Loading...
HomeMy WebLinkAbout01-29-15 Special Called Meeting of the Planning and Zoning CommissionCity of La Porte Planning and Development Department City of La Porte Planning and Zoning Commission Agenda Notice is hereby given of a special called meeting of the La Porte Planning and Zoning Commission to be held on January 29, 2015 at 6:00 p.m. at City Hall Council Chambers, 604 West Fairmont Parkway, La Porte, Texas, regarding the items of business according to the agenda listed below: 1. Call to order. 2. Roll call of members. 3. Consider approval of meeting minutes: December 18, 2014. 4. Open public hearing to receive input on an application for Special Conditional Use Permit #14-91000003 by Medders Construction Inc., to allow for construction of an off -site parking lot on a 6,250 square foot lot further described as Lots 1 & 2, Block 789, Town of La Porte, City of La Porte, Harris County, Texas. a. Staff Presentation b. Applicant Presentation c. Public Comments (for, against, or questions) d. Question and Answer 5. Close public hearing. 6. Consider recommendation to City Council on Special Conditional Use Permit #14-91000003. 7. Consider approval of Major Development Site Plan #14-83000003; a request by La Porte Independent School District for construction of an addition to and other site improvements for La Porte High School located at 301 E. Fairmont Parkway. 8. Administrative reports. 9. Commission comments on matters appearing on the agenda or inquiry of staff regarding specific factual information or existing policy. 10. Adjourn. A quorum of City Council members may be present and participate in discussions during this meeting; however, no action will be taken by the Council. In compliance with the Americans with Disabilities Act, The City of La Porte will provide for reasonable accommodations for persons attending public meetings. To better serve attendees, requests should be received 24 hours prior to the meetings. Please contact Patrice Fogarty, City Secretary, at 281-470-5019. CERTIFICATION I certify that a copy of the January 29, 2015, agenda of items to be considered by the Planning and Zoning Commission was posted on the City Hall bulletin board on the day of 2015. Title: City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020 Planning and Development La Porte, TX 77571-6215 Fax: (281) 470-5005 www.laportetx.gov Commissioners Present: Commissioners Absent: Councilmembers Present: City Staff Present: 1. Call to order. Planning and Zoning Commission Minutes of December 18, 2014 Richard Warren, Mark Follis, Wyatt Smith, Lou Ann Martin, Trey Kendrick, Nick Barrera, and Hal Lawler Helen LaCour and Les Bird Councilmen Mike Clausen and John Zemanek City Planner Eric Ensey, Assistant City Attorney Clark Askins, and Office Coordinator Peggy Lee Chairman Hal Lawler called the meeting to order at 6:01 p.m. 2. Roll Call of Members. Commissioners Warren, LaCour, Follis, Martin, and Lawler were present for roll call. 3. Consider approval of meeting minutes: December 4, 2014. Motion by Commissioner Kendrick to approve the December 4, 2014, meeting minutes. Second by Commissioner Martin. Motion carried. Ayes: Commissioners Warren, Follis, Smith, Martin, Kendrick, Barrera, and Lawler Nays: None 4. Open public hearing to receive input on an application for Special Conditional Use Permit #14- 91000004 by Kobelco Compressors America, Inc., owner of a 1.176 acre tract of land, described as Reserve 7, Spencer Highway Subdivision, Addition No. 3 Reserve 7, City of La Porte, Harris County, Texas, to allow construction of a compressor repair and service facility. Chairman Lawler opened the public hearing at 6:04 p.m. a. Staff Presentation City Planner Eric Ensey presented the staff report on Special Conditional Use Permit request #14-91000004 to allow construction of a compressor repair and service facility at the southeast corner of Spencer Highway and Fleetwood Drive, requested by Kobelco Compressors America, Inc. b. Applicant Presentation General Manager of Operations for Kobelco Compressors, America, Inc., Stan Kawahara, thanked the Commissioners for the opportunity to explain their case. Mr. Kawahara provided background information and an overview of the company. He introduced the following representatives of the project: Planning and Zoning Commission Minutes of December 18, 2014 Page 2 of 5 Reid Wilson, local counsel with Wilson, Cribbs, and Goren provided Commissioners with a hand-out and gave a brief presentation. Mr. Wilson spoke about the SIC codes in question and addressed the City's requirements for approving a special conditional use permit. Glenn Guise, Kobelco Repair Facility Supervisor, described his role as supervisor and the process that will be used to service the compressors. Mark Benoit, Re/Max I" Source Realtor, believes the location that was selected is a good fit for the neighborhood. Mr. Benoit does not feel the development would adversely affect property values. Sam Thomas, Duplantis Design Group, provided the geotechnical and due diligence study and recommended the site. Aaron Wolfe, Architect and Engineer, described the plans for the building and the site. Access from Fleetwood Dr. will be removed from the plans. Todd Warnecke, Construction Project Manager with Drive Construction, spoke about how the impacts associated with construction would be kept at a minimum. c. Public Comments (for, against, or questions) Kevin D. Johnson, 10836 Sycamore Dr. N., formerly a process technician for Lyondell Chemical, who is now practicing law, opposes the request because the property is zoned for commercial not industrial. Mr. Johnson stated his concerns with allowing this development to locate at this entrance to his subdivision. Robert Jackson, 10900 Sycamore Dr. N., opposes the request due to the type of business. Mr. Jackson believes it is an industrial use that should not be allowed to locate near a residential neighborhood. Joel Bales, 10838 Sycamore Dr. N., opposes the request. Mr. Bales does not like the idea of compressors that may be contaminated with chemicals coming into a residential area. Mr. Bales spoke about information he found on the company's website. John Kling, 11025 Pinewood Ct., opposes the request. Mr. Kling was concerned with the development process that allowed the request to get this far, suggesting it should be looked into. Gary Wilkerson, 10915 Sycamore Dr. S., was concerned because he was not informed of the proposed development even though he lives only 250 feet from the site. Mr. Wilkerson questioned the size and set-up of the proposed facility because it is not an operation that belongs at that location. Planning and Zoning Commission Minutes of December 18, 2014 Page 3 of 5 Michael Prasek, 10925 Dogwood Dr., Secretary of the Fairmont Park East Homeowners Association, stated the Association neither endorses nor opposes the request. As a homeowner, Mr. Prasek asked the Commission to do the right thing. Sara Ragen, 10841 Sycamore Dr. N., opposes the request because it is not a good location for the development and it will reduce property values. Robbie McClaren, Sycamore Dr. N., opposes the request because the location is not appropriate. Mark Lindsey, 10991 Spruce Dr. S., opposes the request. Mr. Lindsey is concerned about how the wastewater from the facility is going to be treated. d. Question and Answer Commissioner Follis asked the following questions of Mr. Kawahara: What will be the hook height and crane capacity? Will there be machines in the facility? Will there be 18-wheeler traffic? Is the facility in Carona, California in a zoned area? What is the closest residential subdivision to the facility in Carona, California? What will be the building's eave height? Was a zoning permit obtained from the City of La Porte? Does the Carona plant have a classification number of 3563? Mr. Kawahara responded to Mr. Follis's questions: The hook height will be 28' from the hook to the floor. There will be a mill and lathe. In some cases, 18-wheeler traffic will be necessary. The Carona, California location is a manufacturing plant. The closest houses to the Carona, California facility are approximately 600'. The