Loading...
HomeMy WebLinkAbout1975-03-12 Special Meeting~ ~ • MINUTES - SPECIAL MEETING OF THE LA PORTE CITY COMMISSION, LA PORTE, TEXAS MARCH 12, 1975 7:00 P.M. MEMBERS OF THE COMMISSION PRESENT: Mayor E. A. Thomas, Commissioners C. D. Christensen, I. J. Kibodeaux, A. Uel Price, and C. D. Boyle. MEMBERS OF THE COMMISSION ABSENT: None. OTHER CITY OFFICIALS PRESENT: Larry L. Broussard, Director of Finance; Margie Goyen, City Clerk; • Knox Askins, City Attorney; Larry Morton, Director of Public Works; Herb F. Freeman, Chief of Police OTHERS PRESENT: Mr. James Hutchison, Busch, Hutchison & Associates, Inc.,; Mr. Elliot Jones, Representative of Blue Cross; Mr. Ray Treaccar, Group Placement and Administrative Services, Inc., representing American National for Stephens- Baker Insurance. PRESIDING: Mayor Thomas. + + + 1. CALL TO ORDER - Mayor Thomas called the meeting to order. + + + • ~ ~ • Special Meeting 3/12/75 2 2. APPROVE PAY ESTIMATE NO. 2 - MC KEY CONSTRUCTION & EQUIPMENT RENTALS FOR CONSTRUCTION OF SANITARY SEWER, SOUTH SIDE - JOB NO. 74-1132 - Motion by Commissioner Christensen, seconded by Commissioner Kibodeaux, to approve Pay Estimate No. 2 to McKey Construction & Equipment Rentals for construction of Sanitary Sewer, South Side - Job No. 74-1132 in the amount of $20,497.79. Motion carried by the following vote: AYES: Commissioners Christensen, Kibodeaux, Price, and Boyle. NAYS: None. A copy of Pay Estimate No. 2 is attached and made a part of these minutes. + + + • 3. CHANGE ORDER ON CONSTRUCTION OF SANITARY SEWER, SOUTH SIDE - JOB NO. 74-1132 - After a letter was read in full, motion y Commissioner Kibodeaux, seconded by Commissioner Price to authorize the change order on construction of sanitary sewer, south side - Job No. 74-1132 in the amount of $20,142.95, for a total contract price of $241,632.37. A copy of which is attacced and made a part of these minutes. Motion carried by the following vote: AYES: Commissioners Christensen, Kibodeaux, Price, and Boyle. NAYS: None. + + + 4. DISCUSS GROUP INSURANCE - BLUE CROSS - Mr. Elliot Jones of Blue Cross was recognized and presented a review of the previously presented plan. There was a brief discussion of same. DISCUSS GROUP INSURANCE - STEPHENS-BAKER - Mr. Ray Treaccar representing Stephens-Baker Insurance Company was recognized and presented a review of the previously presented plan. There was a brief discussion on same. • If possible, the City Attorney will have a recommendation to present to the Commission at the March 17, 1975 meeting. + + + • • • Special Meeting 3/12/75 3 ~. DISCUSS GROUP INSURANCE (Cont'd.) Motion by Commissioner Christensen, seconded by Commissioner Kibodeaux to table a decision on Group Insurance until an opinion could be given by the City Attorney. Motion carried by the following vote: AYES: Commissioners Christensen, Kibodeaux, Price, and Boyle. NAYS: None. + + + 5. CONSIDER AUTHORIZING HIRING E.M.T. FOR AMBULANCE SERVICE - After a discussion regarding the need for an E.M.T. for the ambulances, the negotiations with industry for ambulance service and making a separate department for the ambulance service or increasing the number of