HomeMy WebLinkAbout1975-03-12 Special Meeting~ ~
•
MINUTES - SPECIAL MEETING
OF THE
LA PORTE CITY COMMISSION, LA PORTE, TEXAS
MARCH 12, 1975
7:00 P.M.
MEMBERS OF THE COMMISSION PRESENT: Mayor E. A. Thomas,
Commissioners C. D. Christensen, I. J. Kibodeaux,
A. Uel Price, and C. D. Boyle.
MEMBERS OF THE COMMISSION ABSENT: None.
OTHER CITY OFFICIALS PRESENT: Larry L. Broussard,
Director of Finance; Margie Goyen, City Clerk;
• Knox Askins, City Attorney; Larry Morton, Director
of Public Works; Herb F. Freeman, Chief of Police
OTHERS PRESENT: Mr. James Hutchison, Busch, Hutchison &
Associates, Inc.,; Mr. Elliot Jones, Representative of Blue
Cross; Mr. Ray Treaccar, Group Placement and Administrative
Services, Inc., representing American National for Stephens-
Baker Insurance.
PRESIDING: Mayor Thomas.
+ + +
1. CALL TO ORDER - Mayor Thomas called the meeting to order.
+ + +
•
~ ~
•
Special Meeting 3/12/75
2
2. APPROVE PAY ESTIMATE NO. 2 - MC KEY CONSTRUCTION &
EQUIPMENT RENTALS FOR CONSTRUCTION OF SANITARY SEWER,
SOUTH SIDE - JOB NO. 74-1132 - Motion by Commissioner
Christensen, seconded by Commissioner Kibodeaux, to
approve Pay Estimate No. 2 to McKey Construction &
Equipment Rentals for construction of Sanitary Sewer,
South Side - Job No. 74-1132 in the amount of $20,497.79.
Motion carried by the following vote:
AYES: Commissioners Christensen, Kibodeaux,
Price, and Boyle.
NAYS: None.
A copy of Pay Estimate No. 2 is attached and made a
part of these minutes.
+ + +
•
3. CHANGE ORDER ON CONSTRUCTION OF SANITARY SEWER, SOUTH
SIDE - JOB NO. 74-1132 - After a letter was read in full,
motion y Commissioner Kibodeaux, seconded by Commissioner
Price to authorize the change order on construction of
sanitary sewer, south side - Job No. 74-1132 in the amount
of $20,142.95, for a total contract price of $241,632.37.
A copy of which is attacced and made a part of these minutes.
Motion carried by the following vote:
AYES: Commissioners Christensen, Kibodeaux,
Price, and Boyle.
NAYS: None.
+ + +
4. DISCUSS GROUP INSURANCE - BLUE CROSS - Mr. Elliot Jones of
Blue Cross was recognized and presented a review of the
previously presented plan. There was a brief discussion
of same.
DISCUSS GROUP INSURANCE - STEPHENS-BAKER - Mr. Ray Treaccar
representing Stephens-Baker Insurance Company was recognized
and presented a review of the previously presented plan.
There was a brief discussion on same.
•
If possible, the City Attorney will have a recommendation
to present to the Commission at the March 17, 1975 meeting.
+ + +
• •
• Special Meeting 3/12/75 3
~. DISCUSS GROUP INSURANCE (Cont'd.)
Motion by Commissioner Christensen, seconded by Commissioner
Kibodeaux to table a decision on Group Insurance until an
opinion could be given by the City Attorney. Motion carried
by the following vote:
AYES: Commissioners Christensen, Kibodeaux,
Price, and Boyle.
NAYS: None.
+ + +
5. CONSIDER AUTHORIZING HIRING E.M.T. FOR AMBULANCE SERVICE -
After a discussion regarding the need for an E.M.T. for
the ambulances, the negotiations with industry for ambulance
service and making a separate department for the ambulance
service or increasing the number of patrolmen or reserve
policemen, motion by Commissioner Boyle to hire an E.M.T.,
for the ambulances, pay to be $890.00 per month. Applications
would be accepted. The best applicant would be hired.