building's eave height will be 42'. A zoning permit from the City of La Porte was not requested. The Carona plant does not have a classification number of 3563, but it is in the 3500 series. Commissioners inquired as to whether the City was contacted and the development plan discussed prior to the land being purchased. Mr. Kawahara stated that there were meetings with the City. City Planner Eric Ensey responded that at the time the early meetings occurred, the SIC classification code that was being discussed was 7699. It wasn't until after staff received additional information from the applicant as to what they were proposing to do at the site that staff determined SIC #7699 was not the correct classification code. Commissioner Barrera expressed concern that an apparent industrial use would try to develop in a commercial area. Mr. Barrera was also concerned about the risk of chemical exposure with the compressors and how that would be handled. He inquired about the weight capacity of the cranes because of the roadway damage that could occur with transporting the compressors. Planning and Zoning Commission Minutes of December 18, 2014 Page 4 of 5 In response to Mr. Barrera's concerns, Glenn Guise explained the process that would be used to handle the compressors with regard to chemical exposure. Mr. Kawahara stated the largest compressor that would be in the facility would be approximately 32,000 lbs. and the maximum number of compressors that would be in the building at any time would be three. Commissioners Smith and Martin agreed they would be in favor of having the business locate to La Porte, but not at the requested location. Mr. Kawahara stated the land was purchased as a result of the due diligence study. Chairman Lawler spoke about how the City tries to accommodate incoming developments as much as possible and then concluded discussion on the matter. 5. Close public hearing. Chairman Lawler closed the public hearing at 8:14 p.m. 6. Consider recommendation to City Council on Special Conditional Use Permit #14-91000004. Motion by Commissioner Warren to recommend denial to City Council of Special Conditional Use Permit #14-91000004. Second by Commissioner Barrera. Motion carried. Ayes: Commissioners Warren, Follis, Smith, Martin, Kendrick, Barrera, and Lawler Nays: None Chairman Lawler called for a break at 8:18 p.m. The meeting reconvened at 8:26 p.m. 7. Consider approval of a Major Development Site Plan #14-83000001; a request by La Porte Independent School District to allow construction of a new school building at the site of the existing Baker 61" Grade Campus located at 9800 Spencer Highway. Eric Ensey presented the staff report on a Major Development Site Plan for LPISD's new Baker 61n Grade campus located at the southeast corner of Spencer Highway and Underwood Road. Commissioner Follis stated he would be in favor of approving the plan when the plan is considered administratively complete, which would include the following changes to the plan: • Signature block should read "Planning and Development Director" instead of "Community Development Director." • Show existing, proposed, and required parking spaces. • Show adjacent property owners. • Show NAICS Number. Planning and Zoning Commission Minutes of December 18, 2014 Page 5 of 5 Commissioner Kendrick recommended the following additional change: • Correct school name and acreage. Motion by Commissioner Follis to approve Major Development Site Plan #14-83000001 to allow construction of a new school building at the site of the existing LPISD Baker 6`" Grade campus located at 9800 Spencer Highway. Second by Commissioner Kendrick. Motion carried. Ayes: Commissioners Warren, Follis, Smith, Martin, Kendrick, Barrera, and Lawler Nays: None 8. Administrative reports. There were no administrative reports. 9. Commission comments on matters appearing on the agenda or inquiry of staff regarding specific factual information or existing policy. Commissioner Martin reported the northeast corner of Sens and Spencer is under contract and in the 60-day feasibility period. 10. Adjourn Motion by Commissioner Warren to adjourn. Second by Commissioner Martin. Chairman Lawler adjourned the meeting. Respectfully submitted, Peggy Lee Secretary, Planning and Zoning Commission Passed and Approved on Hal Lawler Chairman, Planning and Zoning Commission 2015. City of La Porte, Texas Planning and Zoning Commission January 29, 2015 AGENDA ITEM 4 Consider recommendation of approval of a Special Conditional Use Permit (#14-91000003) to allow for construction of an off -site parking lot with covered parking on the property known as Lots 1 & 2, Block 789, Town of La Porte, La Porte, Harris County, Texas Applicant: Medders Construction. Eric J. Ensey, City Planner Planning and Development Department City of La Porte, Texas I'1 �r�r�iri�, �ri'� /rJruri�; r,rJrrrrrri��irJri ';;,r r i ,l r, �llt ,} I/I�,t Yiri; ri J ,r;i 29) Jt Planning and Development Department Staff Report ISSUE Should the Planning and Zoning Commission recommend approval to the City Council of a request by Medders Construction for a Special Conditional Use Permit (SCUP) to allow construction of an off -site parking lot with covered parking on the property located at the southeast corner of S. 161" Street and W. C Street also described as Lots 1 & 2, Block 789, Town of La Porte as described in the attached ordinance (see Exhibit A)? RECOMMENDATION Should the Commission desire to consider a recommendation for approval of this request, staff recommends considering various conditions, as described later in this staff report. DISCUSSION Applicant: Medders Construction Applicant's Request: The applicant desires to construct an off -site parking lot with covered parking on the subject site. The attached Exhibit B includes the SCUP Application, project description letter and site plan submitted by the applicant. Site: Vacant parcel of land located at the southeast corner of S. 161" Street and W. C Street also described as Lots 1 & 2, Block 789, Town of La Porte. The applicant owns and operates a general contractor construction company immediately across W. C Street at 311 S. 161" Street. The attached Exhibit C is an area vicinity map showing the location of the proposed off -site parking lot as well as the main building for Medders Construction. Background Information: The subject site is a vacant parcel of land with 6,250 square feet (.143 acres) in area zoned GC, General Commercial. The City of La Porte's Land Use Map identifies this parcel as "commercial." The attached Exhibit D are Area Maps that show the location of I'1 �r�r�iri�, �ri'� /rJruri�; r,rJrrrrrri��irJri ';;,r r i ,l r, �llt ,} I/I�,t Yiri; ri J ,r;i 29) Jt i i.'D the property as well as surrounding zoning and land use. The following table summarizes the surrounding zoning and land uses: Zoning Land Use North GC, General Commercial Medders Construction main building at 311 S. 16t" Street South GC, General Commercial Existing commercial use (405 S. 16t" Street) West LI, Light Industrial Existing light industrial use (402 S. 16t" Street) East R-2, Medium Density Residential Existing house (402 S. 15t" Street) Notification Requirements: Staff finds that the public hearing notification requirements outlined in Section 106-171 were performed in accordance with all applicable code provisions, including the following: notice in a newspaper of general circulation at least 15 days prior to the hearing; written notice mailed to owners of real property within 200 feet of the site within 10 days of the hearing; sign posted on the site within 15 days of the hearing. Additional notice of the public hearing was posted at City Hall and on the City's website as required by state law. At the time this staff report was drafted, the city received no responses from the mailed notice. Analysis: The city's commercial use table (Section 106-441) allows for off -site parking through consideration of a Special Conditional Use Permit. The following are a number of considerations staff analyzed as part of this application: Use. The use of the site is intended to provide additional parking of vehicles and flat-bed trailers (wheeled stock) for Medders Construction, which owns the building across the street at 311 S. 161" Street. In order to prevent future use of this site as a storage yard, staff is recommending a condition prohibiting the use of the site for outdoor storage of materials. Additionally, staff is recommending that this SCUP be used only by Medders Construction or subsequent owners and lessees of 311 S. 161" Street. Site Development Plan. Should the SCUP be approved, the applicant will need to submit application for a site development plan to be reviewed administratively. All proposed improvements will need to comply with the various code requirements outlined in the city's Zoning Ordinance (Chapter 106), including but not limited to landscaping, setbacks, and screening, along with any conditions imposed by the SCUP. I'1 �r�r�iri�, �ri'� /rJruri�; r,rJrrrrrri��irJri ';;,r r i ,l r, �llt ,} I/I�,t Yiri; ri J ,r;i 29) Jt Driveway Access. Driveway access will be reviewed at the time of site plan submittal. The conceptual plan is not of sufficient detail at this point for staff to review. However, staff recommends that consideration be given to limiting access of this lot only to 16t" Street to prevent cut -through traffic in the residential neighborhood to the east. The applicant will need to comply with all driveway design criteria outlined in Section 106-835. Proximity to Residential: The proposed site is located in close proximity to R-2, Medium Density Residential, zoned property. Although not adjacent, the site is located across a 16-foot alley from an existing single family house at 402 S. 15t" Street. The city's Code of Ordinances requires that development of commercially zoned properties adjacent to residential must provide a screening buffer. Section 106-444(a)(1) outlines the city's screening requirements. Should this SCUP be approved, staff recommends that consideration be given to a condition that would require screening in accordance with the provisions of the city's screening requirements, which includes a solid wood, masonry or vinyl fence with tree plantings at 20' on center. Covered Parking Awning. The proposed covered awning will need to be located on the property so as to comply with all applicable setbacks and height limitations as outlined in Section 106-741(b). The code allows for a maximum height of 15 feet for accessory structures. Additionally all accessory structures are required to be at least 3 feet from any property line. Parking Lot Surface. The city code requires that parking surfaces be of a dust -free material. Staff has included a condition to the SCUP requiring the surface to be either asphalt or concrete. Further, the surface must be maintained in good condition and repaired as necessary in the future. Drainage. Drainage will be accommodated on site in accordance with all applicable standards and reviewed at the time of submittal of the site development plan. Conclusion: Section 106-217 of the Code of Ordinances outlines specific conditions for approval of SCUP applications. There are three different conditions that must be met in order to approve a SCUP. The following table identifies each of the three conditions and staff's finding on each: I'1 �r�r�iri�, �ri'� /rJruri�; r,rJrrrrrri��irJri ';;,r r i ,l r, �llt ,} I/I�,t Yiri; ri J ,r;i 29) Jt Condition: Staff Analysis: (1) That the specific use will be The proposed use of the site as an off -site parking lot to provide the compatible with and not applicant additional parking for their main building at 311 S. 16t" injurious to the use and Street is allowed in the code subject to approval of a special enjoyment of other property, conditional use permit. The conditions outlined in the SCUP are nor significantly diminish or recommended to assure that the proposed development is impair property values within compatible with surrounding properties. the immediate vicinity. (2) That the conditions placed on As a condition of approval of the proposed SCUP, the applicant is such use as specified in each required to submit a site development plan in accordance with the district have been met by the requirements of the city's Development Ordinance. Additionally, the applicant. site development plan will need to comply with all other provisions of the city's Zoning Ordinance and will be reviewed during the site development review. Any conditions imposed as part of a SCUP approval will need to be incorporated in the site development plan. (3) That the applicant has agreed The applicant will need to provide confirmation that they are to meet any additional agreeable to the conditions imposed on the SCUP. Staff has provided a conditions imposed, based on list of conditions as part of this report. However, the Commission and specific site constraints, and City Council may impose additional conditions, should they approve necessary to protect the public the proposed SCUP. interest and welfare of the community. Based on the analysis above, staff finds that if the Planning and Zoning Commission desires to recommend approval of the proposed Special Conditional Use Permit, then a number of conditions should be considered in the approval. 1. A site development plan shall be submitted in accordance with applicable requirements of the City of La Porte's Development Ordinance. 2. The plan shall comply with all other provisions of Chapter 106, "Zoning" of the City's Code of Ordinances and all other department reviews and applicable laws and ordinances of the City of La Porte and the State of Texas. All necessary documentation for building permit review must be submitted in conjunction with the city's building permit application process. 4. The applicant shall provide screening in accordance with the provision of Section 106- 444(a) on the east property line to mitigate impacts of the proposed parking lot on the residential properties to the east. Driveway access shall only be permitted on S. 16t" Street; not on W. C Street. 6. No outside storage of materials is permitted on site. I'1 �r�r�iri�, �ri'� /rJruri�; r,rJrrrrrri��irJri ';;,r r i ,l r, �llt ,} I/I�,t Yiri; ri J ,r;i 29) Jt 7. Parking shall be only for Medders Construction or subsequent owner of the property at 311 S. 16t" Street. 8. The paved surface shall be either asphalt or concrete. 9. The pavement shall remain in good, operable, dust free condition over time, and that repairs shall be made as necessary, or upon written notification by the city. 10. No hazardous materials are allowed on -site at any time. 11. Minor amendments to the plans shall be subject to approval by the Director of Planning and Development. A significant change in the approved concept shall be subject to the Planning and Zoning Commission's review. ATTACHMENTS Exhibit A: Draft Ordinance Exhibit B: SCUP Application and Supplemental Information from the Applicant Exhibit C: Area Map Exhibit D: Zoning and Land Use Map ORDINANCE NO. AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF LA PORTE, CHAPTER 106, MORE COMMONLY REFERRED TO AS THE ZONING ORDINANCE OF THE CITY OF LA PORTE, BY GRANTING SPECIAL CONDITIONAL USE PERMIT NO. 14-91000003 FOR THAT CERTAIN PARCEL OF LAND HEREIN DESCRIBED, FOR THE PURPOSE OF DEVELOPING AN OFF -SITE PARKING LOT FOR MEDDERS CONSTRUCTION AT THE SOUTHEAST CORNER OF S. 16TH STREET AND W. C STREET; MAKING CERTAIN FINDINGS OF FACT RELATED TO THE SUBJECT; CONTAINING A SEVERABILITY CLAUSE; FINDING COMPLIANCE WITH THE OPEN MEETINGS LAW; AND PROVIDING AN EFFECTIVE DATE HEREOF; BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE, TEXAS: Section 1. Chapter 106 "Zoning" of the Code of Ordinances is hereby amended by granting Special Conditional Use Permit 414-91000003, attached hereto as Exhibit A and incorporated by reference for all purposes, to allow for the development of an off -site parking lot for Medders Construction at the following described property, to wit:.143 acre tract further described as Lots 1 & 2, Block 789, Town of La Porte, City of La Porte, Harris County, Texas, within a General Commercial (GC) zoning district. Section 2. All ordinances or parts of ordinances inconsistent with the terms of this ordinance are hereby