Loading...
HomeMy WebLinkAbout1977-12-20 Regular Meeting e e . MINUTES - REGULAR MEETING OF THE LA PORTE CITY COMMISSION, LA PORTE, TEXAS DECEMBER 20, 1977 7:00 P.M. MEMBERS OF THE COMMISSION PRESENT: Mayor J. J. Meza, Commissioners Bill Love, 1. J. Kibodeaux, Virginia Cline and Tom Simons. MEMBERS OF THE COMMTSSION ABSENT: None. OTHER CITY OFFICIALS PRESENT: Larry L. Broussard, Director of Finance; Margie Goyen, City Clerk; Knox Askins, City Attorney; H. F. Freeman, Chief of Police; Royal Shepherd, Assistant Public . Works Director; Stanley Sherwood, Director of Parks and Recreation; Joe Sease, Fire Chief; D. R. McLaughlin, Fire Marshall. OTHER CITY OFFICIALS ABSENT: None. OTHERS PRESENT: Johnny Busch of Busch, Hutchison & Associates, Inc. , Consulting Engineers; Ron Gentry of Turner, Collie & Braden, Consulting Engineers. PRESIDING: Mayor Meza. + + + l. CALL TO ORDER - Mayor Meza called the meeting to order. + + + . 2. INVOCATION - The invocation was given by Mayor Meza. + + + ----.---.- e e Regular Meeting 12/20/77 2 . 3. ACCEPT BIDS - SOUTHERN PACIFIC GRADE SEPARATION - The following bids were opened and read aloud: BROWN & ROOT, INC. P. O. BOX 3 HOUSTON, TEXAS 77001 BID: $ 1,220,991.55 STAR CONCRETE CONSTRUCTION, INC. 2401 PRIEST DRIVE HOUSTON, TEXAS 77010 BID: 1,350,226.00 E. B. L., INC. 3816 FANNIN STREET HOUSTON, TEXAS 77004 BID: 1,549,000.00 MARATHON PAVING AND UTILITY CONSTRUCTORS, INC. P. O. BOX 1388-1 HOUSTON, TEXAS 77045 BID: 1,195,306.00 AUSTIN BRIDGE COMPANY P. O. BOX 1590 DALLAS, TEXAS 75221 BID: 1,159,807.00 WARREN BROTHERS COMPANY . GULF DISTRICT DIVISION ASHLAND OIL, INC. P. O. BOX 2572 HOUSTON, TEXAS 77001 BID: 1,349,586.00 TRINITY CONSTRUCTION COMPANY, INC. P. O. BOX 3024 HOUSTON, TEXAS 77001 BID: 1,407,041.00 Motion by Commissioner Kibodeaux seconded by Commissioner Simons that the bids be accepted for tabulation. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 4. ACCEPT BIDS - ONE HOT MIX SPREADER - The following bids were opened and read aloud: R. B. EVERETT & COMPANY P. O. BOX 327 . HOUSTON, TEXAS 7001 BID: 6,379.00 PLAINS MACHINERY COMPANY P. O. BOX 2089 HOUSTON, TEXAS 77001 BID: 13,866.00 e e Regular Meeting 12/20/77 3 . Motion by Commissioner Love seconded by Commissioner Kibodeaux that the bids be accepted for tabulation. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 5. ACCEPT BIDS - FOUR PATROL UNITS - The following bids were opened and read aloud: JOE CAMP, INC. 621 NEW HWY. 146 SOUTH LA PORTE, TEXAS 77571 BID: PER UNIT $ 5,741. 62 PAGE DITTMAN MOTORS 310 NORTH MAIN BAYTOWN, TEXAS 77520 BID: PER UNIT 5,090.10 JAY MARKS CHEVROLET P. O. BOX 1118 . LA PORTE, TEXAS 77571 BID: FOUR UNITS 22,263.28 LUMUS BAYTOWN DODGE, INC. 2800 MARKET STREET BAYTOWN, TEXAS 77520 BID: PER UNIT 5,211.32 Motion by Commissioner Kibodeaux seconded by Commissioner Love that the bids be accepted for tabulation. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 6. ACCEPT BIDS - SALE OF TAX ACQUIRED PROPERTY - No bids were received. After a brief discussion the Commission asked that Larry L. Broussard, Director of Finance, negotiate the the sale of these properties. Motion by Commissioner Cline seconded by Commissioner Kibodeaux for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. . NAYS: None. + + + ---- -- --- ---- e e Regular Meeting 12/20/76 4 . 