• The motion failed for lack of a second.
+ + +
6. ADJOURNMENT - Motion by Commissioner Kibodeaux, seconded by
Commissioner Price that the meeting adjourn. The motion
carried by the following vote:
AYES: Commissioners Christensen, Kibodeaux,
Price, and Boyle.
NAYS: None.
The meeting adjourned at 8:00 P.M.
argie oyen, Ci y Clerk
Passed and approved this
the 17th day of March, 1975.
• E. A. Thomas, Mayor
. o •
or`
~ ~~
CITY OF LAPORTE
P.O. Box 1115, LaPorte, Texas 77571
Mr. Larry Broussard, Group Representative
SUMMARY OF BENEFITS: .
$30 room for 30 days
All usual hospital services covered in full except
blood and plasma
ICU in full
$500 Surgical Schedule
20% Anesthesia
Jumbo Major Medical
$250,000 Maximum .
$60 room limit
$100 Deductible
Op Drugs in full
Op Psy-Care (12.50 maximum per week)
$150 Acc Inj Supplement
RATES EFFECTIVE 3-1-75:
Individual $21.36
Emp. and Child(ren), 42.13
Two-Pe: son (a,-,~~~ '~ ~) 50.07
Family ~,, . ~,~'~"~~~~~.`~~~.~.:~) 58.33
~ a~~~ ~J ~
®. ~ •
~'~.$~~,•y~y}' ~ ~ ~ ~ (713).621-0822
Y Y •
O ~ ~~~ ~~~e~~~~~
~~
P. O. BOX 27246 HOUSTON, TEXAS 71027
CITY OF I,A PORTE •
P1ara I Com~elion.sivc Aiaio: MEdica.lt; '
A: ter $100 calendax yaaac deductibles progaarn would pay 80~ of
next $Ss000 and 100 oS balances in yeax up to a lifetime maxi3aum
of $2S0°000. Deductible waivEd for expen.~c: due to accident.
Only internal limit is on hosgit<a.l room 'and board which is s®t at
average semi-private of aorfin3ng hospital.
~ Plan z2 Comprehensive Y~iajor I4edic~.1:
Same as Plate I° but with deductible r~1so waived on hospital
and surg3.cal c~xponses and first $1s00U of hospital expense paid
in full.
® tions~ ~ .
A. Blanket l~iaternity Covar.~ge - 4 S00 paid in full for normal
eliildb~.rth, $10000 for Caesarean or Ectogic, $250 for mis-
carrimgo,
B. I;edical fieimbursemezat Prog:caru -where City of I,a Porte would
°s out of pocket cost under oontract up to a
share claLmant
~/
ma)C'1..1num of $554 Per Y~•
C. 2Yiird Party Administration -wher® City of I~~Porte would
contract ,out clains verifications filing with insurance
carrier and checkigg.
COST COMPARISON
BC~BS ~ ANICO-I ANICO-II
F~aployee $ 22.90
F~~ployee and Ore Dagondent ~ $ 5'x•51
.
Rnployee and All D3pc~ndents $ 63.18 ,
Sponsored Doper.dent $ 12.91
Emgloyee ~- • 17.20 $ 21. ;0
1-0raployee and Dopendentl-a. s~p,,$ 45.55
8
6
2 $ . S6.9S
570
95
$3
5
5
.
.Total Monthly Cost (on pre.sont census) $30853.6? $z° .
0
t~dnSP
Blantcet Maternity - $3.50 gsr dependent -.Total Monthly
$ 175.5'
I~iedical Reimbursement -`B3sed.on last yoar°s losses and
O loaded 12~ for in.~'l.atioz~ - P4onthly $ 352.00
Third k'a~•ty Administration -Monthly $ 200.00
F~:ample - ANICO I plus all op-cions -Total Monthly Cast $3 r 595.'75
•
_ __ . _ _ .. _ _ _ - _._.x_ _ _.~__.__..__ ...
