground Estates
subdivision. Project is prefunded; $65,000 for
preliminary design.
Several complaints received about street flooding
Roseberry Drive Drainage along Roseberry. The Drainage Committee
9
Improvementsconsented to further evaluation of the Roseberry
drainage system at the August 12, 2019 meeting.
Mission Drive Drainage Storm sewer system within Monument Estates
11
Improvementssubdivision holds water because conveyance
August10,2020-Drainage and Flooding Committee Minutes
channel between N P and N L has not been
maintained.
Subdivision do not have roadside ditches or
Sylvan Beach Subdivision enclosed drainage system. All drainage is
10
Drainage Improvementsconveyed along street surface. Roadway is
flooded during moderate rain events.
Bay Colony Subdivision Inconsistent pipe sizes and elevations create
N/A
Drainage Improvementsrestrictions within the drainage system.
(d)Presentation, discussion, and possible action in connection with receipt of a report regarding the
plans relating to flooding in the City of La Porte.\[Lorenzo Wingate, Assistant Director of Public
Works\]
William Conlan of Lockwood, Andrews, & Newnam, a consultant for Harris CountyFlood Control District,
andproject manager for the Galveston Bay Watershed Planning Project, discussed the completed
evaluation and remaining challenges for related to the F212-00-00 channel.
(e)Presentation, discussion, and possible action regarding the status of current drainage projects.
\[Lorenzo Wingate, Assistant Director of Public Works\]
Mr. Wingatereferred to status changes on several projects.He said he was waiting onproposalsfor Little
Cedar Bayou Phase III and Battleground Estates Phase II,and that a notice to proceed would be issued
tomorrow on the airport project.
(f)Presentation, discussion, and possible action to provide staff with direction, if necessary,
regarding additional drainage concerns. \[Lorenzo Wingate, Assistant Director of Public Works
There were no additional items.
4. Set next meeting-The next meeting datewas set forSeptember 14, 2020.
5. Committee Member CommentsThere were no comments.
ADJOURNThe meeting was adjourned without objection at 5:50p.m.
____________________________________
Lee Woodward, City Secretary
August10,2020-Drainage and Flooding Committee Minutes
REQUEST FOR DRAINAGE& FLOODINGCOMMITEEAGENDA ITEM
Appropriation
Agenda Date Requested:September 14, 2020
Requested By:Lorenzo Wingate, Asst. Director Source of Funds:
Department:Public Works
Account Number:
Amount Budgeted:
ReportResolutionOrdinance
Amount Requested:
Budgeted Item:YesNo
Exhibits:
SUMMARY & RECOMMENDATION
Harris County has recommended that the City update its detention rate to become consistent with Harris
-
0.20 acre-ft/acre (0-1 acre); 0.45 acre-ft/acre (1-10 acres); per HCFCD criteria (10+ acres).Changes to
subsequent Council approval of the respective changes. Staff recommends a consistent detention rate
for all development, not contingent upon development size. Additional consideration should be given to
potential adverse impacts of not detaining at a rate not to exceed the pre-development flow rate and
capacity of the receivingsystem.
ACTION REQUIRED BY DRAINAGE AND FLOODING COMMITTEE
Receive report, and provide staff with direction, as necessary.
Approved for Drainage CommitteeAgenda
Corby D. Alexander, City ManagerDate
REQUEST FOR DRAINAGE & FLOODING COMMITEEAGENDA ITEM
Appropriation
Agenda Date Requested:September 14, 2020
Requested By:Lorenzo Wingate, Asst.Director Source of Funds:
Department:Public Works
Account Number:
Amount Budgeted:
ReportResolutionOrdinance
Amount Requested:
Exhibits:Project map
Budgeted Item:YesNo
Project update chart
Harris County Drainage Network Map
SUMMARY& RECOMMENDATION
Refer to attached exhibit(s) for updates on various drainage projects throughout the
City.
ACTION REQUIRED BY DRAINAGE AND FLOODING COMMITTEE
Receive report, and provide staff with direction, as necessary.
Approved for Drainage CommitteeAgenda
Corby D. Alexander, City ManagerDate
The City of La Porte Drainage Projects 2019
´
3
!
(
9
!
(
4
!
(
8
!
(
5
!
(
10
!
(
7
!
(
6
!
(
1
!
(
2
!
(
NUMBERPROJECT
1Brookglen Flooding Mitigation Analysis
2Bayside Terrace Drainage Improvements
3Lomax/F101-03-00 Drainage Channel Feasibility Study
4Little Cedar Bayou F216 Phase III Improvement
56th Street Madison to Main Paving and Drainage
68th & D Storm Water Conveyance Improvements
7Bob's Gully
8Little Cedar Bayou F216 Phase II Improvements
00.512Miles
9Coupland Drive
10Airport On-site Drainage Improvements
REQUEST FOR DRAINAGE & FLOODING COMMITEEAGENDA ITEM
Appropriation
Agenda Date Requested:September 14, 2020
Requested By:Lorenzo Wingate, Asst. Director Source of Funds:
Department:Public Works
Account Number:
Amount Budgeted:
ReportResolutionOrdinance
Amount Requested:
Exhibits:
Budgeted Item:YesNo
SUMMARY & RECOMMENDATION
Receive report regarding Harris County Flood Control District(HCFCD)and Harris County
current and future plans relatedto flooding in the City of La Porte.