patrolmen or reserve policemen, motion by Commissioner Boyle to hire an E.M.T., for the ambulances, pay to be $890.00 per month. Applications would be accepted. The best applicant would be hired. • The motion failed for lack of a second. + + + 6. ADJOURNMENT - Motion by Commissioner Kibodeaux, seconded by Commissioner Price that the meeting adjourn. The motion carried by the following vote: AYES: Commissioners Christensen, Kibodeaux, Price, and Boyle. NAYS: None. The meeting adjourned at 8:00 P.M. argie oyen, Ci y Clerk Passed and approved this the 17th day of March, 1975. • E. A. Thomas, Mayor . o • or` ~ ~~ CITY OF LAPORTE P.O. Box 1115, LaPorte, Texas 77571 Mr. Larry Broussard, Group Representative SUMMARY OF BENEFITS: . $30 room for 30 days All usual hospital services covered in full except blood and plasma ICU in full $500 Surgical Schedule 20% Anesthesia Jumbo Major Medical $250,000 Maximum . $60 room limit $100 Deductible Op Drugs in full Op Psy-Care (12.50 maximum per week) $150 Acc Inj Supplement RATES EFFECTIVE 3-1-75: Individual $21.36 Emp. and Child(ren), 42.13 Two-Pe: son (a,-,~~~ '~ ~) 50.07 Family ~,, . ~,~'~"~~~~~.`~~~.~.:~) 58.33 ~ a~~~ ~J ~ ®. ~ • ~'~.$~~,•y~y}' ~ ~ ~ ~ (713).621-0822 Y Y • O ~ ~~~ ~~~e~~~~~ ~~ P. O. BOX 27246 HOUSTON, TEXAS 71027 CITY OF I,A PORTE • P1ara I Com~elion.sivc Aiaio: MEdica.lt; ' A: ter $100 calendax yaaac deductibles progaarn would pay 80~ of next $Ss000 and 100 oS balances in yeax up to a lifetime maxi3aum of $2S0°000. Deductible waivEd for expen.~c: due to accident. Only internal limit is on hosgit<a.l room 'and board which is s®t at average semi-private of aorfin3ng hospital. ~ Plan z2 Comprehensive Y~iajor I4edic~.1: Same as Plate I° but with deductible r~1so waived on hospital and surg3.cal c~xponses and first $1s00U of hospital expense paid in full. ® tions~ ~ . A. Blanket l~iaternity Covar.~ge - 4 S00 paid in full for normal eliildb~.rth, $10000 for Caesarean or Ectogic, $250 for mis- carrimgo, B. I;edical fieimbursemezat Prog:caru -where City of I,a Porte would °s out of pocket cost under oontract up to a share claLmant ~/ ma)C'1..1num of $554 Per Y~• C. 2Yiird Party Administration -wher® City of I~~Porte would contract ,out clains verifications filing with insurance carrier and checkigg. COST COMPARISON BC~BS ~ ANICO-I ANICO-II F~aployee $ 22.90 F~~ployee and Ore Dagondent ~ $ 5'x•51 . Rnployee and All D3pc~ndents $ 63.18 , Sponsored Doper.dent $ 12.91 Emgloyee ~- • 17.20 $ 21. ;0 1-0raployee and Dopendentl-a. s~p,,$ 45.55 8 6 2 $ . S6.9S 570 95 $3 5 5 . .Total Monthly Cost (on pre.sont census) $30853.6? $z° . 0 t~dnSP Blantcet Maternity - $3.50 gsr dependent -.Total Monthly $ 175.5' I~iedical Reimbursement -`B3sed.on last yoar°s losses and O loaded 12~ for in.~'l.atioz~ - P4onthly $ 352.00 Third k'a~•ty Administration -Monthly $ 200.00 F~:ample - ANICO I plus all op-cions -Total Monthly Cast $3 r 595.'75 • _ __ . _ _ .. _ _ _ - _._.x_ _ _.~__.__..