•
BUSCH, HUTCHISON & ASSOCIATES, INC. CONltULTINO[NOtN[[11~
1107 FL[[TWOOD ORIV[ - OAYTOWN, T[7(A• 77520 - FMON[ (71') 422.02171
•
DATE: March 7, 1975
ESTIMATE NUMBER: Two (2) - February 1, 1975 through February 28, 1975 '
PROJECT: City of La Porte - Construction of Sanitary Sewers, South Side -Job No. 74-1132
CONTRACTOR:_ McKay Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas
AMOUNT OF CONTRACT:_$221,489.42 CONSTRUCTION TIME: 90 Working Days
tam
No. Item uantit Unit Unit Price Total
1. 8" V.C. Sanitary Sewer,
R.G. Joints 0 - 6' cut
Com late in lace - 0 - L.F. 5.15 - 0 -
2. 8" V.C. Sanltary Sewer,
R.G. Joints 6 - 8' cut
com late in lace - 0 - L.F. 5.47 - 0 -
3. 12" V.C. Sanitary Sewer,
R.G. Joints 0 - 6' cut
com fete in lace 300 L.F. 6.26 1,878.00
4. 12" V.C. Sanitary Sewer,
R.G. Joints 6 - 8' cut
Com late in lace 400 L.F. 7.10 2 840.00
5. 12" Y.C. Sanitary Sewer, "
R.G. Joints 8 - 10'' cut
Com late in lace 236 L.F. 9.35 2,206.60
f 6. 12" V.C. Sanitary Sewer,
~ R.G. Joints 10 - l2' cut
Com late in lace 545 L.F. 17.58 9,581.10
7. 15" V.C. Sanitary Sewer,
R.G. Joints 8 - 10' cut
Com late in lace 945 L.F. 11.70 11 056.50
8. 21" V.C. Sanitary Sewer,
R. G. Joints 8 - 10' cut
Com late in lace 150 1. g 6 , 2 794.50
9. 21" V.C. Sanitary Sewer,
R.G. Joints 10 - 12' cut
om late in Lace 659 .F. 26.86 17 700.74
f
_ _ _ _ _ _ . _
. • •
Page Two - City of La Porte - Construction of Sanitary Sewers, South S1de
• McKey Construction b Equipment Rentals, Inc.. Job No. 74-1132 - Estimate 2
Item •
No. Item uantit Unit Unit Price Total
10. 8" C.I. Sanitary Sewer
Pipe, AWWA Class 150 ,
0 - 6' cut
Com lete in lace Deleted L.F. 13.57 Deleted
11. 8" C.I. Sanitary Sewer
Pipe, AWWA Class 150
6 8' cut
Com lete in lace Deleted L.F. 14.35 Deleted
12. Sanitary Sewer Manhole
Com lete in lace 9 Each 400.00 3,600.00
13. Extra Depth for Sanitary
Sewer Manhole in excess Vert
of 8 feet - 0 - Feet 40.00 - 0 -
14. 8" V.C. Sanitary Sewer,
R.G. Joints by augered
const. Com lete in lace - 0 - L.F. 16.00 - 0 -
15. 8" Cleanouts, Comp~iete
in lace 0 - Each 75.00 - 0 -
16. Sanitary Sewer Creek
Crossing to include pipe
supports, 8" steeY pipe
and appurtenances from
Sta 19+00 to lift Sta.
Complete in place Lump
See sheets 3 & 12 - 0 - Sum 17 000.00 - 0 -
17. Sanitary Sewer Lift Sta.
with wet well, Complete
in place Lump
See sheets 4 & 12: ~ 10~ Sum 27 750.00 2,775.x0
18. 6" P.V.C. Sanitary,5ewer
Force Main, R.G. Joints
Necessary to conne, t "M"
Street Lift Stdtio~ Lump
Com lets in lace ~
-'0 - ,
Sum
1 500.00
- 0 -
,, ._.
