HomeMy WebLinkAbout01-29-15 Special Called Meeting of the Planning and Zoning Commission
CityofLaPorte
PlanningandZoningCommissionAgenda
NoticeisherebygivenofaspecialcalledmeetingoftheLaPortePlanningandZoningCommissiontobeheldon
January29,2015at6:00p.m.atCityHallCouncilChambers,604WestFairmontParkway,LaPorte,Texas,
regardingtheitemsofbusinessaccordingtotheagendalistedbelow:
1.Calltoorder.
2.Rollcallofmembers.
3.Considerapprovalofmeetingminutes:December18,2014.
4.OpenpublichearingtoreceiveinputonanapplicationforSpecialConditionalUsePermit#1491000003by
MeddersConstructionInc.,toallowforconstructionofanoffsiteparkinglotona6,250squarefootlot
furtherdescribedasLots1&2,Block789,TownofLaPorte,CityofLaPorte,HarrisCounty,Texas.
a.StaffPresentation
b.ApplicantPresentation
c.PublicComments(for,against,orquestions)
d.QuestionandAnswer
5.Closepublichearing.
onSpecialConditionalUsePermit#1491000003.
6.ConsiderrecommendationtoCityCouncil
7.ConsiderapprovalofMajorDevelopmentSitePlan#1483000003;arequestbyLaPorteIndependent
SchoolDistrictforconstructionofanadditiontoandothersiteimprovementsforLaPorteHighSchool
locatedat301E.FairmontParkway.
8.Administrativereports.
9.Commissioncommentsonmattersappearingontheagendaorinquiryofstaffregardingspecificfactual
informationorexistingpolicy.
10.Adjourn.
AquorumofCityCouncilmembersmaybepresentandparticipateindiscussionsduringthismeeting;however,no
actionwillbetakenbytheCouncil.
IncompliancewiththeAmericanswithDisabilitiesAct,TheCityofLaPortewillprovideforreasonable
accommodationsforpersonsattendingpublicmeetings.Tobetterserveattendees,requestsshouldbereceived24
hourspriortothemeetings.PleasecontactPatriceFogarty,CitySecretary,at2814705019.
CERTIFICATION
IcertifythatacopyoftheJanuary29,2015,agendaofitemstobeconsideredbythePlanningandZoning
CommissionwaspostedontheCityHallbulletinboardonthe____dayof____________________,2015.
Title:
CityofLaPorte604W.FairmontParkwayPhone:(281)4715020
PlanningandDevelopmentLaPorte,TX775716215Fax:(281)4705005
PlanningandZoningCommission
MinutesofDecember18,2014
CommissionersPresent:RichardWarren,MarkFollis,WyattSmith,LouAnnMartin,Trey
Kendrick,NickBarrera,andHalLawler
CommissionersAbsent:HelenLaCourandLesBird
CouncilmembersPresent:CouncilmenMikeClausenandJohnZemanek
CityStaffPresent:CityPlannerEricEnsey,AssistantCityAttorneyClarkAskins,andOffice
CoordinatorPeggyLee
Calltoorder.
1.
ChairmanHalLawlercalledthemeetingtoorderat6:01p.m.
RollCallofMembers.
2.
CommissionersWarren,LaCour,Follis,Martin,andLawlerwerepresentforrollcall.
Considerapprovalofmeetingminutes:December4,2014.
3.
MotionbyCommissionerKendricktoapprovetheDecember4,2014,meetingminutes.
SecondbyCommissionerMartin.Motioncarried.
Ayes:CommissionersWarren,Follis,Smith,Martin,Kendrick,Barrera,andLawler
Nays:None
OpenpublichearingtoreceiveinputonanapplicationforSpecialConditionalUsePermit#14
4.
91000004byKobelcoCompressorsAmerica,Inc.,ownerofa1.176acretractofland,describedas
Reserve7,SpencerHighwaySubdivision,AdditionNo.3Reserve7,CityofLaPorte,Harris
County,Texas,toallowconstructionofacompressorrepairandservicefacility.
ChairmanLawleropenedthepublichearingat6:04p.m.
a.StaffPresentation
CityPlannerEricEnseypresentedthestaffreportonSpecialConditionalUsePermitrequest
#1491000004toallowconstructionofacompressorrepairandservicefacilityatthe
southeastcornerofSpencerHighwayandFleetwoodDrive,requestedbyKobelco
CompressorsAmerica,Inc.
b.ApplicantPresentation
GeneralManagerofOperationsforKobelcoCompressors,America,Inc.,StanKawahara,
thankedtheCommissionersfortheopportunitytoexplaintheircase.Mr.Kawahara
providedbackgroundinformationandanoverviewofthecompany.Heintroducedthe
followingrepresentativesoftheproject:
PlanningandZoningCommission
MinutesofDecember18,2014
Page2of5
ReidWilson,localcounselwithWilson,Cribbs,andGorenprovidedCommissionerswitha
handoutandgaveabriefpresentation.Mr.WilsonspokeabouttheSICcodesinquestion
andaddressedthe/źƷǤƭrequirementsforapprovingaspecialconditionalusepermit.
GlennGuise,KobelcoRepairFacilitySupervisor,describedhisroleassupervisorandthe
processthatwillbeusedtoservicethecompressors.
st
MarkBenoit,Re/Max1SourceRealtor,believesthelocationthatwasselectedisagoodfit
fortheneighborhood.Mr.Benoitdoesnotfeelthedevelopmentwouldadverselyaffect
propertyvalues.
SamThomas,DuplantisDesignGroup,providedthegeotechnicalandduediligencestudy
andrecommendedthesite.
AaronWolfe,ArchitectandEngineer,describedtheplansforthebuildingandthesite.
AccessfromFleetwoodDr.willberemovedfromtheplans.
ToddWarnecke,ConstructionProjectManagerwithDriveConstruction,spokeabouthow
theimpactsassociatedwithconstructionwouldbekeptataminimum.
c.PublicComments(for,against,orquestions)
KevinD.Johnson,10836SycamoreDr.N.,formerlyaprocesstechnicianforLyondell
Chemical,whoisnowpracticinglaw,opposestherequestbecausethepropertyiszonedfor
commercialnotindustrial.Mr.Johnsonstatedhisconcernswithallowingthisdevelopment
tolocateatthisentrancetohissubdivision.