repealed; provided, however, that such repeal shall be only to the extent of such inconsistency and in all other respects this ordinance shall be cumulative of other ordinances regulating and governing the subject matter covered by this ordinance. Section 3. Should any section or part of this ordinance be held unconstitutional, illegal, or invalid, or the application to any person or circumstance for any reasons thereof ineffective or inapplicable, such unconstitutionality, illegality, invalidity, or ineffectiveness of such section or part shall in no way affect, impair or invalidate the remaining portions thereof, but as to such remaining portion or portions, the same shall be and remain in full force and effect and to this end the provisions of this ordinance are declared to be severable. Section 4, The City Council officially finds, determines, recites and declares that a sufficient written notice of the date, hour, place and subject of this meeting of the City Council is posted at a place convenient to the public at the City Hall of the city for the time required by law preceding this meeting, as required by Chapter 551, Tx. Gov't Code; and that this meeting has been open to the public as required by law at all times during which this ordinance and the subject matter thereof has been discussed, considered and formally acted upon. The City Council further ratifies, approves and confirms such written notice and the contents and posting thereof. Section 5. The City Council of the City of La Porte hereby finds that public notice was properly mailed to all owners of all properties located within two hundred feet (200') of the properties under consideration. EXHIBIT A Section 6. The City Council of the City of La Porte hereby finds, determines, and declares that all prerequisites of law have been satisfied and hereby determines and declares that the amendments to the City of La Porte Zoning Classification contained in this Ordinance as amendments thereto are desirable and in furtherance of the goals and objectives stated in the City of La Porte's Comprehensive Plan. Section 7. This ordinance shall be effective after its passage and approval. PASSED AND APPROVED this the day of , 2015. ATTEST: Patrice Fogarty, City Secretary APPROVED: Clark Askins, Assistant City Attorney CITY OF LA PORTE Louis R. Rigby, Mayor 2 EXHIBIT A This permit is issued to For Development of. Legal Description: Zoning: Use: City of La Porte Special Conditional Use Permit #14-91000003 Medders Construction Owner or Agent 311 S. 16t' Street, La Porte, Texas 77571 Address Off -Site Parking Lot Development Name Vacant Parcel located at the Southeast Corner of S. 16t' St. and W. C St. LaPorte, TX 77571 Address Lot 1 & 2, Block 789, Town of LaPorte, City of LaPorte, Harris County, Texas General Commercial (GC) Off -Site Parking for a Construction Company Permit Conditions: This Special Conditional Use Permit is applicable for the subject property and subsequent plan received November 11, 2014, but not yet approved, a copy of which shall be maintained in the files of the City's Planning and Development Department upon approval. Project development shall be consistent with such approved plan, except as otherwise specified in these conditions of approval: A site development plan shall be submitted in accordance with applicable requirements of the City of La Porte's Development Ordinance. 2. The plan shall comply with all other provisions of Chapter 106, "Zoning" of the City's Code of Ordinances and all other department reviews and applicable laws and ordinances of the City of La Porte and the State of Texas. All necessary documentation for building permit review must be submitted in conjunction with the city's building permit application process. 4. The applicant shall provide screening in accordance with the provision of Section 106-444(a) on the east property line to mitigate impacts of the proposed parking lot on the residential properties to the east. Driveway access shall only be permitted on S. 16"' Street; not on W. C Street. 6. No outside storage of materials is permitted on site. 7. Parking shall be only for Medders Construction or subsequent owner of the property at 311 S. 16t' Street. The paved surface shall be either asphalt or concrete. EXHIBIT A 9. The pavement shall remain in good, operable, dust free condition over time, and that repairs shall be made as necessary, or upon written notification by the city. 10. No hazardous materials are allowed on -site at any time. 11. Minor amendments to the plans shall be subject to approval by the Director of Planning and Development. A significant change in the approved concept shall be subject to the Planning and Zoning Commission's review. Failure to occupy the building within 12 months after issuance or as scheduled under the terms of a special conditional use permit shall void the permit as approved, except upon an extension of time granted after application to the Planning and Zoning Commission. If contract or agreement is terminated after completion of any stage and there is ample evidence that further development is not contemplated, the ordinance establishing such special conditional use permit may be rescinded by the City Council, upon its own motion or upon the recommendation of the Planning and Zoning Commission of the City of La Porte, and the previous zoning of the entire tract shall be in full effect on the portion which is undeveloped. Validation Date: Director of Planning and Development City Secretary 4 City of La Porte 604 W. Fairmont Pkwy. La Porte, TX 77571 Planning & Development Department SPEC[ AL CONDITIONAL USE PERMIT APPLICATION Phone: 281.470.5073 Fax: 281.470.5005 vrww,Iaportetx.gov 1. PROPERTY OWNER CONTACT INFORMATION: OWNER NAME: Terry Medders PHONE 1: 281-930-1872 PHONE 2: 281-898-0429 FAX #: 281-478-5180 E-MAIL: twmedders@sbcglobal.net MAILING ADDRESS: 311 S. 16th Laporte Tx 77571 2. BUSINESS INFORMATION: BUSINESS NAME: N/A BUSINESS TYPE: NIA CONTACT NAME: Terry Medders PHONE#: 281-898-0429 E-MAIL: twmedders@sbcglobal.net FAX #.281-478-5180 MAILING ADDRESS: 311 S 16th Laporte Tx 3- PROPERTY DESCRIPTION: PARCEL NO(s) (13-digit HCAD Tex ID PROPERTY ADDRESS (if existing): 401 S. 16th PROPERTY LEGAL DESCRIPTION. 4. SUPPORTING DOCUMENTATION (Check Applicable): XGENERAL PLAN SITE PLAN PLAT REASON FOR REQUEST?: Parking Area OWNER or AUTHORIZED AGENT'S SIGNATURE: PRINTED NAME: Terry Medders DATE: 11-20-2014 S. APPLICATION CHECKLIST & SUPPORTING DOCUMENTATION: COMPLETE ITEMS 1 THRU 4 OF APPLICATION ATTACH APPLICABLE PLAN(S) SUBMIT$300.00 NON-REFUNDAB LE APPLICATION FEE (51AFF USE ONLY): + DATERECOVED: ,1 RECEIVED BY: g DA O PROJECT NUMBER., - SCHEDULED DATE FOR PLANNING & ZONING COMMISSION AGENDA: FJA - ° koo PAc.. PE7aL4�Nf 1 F, r IflllfY eAa�wr Q C i1R07, ug4UM@7T --fir- -,Room FD= LEGEND • =4 vUT WAY 1PPZA4 w • BELCA' , rAP. - Pol Wpt PIPL - PVBYUrpO BASF WK PPPE uiJ3/x9 WJ - YgpFp1 posF[ v== r,E: » (tLCSAL' R PR(f'a{tt U+� --W— - aY.N N411? CA70R4RT 1lVL mar UL w UIE1fY 1AS01ENY Y.A - 14Y/1 P06Y Cr - 43AC16 Fl.G FM1dEER P.G PLhR Cr QE:lA7�C P.k - 4dii Cr 7 v'.9�%r �• ••- • FAfPR7R L4�E --� - YEYFi fClCE at LMiX A.4 - PDEfE K CCWNt1iJ P.Ob. - POiWE Lr > PAQ . PWtE CF FE1vt5E d.A�'tRal PAPa.C.. POhT Of MPi�R�7 PXNAiVAt .--.^_ - mumaes8!LiG t8.t �� - .YE SSE w S #APR E15O�ST7 STi3.G - S1YRW 3(JE7: GtAYDf1' aL - pU1C1N0 W.¢ . E`7t51, COIF NOY faU.D - B'F�A9 WAIL —�f—- YkDt:i VWY r t •, <... riA t8g F�SPO:f an r BLW ;LL& l�+U& To wr SCALE s•'za' SOUTH 16th STREET `w r NORTH 50.Ou uz 410.00' ol o I o O � V} Lil V w f O!� LOT 3 i V7 LOTS 1 & 2 U BLOCf 789 (VACrNT)I w �l 7 FdP, i 4' SOUTH 50.00Y '+ o a 16'• ALLEY FIN 7" F2of�WN & Ae;capcad b�r Date ! Oa:a LEGAL DESCRIPTION L-0m,tio LOTS 1 & 2 OF BLOCK 789 IN THE TOWN OF LA PONE, A SUBDIVISION IN HARRIS s:sm PUT TD A NHL RECAN9£U Nn1 COUNTY, TEXAS, ACCORDING TO THE. MAP OR PLAT THEREOF, RECORDED IN VOLUME SECT sbua�Yat was aor nmEmat�E7mr nssr7uc 7n 58, PAGE 460 OF THE MAP RECORDS OF HARRIS COUNTY, TEXAS F U`iOEFGR0U7A VnUtt QISTN1A770FiS,U!