• •
Page Three - City of La Porte - Construction of San~ita~y Sewers, South Side
• McKey Construction d~ Equipment Rentals, Inc., Job No. 74-1132 - Estimate 2
C
Item '
No. Item uantit Unit Un1t Price 1'o al
19. 8" x 4" V.C. Sanitary
Sewer Wye, R.G. Joints
Com lete in lace - 0 - Each 970:00 - 0 -
20. 12" x 4" V.C. Sanitary
Sewer Wye, R.G. Joints
Com lets in lace - 0 - Each 20.38 - 0 -
21. 12" x 6" V.C. Sanitary
Sewer Wye, R.G. Joints
Com lets in lace - 0 - Each 20.38 - 0 -
22. 4" V.C. Sanitary Sewer,
R.G. Joints Service
,
Connection I
Com lets in lace ~ - 0 - L.F. 4.68 - 0 -
23. 6" U.C. Sanitary Sewer,
R.G. Joints Service
Connection
Com lets in lace - 0 -~ L.F. 5.08 - 0~-
24. 4" Concrete Sanitary ~
\
Sewer Plug
Com lets in lace ;. ~ - 0 -' Each .86 - 0 -
25. 6" Concrete Sanitary
Sewer Plug
~
Com lets in lace
~ - 0 -~ Each 1.95 - 0 -
26. Road Shell or crushed ~ ,
limestone for road,. ~
shoulder, driveway, etc.
Repairs (Delivery ticket.
basis Com lets in lace. ~ - 0 - .Y. 10.00 - 0 -
27. ~:
Timber order left i~n
1000
rench ~ - 0 - B.F. 10.00 - 0 -
28. Removing existing con-
Crete driveways and
replacing with 4" r~on-
crete drivewa
- 0 -
.Y. 20.00 - 0 -
~f
i
:~ ,
}
.~
.. r.. _
~ge 4 - City of La Porte - Construction of Senita~ry Sewers. South Side
McKey Construction b Equipment Rentals, Inc., Job No. 74-1132 - Estimate
Item
No.
Item
uantit
Unit
Un1t Price
Total
29. emoving existing flex-
ible base pavement and
replacing with 8" cement
stabiiixed shell bass
and 1-i/2" Type "F" Hot
ix As halt Surface - 0 - S.Y. 10.00 ^ ~.-
Material nelivarpri m tic Qaa n~ TOTAL WORK COMpLETEQ 54 432.44
Less Material Installed 17,247..91
Materi'a1 on hand
TOTAL MATERIAL & WORK
Pay 90X of ~ 67,083.56, ~ 60,315.20
Less Previous Payments- 39,877.41
PAY THIS AMOUNT ~ 20,497.79
WORK QAY ANALYSIS ~
Contractor's first day of work - January 27, 1975
Lost Time:January, 1975 0 days
February, 1975 1 "
TOTAL LOST TIME 1 day
Total work days since start 25
Total days lost due to weather 1
Totai time charged ~ days
Progress .
Number of days chargedt 24 ^ 27 x
Work Completed: ~~~,~- ^ '"~"-x
Position
2 96 or 1.8 days behind
1 ~
mes P. Hutch n,,
JPH/sh
12,651.12
X67,083.56
• •
3USCH, HUTCHISON & ASSOCIATES, INC. CONfULrINO tNO1NttRf
1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77620 -- PHONE (713j 422.8213
March 12, 1975
n
~J
Honorable Mayor and City Commission
City of La Porte
124 South 2nd Street
La Porte, Texas 77571
CHANGE ORDER FOR JOB N0. 74-1132 - SANITARY SEWER EXTENSION TO THE SOUTH
Because of some design changes required by the Texas Highway Department
and some omissions from the original bid sheets, it has become necessary
to consider a change order to the subject contract. The amount of the
change order will be an added $20,142.95 for a total contract price of
$241,632.37, subject to final measurements, of course.