RobertJackson,10900SycamoreDr.N.,opposestherequestduetothetypeofbusiness.
Mr.Jacksonbelievesitisanindustrialusethatshouldnotbeallowedtolocateneara
residentialneighborhood.
JoelBales,10838SycamoreDr.N.,opposestherequest.Mr.Balesdoesnotliketheideaof
compressorsthatmaybecontaminatedwithchemicalscomingintoaresidentialarea.Mr.
BalesspokeaboutinformationhefoundontheĭƚƒƦğƓǤƭwebsite.
JohnKling,11025PinewoodCt.,opposestherequest.Mr.Klingwasconcernedwiththe
developmentprocessthatallowedtherequesttogetthisfar,suggestingitshouldbelooked
into.
GaryWilkerson,10915SycamoreDr.S.,wasconcernedbecausehewasnotinformedofthe
proposeddevelopmenteventhoughhelivesonly250feetfromthesite.Mr.Wilkerson
questionedthesizeandsetupoftheproposedfacilitybecauseitisnotanoperationthat
belongsatthatlocation.
PlanningandZoningCommission
MinutesofDecember18,2014
Page3of5
MichaelPrasek,10925DogwoodDr.,SecretaryoftheFairmontParkEastHomeowners
Association,statedtheAssociationneitherendorsesnoropposestherequest.Asa
homeowner,Mr.PrasekaskedtheCommissiontodotherightthing.
SaraRagen,10841SycamoreDr.N.,opposestherequestbecauseitisnotagoodlocation
forthedevelopmentanditwillreducepropertyvalues.
RobbieMcClaren,SycamoreDr.N.,opposestherequestbecausethelocationisnot
appropriate.
MarkLindsey,10991SpruceDr.S.,opposestherequest.Mr.Lindseyisconcernedabout
howthewastewaterfromthefacilityisgoingtobetreated.
d.QuestionandAnswer
CommissionerFollisaskedthefollowingquestionsofMr.Kawahara:
Whatwillbethehookheightandcranecapacity?
Willtherebemachinesinthefacility?
Willtherebe18wheelertraffic?
IsthefacilityinCarona,Californiainazonedarea?
WhatistheclosestresidentialsubdivisiontothefacilityinCarona,California?
WhatwillbetheĬǒźƌķźƓŭƭeaveheight?
WasazoningpermitobtainedfromtheCityofLaPorte?
DoestheCaronaplanthaveaclassificationnumberof3563?
Mr.KawahararespondedtoMr.Cƚƌƌźƭƭquestions:
ThehookheightwillbeЋБfromthehooktothefloor.
Therewillbeamillandlathe.
Insomecases,18wheelertrafficwillbenecessary.
TheCarona,Californialocationisamanufacturingplant.
TheclosesthousestotheCarona,CaliforniafacilityareapproximatelyЏЉЉ͵
TheĬǒźƌķźƓŭƭeaveheightwillbeЍЋ͵
AzoningpermitfromtheCityofLaPortewasnotrequested.
TheCaronaplantdoesnothaveaclassificationnumberof3563,butitisinthe3500series.
CommissionersinquiredastowhethertheCitywascontactedandthedevelopmentplan
discussedpriortothelandbeingpurchased.Mr.Kawaharastatedthatthereweremeetings
withtheCity.CityPlannerEricEnseyrespondedthatatthetimetheearlymeetings
occurred,theSICclassificationcodethatwasbeingdiscussedwas7699.ItǞğƭƓƷuntilafter
staffreceivedadditionalinformationfromtheapplicantastowhattheywereproposingto
doatthesitethatstaffdeterminedSIC#7699wasnotthecorrectclassificationcode.
CommissionerBarreraexpressedconcernthatanapparentindustrialusewouldtryto
developinacommercialarea.Mr.Barrerawasalsoconcernedabouttheriskofchemical
exposurewiththecompressorsandhowthatwouldbehandled.Heinquiredaboutthe
weightcapacityofthecranesbecauseoftheroadwaydamagethatcouldoccurwith
transportingthecompressors.
PlanningandZoningCommission
MinutesofDecember18,2014
Page4of5
InresponsetoMr..ğƩƩĻƩğƭconcerns,GlennGuiseexplainedtheprocessthatwouldbe
usedtohandlethecompressorswithregardtochemicalexposure.Mr.Kawaharastatedthe
largestcompressorthatwouldbeinthefacilitywouldbeapproximately32,000lbs.andthe
maximumnumberofcompressorsthatwouldbeinthebuildingatanytimewouldbethree.
CommissionersSmithandMartinagreedtheywouldbeinfavorofhavingthebusiness
locatetoLaPorte,butnotattherequestedlocation.
Mr.Kawaharastatedthelandwaspurchasedasaresultoftheduediligencestudy.
ChairmanLawlerspokeabouthowtheCitytriestoaccommodateincomingdevelopments
asmuchaspossibleandthenconcludeddiscussiononthematter.
Closepublichearing.
5.
ChairmanLawlerclosedthepublichearingat8:14p.m.
ConsiderrecommendationtoCityCouncilonSpecialConditionalUsePermit#1491000004.
6.
MotionbyCommissionerWarrentorecommenddenialtoCityCouncilofSpecialConditionalUse
Permit#1491000004.
SecondbyCommissionerBarrera.Motioncarried.
Ayes:CommissionersWarren,Follis,Smith,Martin,Kendrick,Barrera,andLawler
Nays:None
ChairmanLawlercalledforabreakat8:18p.m.Themeetingreconvenedat8:26p.m.
ConsiderapprovalofaMajorDevelopmentSitePlan#1483000001;arequestbyLaPorte
7.
IndependentSchoolDistricttoallowconstructionofanewschoolbuildingatthesiteofthe
th
existingBaker6GradeCampuslocatedat9800SpencerHighway.
th
EricEnseypresentedthestaffreportonaMajorDevelopmentSitePlanfor\[tL{5ƭnewBaker6
GradecampuslocatedatthesoutheastcornerofSpencerHighwayandUnderwoodRoad.
CommissionerFollisstatedhewouldbeinfavorofapprovingtheplanwhentheplanisconsidered
administrativelycomplete,whichwouldincludethefollowingchangestotheplan:
SignatureblockshouldreadͻtƌğƓƓźƓŭandDevelopment5źƩĻĭƷƚƩͼinsteadofͻ/ƚƒƒǒƓźƷǤ
Development5źƩĻĭƷƚƩ͵ͼ
Showexisting,proposed,andrequiredparkingspaces.