�:GROI+M1O VJFRO'.E�IIS. i tOUN@410t5 AYo/oR o777at utmERc7:ovNo CLIENT ADDRESS srnvcrvPEs wEas CuTnm 7gCATED En T7us SURYEv PIS TERRY L MEDDERS SOUTH 16th STREET wcarYtnu7uETc AbD11glNL DmTmJ71DZa OR SUBSFOUEN7 01YTERi •- S1/R1£of TO RE55R�CTNE COYfNA'!fS m PER ommm JOB # 1408286 f ENFORCW 91 lOGV. 7fIkeCRAL1IiE5 DF DATE 08/25/2014 y;�kr��gPo9� :,..... GFS 1420186728 AREA MAP # 14-91000003 1pp ��Ipp pp pp 'i ������ PROPOSED OFF -SITE PARKING G LOT ch = 100 feet PROPOSED OFF -SITE PARKING L lu AREA MAP # 14-91000003 MEDDERS CONSTRUCTION ZONING R Zoning Legend MED-DENSITY RESIDENTIAL GENERAL COMMERCIAL LIGHT INDUSTRIAL LAND USE City of La Porte, Texas Planning and Zoning Commission January 29, 2015 AGENDA ITEM 7 Consider approval of a Major Development Site Plan (#14-83000003) to allow for construction of an addition and other site improvements for La Porte High School located at 301 E. Fairmont Parkway. Applicant: La Porte Independent School District Eric J. Ensey, City Planner Planning and Development Department City of La Porte, Texas rrrur;? Sri'} /r,rir�? ("u rrrrrrirJri I't r' it r A t 't11, ]'Ii i ,r;i J) Jtr i„D f rJr lrt up] -Orr riY 'rtt Ph)ri Ilurtr,, I,,,11,41 Sr hrr)I Planning and Development Department Staff Report ISSUE Should the Planning and Zoning Commission approve a request by the La Porte Independent School District for a Major Development Site Plan to allow construction of an addition to La Porte High School located at 301 E. Fairmont Parkway? RECOMMENDATION Staff recommends approval of the proposed Major Development Site Plan. However, the approval should be subject to the condition that the applicant resolve a number of minor issues outlined in this staff report prior to the city's issuance of a building permit. DISCUSSION Applicant/Property Owner: La Porte Independent School District Applicant's Request: The applicant is seeking to construct an addition to the existing La Porte High School building located at 301 E. Fairmont Parkway. Upon completion of the project, the high school campus will consist of 571,464 square feet of total building area, which includes the high school, sports facilities, and administration. The District plans to utilize the current building while the addition is under construction. The scope of work will consist of 2 phases: the first phase consisting of paving and sports facilities; and the second phase being building demo and new structures/addition. The attached Exhibit A is the proposed site development plan. Background Information: The subject site is approximately 53.35 acres and is located at the northeast corner of E. Fairmont Parkway and Texas Street. The attached Exhibit B is an Area Map showing the location of the subject property. The legal description of the property is "a 53.3544 acre subdivision of out blocks 273-275, 295-299, 301-304, 319-322, Town of La Porte, Vol. 60 Pg. 113, HCDR, and block 51, Vol. 3 Pg. 72, HCMR, Sylvan Beach First Subdivision, of the J. Hunter Survey, A-35, City of La Porte, State of Texas." I'l�riruri;? Sri'} /rJrliri�? r,rJrrrrrri��irJri I't r' it �r I /It t '[iri'� ri J ,r;i J 1, Jtr I/I )f ur Iup]-Orr riY sett Pl )ri Ilurtr,, I,,,11,41 Sr hrx)I The site is currently zoned R-2, Medium Density Residential, and contains the existing La Porte High School Campus, including administration buildings, sports facilities and the high school. The school is a permitted use in the R-2 District. The City of La Porte's Land Use Map identifies this parcel as "Public/Institutional." The following table summarizes the surrounding zoning and land uses: Zoning Land Use North R-2, Medium Density Residential Junior High/Elementary School Campus (across G Street) South GC, General Commercial Commercial, church and vacant (across Fairmont Parkway) West GC, General Commercial Commercial (across Texas Street) East R-3, High Density Residential R-1, Low Density Residential Existing residential development (across San Jacento Avenue) Analysis: This site development plan was reviewed according to the provisions of Appendix E of the city's Development Ordinance (No. 1444). Because the site is greater than 10 acres in size, it requires approval by the Planning and Zoning Commission. The site plan is also subject to all applicable requirements of the city's Zoning Ordinance (Chapter 106 of the city's Code of Ordinances). Planning staff has reviewed the proposed site development plan and concluded that the application complies with all applicable code requirements. Staff is working to accommodate the timing of this application and the need to begin construction in a timely manner. As a result, there may be a couple of items that need to be addressed and will be recommended as conditions of approval. The following is a description of staff's analysis of various considerations: Site Improvements. The applicant is proposing phasing of the project in a manner to have minimal impact on the existing operations of the school. The first phase will be construction of all sports facilities on the site, including fields, tennis courts, proposed scoreboard, etc. Then they will proceed with the second phase being building demolition and construction. Following completion of construction, the high school campus will include 571,464 square feet of total building square footage and 876 parking spaces. The city sent out a review letter to the applicant on January 161" outlining a number or items that still need to be addressed with the site plan (see the attached Exhibit Q. Should the Commission recommend approval of the proposed site plan, the approval should be contingent on the applicant resolving all these issues prior to executing the approval certificates on the site plan. riruri;? Sri'} /rrliri�? r,rrrrrrrrirri P2 Jt r [ A t 't11, ]'Ii ,r;i J 1, Jtr „D f rr I,u up] -Orr riY sett P )ri Ilurtr,, I,,,11,41 Sr hrr)I Landscaping. The site development plan includes proposed landscaping in accordance with the provisions of Section 106-800 of the Code of Ordinances. Landscaping is required in locations adjacent to where site improvements have been proposed. The proposal includes street trees planted in various locations along the perimeter of the property as well as in locations where parking improvements are proposed. Parking and circulation. Section 106-838 of the Code of Ordinances outlines the city's parking requirements for high school uses. Specifically the code requires: 1 space per 4 students and 1 space per staff. Based on this ratio, the site is required a total of 838 parking spaces. The proposal includes the addition of 73 parking spaces, for a total at project completion of 876 spaces. Fire Hydrant Locations. This is one item that has not been fully resolved at the time of review by the Planning and Zoning Commission. Staff recommends that a condition of approval be included with any approval of the site plan requiring the applicant to continue to work with the Fire Marshal on the location of hydrants on the site and to add any fire hydrants required. Drainage and detention. The attached Exhibit D is a copy of the Drainage Analysis Report prepared by the applicant's engineer. The City Engineer has reviewed the report for compliance with the city's Public Improvement Criteria Manual (PICM) and has accepted it. The proposal also includes the closing of an open drainage channel and facilitating the flow of that channel in an underground box culvert. This allows the applicant to utilize more of the property above ground for other improvements and to facilitate easier access across the site. The study identifies two alternatives and recommends the alternative that does not withhold the drainage getting to Galveston Bay. Additionally, the City Engineer concurs with the report's finding that the preferred alternative does not increase the water surface elevation and uses the pond as severe event overflow. In summary, the preferred alternative design will not impact the flow of water in the channel and will not impact properties up or down stream. Conclusion: Based on the analysis above, staff finds that the proposed Major Development Site Plan for the La Porte High School campus complies with the various applicable code requirements and should be considered for approval subject to resolution of the location of fire hydrants and the resolution