7. APPROVAL OF MINUTES - REGULAR MEETING - DECEMBER 6, 1976 - Motion by Commissioner Love seconded by Commissioner Kibodeaux for approval of the minutes. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 8. APPROVAL OF ACCOUNTS PAYABLE - After a brief discussion, Motion by Commissioner Love seconded by Commissioner Kibodeaux for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + . 9. AUDIT REPORT FROM AUDITOR - Eugene Hovey, CPA, read a synopsis of the audit report, reporting the City is in good financial condition. Motion by Commissioner Kibodeaux seconded by Commissioner Love to accept the audit report as presented. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 10. VISITORS WISHING TO ADDRESS THE COMMISSION - Florence Alworth, President of the La Porte Bayshore Neighbor Centers Association addressed the Commission regarding the future use of the Civic Center. Eugenia Riley, 401 North Sixth, addressed the Commission regarding the need of a doctor at the Clinic. + + + . ,~ ~------ e e Regular Meeting 12-20-76 5 . II. CONSIDER APPROVING PAY ESTIMATE - BEN FELTS UTILITY CONTRACTING COMPANY - NORTH 16TH STREET WATER MAIN - IN THE AMOUNT OF $2,235.29 - After a brief discussion, motion by Commissioner Simons seconded by Commissioner Cline. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 12. CONSIDER APPROVING PAYMENT TO ALVIN IMPLEMENT & SUPPLY FOR ONE BACKHOE AND FRONT END LOADER IN THE AMOUNT OF $14,350.00 - After a brief discussion, motion by Commissioner Kibodeaux seconded by Commissioner Cline. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + . 13. CONSIDER APPROVING PAY ESTIMATE NO. ONE - SKRLA, INC. , - CONSTRUCTION OF IMPROVEMENTS - LA PORTE MUNICIPAL AIRPORT - IN THE AMOUNT OF $20,360.70 - After a brief discussion, motion by Commissioner Kibodeaux seconded by Commissioner Cline for approval of payment. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 14. CONSIDER APPROVING PAY ESTIMATE NO. FOUR - CHATHAM CONSTRUCTION COMPANY - CONSTRUCTION OF FAIRMONT PARK RECREATIONAL FACILITIES - IN THE AMOUNT OF $29,659.04 - After a brief discussion, motion by Commissioner Love, seconded by Commissioner Kibodeaux for approval of payment as presented. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. . + + + e e Regular Meeting 12/20/76 6 . 15. CONSIDER APPROVING FINAL PAY ESTIMATE - BEN FELTS UTILITY CONTRACTING COMPANY - NORTH 16TH STREET WATER MAIN - IN THE AMOUNT OF $5,377.08 - After a brief discussion, motion by Commissioner Kibodeaux seconded by Commissioner Love for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 16. CONSIDER APPROVING PAYMENT TO BUSCH, HUTCHISON & ASSOCIATES, INC., FOR PARK FACILITIES AT FAIRMONT PARK, RESIDENT INSPECTION, $119.70; IMPROVEMENTS FOR LA PORTE MUNICIPAL AIRPORT, RESIDENT OBSERVATION, $2,268.00; 16TH STREET WATER MAIN, RESIDENT INSPECTION, $863.10; 16TH STREET WATER MAIN, SURVEY $165.20; SANITARY SEWER - SOUTH 14TH, SOUTH 15TH, SOUTH 16TH, WEST "A" AND WEST "B", RESIDENT INSPECTION, $1,208.80 - After a brief discussion, motion by Commissioner Love seconded by Commissioner Kibodeaux for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. . NAYS: None. + + + 17. CONSIDER APPROVING FINAL PLAT - FAIRMONT PARK WEST, SECTION II - Planning and Zoning Commission submitted a recommendation. After a brief discussion, motion by Commissioner Love seconded by Commissioner Kibodeaux for approval. Motion carried by the following vote: AYES: Commissioner Love, Kibodeaux, Cline and Simons. + + + 18. DISCUSS AIRPORT LIGHTS - Royal Shepherd, Assistant Public Works Director reported the present lighting could not be saved, a new system is needed. After a brief discussion, motion by Commissioner Love seconded by Commissioner Kibodeaux to approve the emergency expenditure of funds for lighting at the airport. Motion carried by the following vote: . AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + ---- e e Regular Meeting 12/20/76 7 .- 19. CONSIDER AUTHORIZING ADVERTISING AND ACCEPTING BIDS TO BE RECEIVED ON JANUARY 17, 1977, AT 7:00 P.M. --- - ~'U!{ UNE AUTOMOBILE - FIRE PREVENTION DEPARTMENT - After a brief discussion, motion by Cvuuuissioner Simons seconded by Commissioner Cline for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + 20. CONSIDER AUTHORIZING ADVERTISING AND ACCEPTING BIDS TO BE RECEIVED ON JANUARY 17, 1977, AT 7:00 P.M. FOR ONE BACK LOADING GARBAGE TRUCK - After a brief discussion, motion by Commissioner Love seconded by Commissioner Kibodeaux for approval. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. + + + . 21. CORRESPONDENCE - Mayor Meza read a letter from the Texas Highway Department regarding the problem of litter on the highways in this district, asking the City officials to help in this matter. + + + 22. DISCUSSION OF DEPARTMENT PROJECTS - Commissioner Love invited everyone to attend a meeting at the Civic Center on December 21, 1976, at 7:30 P.M. Johnny Busch - Commending the City Officials on the handling of City endeavors. + + + . e e Regular Meeting 12/20/76 8 . 23. EXECUTIVE SESSION - V.A.T.S. - ARTICLE 6252-17 - SECTION 2 (E) AND (G) - (LITIGATION AND PERSONNEL) - Motion by Commissioner Kibodeaux seconded by Commissioner Love that the meeting adjourn to executive session. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. The meeting recessed at 8:38 P.M. The meeting reconvened at 9:30 P.M. + + + 24. ADJOURNMENT - Motion by Commissioner Simons seconded by Commissioner Cline that the meeting adjourn. Motion carried by the following vote: AYES: Commissioners Love, Kibodeaux, Cline and Simons. NAYS: None. . The meeting adjourned at 9:33 P.M. hJ~~k Marg'ie GO-yen, City lerk Passed and Approved this the 17th day of January, 1977. <~~,~. - -:J. J. Meza:::y~ . ( AUTHORIZED D~BURSEHENTS e ( PAGE 1 12-17-76 ( ( \ (e - AUTO ELECTRIC REPAIR GAS TANK ( 001-707-402.00 20.00 ( 12-17-76 2349 $20.00 . ( I ANDY CORDELL BRICK . ' RED BRICK ( 002-776-424.00 320.00 ( - . I>'..) .. '~'. .-'1 -, . ( -. ( 12-17-76 2350 $320.00 ( ( ADMIRAL LINEN SERVo UNIFORMS 001-703-202.00 22.11 ( . ( 001-706-202.00 15.00 . . ( 001-707-210.00 '\.:' 8.30 ( " , ,::. ~ t - . '\' J :' f: : .. . 