Showadjacentpropertyowners.
ShowNAICSNumber.
PlanningandZoningCommission
MinutesofDecember18,2014
Page5of5
CommissionerKendrickrecommendedthefollowingadditionalchange:
Correctschoolnameandacreage.
MotionbyCommissionerFollistoapproveMajorDevelopmentSitePlan#1483000001toallow
th
constructionofanewschoolbuildingatthesiteoftheexistingLPISDBaker6Gradecampus
locatedat9800SpencerHighway.
SecondbyCommissionerKendrick.Motioncarried.
Ayes:CommissionersWarren,Follis,Smith,Martin,Kendrick,Barrera,andLawler
Nays:None
Administrativereports.
8.
Therewerenoadministrativereports.
Commissioncommentsonmattersappearingontheagendaorinquiryofstaffregardingspecific
9.
factualinformationorexistingpolicy.
CommissionerMartinreportedthenortheastcornerofSensandSpencerisundercontractandin
the60dayfeasibilityperiod.
Adjourn
10.
MotionbyCommissionerWarrentoadjourn.
SecondbyCommissionerMartin.
ChairmanLawleradjournedthemeeting.
Respectfullysubmitted,
PeggyLee
Secretary,PlanningandZoningCommission
PassedandApprovedon________________________,2015.
HalLawler
Chairman,PlanningandZoningCommission
CityofLaPorte,Texas
PlanningandZoningCommission
January29,2015
AGENDAITEM4
ConsiderrecommendationofapprovalofaSpecialConditionalUsePermit(#1491000003)
toallowforconstructionofanoffsiteparkinglotwithcoveredparkingonthepropertyknownas
Lots1&2,Block789,TownofLaPorte,LaPorte,HarrisCounty,Texas
Applicant:MeddersConstruction.
9ƩźĭW͵9ƓƭĻǤͲ/źƷǤtƌğƓƓĻƩ
tƌğƓƓźƓŭğƓķ5ĻǝĻƌƚƦƒĻƓƷ5ĻƦğƩƷƒĻƓƷ
/źƷǤƚŅ\[ğtƚƩƷĻͲĻǣğƭ
PlanningandZoningCommissionSpecialCalledMeeting
January29,2015
SCUP,MeddersConstruction
PlanningandDevelopmentDepartment
StaffReport
ISSUE
ShouldthePlanningandZoningCommissionrecommendapprovaltotheCityCouncilof
arequestbyMeddersConstructionforaSpecialConditionalUsePermit(SCUP)toallow
constructionofanoffsiteparkinglotwithcoveredparkingonthepropertylocatedat
th
thesoutheastcornerofS.16StreetandW.CStreetalsodescribedasLots1&2,Block
789,TownofLaPorteasdescribedintheattachedordinance(seeExhibitA)?
RECOMMENDATION
ShouldtheCommissiondesiretoconsiderarecommendationforapprovalofthis
request,staffrecommendsconsideringvariousconditions,asdescribedlaterinthisstaff
report.
DISCUSSION
Applicant:
MeddersConstruction
:
!ƦƦƌźĭğƓƷƭRequest
Theapplicantdesirestoconstructanoffsiteparkinglotwithcoveredparkingonthe
subjectsite.TheattachedExhibitBincludestheSCUPApplication,projectdescription
letterandsiteplansubmittedbytheapplicant.
Site:
th
VacantparceloflandlocatedatthesoutheastcornerofS.16StreetandW.CStreet
alsodescribedasLots1&2,Block789,TownofLaPorte.Theapplicantownsand
operatesageneralcontractorconstructioncompanyimmediatelyacrossW.CStreetat
th
311S.16Street.TheattachedExhibitCisanareavicinitymapshowingthelocationof
theproposedoffsiteparkinglotaswellasthemainbuildingforMeddersConstruction.
BackgroundInformation:
Thesubjectsiteisavacantparceloflandwith6,250squarefeet(.143acres)inarea
zonedGC,GeneralCommercial.TheCityofLatƚƩƷĻƭLandUseMapidentifiesthis
parcelasͻĭƚƒƒĻƩĭźğƌ͵ͼTheattachedExhibitDareAreaMapsthatshowthelocationof
1
PlanningandZoningCommissionSpecialCalledMeeting
January29,2015
SCUP,MeddersConstruction
thepropertyaswellassurroundingzoningandlanduse.Thefollowingtable
summarizesthesurroundingzoningandlanduses:
ZoningLandUse
th
bƚƩƷŷ GC,GeneralCommercialMeddersConstructionmainbuildingat311S.16
Street
th
{ƚǒƷŷ GC,GeneralCommercialExistingcommercialuse(405S.16Street)
th
ĻƭƷ LI,LightIndustrialExistinglightindustrialuse(402S.16Street)
th
9ğƭƷ R2,MediumDensityResidentialExistinghouse(402S.15Street)
NotificationRequirements:
StafffindsthatthepublichearingnotificationrequirementsoutlinedinSection106171
wereperformedinaccordancewithallapplicablecodeprovisions,includingthe
following:noticeinanewspaperofgeneralcirculationatleast15dayspriortothe
hearing;writtennoticemailedtoownersofrealpropertywithin200feetofthesite
within10daysofthehearing;signpostedonthesitewithin15daysofthehearing.
AdditionalnoticeofthepublichearingwaspostedatCityHallandonthe/źƷǤƭwebsite
asrequiredbystatelaw.
Atthetimethisstaffreportwasdrafted,thecityreceivednoresponsesfromthemailed
notice.
:
Analysis
TheĭźƷǤƭcommercialusetable(Section106441)allowsforoffsiteparkingthrough
considerationofaSpecialConditionalUsePermit.Thefollowingareanumberof
considerationsstaffanalyzedaspartofthisapplication:
Use.
Theuseofthesiteisintendedtoprovideadditionalparkingofvehiclesandflatbed
trailers(wheeledstock)forMeddersConstruction,whichownsthebuildingacrossthe
th
streetat311S.16Street.Inordertopreventfutureuseofthissiteasastorageyard,
staffisrecommendingaconditionprohibitingtheuseofthesiteforoutdoorstorageof
materials.Additionally,staffisrecommendingthatthisSCUPbeusedonlybyMedders
th
Constructionorsubsequentownersandlesseesof311S.16Street.