of all items addressed in the city's review letter dated January 16, 2015. P|annin�andZonin�Commissionu|ar�Weetin� ]anuary2� 2Ol5 �W�or Deve|opmPI, tSite P|an —La Pojrte Hi,h Schoo| P|annin�andZonin�Commissionu|ar�Weetin� ]anuary2� 2Ol5 Deve|opmentSite P|an —La Pojrte Hi,h Schoo| ATTACHMENTS � Exhibit A: Proposed Baker " 1h Grade Campus Site Plan ExhibitB: Area Map ExhibitC: Review Letter Dated January 16,2015 :9 lasso q Ely *%1 114v1i, !i! o1i0l a, omOW t tRo! 1 1to j I oMCPAMmqW1IO!, CmmR EPel = �4 psi W A tip Mg oil 0 figJy a R 10 nip z M lit 01 own AMI I v N MMd Mkt I Out PE� S , P M,(,6 W, ON Y�N I�V 05 M I WY11 a Sal Lj E 5, i gn - - - ------- ------- (A CVI,5 (,.4 (A , (J' 3 P x UJ Af j a f Y IL 4 6 d d 3 , > 7TWI • .916' ITS 5 AREA MAP f City of La Porte Planning and Development Depa"rtment January 16, 2015 Adam Hutchinson Arborleaf Engineering & Surveying 1002 Village Square Drive, Suite B Tomball, Texas 77375 RE: Major Development Site Plan Application 414-83000003 (Review of Submittal #3) La Porte High School — 10615 N. "L" Street Dear Mr. Hutchinson, The City of La Porte received your resubmittal and conducted our review of the documentation submitted. This letter includes all comments and questions related to your plan submittal by the various city agencies. Planning: (Eric Ensey, City Planner, 281-470-5063, ense)2e(-&,laportetx.gov) 1. The plan included a note regarding the location of dumpsters, but this note will also need to include screening materials used for the dumpster. 2. The street trees need to be shade trees not ornamental trees. Near the new entrance on San Jacinto, there is a reference to "8 Waxleaf Ligustrum" but I do not see where those plants are located. Please identify on the site plan. Building: (Mark Huber, Chief Building Official, 281-470-5067, hubermnlaportetx.gov) 4. No additional comments. Utilities: (Curtis Herrod, Utilities Superintendent, 281-470-5107, herrodcnlaportetx.gov) 5. Call out size of the domestic water service and meter for the proposed baseball field facility. 6. Indicate if the existing sanitary sewer running through proposed baseball field will be abandoned or remain. 7. Shown and call out a U.E. for the existing 6" water line. 8. Call out proposed 4" water meter for proposed not labeled. 9. Possible conflict between existing fire line ( size not known ) and the proposed 2-4 x6 box culverts near the outfall to the detention pond. 10. Label proposed Baseball field. 11. The utility easement is shown but not called out for proposed water line to be relocated 12. Show and call out existing water service and meter for existing Mechanical bldg. City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020 Planning and Development LaPorte, TX 77571-6215 Fax: (281) 470-5005 www.laportetx.gov Mr. Adam Hutchinson January 16, 2014 Page 2 13. Show and call out existing fire line and domestic water service for Administration Bldg. 14. Clarify and call out if sanitary sewer or manholes will be abandoned in place. 15. Contact Public Works for specifications regarding the proposed 3" and 4" domestic water meters and other meter installation requirements. Engineering: (Bob Eng, City Engineer, 281-470-5058, en= b(a�laaortetx. ov) 16. No additional comments. I would suggest submitting application for your fill dirt permit and stormwater quality permits at this time so they can be ready at the time the building permit is ready to be issued. Fire: (ClifMeekins, Fire Marshal, 281-470-5175, naeekinscnlaportea.gov) 17. Contact Donald Ladd, Deputy Fire Chief, to discuss fire hydrant locations at 281-470- 5182. After you have addressed the comments from the various city agencies as specified in this letter, please provide me with a revised submittal. Your submittal may be submitted electronically or via one copy of the revised site plan and any additional information requested. I have this case scheduled for the January 29, 2015 meeting agenda for the Planning and Zoning Commission. If you have any further questions, please don't hesitate to contact me directly at 281-470-5063 or via email at ens eye glgportetx.gov. Sincerely, Eric J. Ensey City Planner City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020 Planning and Development LaPorte, TX 77571-6215 Fax: (281) 470-5005 www.laportetx.gov DRA INA GE A NA L YSIS 1:14i " MIA ilio=� !!IIII 111 11111111111 iiiiiiiiij WE=� UA Engineering, Inc. 44 Firm Registration NIo. F-1386 29129 Briarpark, Suite 600 Houston, Texas 77042-3703 Phone 713.953.5200 Fax 711953.5026 LJA Job Number 2265-1401 DRA INA GE A NA L YSI La Poirtei High S�cih�ooil Drainage Chan�nel wa=-IIM iiiiiiii iplill 1111111 11111111111111 111 iiiiiiiiiij I WE=-IM UALEngineering, Inc. Firm Registration No. F-1 3,86 2929 Briarpark, Suite 600, Houston, Texas 77042-3703 Phone 713.9,53,5200 Fax 713.953.5026 LJA Job Number 2265-1401 X OF DAVID HI, ZU Hl LK E 83,450 6" E..N.5' Oww ONA 1.1. Project Background LJA Engineering, Engineering, Inc. (LJA) was contacted by ArborLeaf Engineering and Surveying (ArborLeaf) to determine the size of a box storm drain system to enclose the, existing earthen open channel for future development of the, site. The project area is shown on Exhibit 1. Exhibits 2 and 3 show the study drainage areas based on topographic survey provided to LJA and discussions with ArborLeaf. The existing open channel and existing crossing culverts are shown on Exhibit 4. For the study limits, the downstream end of the existing open channel outfalls into existing 48- inch pipes just upstream of Park Street, The Park Street storm sewer system was not modeled as part of the analysis. The Base Flood Elevation (BFE) for the site is at Elevation 14 based on the preliminary Flood Insurance Rate Map (FIRM) dated March 29, 2013. The BFE of 14 was used as it is higher value than the current effective value. Both, FIRM panels are shown in Appendix A. 1.2. Purpose The purpose of this study is to analyze the size of proposed box systeirn to enclose an existing earthen open channel located on the high school campus. Drainage areas were determined and flows calculated for use in hydraulic modeling of the box system. In addition, the south ditch running east and west along G Street was sized for pipe to endlose that ditch system. Flows were calculated for the G Street ditch and capacity checked but no detail hydraulic modeling was completed for it. 1.3. Scope of Work The scope of work consists of performing a hydrology and hydraulic (H&H) analysis and providing supporting documentation for planning the, enclosing of the existing channel between G Street and Park Street. The tasks outlined below were performed as part of the drainage analysis: Previously collected topographic survey information for the high school campus was provided by ArborLeaf. Existing condition hydrologic analysis to establish the base conditions. Drainage areas were analyzed using topographic information, Peak runoff rates were calculated and existing condition runoff hydirographs were computed. • Hydraufic analysis of existing drainage structures was conducted. Water surface elevations were determined using XP-Storm. • Hydraulic analysis of proposed conveyance improvement alternatives was conducted. Water surface elevations were determined using XP-Stoirm and compared to the existing condition. • The methods, assumptions, conclusions, and recommendations of the computations performed are documented in this, drainage analysis report. JA2265M401%DRN1La Pone Dra�nage Analysis-rev1214.docx 1 - 1 1.4. Additional Prolect information The proposed project horizontal datum is Texas, Coordinate System South Central Zone NAD83. The vertical datum is based on NAVID 88 (Harris County Reference Mark System) as provided by ArborLcaf. The FEMA FIRM panel for the La Porte High; Schodl campus is covered on panel 48201 C09154L and is shown in Appendix A. J:T265M401WRNM.a Porte Dramage Analysis-rev1214.docx I- ellllrmw�.