001-710-202.00 6.01 ( Q " 00'1-750-759.00 76.80 (e ~ . 002-775-205.00 24.90 ( 002-776-205.00 (,.' 24.90 ( ~ i '. 12-17-76 2351 $118.02 ALLEN & KERBER ' AUTO PARTS ( 001- '115 -000.00 7.59 . . 001-703-402.00 19.42 - ( 00'1-(04-402.00 2.60 ( 00'1-(07-402.00 40.64 ( 001-709-205.00 19.37 ( .. 001-709-402.00 3.12 , ( \ 002-776-501.00 2.00 \. 12-17-76 2352 $94.74 ( BINSWANGER GLASS GLASS ( 001-706-301.00 17.92 ( e- 12-17-76 2353 $17.92 \. ( ( PAGE TOTALS 630.68 , ( AUTHORIZ~D D"BURSEHENTS e PAGE 2 .12-17-76 ( ( BLUE CROSS-BLUE SHIELD EMP. HOSP. (. 001-750-753.00 5601.58 ( 12-17-76 2354 $5,601.58 l BOWMAN DISTRIBUTION TAPE, CONNECTORS ( 001-'115-000.00 34.55 ..~ . ~ - . ,. ;.,1 ( 12-17-76 2355 $34.55 ( JIM BALL INTERNATIONAL AUTO PARTS ( - 001-'(08-402.00 94.58 ( 12-17-76 2356 $94.58 C ( BAY PLUMBING CO. PIPE, FITTINGS 002-115-000.00 568.43 ( ( 12-'17-76 2357 $568.43 ( BAYSHORE LUMBER BUILDING MATERIALS ( 00.1-700-301.00 26.57 C 001-706-403.00 .60 ( 001-708-402.00 14.00 ( ( . 001-('09-304.00 13.06 001-709-306.00 3.65 ( ( { 001-710-205.00 8.90 ( ( 001-710-301.00 171.65 -~ , 001-710-931.00 8.99 ( 002-600-135.00 53.20 i ( 12-17-76 2358 $300.62 ( BAY SHORE LUMBER BUILDING MATERIALS ( 001-704-301.00 2.31 ( 002-115-000.00 171.00 ( 002-775-411.00 8.95 '- ( 002-775-413.00 28.50 ( 002-775-415.00 144.55 ( I,. 002-776-421.00 1. 30 002-776-425.00 C .98 t 12-17-76 2359 $357.59 ( :. PAGE TOTALS _ __,~_'?~L.J5__ ~- ( e e ( ~~~~ORI~ED DISBU~~~~7~~~ l ( IAYTOWN COMMUNICATIONS SWITCH, REPAIRS 001-707-407.00 50.80 (e C 001-710-407.00 141 .05 (. 12-17-76 2360 $191.85 ( BRIGGS-WEAVER GLOVES, BOLTS ( 00'1 -115 -000.00 71. 64 ( . . , 001-708-402.00 7.94 ( ( 12-17-76 2361 $ 7Y. 58 ( DANIEL'S DUMP TRUCK LIMESTONE ( 001-709-302.00 993.55 C 12-17-76 2362 $993.55 ( DIXIE CHEMICAL CHLORINE ( 002-776-425.00 750.00 (' 12-17-76 2363 $750.00 ( ( . DICKSON OIL CO. OIL 00'1-710-207.00 13.80 ( ( " $13.80 e 12-17-76 2364 ( EVERSON ROSS CO. BADGE (. 001-707-209.00 16.40 12-17-76 2365 $16.40 ( ~ E C H CORP. MODULATION METER I 001-228-012.00 174.85 ( 12-'17-76 2366 $174.85 I. ( ELECTROLUX ATTACHMENTS, SERVICE 001-700-202.00 ., 29.50 I ( '- 001-700-404.00 190.75 l 12-17-76 2367 $Z20.25 ( ENTEX NATURAL GAS l. 001-706-508.00 2.25 ( 002-775-602.00 4.61 ( <.. 12-17-76 2368 $6.86 Ce " I. PAGE TOTALS 2447.14 ( ( . ( ( . e AUTHORIZED DISBURSEMENTS PAGE 4 '12-17-76 (. ( BEN FRANKLIN ORNAMENTS, SUPPLIES C. 001-703-201.00 6.25 ( 001-703-202.00 17.12 l 001-700-205.00 27.90 ( 12-17-76 2369 $51.27 ,( ( FIRE FOX CORP. FIRE HOSE - 2290.00 - . , (, ~.: ( 001-201-000.00 ( 12-17-76 2370 $2,290.00 C ( GEHEG OIL CO. STARTER FLUID 001-115-000.00 14.96 ( ( 12-17-76 2371 $14.96 ( GULF COAST DODGE PUMP ( 00 "1-708-402.00 1"10.78 (" 12-17-76 2372 $'110.78 ( GOLDEN TRIANGLE HEAD GASKET ( 001-708-402.00 40.39 ( '. 12-17-76 2373 $40.39 I. , ( GUL.F OIL CO. GASOLINE 001-(10-207.00 1603.87 ( 12-17-76 2374 $1,603.87 """ HUNTER CHEHICALS LINERS ( 001-700-202.00 20.00 " 12-17-76 2375 $20.00 ( THE HE ITMAN CO., INC. BUSHINGS ( 001-709-402.00 ., 20.00 ( 12-17-76 2376 $20.00 ( ( HI LO AUTO SUPPLY AUTO PARTS 001-115-000.00 116.55 I ( , 001-704-402.00 8.80 ( , '. (. 