The bulk of the addition is due to the Highway Department insisting on
steel liners for the roadway crossing at five locations and deepening
of about 5,500 feet of the sewer line. The casing adds about $7,000.00
and the deepening about $10,000.00, totaling $17,000.00. Part of the
balance of the added cost, about $1,000.00, covers a new bid item
"Clearing and Grubbing" which was left off the original bid sheet. The;
other $2,000.00 arose from a difference in the estimated depth of abou~~!
400 feet of the 21 inch diameter line along "K" Street. The depth of ;~_.
this line lay right at 10 feet and this is also the break point in the;';;'
unit bid prices, that is, an 8 - 10 foot cut is one price, and a 10 -~,;,
12 foot cut is another price. Unfortunately the final measurement of
the construction depth showed more of the line below 10 feet than was;"
estimated.
Some minor design changes have been made to improve the installation
and reduce costs in some areas. For example, PVC pipe will be used i
the cased crossings rather than the cast iron specified to be used
without the casings. These changes result in there being seven new
bid items and the deletion of two original bid items. The attached,
revised, bid sheet reflects these changes and the negotiated bid pric
for the new items.
If there are questions, I will be happy to answer them at the next
commission meeting.
J es P. Hutchison, P.E.
V e President
:~ .
is ~l~'
~~
~:
,I
JPH/sh
_..~_.,--- ~~__--,_n__------ _~._._._.._._r-...
USCH, HUTCHISON & ASSOCIATES, INC. CONSULTING [NOIN[[Rs
1107 FL[[TWOOD DRIV[ - oAYTOWN, T[XAS 77620 - -NON[ (717) AZ2•5117
GATE:
ESTIMATE NUMBER:
PROJECT: City of La Porte -Construction of Sanitary Sewers,L South Side -Job No. 74-1132
CONTRACTOR: McKey Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas
AMOUNT OF CONTRACT: $241,632.37 CONSTRUCTION TIME: 90 Working Days
Item
No. Item uantit Unit Unit P~•ice Total
1. 8" V.C. Sanitary Sewer,
R.G. Joints 0 - 6' cut
Com lete in lace 6 215 L.F. 5.15 32 007.25
2. 8" V.C. Sanitary Sewer,
R.G. Joints 6 - 8' cut
com lete in lace 630 L.F. 5.47 3 X46.10
* 2a 8" PVC Sanitary Sewer,
R.G. Joints 0 - 6' cut +~
Com l ete i n lace 20 L.F. 9.00 1330.00
* 2b
8" PVC Sanitary Sewer ~ ~°
±~ 4
,
R.G. Joints 6 - 8' cut
~
Com lete in lace 20 L.F. 10.00 `
~~~~.00
..
,
3. 12" V.C. Sanitary Sewer, ~ ~
#
~ .
~"~'~
R.G. Joints 0 - 6' cut ~
~,;
'
Com lete in lace 1,150 L.F. 6.26 7~ ~~
~,00
4.
12" V.C. Sanitary Sewer, ~~
; _
,~'~~~
R.G. Joints 6 - 8' cut ~ ~ ~ ; ~
Com fete in lace 1,605 L.F. 7.10 11 ~ ~°~~~a.50
°
5. 12" V.C. Sanitary Sewer 4 ~"
~-,;
~
~
R.G. Joints 8 - 10' cut !
~` ~
l-
Com 1 ete i n 1 ace 970 L . F. 9.35 Cx~~~ : 50
g
6. 12" V.C. Sanitary Sewer k~~I,~
R.G. Joints 10 - 12' cut ~ ~ `'
~~
x'
Com lets in lace 1,385 L.F. 17.58 ~ 24
~^
.30
~M-
* 6a
12" V.C. Sanitary Sewer I
~;~~~1
R.G. Joints 12 - 14' cut
~
75 ~~~~; ~j
~'!