- 6 The existing topography in the project area is relatively flat. The general fall of the land northwest to southeast. SJIr r r w a For this analysis,, no hydrologic modeling was created. As a way to develop flow values, Malcolm's Small Hydrograph Method (or Small Watershed Method), was used to determine a storage volume for the 100-year storm event. Malcolm's Small Watershed Method evaluates single peak discharge values and creates hydrographs for comparison based on drainage area characteristics. The, Small Watershed is technique for hydrogiraph development, which is useful in hydrologic studies for relatively small watersheds (up to approximately 640 acres) and was developed by H.R. Malcolm. The Small Watershed method is discussed in detail the Harris County Flood Control Criteria Manual and can be used in conjunction with the drainage area - discharge curves (site, runoff curves) or the Rational Method. The methodology utilizes a pattern hydrograph to obtain a curvilinear hydrogiraph that peaks at the peak flow rate, determined Iby use of site runoff curves or the Rational Method and which, contains a runoff volume consistent with desired rainfall amount. Method for this analysis, the existing and proposed flow values, were created and used as the hydrographs for comparison. For this analysis, the, HCFC D site runoff curves were used for the 1 00-year event. Table 2.1 shows the HCFCD Site Runoff Curve values. Table 2.1 Site Runoff Curves Impervious 10 Year Prob 100 Year Cover < 20 acres >20 acres < 20 acres >210 acres 0% 1.2 2.1 2.0 3.4 101% 1.5 2.6 2.5 4.3 20% 1.8 3A 3.1 5.3 30% 2.3 3.9 3.8 6.4 40% 2.7 4.6 4.3 73 85% 3.5 5.9 5.1 6-.-7 The equation for the Site Runoff Curves is. Where: Q = peak discharge (cfs) A = drainage area (acres) m = 1.0 for 1 to 20 acres and 0.823 for more than 20 acres up to 640 acres J,122M1401TRN\La Porte Dainage Analysis-rev1214.docx 2-1 Table 2.2 shows the drainage areas and the corresponding area used in, the peak flow calicOation from the site runoff curves. Table 2.2 Drainag e.Areas DA ID Area i(ac) DA-I �DA-2 20.9 5.5 DA-3 8.6 DA-4 3.9 DA-5 2.8 17 DA-16 3.6 Appendix B contains the spreadsheets that show the determination of the hydrolgraphs from the peak flow values calculated from each drainage areas. These hydrographs were entered in the XP-Storm models. JA2265\1401DRNLa Porte Drainage Anallps-rev1214,docx 2-2 3.0 Hydraulic Analysis This section presents the hydraulic analysis performed for the enclosing of the existing open channel on the La Porte High School Campus. The hydraulic analysis was performed using XP- Storm, program. XP-Storm is a dynamic rainfall -runoff -subsurface -runoff simulation model used for single -event to continuous simulation of flow quantity and quality from primarily urban/suburban areas. While the program Ihas both hydrology and hydraulic components, for the purposes of this analysis only the hydraulic components were utilized. XP-Storm utilizes the EPA SWMM 5 engine for calculations. The hydraulic portion of XP-Storm routes water flow through user -defined storm water network that can include components such as closed pipes, open channels, storages:, ponds, diversion structures, pumps, orifices, weirs, outlets,, outfalls, and other regulators. XP-Storm tracks the quantity of flow as it progresses through the system to the outlet. The program also tracks flow rate and depth of water in each pipe and channel during the simulation time period. To build the XP-Storm hydraulic imodel, the system is defined by establishing a network representation of the physical components of the study area. The first step in building the XP- Storm models for this analysis was to establish junction locations within the model. The junctions physically represent the confluence of natural channels, manholes in a storm sewer system, or pipe connections. The primary input parameters at the junctions were invert elevation and external inflow data (hydrograplhs). Once, the Junction nodes were defined, the outfall node(s) were established. In an XP-Storm model, outfalls are terminal nodes of a drainage system used to define final downstream boundary conditions in dynamic flow routing. Outfalls operate as a junction node in other types of flow routing. The primary input parameters at the outfalls for this analysis are invert elevations and Iboundary condition type and stage description. The next step in the model development was to connect junction nodes and outfalls with conduit links such as pipes or channels to conveyance water through the system. The primary input parameters used for conduits in this analysis were offset elevation above inverts, conduit length, manning's roughness, cross -sectional geometry, and entrance/exit losses, Once the network was linked, flow was routed through the network usinig Dynamic wave routing which solves the complete one-dimensional Saint Veinant flow equations and therefore produces the most theoretically accurate results. These equations consist of the continuity and momentum equations for conduits and a volume continuity equation at nodes. Model runs were conducted for the existing hydraulic condition using the I 00-year flows. 3.2. Hydraulic Analysis 3.2.1. Existing The model for the existing conveyance system was run using the 1 010-year flows. The existing system was modeled using cross sections cut from the existing topographic survey information form the open ditch section. The two double 4-inch culvert crossing were modeled as, well in the, existing conditions. Table 3.1 Ibelow shows the existing flows and maximum water surfaces for existing conditions from the XP-Storm model, Appendix C contains the XP-Storm output for the existing conditions. J:N2265114DIiDRMLa Porte D4nage Analysis- rev 1214.do" 3-1 Table 3.1 Existina Conditions IResurlts Link Name Shape �flax Flow of Maximum Water Elevation ( ft) Link8 Natural 73.00 11.70 Link7 2-48-in 73.48 11.59 Link6 Natural 961.03 11.59 Links 2-48-in 96.14 11.37 Link4 Natural 103.06 11.37 Llnk3 Natural 109.30 11.21 Link2 Natural 1109,33 11.13 Unkl Natural 117.57 11.06 Unko 2-48-in 117.54 10.83 3.2.2. Proposed with Restrictoirs The first proposed scenario consists of enclosing the upstream end of the existing channel with 2-6'x4' RBC for approximately 1300 linear feet downstream of G Street, The downstream end of the existing channel will be expanded for a proposed detention facility. Exhibit 5 shows this configuration layout. The proposed school plan was provided by ArborLeaf and proposed flows developed for the increased impervious areas. Link I was changed to a storage area based on the proposed detention basin at the downstream end of the study area. This alternative does have an increase in water surface elevation but no increase in flows for the 1 00-year event. For control purposes at the detention basin, the existing 48 inch pipes are both restricted down to 36 inch pipes. This restrictor increases the water surface elevation but all increases are well below the BFE value of elevation 14 and within the school property. The water surface elvations are increased to 0.9 feet above the existing values in the model. The flows and water surface elevations are based on the 1 010-year storm event. Table 3.2 below shows the proposed flows and maximum water surfaces for proposed conditions from the XP-Storm model. Appendix C contains the, XP-Storm output for the proposed system. For enclosing 1300 linear feet of existing channel below the BFE with 2-6x4 RBC will require providing approximately 0.7 acre-feet of floodpllain fifl mitigation and 0A acre-feet of lost storage for filling in the south ditch along G Street. Based on a technical memorandum by ArborLeaf, the proposed detention mitigation volume for the improvments to the school site will require 1.22 acre-feet of storage. As designed, the proposed storage area at the downstream end of the system will provide 5 acre-feet of storage. This volume will provide the required volluirne for both the impervious increase and the lost floodplain storage. JA2265114131\DRN.La Pode Drainage Analysis-rev1214.dom -2 Table 3.2 ProDosed Results with Restrictors, 111aximurn Water ML- Max Flow Elevation I efs 3.2.3. Proposed without IRestrictors The second proposed scenario consists of lenclosing the same existing channel with 2-6'x4' RBC for approximately 1300 linear feet downstream of G Street. The downstream end of the existing