SiteDevelopmentPlan.
ShouldtheSCUPbeapproved,theapplicantwillneedtosubmitapplicationforasite
developmentplantobereviewedadministratively.Allproposedimprovementswill
needtocomplywiththevariouscoderequirementsoutlinedintheĭźƷǤƭZoning
Ordinance(Chapter106),includingbutnotlimitedtolandscaping,setbacks,and
screening,alongwithanyconditionsimposedbytheSCUP.
2
PlanningandZoningCommissionSpecialCalledMeeting
January29,2015
SCUP,MeddersConstruction
DrivewayAccess.
Drivewayaccesswillbereviewedatthetimeofsiteplansubmittal.Theconceptualplan
isnotofsufficientdetailatthispointforstafftoreview.However,staffrecommends
th
thatconsiderationbegiventolimitingaccessofthislotonlyto16Streettoprevent
cutthroughtrafficintheresidentialneighborhoodtotheeast.Theapplicantwillneed
tocomplywithalldrivewaydesigncriteriaoutlinedinSection106835.
ProximitytoResidential:
TheproposedsiteislocatedincloseproximitytoR2,MediumDensityResidential,
zonedproperty.Althoughnotadjacent,thesiteislocatedacrossa16footalleyfroman
th
existingsinglefamilyhouseat402S.15Street.TheĭźƷǤƭCodeofOrdinancesrequires
thatdevelopmentofcommerciallyzonedpropertiesadjacenttoresidentialmust
provideascreeningbuffer.Section106444(a)(1)outlinestheĭźƷǤƭscreening
requirements.ShouldthisSCUPbeapproved,staffrecommendsthatconsiderationbe
giventoaconditionthatwouldrequirescreeninginaccordancewiththeprovisionsof
theĭźƷǤƭscreeningrequirements,whichincludesasolidwood,masonryorvinylfence
withtreeplantingsatЋЉoncenter.
CoveredParkingAwning.
Theproposedcoveredawningwillneedtobelocatedonthepropertysoastocomply
withallapplicablesetbacksandheightlimitationsasoutlinedinSection106741(b).The
codeallowsforamaximumheightof15feetforaccessorystructures.Additionallyall
accessorystructuresarerequiredtobeatleast3feetfromanypropertyline.
ParkingLotSurface.
Thecitycoderequiresthatparkingsurfacesbeofadustfreematerial.Staffhasincluded
aconditiontotheSCUPrequiringthesurfacetobeeitherasphaltorconcrete.Further,
thesurfacemustbemaintainedingoodconditionandrepairedasnecessaryinthe
future.
Drainage.
Drainagewillbeaccommodatedonsiteinaccordancewithallapplicablestandardsand
timeofsubmittalofthesitedevelopmentplan.
reviewedatthe
Conclusion:
Section106217oftheCodeofOrdinancesoutlinesspecificconditionsforapprovalof
SCUPapplications.Therearethreedifferentconditionsthatmustbemetinorderto
approveaSCUP.ThefollowingtableidentifieseachofthethreeconditionsandƭƷğŅŅƭ
findingoneach:
3
PlanningandZoningCommissionSpecialCalledMeeting
January29,2015
SCUP,MeddersConstruction
Condition:StaffAnalysis:
(1)Thatthespecificusewillbe
Theproposeduseofthesiteasanoffsiteparkinglottoprovidethe
th
compatiblewithandnotapplicantadditionalparkingfortheirmainbuildingat311S.16
injurioustotheuseandStreetisallowedinthecodesubjecttoapprovalofaspecial
enjoymentofotherproperty,conditionalusepermit.TheconditionsoutlinedintheSCUPare
norsignificantlydiminishorrecommendedtoassurethattheproposeddevelopmentis
impairpropertyvalueswithincompatiblewithsurroundingproperties.
theimmediatevicinity.
(2)ThattheconditionsplacedonAsaconditionofapprovaloftheproposedSCUP,theapplicantis
suchuseasspecifiedineachrequiredtosubmitasitedevelopmentplaninaccordancewiththe
districthavebeenmetbytherequirementsoftheĭźƷǤƭDevelopmentOrdinance.Additionally,the
applicant.sitedevelopmentplanwillneedtocomplywithallotherprovisionsof
theĭźƷǤƭZoningOrdinanceandwillbereviewedduringthesite
developmentreview.AnyconditionsimposedaspartofaSCUP
approvalwillneedtobeincorporatedinthesitedevelopmentplan.
(3)ThattheapplicanthasagreedTheapplicantwillneedtoprovideconfirmationthattheyare
tomeetanyadditionalagreeabletotheconditionsimposedontheSCUP.Staffhasprovideda
conditionsimposed,basedonlistofconditionsaspartofthisreport.However,theCommissionand
specificsiteconstraints,andCityCouncilmayimposeadditionalconditions,shouldtheyapprove
necessarytoprotectthepublictheproposedSCUP.
interestandwelfareofthe
community.
Basedontheanalysisabove,stafffindsthatifthePlanningandZoningCommission
desirestorecommendapprovaloftheproposedSpecialConditionalUsePermit,thena
numberofconditionsshouldbeconsideredintheapproval.
1.Asitedevelopmentplanshallbesubmittedinaccordancewithapplicablerequirements
oftheCityofLatƚƩƷĻƭDevelopmentOrdinance.
2.TheplanshallcomplywithallotherprovisionsofChapter106,ͻƚƓźƓŭͼofthe/źƷǤƭ
CodeofOrdinancesandallotherdepartmentreviewsandapplicablelawsandordinancesofthe
CityofLaPorteandtheStateofTexas.
3.Allnecessarydocumentationforbuildingpermitreviewmustbesubmittedin
conjunctionwiththeĭźƷǤƭbuildingpermitapplicationprocess.
4.TheapplicantshallprovidescreeninginaccordancewiththeprovisionofSection106
444(a)ontheeastpropertylinetomitigateimpactsoftheproposedparkinglotonthe
residentialpropertiestotheeast.
th
5.DrivewayaccessshallonlybepermittedonS.16Street;notonW.CStreet.
6.Nooutsidestorageofmaterialsispermittedonsite.