__ ... • BUSCH, HUTCHISON & ASSOCIATES, INC. CONltULTINO[NOtN[[11~ 1107 FL[[TWOOD ORIV[ - OAYTOWN, T[7(A• 77520 - FMON[ (71') 422.02171 • DATE: March 7, 1975 ESTIMATE NUMBER: Two (2) - February 1, 1975 through February 28, 1975 ' PROJECT: City of La Porte - Construction of Sanitary Sewers, South Side -Job No. 74-1132 CONTRACTOR:_ McKay Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas AMOUNT OF CONTRACT:_$221,489.42 CONSTRUCTION TIME: 90 Working Days tam No. Item uantit Unit Unit Price Total 1. 8" V.C. Sanitary Sewer, R.G. Joints 0 - 6' cut Com late in lace - 0 - L.F. 5.15 - 0 - 2. 8" V.C. Sanltary Sewer, R.G. Joints 6 - 8' cut com late in lace - 0 - L.F. 5.47 - 0 - 3. 12" V.C. Sanitary Sewer, R.G. Joints 0 - 6' cut com fete in lace 300 L.F. 6.26 1,878.00 4. 12" V.C. Sanitary Sewer, R.G. Joints 6 - 8' cut Com late in lace 400 L.F. 7.10 2 840.00 5. 12" Y.C. Sanitary Sewer, " R.G. Joints 8 - 10'' cut Com late in lace 236 L.F. 9.35 2,206.60 f 6. 12" V.C. Sanitary Sewer, ~ R.G. Joints 10 - l2' cut Com late in lace 545 L.F. 17.58 9,581.10 7. 15" V.C. Sanitary Sewer, R.G. Joints 8 - 10' cut Com late in lace 945 L.F. 11.70 11 056.50 8. 21" V.C. Sanitary Sewer, R. G. Joints 8 - 10' cut Com late in lace 150 1. g 6 , 2 794.50 9. 21" V.C. Sanitary Sewer, R.G. Joints 10 - 12' cut om late in Lace 659 .F. 26.86 17 700.74 f _ _ _ _ _ _ . _ . • • Page Two - City of La Porte - Construction of Sanitary Sewers, South S1de • McKey Construction b Equipment Rentals, Inc.. Job No. 74-1132 - Estimate 2 Item • No. Item uantit Unit Unit Price Total 10. 8" C.I. Sanitary Sewer Pipe, AWWA Class 150 , 0 - 6' cut Com lete in lace Deleted L.F. 13.57 Deleted 11. 8" C.I. Sanitary Sewer Pipe, AWWA Class 150 6 8' cut Com lete in lace Deleted L.F. 14.35 Deleted 12. Sanitary Sewer Manhole Com lete in lace 9 Each 400.00 3,600.00 13. Extra Depth for Sanitary Sewer Manhole in excess Vert of 8 feet - 0 - Feet 40.00 - 0 - 14. 8" V.C. Sanitary Sewer, R.G. Joints by augered const. Com lete in lace - 0 - L.F. 16.00 - 0 - 15. 8" Cleanouts, Comp~iete in lace 0 - Each 75.00 - 0 - 16. Sanitary Sewer Creek Crossing to include pipe supports, 8" steeY pipe and appurtenances from Sta 19+00 to lift Sta. Complete in place Lump See sheets 3 & 12 - 0 - Sum 17 000.00 - 0 - 17. Sanitary Sewer Lift Sta. with wet well, Complete in place Lump See sheets 4 & 12: ~ 10~ Sum 27 750.00 2,775.x0 18. 6" P.V.C. Sanitary,5ewer Force Main, R.G. Joints Necessary to conne, t "M" Street Lift Stdtio~ Lump Com lets in lace ~ -'0 - , Sum 1 500.00 - 0 - ,, ._. • • Page Three - City of La Porte - Construction of San~ita~y Sewers, South Side • McKey Construction d~ Equipment Rentals, Inc., Job No. 74-1132 - Estimate 2 C Item ' No. Item uantit Unit Un1t Price 1'o al 19. 8" x 4" V.C. Sanitary Sewer Wye, R.G. Joints Com lete in lace - 0 - Each 970:00 - 0 - 20. 12" x 4" V.C. Sanitary Sewer Wye, R.G. Joints Com lets in lace - 0 - Each 20.38 - 0 - 21. 12" x 6" V.C. Sanitary Sewer Wye, R.G. Joints Com lets in lace - 0 - Each 20.38 - 0 - 22. 4" V.C. Sanitary Sewer, R.G. Joints Service , Connection I Com lets in lace ~ - 0 - L.F. 4.68 - 0 - 23. 6" U.C. Sanitary Sewer, R.G. Joints Service Connection Com lets in lace - 0 -~ L.F. 5.08 - 0~- 24. 4" Concrete Sanitary ~ \ Sewer Plug Com lets in lace ;. ~ - 0 -' Each .86 - 0 - 25. 