ACTION REQUIRED BY DRAINAGE AND FLOODING COMMITTEE
Receive report, and provide staff with direction, as necessary.
Approved for Drainage CommitteeAgenda
Corby D. Alexander, City ManagerDate
Galveston Bay Watershed
Planning Project
City of LaPorte
Drainage Committee Meeting
(August 10, 2020)
Problem Area 2
(N+6)
F212-00-00 &
F210-00-00
Content:
Source of Flooding
Possible Flood
Mitigation Projects
Constraints &
Opportunities
Damage Reduction
Metrics and Costs
Recommendations
2
3
PROBLEM AREA:N +6
Sources of Flooding
Existing Conditions (100-YR)
1
1
1
1
F212-00-00 & F210-00-00
1
2
2
2
Likely Cause
1 Undersized Culvert
2 Undersized Trunk-line
Flood Risk
1 Riverine Flooding
Sheet Flow to Southeast
2
Sheet Flow to Northeast
3
Metrics (100-YR)
Structures (total)70
Roadway (mi.)1.79
3
Floodplain (ac.)100.9
PROBLEM AREA:N +6
Sources of Flooding
Existing Conditions (100-YR)
F212-00-00 & F210-00-00
Video
4
PROBLEM AREA:N +6
Possible Flood Damage
Reduction Projects
Alternative D
(Recommended)
Channel Improvement + Box
Culvert Replacement
Channel Improvement:
N Broadway St to N Utah St
Deepening, 4:1 side slope
Box Culvert Replacement:
N Utah St to East E St
ItemCost
Construction$3,433,100
culvert
ROW$150,000
Engr. Design$755,400
5
Total$4,339,000
3
PROBLEM AREA:N +6
Sources of Flooding
Existing Conditions (100-YR)
1
1
1
1
F212-00-00 & F210-00-00
1
Damage Reduction (total)
2
2
TypeExistingProposedReduction
2
TPASF501993193
Structures70070
Roadway (mi.)1.790.121.67
Floodplain (ac.)61.953.28.7
6
PROBLEM AREA:N +6
Sources of Flooding
Proposed Conditions (100-YR)
F212-00-00
Damage Reduction (total)
TypeExistingProposedReduction
TPASF501993193
Structures70070
Roadway (mi.)1.790.121.67
Floodplain (ac.)61.953.28.7
7
F212-00-00 RECOMMENDED IMPROVEMENTS -ALTERNATIVE D
OPINION OF PROBABLE COST
GROSS COST
PROBLEM AREA:N +6
ITEM NAMEQTYUNITUNIT COST
(USD.)
Probable Costs
DEMOLITION
REMOVE STR BOX CULVEA.
11$5,844.92$64,300
Alternative D (Recommended)
REMOVE STR DRIVEWAY CULV
EA.7$736.42$5,200
(5 Along Idaho St. & 2 Along Main St.)
RELOCATE ELECTRICAL SERVICESEA
11$2,439.86$26,900
REMOV STR (BOX CULVERT)LF.3,000.00
$47.94$143,900
ROAD & CROSSING IMPROVEMENTS
FULL -DEPTH REPAIR CRCP (8")SY
458.33$237.17$108,800
BOX CULVERTS -2 (8 FT X 5 FT) BOX
LF.$570.05
3,600.00 $2,052,200
CULVERTS @ 1,800 LF.
DETENTION PONDS 1
EXCAVATION (CHANNEL) CY.
10,137.00 $11.80$119,700
REMOV STR (MANHOLE)EA
2$460.12$1,000
ROW ACQUISITION & TRAFFIC CONTROL
TRAFFIC CONTROLMO
6$2,500.00$15,000
EROSION CONTROL MEASURESMO
6$1,000.00$6,000
MOBILIZATION & START UP%5-$127,200
CONTINGENCY%
30-$762,900
TOTAL CONSTRUCTION COST
$3,433,100
ROW ACQUISITION & TRAFFIC CONTROL
ROW ACQUISITION (2.5 ACRES TOTAL)LS.2.5$60,000.00$150,000
TOTAL ROW COST
$150,000
DESIGN PHASE SERVICES
ENGINEERING / SURVEYING / GEOTECH%12-$412,000
CONSTRUCTION MANAGMENT /
%
10-$343,400
PERMITTING
8
TOTAL ENGINEERING COST
$755,400
TOTAL PROJECT COST$4,338,500
REQUEST FOR DRAINAGE& FLOODINGCOMMITEEAGENDA ITEM
Appropriation
Agenda Date Requested:September 14, 2020
Requested By:Lorenzo Wingate, Asst. Director Source of Funds:
Department:Public Works
Account Number:
Amount Budgeted:
ReportResolutionOrdinance
Amount Requested:
Budgeted Item:YesNo
Exhibits:
SUMMARY & RECOMMENDATION
Opportunity to discuss any drainage concerns not covered by previous items.
ACTION REQUIRED BY DRAINAGE AND FLOODING COMMITTEE
Receive report, and provide staff with direction, as necessary.