4
PlanningandZoningCommissionSpecialCalledMeeting
January29,2015
SCUP,MeddersConstruction
7.ParkingshallbeonlyforMeddersConstructionorsubsequentownerofthepropertyat
th
311S.16Street.
8.Thepavedsurfaceshallbeeitherasphaltorconcrete.
9.Thepavementshallremainingood,operable,dustfreeconditionovertime,andthat
repairsshallbemadeasnecessary,oruponwrittennotificationbythecity.
10.Nohazardousmaterialsareallowedonsiteatanytime.
11.MinoramendmentstotheplansshallbesubjecttoapprovalbytheDirectorofPlanning
andDevelopment.AsignificantchangeintheapprovedconceptshallbesubjecttothePlanning
andZoning/ƚƒƒźƭƭźƚƓƭreview.
ATTACHMENTS
ExhibitA:DraftOrdinance
ExhibitB:SCUPApplicationandSupplementalInformationfromtheApplicant
ExhibitC:AreaMap
ExhibitD:ZoningandLandUseMap
5
EXHIBIT A
ORDINANCE NO. _____________
AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF LA
PORTE, CHAPTER 106, MORE COMMONLY REFERRED TO AS THE ZONING
ORDINANCE OF THE CITY OF LA PORTE, BY GRANTING SPECIAL
CONDITIONAL USE PERMIT NO. 14-91000003 FOR THAT CERTAIN PARCEL OF
LAND HEREIN DESCRIBED, FOR THE PURPOSE OF DEVELOPING AN OFF-SITE
PARKING LOT FOR MEDDERS CONSTRUCTION AT THE SOUTHEAST CORNER
TH
OF S. 16 STREET AND W. C STREET; MAKING CERTAIN FINDINGS OF FACT
RELATED TO THE SUBJECT; CONTAINING A SEVERABILITY CLAUSE; FINDING
COMPLIANCE WITH THE OPEN MEETINGS LAW; AND PROVIDING AN
EFFECTIVE DATE HEREOF;
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE, TEXAS:
Section 1.
Chapter 106 “Zoning” of the Code of Ordinances is hereby amended by granting
Special Conditional Use Permit #14-91000003, attached hereto as Exhibit A and incorporated by
reference for all purposes, to allow for the development of an off-site parking lot for Medders
Construction at the following described property, to wit: .143 acre tract further described as Lots 1
& 2, Block 789, Town of La Porte, City of La Porte, Harris County, Texas, within a General
Commercial (GC) zoning district.
Section 2.
All ordinances or parts of ordinances inconsistent with the terms of this ordinance are
hereby repealed; provided, however, that such repeal shall be only to the extent of such
inconsistency and in all other respects this ordinance shall be cumulative of other ordinances
regulating and governing the subject matter covered by this ordinance.
Section 3
. Should any section or part of this ordinance be held unconstitutional, illegal, or
invalid, or the application to any person or circumstance for any reasons thereof ineffective or
inapplicable, such unconstitutionality, illegality, invalidity, or ineffectiveness of such section or
part shall in no way affect, impair or invalidate the remaining portions thereof; but as to such
remaining portion or portions, the same shall be and remain in full force and effect and to this
end the provisions of this ordinance are declared to be severable.
Section 4.
The City Council officially finds, determines, recites and declares that a sufficient
written notice of the date, hour, place and subject of this meeting of the City Council is posted at
a place convenient to the public at the City Hall of the city for the time required by law
preceding this meeting, as required by Chapter 551, Tx. Gov’t Code; and that this meeting has
been open to the public as required by law at all times during which this ordinance and the
subject matter thereof has been discussed, considered and formally acted upon. The City Council
further ratifies, approves and confirms such written notice and the contents and posting thereof.
Section 5.
The City Council of the City of La Porte hereby finds that public notice was properly
mailed to all owners of all properties located within two hundred feet (200’) of the properties
under consideration.
EXHIBIT A
EXHIBIT A
Section 6.
The City Council of the City of La Porte hereby finds, determines, and declares that
all prerequisites of law have been satisfied and hereby determines and declares that the
amendments to the City of La Porte Zoning Classification contained in this Ordinance as
amendments thereto are desirable and in furtherance of the goals and objectives stated in the City
of La Porte’s Comprehensive Plan.
Section 7.
This ordinance shall be effective after its passage and approval.
PASSED AND APPROVED this the______ day of _________________, 2015.
CITY OF LA PORTE
By:
Louis R. Rigby, Mayor
ATTEST:
Patrice Fogarty, City Secretary
APPROVED:
Clark Askins, Assistant City Attorney
2
EXHIBIT A
EXHIBIT A
City of La Porte
Special Conditional Use Permit #14-91000003
This permit is issued to: Medders Construction
Owner or Agent
th
311 S. 16 Street, La Porte, Texas 77571
Address
For Development of: Off-Site Parking Lot
Development Name
th
Vacant Parcel located at the Southeast Corner of S. 16 St. and W. C St.
La Porte, TX 77571
Address
Legal Description: Lot 1 & 2, Block 789, Town of La Porte, City of La Porte, Harris
County, Texas
Zoning: General Commercial (GC)
Use: Off-Site Parking for a Construction Company
Permit Conditions:
This Special Conditional Use Permit is applicable for the subject property and subsequent plan received
November 11, 2014, but not yet approved, a copy of which shall be maintained in the files of the City’s
Planning and Development Department upon approval. Project development shall be consistent with such
approved plan, except as otherwise specified in these conditions of approval:
1.A site development plan shall be submitted in accordance with applicable requirements of the
City of La Porte’s Development Ordinance.
2.The plan shall comply with all other provisions of Chapter 106, “Zoning” of the City’s Code of
Ordinances and all other department reviews and applicable laws and ordinances of the City of La
Porte and the State of Texas.
3.All necessary documentation for building permit review must be submitted in conjunction with
the city’s building permit application process.
4.The applicant shall provide screening in accordance with the provision of Section 106-444(a) on
the east property line to mitigate impacts of the proposed parking lot on the residential properties
to the east.
th
5.Driveway access shall only be permitted on S. 16 Street; not on W. C Street.
6.No outside storage of materials is permitted on site.
7.Parking shall be only for Medders Construction or subsequent owner of the property at 311 S.
th
16 Street.
8.The paved surface shall be either asphalt or concrete.