6" Concrete Sanitary Sewer Plug ~ Com lets in lace ~ - 0 -~ Each 1.95 - 0 - 26. Road Shell or crushed ~ , limestone for road,. ~ shoulder, driveway, etc. Repairs (Delivery ticket. basis Com lets in lace. ~ - 0 - .Y. 10.00 - 0 - 27. ~: Timber order left i~n 1000 rench ~ - 0 - B.F. 10.00 - 0 - 28. Removing existing con- Crete driveways and replacing with 4" r~on- crete drivewa - 0 - .Y. 20.00 - 0 - ~f i :~ , } .~ .. r.. _ ~ge 4 - City of La Porte - Construction of Senita~ry Sewers. South Side McKey Construction b Equipment Rentals, Inc., Job No. 74-1132 - Estimate Item No. Item uantit Unit Un1t Price Total 29. emoving existing flex- ible base pavement and replacing with 8" cement stabiiixed shell bass and 1-i/2" Type "F" Hot ix As halt Surface - 0 - S.Y. 10.00 ^ ~.- Material nelivarpri m tic Qaa n~ TOTAL WORK COMpLETEQ 54 432.44 Less Material Installed 17,247..91 Materi'a1 on hand TOTAL MATERIAL & WORK Pay 90X of ~ 67,083.56, ~ 60,315.20 Less Previous Payments- 39,877.41 PAY THIS AMOUNT ~ 20,497.79 WORK QAY ANALYSIS ~ Contractor's first day of work - January 27, 1975 Lost Time:January, 1975 0 days February, 1975 1 " TOTAL LOST TIME 1 day Total work days since start 25 Total days lost due to weather 1 Totai time charged ~ days Progress . Number of days chargedt 24 ^ 27 x Work Completed: ~~~,~- ^ '"~"-x Position 2 96 or 1.8 days behind 1 ~ mes P. Hutch n,, JPH/sh 12,651.12 X67,083.56 • • 3USCH, HUTCHISON & ASSOCIATES, INC. CONfULrINO tNO1NttRf 1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77620 -- PHONE (713j 422.8213 March 12, 1975 n ~J Honorable Mayor and City Commission City of La Porte 124 South 2nd Street La Porte, Texas 77571 CHANGE ORDER FOR JOB N0. 74-1132 - SANITARY SEWER EXTENSION TO THE SOUTH Because of some design changes required by the Texas Highway Department and some omissions from the original bid sheets, it has become necessary to consider a change order to the subject contract. The amount of the change order will be an added $20,142.95 for a total contract price of $241,632.37, subject to final measurements, of course. The bulk of the addition is due to the Highway Department insisting on steel liners for the roadway crossing at five locations and deepening of about 5,500 feet of the sewer line. The casing adds about $7,000.00 and the deepening about $10,000.00, totaling $17,000.00. Part of the balance of the added cost, about $1,000.00, covers a new bid item "Clearing and Grubbing" which was left off the original bid sheet. The; other $2,000.00 arose from a difference in the estimated depth of abou~~! 400 feet of the 21 inch diameter line along "K" Street. The depth of ;~_. this line lay right at 10 feet and this is also the break point in the;';;' unit bid prices, that is, an 8 - 10 foot cut is one price, and a 10 -~,;, 12 foot cut is another price. Unfortunately the final measurement of the construction depth showed more of the line below 10 feet than was;" estimated. Some minor design changes have been made to improve the installation and reduce costs in some areas. For example, PVC pipe will be used i the cased crossings rather than the cast iron specified to be used without the casings. These changes result in there being seven new bid items and the deletion of two original bid items. The attached, revised, bid sheet reflects these changes and the negotiated bid pric for the new items. If there are questions, I will be happy to answer them at the next commission meeting. J es P. Hutchison, P.E. V e President :~ . is ~l~' ~~ ~: ,I JPH/sh _..