channel will be expanded for a proposed detention facility. Exhibit 5 shows this configuration layout. The proposed school plan was provided by Arborl-eaf and proposed flows developed for the increased impervious areas. Link 1 was changed to a storage area based on the proposed detention (basin at the downstream end of the study area. This afternative does not restrict the existing 48 finch pipes. This alternative does have a slight increase in water surface but it is all within the downstream storage area for the models. Without restricting down the existing 48 inch pipes at the outfall, there is, an 8 cfs increase in 1 00-year discharge from the site. With the school site less than 1500 feet from Galveston Bay, this slight increase in the 100-year discharge from the project site is not an adverse impact to the receiving stream. All modeled water surface elevations are well below the BF E for this area. The flows and water surface elevations are based on the 100-year storm event. Table 3.3 below shows the proposed flows and maximum water surfaces for proposed conditions from the P-Storm model. Appendix C contains the XP-Storm output for the proposed system. The same floodplain fill discussion is applicable to this proposed scenario. D226511401VIRNU Pouts lDrainagie An alysis-irev I 214-cfoox 3-3 Fable 33 Proposed Results without Restrictors Maximum Water Max Flow El ation cfs, JV265X14011DRMLa Porte Drainage AnMysis,rev1214-docx 3-4 4.0 CONCLUSION The drainage analysis modeled the existing earthen open channel using IFS-SWMM to develop baseline conditions for flow and water surface elevations for the I 00-year storm event. Using the provide proposed development plan foir the school site, proposed flow values were developed for the increased impervious cover. The proposed 2-6'x4' box culvert system was, modeled in XP-SWMM from G Street to approximately 1300 feet downstream. At this location, a detention basin was modeled using a storage node. Two proposed scenarios were modeled with the storage area. The first restricted the existing double 48 inch pipes clown to double 36 inch to reduce the proposed flows down to, or below existing 100-year flow values. This does increase the existing water surfaces within the school site but well below the BFE for this area. The second scenario modeled the same box culverts and storage area but did not restrict the existing double 48 inch pipes. This only slightly increased the, water surface elevation within the proposed storage node and no other areas on the school site. This non- restricted scenario does allow an increase of 8 cfs over the existing 1 00-year flow value at the downstream end. While this is, an impact to the, 1 00-year flow, it is not considered an adverse impact as the receiving stream is Galveston Bay and is less than 1500 feet from the site. Based on the better water surface elevations within the school site and the close proximity to Galveston Bay, the non -restricted Iproposed scenario is the recommended scenario. The recommended scenario will not have an adverse, impact to, the, school site or to Galveston Bay for the 1 00-year storm event. Approximately 0.7 acre feet of storage is required below the BFE which is offset by the excavation of the detention basin. D226M14DINDRN\La Pole Dminage AnWysm-rev1214 doox 4-1 lo. -. c 04 m & ; c! Uj _ � Z cc \\ - J\ k \ � � : t� �` .......... . v. >0 a o 3-1 ;r A,gr� �El� 40 aqual/ Allm"ll A/m/ gp � ` \ \ ) 0 w �� 0 CL 13 Zo ° 0 1 \ Im wG /} � ° � � j � o"M MO Iz u z 52 R.: , \/ /[2-%E 01 UJ H in, ............... 31 J.'e I If it I m Mal M 0 H F P1 I., ARA qA mp I "i I Hi'll IN MIRig a m5ii It "42 lug hv At, 4N , pt lo' sa -IN -OP ONi i ;l, 9 tp -k s i,- ""j- Ez A, use :Jag 0, �!A - j,� fl 1 � q �iol I 11,1H i la , . h a, f I o I TH�r°finI Miscellaneous A Meeting of the La Porte Planning & Zoning Commission (Type of Meeting) L'• Scheduled for FEB 18 �014 February 19, 2015 sY� (Date of Meeting) to Consider Zone Change Request #15-92000001 (Type of Request) I have received notice of the above referenced public hearing. I am in FAVOR of granting this request for the following reasons: I am OPPOSED to granting this request for the following reasons: Name (please print) Signature Address f City, te, Zip t ��r,�3u A Meeting of the La Porte RZ ARM,, Planning & Zoning Commission b �i (Type of Meeting) �EB Scheduled for �Y February 19, 2015 (Date of Meeting) to Consider Zone Change Request #15-92000001 (Type of Request) I have received notice of the above referenced public hearing. I am in FAVOR of granting this request for the following reasons: I am OPPOSED to granting this request for the following reasons: Se C-- 741" c -h e c Name (please print) Signature ,J 6 0 .� v C,n.5 X z Address )-w 106 . -? -2 s✓ Z City, State, p 9 I oppose the change to commercial for the following reasons: 1. Noise traffic - Traffic in and out 24 hours a day. We have enough people coming and going all hours of the day in our front yard. 2. Security problems - This type of business usually attracts the possibility of being broken into. 3. Safety concerns - The police have not been any help in controlling the theft problems with the Pecan Grove Trailer Park. 4. Pollution - Pollution and environmental problems from oil and gas create unknown fumes from vehicles causing health problems. 5. Too many businesses - There are too many businesses with all the noises 24 hours a day. 6. Traffic problems - We can't get out of our own driveway right now due to high volumes of traffic. I hope the zoning commission will not grant this change. We have lived and paid taxes for 66 years and hope our input will be fairly considered. &A— CONSTRUCTIO Quala 6.4 acre development and parking lot expansion Prepared for: City of Laporte, Planning and Zoning committee, Quala US , Laporte ,Tx 77571. Dan Langdon, Vice President. Legal Description: TRS 351 & 352 LaPorte Outlets Prepared by: Tony Garcia, Jr, President SDC Construction February 19, 2015 Proposal number: 2015-33015 SDC CONSTRUCTION 4221 Mckinney St. HOUSTON, TX 77023 832-724-0206 EXECUTIVE SUMMARY Objective Proposed South parking lot development and expansion in 2015: provide approximately 100+ parking spaces on behalf of Quala. The proposed expansion located at 11110 Hwy 225 LaPorte, Tx consists of developing 6.4 acres to improve parking efficiency, circulation and safety. Goals To address the social and ecological environment impacted by the proposed 6.4 acres parking lot development. To form a full collaborative'effort between the City of LaPorte and Harris County, meeting all local and county codes. Solution - In providing a quality and sound project, SDC shall be mindful of neighboring residents and the City of Laporte in its approach, appearance and design during the entire planning, development and construction process. Project Outline To offset the impact of developing 6.4 acres of wooded lot due to possible increase in parking activity, impervious land cover and potential increase in storm water runoff we plan to do as follows: • Tree preservation plan: maintain 30 feet at the West and 20 feet at South perimeter. Perform tree survey with replanting guide plan to offset quality trees lost during land development; • Add approximately 100+ parking spaces to the existing Quala facility; • Parking expansion to meet current standards and codes for safety, accessibility and efficiency; • Land impact: perform engineering, soil test and runoff impact to determine appropriate measures for storm water management following local and county codes and guidelines; • Lighting Mitigation plan: to offset the lighting impact we propose to utilize hooded yellow sodium vapor lights; • Sound mitigation plan: provide fence and barrier to be per code 8' tall wood fence on the South and West end of property so sound reduction; • Asphalt parking to be light truck and vehicle rated; • Project working hours to be limited to standard working hours Monday through Saturday; • Design and Planning to take approximately 2 months; • Permitting approximately 2 months; • Construction time approximately 4 months. SDC CONSTRUCTION 4221 Mckinney St. HOUSTON, TX 77023 832-724-0206