EXHIBIT A
EXHIBIT A
9.The pavement shall remain in good, operable, dust free condition over time, and that repairs shall
be made as necessary, or upon written notification by the city.
10.No hazardous materials are allowed on-site at any time.
11.Minor amendments to the plans shall be subject to approval by the Director of Planning and
Development. A significant change in the approved concept shall be subject to the Planning and
Zoning Commission’s review.
Failure to occupy the building within 12 months after issuance or as scheduled under the terms of a
special conditional use permit shall void the permit as approved, except upon an extension of time granted
after application to the Planning and Zoning Commission.
If contract or agreement is terminated after completion of any stage and there is ample evidence that
further development is not contemplated, the ordinance establishing such special conditional use
permit may be rescinded by the City Council, upon its own motion or upon the recommendation of
the Planning and Zoning Commission of the City of La Porte, and the previous zoning of the entire
tract shall be in full effect on the portion which is undeveloped.
Validation Date:
Director of Planning and Development City Secretary
4
EXHIBIT B
EXHIBIT B
AREA MAP
EXHIBIT C
# 14-91000003
µ
MEDDERS
CONSTRUCTION
W C ST
PROPOSED
OFF-SITE
PARKING LOT
1 inch = 100 feet
AREA MAP
EXHIBIT D
# 14-91000003
µ
MEDDERS
CONSTRUCTION
PROPOSED
OFF-SITE
PARKING LOT
W C ST
GCR-2
LI
Zoning Legend
MED-DENSITY RESIDENTIAL
GENERAL COMMERCIAL
LIGHT INDUSTRIAL
ZONING
µ
MEDDERS
COM
CONSTRUCTION
PROPOSED
OFF-SITE
PARKING LOT
T
W C S
MHDR
LI
COM
Land Use Legend
MID-HIGH DENSITY RESIDENTIAL
COMMERCIAL
LIGHT INDUSTRIAL
PUBLIC / INSTITUTIONAL
PI
LAND USE
CityofLaPorte,Texas
PlanningandZoningCommission
January29,2015
AGENDAITEM7
ConsiderapprovalofaMajorDevelopmentSitePlan(#1483000003)
toallowforconstructionofanadditionandothersiteimprovements
forLaPorteHighSchool
locatedat301E.FairmontParkway.
Applicant:LaPorteIndependentSchoolDistrict
9ƩźĭW͵9ƓƭĻǤͲ/źƷǤtƌğƓƓĻƩ
tƌğƓƓźƓŭğƓķ5ĻǝĻƌƚƦƒĻƓƷ5ĻƦğƩƷƒĻƓƷ
/źƷǤƚŅ\[ğtƚƩƷĻͲĻǣğƭ
PlanningandZoningCommissionRegularMeeting
January29,2015
MajorDevelopmentSitePlanΑLaPorteHighSchool
PlanningandDevelopmentDepartment
StaffReport
ISSUE
ShouldthePlanningandZoningCommissionapprovearequestbytheLaPorte
IndependentSchoolDistrictforaMajorDevelopmentSitePlantoallowconstructionof
anadditiontoLaPorteHighSchoollocatedat301E.FairmontParkway?
RECOMMENDATION
StaffrecommendsapprovaloftheproposedMajorDevelopmentSitePlan.However,
theapprovalshouldbesubjecttotheconditionthattheapplicantresolveanumberof
minorissuesoutlinedinthisstaffreportpriortotheĭźƷǤƭissuanceofabuildingpermit.
DISCUSSION
Applicant/PropertyOwner:
LaPorteIndependentSchoolDistrict
:
!ƦƦƌźĭğƓƷƭRequest
TheapplicantisseekingtoconstructanadditiontotheexistingLaPorteHighSchool
buildinglocatedat301E.FairmontParkway.Uponcompletionoftheproject,thehigh
schoolcampuswillconsistof571,464squarefeetoftotalbuildingarea,whichincludes
TheDistrictplanstoutilizethe
thehighschool,sportsfacilities,andadministration.
currentbuildingwhiletheadditionisunderconstruction.Thescopeofworkwillconsist
of2phases:thefirstphaseconsistingofpavingandsportsfacilities;andthesecond
phasebeingbuildingdemoandnewstructures/addition.TheattachedExhibitAisthe
proposedsitedevelopmentplan.
BackgroundInformation:
Thesubjectsiteisapproximately53.35acresandislocatedatthenortheastcornerofE.
FairmontParkwayandTexasStreet.TheattachedExhibitBisanAreaMapshowingthe
locationofthesubjectproperty.
Thelegaldescriptionofthepropertyisͻğ53.3544acresubdivisionofoutblocks273275,
295299,301304,319322,TownofLaPorte,Vol.60Pg.113,HCDR,andblock51,Vol.3
Pg.72,HCMR,SylvanBeachFirstSubdivision,oftheJ.HunterSurvey,A35,CityofLaPorte,
StateofĻǣğƭ͵ͼ
1
PlanningandZoningCommissionRegularMeeting
January29,2015
MajorDevelopmentSitePlanΑLaPorteHighSchool
ThesiteiscurrentlyzonedR2,MediumDensityResidential,andcontainstheexistingLa
PorteHighSchoolCampus,includingadministrationbuildings,sportsfacilitiesandthe
highschool.TheschoolisapermitteduseintheR2District.TheCityofLatƚƩƷĻƭLand
UseMapidentifiesthisparcelasͻtǒĬƌźĭΉLƓƭƷźƷǒƷźƚƓğƌ͵ͼThefollowingtablesummarizes
thesurroundingzoningandlanduses:
ZoningLandUse
bƚƩƷŷ R2,MediumDensityResidentialJuniorHigh/ElementarySchoolCampus(acrossG
Street)
{ƚǒƷŷ GC,GeneralCommercialCommercial,churchandvacant(acrossFairmont
Parkway)
ĻƭƷ GC,GeneralCommercialCommercial(acrossTexasStreet)
9ğƭƷ R3,HighDensityResidentialExistingresidentialdevelopment(acrossSanJacento
R1,LowDensityResidentialAvenue)
Analysis:
ThissitedevelopmentplanwasreviewedaccordingtotheprovisionsofAppendixEof
theĭźƷǤƭDevelopmentOrdinance(No.1444).Becausethesiteisgreaterthan10acres
insize,itrequiresapprovalbythePlanningandZoningCommission.Thesiteplanisalso
subjecttoallapplicablerequirementsoftheĭźƷǤƭZoningOrdinance(Chapter106ofthe
ĭźƷǤƭCodeofOrdinances).Planningstaffhasreviewedtheproposedsitedevelopment
planandconcludedthattheapplicationcomplieswithallapplicablecoderequirements.