~_.,--- ~~__--,_n__------ _~._._._.._._r-... USCH, HUTCHISON & ASSOCIATES, INC. CONSULTING [NOIN[[Rs 1107 FL[[TWOOD DRIV[ - oAYTOWN, T[XAS 77620 - -NON[ (717) AZ2•5117 GATE: ESTIMATE NUMBER: PROJECT: City of La Porte -Construction of Sanitary Sewers,L South Side -Job No. 74-1132 CONTRACTOR: McKey Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas AMOUNT OF CONTRACT: $241,632.37 CONSTRUCTION TIME: 90 Working Days Item No. Item uantit Unit Unit P~•ice Total 1. 8" V.C. Sanitary Sewer, R.G. Joints 0 - 6' cut Com lete in lace 6 215 L.F. 5.15 32 007.25 2. 8" V.C. Sanitary Sewer, R.G. Joints 6 - 8' cut com lete in lace 630 L.F. 5.47 3 X46.10 * 2a 8" PVC Sanitary Sewer, R.G. Joints 0 - 6' cut +~ Com l ete i n lace 20 L.F. 9.00 1330.00 * 2b 8" PVC Sanitary Sewer ~ ~° ±~ 4 , R.G. Joints 6 - 8' cut ~ Com lete in lace 20 L.F. 10.00 ` ~~~~.00 .. , 3. 12" V.C. Sanitary Sewer, ~ ~ # ~ . ~"~'~ R.G. Joints 0 - 6' cut ~ ~,; ' Com lete in lace 1,150 L.F. 6.26 7~ ~~ ~,00 4. 12" V.C. Sanitary Sewer, ~~ ; _ ,~'~~~ R.G. Joints 6 - 8' cut ~ ~ ~ ; ~ Com fete in lace 1,605 L.F. 7.10 11 ~ ~°~~~a.50 ° 5. 12" V.C. Sanitary Sewer 4 ~" ~-,; ~ ~ R.G. Joints 8 - 10' cut ! ~` ~ l- Com 1 ete i n 1 ace 970 L . F. 9.35 Cx~~~ : 50 g 6. 12" V.C. Sanitary Sewer k~~I,~ R.G. Joints 10 - 12' cut ~ ~ `' ~~ x' Com lets in lace 1,385 L.F. 17.58 ~ 24 ~^ .30 ~M- * 6a 12" V.C. Sanitary Sewer I ~;~~~1 R.G. Joints 12 - 14' cut ~ 75 ~~~~; ~j ~'! L~~ Com lets in lace 3 L.F. 26.00 9 ~ ,00 *New Items ~,.;~, ,~, ,;,; i j~; ;,~' ~,. - -- ....~~....._.... _ _ .~. _ __...v_ -._. _... ._.:_ -------~---~~- .~ = ~- ---r-~--- .-_..._--- •age Two -City of La Porte -South Side Sanitary SIncrs- Estimate74-1132 McKey Construction & Equipment Rentals, Item No. Item uantit Unit Unit Price Total 7. 15" V.C. Sanitary Sewer, R.G. Joints 8 - 10' cut Com lete in lace 940 L.F. 11.70 10 998.00 8. 21" V.C. Sanitary Sewer, R.G. Joints 8 - 10' cut Com lete in lace 150 L.F. ~ 18.63 2,794.50 9. 21" V.C. Sanitary Sewer,. R.G. Joints 10 - 12' cut Com lete in lace. 659 L.F. 26.86 17,700.74 10. 8" C.I. Sanitary Sewer Pipe, A4lWA C1 ass 150 0 - 6' cut Com lete in lace Deleted L.F. 13.57 DELETE D 11. 8" C.I. Sanitary Sewer Pipe, A4lWA C1 ass 150 6 - 8' cut Com lete in lace Deleted L.F. 14.35 ' D E L FIT E D ! ~ '12. Sanitary Sewer Manhole 34 Each 00 400 13,v=G~.00 Com lete in lace . -• 13. Extra Depth for Sanitary ` ~''' Sewer Manhole i n excess 21 Vert Feet 40.00 i - "; ~ .~~ }~~!~ • 00 of 8 feet t ~~..., .~ b 14. 8" V.C. Sanitary Sewer, ~ ~ ' ` ~ ~~', ~ ~~ * R.G. Joints by augered const. Com lete in lace Deleted L.P. 16.00 D E L~ ~. ~ ~,~i„~ L D_ ~ ; !• i ~ IFS i . ~ ~`~~~~~' ~ ~~ 14a 8" PVC Sanitary Sewer, ~ . , ~ ~~ '' R.G. Joints by tunnel ~ ~~`:' }~~ }~ const. in 12" steel Com lete in lace casin 320 L.P. 40.00 ; ~ ~ ~ 1~~,~'f~'~00 , ~ { p f ~ ~ f 15. 8" C1 eanouts, Complete 9 Each 75.00 ~ , , , . ~' ' ~ f; ~' ~ ~~ ;i'"" x;00 --- i n 1 ace ~ -,-- ~!