L~~
Com lets in lace 3 L.F. 26.00 9
~
,00
*New Items
~,.;~,
,~,
,;,; i
j~;
;,~'
~,.
- --
....~~....._.... _ _ .~. _ __...v_ -._. _... ._.:_
-------~---~~- .~ = ~- ---r-~--- .-_..._---
•age Two -City of La Porte -South Side Sanitary SIncrs- Estimate74-1132
McKey Construction & Equipment Rentals,
Item
No. Item uantit Unit Unit Price Total
7. 15" V.C. Sanitary Sewer,
R.G. Joints 8 - 10' cut
Com lete in lace
940
L.F.
11.70
10 998.00
8. 21" V.C. Sanitary Sewer,
R.G. Joints 8 - 10' cut
Com lete in lace
150
L.F. ~
18.63 2,794.50
9. 21" V.C. Sanitary Sewer,.
R.G. Joints 10 - 12' cut
Com lete in lace. 659 L.F. 26.86 17,700.74
10. 8" C.I. Sanitary Sewer Pipe,
A4lWA C1 ass 150 0 - 6' cut
Com lete in lace
Deleted
L.F.
13.57
DELETE D
11. 8" C.I. Sanitary Sewer Pipe,
A4lWA C1 ass 150 6 - 8' cut
Com lete in lace
Deleted
L.F.
14.35 '
D E L FIT E D
!
~
'12. Sanitary Sewer Manhole 34 Each 00
400 13,v=G~.00
Com lete in lace . -•
13. Extra Depth for Sanitary ` ~'''
Sewer Manhole i n excess
21 Vert
Feet
40.00 i
- "; ~ .~~
}~~!~ • 00
of 8 feet
t ~~...,
.~
b
14. 8" V.C. Sanitary Sewer, ~ ~ ' `
~ ~~', ~ ~~
* R.G. Joints by augered
const. Com lete in lace
Deleted
L.P.
16.00
D E L~
~.
~
~,~i„~ L D_
~
;
!• i ~ IFS i .
~
~`~~~~~' ~ ~~
14a 8" PVC Sanitary Sewer, ~ . ,
~ ~~
''
R.G. Joints by tunnel ~
~~`:'
}~~
}~
const. in 12" steel
Com lete in lace
casin
320
L.P.
40.00 ; ~
~ ~
1~~,~'f~'~00
, ~ {
p f ~
~
f
15.
8" C1 eanouts, Complete
9
Each
75.00 ~
,
,
,
.
~' ' ~ f; ~'
~ ~~ ;i'"" x;00
---
i n 1 ace ~ -,--
~!~,%,
~
16. Sanitary Sewer Creek ~~~`~
~~
~
~ Crossing to include pipe ~ ,', ~ ~~ ~ ~~,!'
supports, 8" steel pipe and ~ f E~~~,~~,j
4
appurtenances from Sta 19fi00
Compl ete fin
to 11 i't Sta
Lump ~ ~ ~ ,
~' i~ °'~ ~ s
'
. ,
lace see sheets 3 & 12 A11 Sum 17 000.00. ~-t}~~~00
'' 17
~
' x ,;
~~i
c ~ ~,. ~~.
~ ~~;..
+,#~,!
~ r tl
~ t
~`~ ~~~
!i V.
- ~, - .r.-._.r..._..__.. ..
.Page Three -City of La Porte -South Side Sanitary Sewers_ Job No. 74-1132
McKey Construction & Equipment Rentals. Inc.. Estimate
1 ~GUi
No. Item uanti t Unit Unit Price Total
17. Sanitary Sewer Lift Sta. with
wet well, Complete in pace
All Lump
Sum
27 750.00 27,750.00
see sheets 4 & 12
18. 6" PVC Sanitary Sewer Force
Main, R.G. Joints necessary to
connect "M" Street Lift Sta.
All Lump
Sum
00
3 200 3,200.00
Com lete in lace .