Staffisworkingtoaccommodatethetimingofthisapplicationandtheneedtobegin
constructioninatimelymanner.Asaresult,theremaybeacoupleofitemsthatneed
tobeaddressedandwillberecommendedasconditionsofapproval.Thefollowingisa
descriptionofƭƷğŅŅƭanalysisofvariousconsiderations:
SiteImprovements.
haveminimalimpacton
Theapplicantisproposingphasingoftheprojectinamannerto
theexistingoperationsoftheschool.Thefirstphasewillbeconstructionofallsports
facilitiesonthesite,includingfields,tenniscourts,proposedscoreboard,etc.Thenthey
willproceedwiththesecondphasebeingbuildingdemolitionandconstruction.
Followingcompletionofconstruction,thehighschoolcampuswillinclude571,464
squarefeetoftotalbuildingsquarefootageand876parkingspaces.
th
ThecitysentoutareviewlettertotheapplicantonJanuary16outlininganumberor
itemsthatstillneedtobeaddressedwiththesiteplan(seetheattachedExhibitC).
ShouldtheCommissionrecommendapprovaloftheproposedsiteplan,theapproval
shouldbecontingentontheapplicantresolvingalltheseissuespriortoexecutingthe
approvalcertificatesonthesiteplan.
2
PlanningandZoningCommissionRegularMeeting
January29,2015
MajorDevelopmentSitePlanΑLaPorteHighSchool
Landscaping.
Thesitedevelopmentplanincludesproposedlandscapinginaccordancewiththe
provisionsofSection106800oftheCodeofOrdinances.Landscapingisrequiredin
locationsadjacenttowheresiteimprovementshavebeenproposed.Theproposal
includesstreettreesplantedinvariouslocationsalongtheperimeterofthepropertyas
wellasinlocationswhereparkingimprovementsareproposed.
Parkingandcirculation.
Section106838oftheCodeofOrdinancesoutlinestheĭźƷǤƭparkingrequirementsfor
highschooluses.Specificallythecoderequires:1spaceper4studentsand1spaceper
isrequiredatotalof838parkingspaces.Theproposal
staff.Basedonthisratio,thesite
includestheadditionof73parkingspaces,foratotalatprojectcompletionof876
spaces.
FireHydrantLocations.
ThisisoneitemthathasnotbeenfullyresolvedatthetimeofreviewbythePlanning
andZoningCommission.Staffrecommendsthataconditionofapprovalbeincluded
withanyapprovalofthesiteplanrequiringtheapplicanttocontinuetoworkwiththe
FireMarshalonthelocationofhydrantsonthesiteandtoaddanyfirehydrants
required.
Drainageanddetention.
TheattachedExhibitDisacopyoftheDrainageAnalysisReportpreparedbythe
ğƦƦƌźĭğƓƷƭengineer.TheCityEngineerhasreviewedthereportforcompliancewiththe
ĭźƷǤƭPublicImprovementCriteriaManual(PICM)andhasacceptedit.
Theproposalalsoincludestheclosingofanopendrainagechannelandfacilitatingthe
flowofthatchannelinanundergroundboxculvert.Thisallowstheapplicanttoutilize
moreofthepropertyabovegroundforotherimprovementsandtofacilitateeasier
accessacrossthesite.Thestudyidentifiestwoalternativesandrecommendsthe
alternativethatdoesnotwithholdthedrainagegettingtoGalvestonBay.Additionally,
theCityEngineerconcurswiththeƩĻƦƚƩƷƭfindingthatthepreferredalternativedoes
notincreasethewatersurfaceelevationandusesthepondassevereeventoverflow.In
summary,thepreferredalternativedesignwillnotimpacttheflowofwaterinthe
channelandwillnotimpactpropertiesupordownstream.
Conclusion:
Basedontheanalysisabove,stafffindsthattheproposedMajorDevelopmentSitePlan
fortheLaPorteHighSchoolcampuscomplieswiththevariousapplicablecode
requirementsandshouldbeconsideredforapprovalsubjecttoresolutionofthe
locationoffirehydrantsandtheresolutionofallitemsaddressedintheĭźƷǤƭreview
letterdatedJanuary16,2015.
3
PlanningandZoningCommissionRegularMeeting
January29,2015
MajorDevelopmentSitePlanΑLaPorteHighSchool
4
PlanningandZoningCommissionRegularMeeting
January29,2015
MajorDevelopmentSitePlanΑLaPorteHighSchool
ATTACHMENTS
th
ExhibitA:ProposedBaker6GradeCampusSitePlan
ExhibitB:AreaMap
ExhibitC:ReviewLetterDatedJanuary16,2015
ExhibitD:DrainageImpactAnalysis
5
AREA MAP
EXHIBIT B
µ
T
E S
W
PROPERTY
LOCATION
T
F S
W
T
S
G
W
W
H ST
W
FAI
RMO
NTE FAIRM
PKONT PKW
WYY
1 inch = 400 feet
T
W K S
EXHIBIT C
January 16, 2015
Adam Hutchinson
Arborleaf Engineering & Surveying
1002 Village Square Drive, Suite B
Tomball, Texas 77375
RE: Major Development Site Plan Application #14-83000003 (Review of Submittal #3)
La Porte High School – 10615 N. “L” Street
Dear Mr. Hutchinson,
The City of La Porte received your resubmittal and conducted our review of the documentation
submitted. This letter includes all comments and questions related to your plan submittal by the
various city agencies.
Planning:
(Eric Ensey, City Planner, 281-470-5063, enseye@laportetx.gov)
1.The plan included a note regarding the location of dumpsters, but this note will also need
to include screening materials used for the dumpster.
2.The street trees need to be shade trees not ornamental trees.
3.Near the new entrance on San Jacinto, there is a reference to “8 Waxleaf Ligustrum” but
I do not see where those plants are located. Please identify on the site plan.
Building:
(Mark Huber, Chief Building Official, 281-470-5067, huberm@laportetx.gov)
4.No additional comments.