~,%, ~ 16. Sanitary Sewer Creek ~~~`~ ~~ ~ ~ Crossing to include pipe ~ ,', ~ ~~ ~ ~~,!' supports, 8" steel pipe and ~ f E~~~,~~,j 4 appurtenances from Sta 19fi00 Compl ete fin to 11 i't Sta Lump ~ ~ ~ , ~' i~ °'~ ~ s ' . , lace see sheets 3 & 12 A11 Sum 17 000.00. ~-t}~~~00 '' 17 ~ ' x ,; ~~i c ~ ~,. ~~. ~ ~~;.. +,#~,! ~ r tl ~ t ~`~ ~~~ !i V. - ~, - .r.-._.r..._..__.. .. .Page Three -City of La Porte -South Side Sanitary Sewers_ Job No. 74-1132 McKey Construction & Equipment Rentals. Inc.. Estimate 1 ~GUi No. Item uanti t Unit Unit Price Total 17. Sanitary Sewer Lift Sta. with wet well, Complete in pace All Lump Sum 27 750.00 27,750.00 see sheets 4 & 12 18. 6" PVC Sanitary Sewer Force Main, R.G. Joints necessary to connect "M" Street Lift Sta. All Lump Sum 00 3 200 3,200.00 Com lete in lace . 18a 6" PVC Sanitary Sewer Force ~ * Main, R.G. Joints necessary to connect "M" Street Lift Station by tunnel const. in 10" steel casing, Com lete in lace 80 L.F. 38.00 3.,040.00 r 19. 8" x 4" V.C. Sanitary Sewer . Wye, R.G. Joints Com 1 ete i n 1 ace 117 Each 9.70 1 ,1:;:;4.90 w . ~ p 20. 12" x 4" V.C. Sanitary Sewer ~ ' ~. " R.G. Joints Wye, Com 1 ete i n 1 ace Deleted Each 20.38 ~ D E t~ ' ~ T E D n 20a k i ncl ud- Sanitary Sewer Stac ; ' `~ ` ' * ing 12" x 4" V.C. Sanitary a ~` Sewer Wye, R.G. Joints 7 Each 00 200 ~~ ~,,00 Com 1 ete i n 1 ace . ~F ~.~.A ~. ~; I ~, , , ~~ 21. 12" x 6" V.C. Sanitary Sewer ,, , ~ ~ Wye, R.G. Joints .,_, _~_~ ~__~. ~~ ~Q n ~ li ~~ r ~ n com i ete i n ~ ace ~~ ~ G ~G.. ,.M.... -- -- - ~ ~,~__ ~; '~ ~' , 21a Sanitary Sewer Stack includ- . - ~~ g~' ' ing 12" x 6" V.C. Sanitary ~ ~ ~~ * R G Joints Sewer Wye, 2 Edch '~ ' ~ ' 200.00 .. ~ ~ , ~ ' ~i0~~ .00 Com 1 ete i n 1 ace . ~ r~~ ~' ~ 22- 4" V.C. Sanitary Sewer, ~~ ~ ~;.~~ R.G. Joints Service Connection Com lete in lace 3 600 L.F. 4.68 l~ ~ , . ;I~i;~,900 ` .~~~ °~ ^ ~''~{ 23. 6" V.C. Sanitary Sewer, R.G. ~ ~ '' Joints Service Connection 20 L F 5.08 ~~ ~'~~~1~~60 Com lete in lace . . I -~~~... t,~ ~,~,~~,. 9~ ~~ ',,~ ,~ ~ ~ rg, ~. :a~._. •• , • _ • _ age Four -City of La Porte -South Side Sanitary Sewers, Job No. 74-11 McKey Construction & Equipment Rentals, Inc. - Estlmate Item No. Item uantit Unit Unit Price 24. 4" Concrete Sanitary Sewer Plug Com lete in lace llg Each .86 25. 6" Concrete Sanitary Sewer Plug Com lete in lace 2 Each 1.25 26. Road Shell or crushed limestone for road, shoulder, driveway, etc. Repairs (Delivery ticket basis Com lete in lace 700 C.Y. 10.00 27. Timber ordered left in 1000 Trench 50 B.F. ~ 10.00 28. Removing existing concrete driveways and replacing with 4" concrete drivewa 50 S.Y. 20.00 28a Clearing and Grubbing, leaving Lump debris stacked in ri ht-of-wa All Sum 1 000.00 29. Removing existing flexible base pavement and replacing with 8" cement stabilized shell base and 1-1/2" Type "F" Hot Mix As halt Surface 535 S.Y. 10.00. TOTAL WORK COMPLETED Total 101.48 2.50 7,000.0 500.00 1,00.00 1,C~l~0.00 ~'„'; r'~ 9` {: ;.; i 5 a.~`:i~i ~'00 _~~ ._,.. $241 , Ci ~~ ,~37 ;f ~~ ,i. ~ I' ~~ ;~ ~; i ., !;!~ i~ ',~ ~ ~~' ~~ ,, ~ ~'~ ,~~~'~~~ ~~ ~; ~ ~~ f I ~ I'~ ~ , lu r ,~ ~ ~ I '~It i i~l!~, .~ I'{ .,~ fi