18a 6" PVC Sanitary Sewer Force ~
* Main, R.G. Joints necessary
to connect "M" Street Lift
Station by tunnel const.
in 10" steel casing,
Com lete in lace 80 L.F. 38.00 3.,040.00
r
19. 8" x 4" V.C. Sanitary Sewer .
Wye, R.G. Joints
Com 1 ete i n 1 ace
117
Each
9.70
1 ,1:;:;4.90
w
.
~ p
20.
12" x 4" V.C. Sanitary Sewer
~
' ~.
"
R.G. Joints
Wye,
Com 1 ete i n 1 ace
Deleted
Each
20.38
~
D E t~ '
~
T E D
n
20a k i ncl ud-
Sanitary Sewer Stac
; ' `~
`
'
* ing 12" x 4" V.C. Sanitary a
~`
Sewer Wye, R.G. Joints
7
Each
00
200 ~~ ~,,00
Com 1 ete i n 1 ace .
~F ~.~.A
~.
~; I ~, , ,
~~
21. 12" x 6" V.C. Sanitary Sewer ,,
, ~
~
Wye, R.G. Joints .,_, _~_~ ~__~. ~~ ~Q n ~ li ~~ r ~ n
com i ete i n ~ ace ~~ ~ G ~G.. ,.M.... -- -- - ~ ~,~__
~;
'~ ~'
,
21a Sanitary Sewer Stack includ- .
- ~~
g~' '
ing 12" x 6" V.C. Sanitary ~ ~
~~
* R G Joints
Sewer Wye,
2
Edch
'~ ' ~ ' 200.00 .. ~ ~
, ~
' ~i0~~ .00
Com 1 ete i n 1 ace . ~ r~~
~' ~
22- 4" V.C. Sanitary Sewer, ~~ ~ ~;.~~
R.G. Joints Service
Connection Com lete in lace
3 600
L.F. 4.68 l~ ~
, . ;I~i;~,900 `
.~~~
°~ ^
~''~{
23. 6" V.C. Sanitary Sewer, R.G. ~ ~ ''
Joints Service Connection 20 L
F 5.08 ~~ ~'~~~1~~60
Com lete in lace .
.
I -~~~...
t,~
~,~,~~,.
9~
~~ ',,~
,~ ~ ~
rg,
~.
:a~._.
•• ,
•
_ • _
age Four -City of La Porte -South Side Sanitary Sewers, Job No. 74-11
McKey Construction & Equipment Rentals, Inc. - Estlmate
Item
No. Item uantit Unit Unit Price
24. 4" Concrete Sanitary Sewer Plug
Com lete in lace llg Each .86
25. 6" Concrete Sanitary Sewer Plug
Com lete in lace 2 Each 1.25
26. Road Shell or crushed limestone
for road, shoulder, driveway,
etc. Repairs (Delivery ticket
basis Com lete in lace 700 C.Y. 10.00
27. Timber ordered left in 1000
Trench 50 B.F. ~ 10.00
28. Removing existing concrete
driveways and replacing with
4" concrete drivewa 50 S.Y. 20.00
28a Clearing and Grubbing, leaving Lump
debris stacked in ri ht-of-wa All Sum 1 000.00
29. Removing existing flexible
base pavement and replacing
with 8" cement stabilized
shell base and 1-1/2" Type
"F" Hot Mix As halt Surface 535 S.Y. 10.00.
TOTAL WORK COMPLETED
Total
101.48
2.50
7,000.0
500.00
1,00.00
1,C~l~0.00
~'„';
r'~
9`
{:
;.; i
5 a.~`:i~i ~'00
_~~
._,..
$241 , Ci ~~ ,~37
;f ~~ ,i.
~ I'
~~
;~
~;
i
.,
!;!~
i~ ',~
~ ~~'
~~
,, ~ ~'~
,~~~'~~~
~~ ~; ~ ~~
f
I ~ I'~
~ , lu
r ,~
~ ~ I '~It
i i~l!~,
.~
I'{
.,~ fi