Utilities:
)
(Curtis Herrod, Utilities Superintendent, 281-470-5107, herrodc@laportetx.gov
5.Call out size of the domestic water service and meter for the proposed baseball field
facility.
6.Indicate if the existing sanitary sewer running through proposed baseball field will be
abandoned or remain.
7.Shown and call out a U.E. for the existing 6” water line.
8.Call out proposed 4” water meter for proposed not labeled.
9.Possible conflict between existing fire line ( size not known ) and the proposed 2-4 x6
box culverts near the outfall to the detention pond.
10.Label proposed Baseball field.
11.The utility easement is shown but not called out for proposed water line to be relocated.
12.Show and call out existing water service and meter for existing Mechanical bldg.
City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020
Planning and Development La Porte, TX 77571-6215 Fax: (281) 470-5005
EXHIBIT C
Mr. Adam Hutchinson
January 16, 2014
Page 2
13.Show and call out existing fire line and domestic water service for Administration Bldg.
14.Clarify and call out if sanitary sewer or manholes will be abandoned in place.
15.Contact Public Works for specifications regarding the proposed 3” and 4” domestic water
meters and other meter installation requirements.
Engineering:
(Bob Eng, City Engineer, 281-470-5058, engb@laportetx.gov)
16.No additional comments. I would suggest submitting application for your fill dirt permit
and stormwater quality permits at this time so they can be ready at the time the building
permit is ready to be issued.
:
Fire
)
(Clif Meekins, Fire Marshal, 281-470-5175, meekinsc@laportetx.gov
17.Contact Donald Ladd, Deputy Fire Chief, to discuss fire hydrant locations at 281-470-
5182.
After you have addressed the comments from the various city agencies as specified in this letter,
please provide me with a revised submittal. Your submittal may be submitted electronically or
via one copy of the revised site plan and any additional information requested. I have this case
scheduled for the January 29, 2015 meeting agenda for the Planning and Zoning Commission.
If you have any further questions, please don’t hesitate to contact me directly at 281-470-5063 or
via email at enseye@laportetx.gov.
Sincerely,
Eric J. Ensey
City Planner
City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020
Planning and Development La Porte, TX 77571-6215 Fax: (281) 470-5005
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
EXHIBIT D
Miscellaneous
,V
A Meeting of the La Porte
Planning&Zoning Commission
(Type of Meeting) `'�' •
Scheduled for FEB 18 2014
February 19,2015 BY.
(Date of Meeting)
to Consider
Zone Change Request#15-92000001
(Type of Request)
I have received notice of the above referenced public hearing.
I am in FAVOR of granting this request for the following reasons:
I am OPPOSED to granting this request for the following reasons:
l ! .
AFe� i2 s�
Name(please print) Address
v i
Signature City,stite,Zip
r
� ���` � U
t
A Meeting of the La Porte RZ ARM,,
Planning&Zoning Commission b �i
(Type of Meeting) �EB
Scheduled for
�Y
February 19,2015
(Date of Meeting)
to Consider
Zone Change Request#15-92000001
(Type of Request)
I have received notice of the above referenced public hearing.
I am in FAVOR of granting this request for the following reasons:
I am OPPOSED to granting this request for the following reasons:
Se C'i 2,741"c-h e c
Name(please print) Address
Signature City,State,Z p
I oppose the change to commercial for the following reasons:
1. Noise traffic-
Traffic in and out 24 hours a day. We have enough people coming and going all hours of the day
in our front yard.
2. Security problems-
This type of business usually attracts the possibility of being broken into.
3. Safety concerns-
The police have not been any help in controlling the theft problems with the Pecan Grove Trailer
Park.
4. Pollution-
Pollution and environmental problems from oil and gas create unknown fumes from vehicles
causing health problems.
5. Too many businesses-
There are too many businesses with all the noises 24 hours a day.
6. Traffic problems-
We can't get out of our own driveway right now due to high volumes of traffic.
I hope the zoning commission will not grant this change.We have lived and paid taxes for 66 years and
hope our input will be fairly considered.
_ xv�
CONSTRUCTION
Quala 6.4 acre development and parking lot
expansion
Prepared for: City of Laporte, Planning and Zoning committee, Quala US , Laporte ,Tx 77571. Dan Langdon,Vice
President.
Legal Description:TRS 351 &352 LaPorte Outlets
Prepared by:Tony Garcia,Jr, President SDC Construction
February 19, 2015
Proposal number: 2015-33015
SDC CONSTRUCTION 4221 Mckinney St. HOUSTON,TX 77023 832-724-0206
CONSTRUCTION
EXECUTIVE SUMMARY
Objective
Proposed South parking lot development and expansion in 2015: provide approximately 100+ parking spaces
on behalf of Quala.The proposed expansion located at 11110 Hwy 225 LaPorte,Tx consists of developing
6.4 acres to improve parking efficiency, circulation and safety.
Goals
To address the social and ecological environment impacted by the proposed 6.4 acres parking lot development.
To form a full collaborative'effort between the City of LaPorte and Harris County, meeting all local and county
codes.
Solution
In providing a quality and sound project, SDC shall be mindful of neighboring residents and the City of Laporte in
its approach, appearance and design during the entire planning, development and construction process.
Project Outline
To offset the impact of developing 6.4 acres of wooded lot due to possible increase in parking activity,
impervious land cover and potential increase in storm water runoff we plan to do as follows:
• Tree preservation plan: maintain 30 feet at the West and 20 feet at South perimeter. Perform tree survey with
replanting guide plan to offset quality trees lost during land development;
• Add approximately 100+parking spaces to the existing Quala facility;
• Parking expansion to meet current standards and codes for safety, accessibility and efficiency;
• Land impact: perform engineering, soil test and runoff impact to determine appropriate measures for storm
water management following local and county codes and guidelines;
• Lighting Mitigation plan:to offset the lighting impact we propose to utilize hooded yellow sodium vapor lights;
• Sound mitigation plan: provide fence and barrier to be per code 8' tall wood fence on the South and West end
of property so sound reduction;
• Asphalt parking to be light truck and vehicle rated;
• Project working hours to be limited to standard working hours Monday through Saturday;
• Design and Planning to take approximately 2 months;
• Permitting approximately 2 months;
• Construction time approximately 4 months.
SDC CONSTRUCTION 4221 Mckinney St. HOUSTON,TX 77023 832-724-0206