001-707-402.00 1 34.94 001-708-402.00 11.52 ( 001-709-402.00 41.69 \ , ( 001-709-404.00 23.00 ( 001-710-402.00 12.84 --~._~ - -- .. -- ._"- ___ --0--. (' 001-710-931.00 5.49 002-775-503.' e ! 15.78 ( 002-776-503.00 26.89 ( 12-17-76 2377 $397.50 <. ( ( PAGE TOTALS 4548.77 ( AUTHORIZED DISBURSEMENTS PAGE 5 12-17-76 ( ( HOUSTON L & P CO. ELECTRICITY 001-706-507.00 177.25 (, ( 001-709-405.00 59.68 C 002-775-601.00 1186.98 ( 008-701-507.00 7.91 C . ( 12-17-76 2378 $1,431.82 ( HOUSTON WELDING OXYGEN ( 001-703-206.00 24.75 ( 12-17-76 2379 $24.75 ( HUGHES OFFICE SUPPLY OFFICE SUPPLIES ( 001-700-203.00 201.88 ( (. 001-700-205.00 12.00 ( 001-700-930.00 112.88 .001-704-931.00 199.00 ( 001-707-203.00- 54.15 001-707-205.00 3.32 ( , 001-710-203.00 9.56 ( , 12-17-76 2380 $592.79 ( ,. ( IBM CORP. RIBBONS, SERVo AGREEMENT 001-707-203.00 87.28 l - ( 001-700-404.00 569.52 l 12-17-76 2381 $656.80 ( INTERSTATE BATTERY AD~USTMENTS \. 001-115-000.00 264.95 C. ~. 12-17-76 2382 $264.95 ( , J V AUTO EQUIPMENT TIRE CHANGER 001-708-933.00 3193.75 l, ( 12-17-76 2383 $3,193.75 < ( LA PORTE BAYSHORE CHAMBER OF C MEMBERSHIP INVESTMENT . . . . 001-750-751.00 480.00 ,. . ( 12-'17-1t 2384 $480.00 e (, ( PAGE TOTALS 6644.86 (e ( l ( AUTHORIZED DISBURSEMENTS PAGE 6 12-17-76 l ( E L LESTER EGUIPMENT SEAL, PUMP 002-776-425.00 129.60 l ( 12-17-76 2385 $129.60 ( LIGUID AIR, INC. OXYGEN ( 001-710-206.00 11.00 C 12-17-76 2386 $11.00 ( LONGHORN TIRE ALIGNMENT l 001-707-402.00 10.00 ( 12-17-76 2387 $10.00 C ( LA PORTE HARDWARE MISC. SUPPLIES 001-115-000.00 40.21 C' ( e 001-700-203.00 17.15 001-700-205.00 3.24 ( ~. 001-700-301.00 4.50 ( 001-703-402.00 9.49 001-706-205.00 32.77 ( 001-706-301.00 35. 16 ! ( 001-707-205.00 .69 ( 001-707-301.00 11. 22 ( '. 001-708-205.00 15.34 l <. 12-17-76 2388 $169.77 l LA PORTE HARDWARE MISC. SUPPLIES ( 001-708-402.00 6.70 l. 001-708-932.00 19.67 ( le 001-709-205.00 30.94 001-709-302.00 <- 3.18 \. 001-709-402.00 1.89 ( 001-709-404.00 24.28 C 001-710-205.00 67.76 .' - ,. ..~--_. -.. .- _r-- ~-- ~-~. --,-~,~':'-"""~-orr--- ...---....,-... ~ (" 001-710-301._ 20.46 e ( 001-710-404.00 12.67 ( ( 001-710-931.00 1.80 C. 12-17-76 2389 $189.35 ( C ( PAGE TOTALS 509.72 AUTHORIZED DISBURSEMENTS C PAGE 7 '12-17-76 ( LA PORTE HARDWARE MISC. SUPPLIES ( 002-775-501.00 1. 79 ( 002-7'/5-923.00 10.95 C ( 002-776-202.00 25.78 ( 002-776-421.00 4.45 ( 002-776-422.00 24.83 ( C .... 002-776-425.00 "14.33 ( 002-776-923.00 58.84 C 12-17-76 2390 $140.97 C ( ,- LA PORTE LUMBER BLDG. SUPPLIES . 001-700-301.00 11.15 ( ( 001-710-301.00 7.11 002-776-424.00 25.02 C. 12-1]-76 2391 $43.28 , ( LUMUS BAYTOWN DODGE AUTO PARTS 001-707-402.00 185 .04 001-708-402.00 200.73 ( ( 12-17-76 2392 $385.77 ( LA PORTE FEED DOG FOOD t. 001-707-208.00 15.70 ( 12-17-76 2393 $15.70 l ( M-S SALES TAPE 001-707-20'1.00 14.00 l ( 12-17-76 2394 $14.00 l. . MC KENZIE EQUIPMENT REPLACE BLOWER BEARINGS ( 002-776-502.00 187.80 l.. 12-17-76 2395 $187.80 ( 6 M MILLER, M. D. WORK PHYSICALS C. 001-708-510.00 80.00 ., ( . . - -- - ,., ....~ .. ,___ -".~_. 0- _ 12-17-":7_ -2396----.--$80~.OO-'c-,....~ - - -.; - - .. ( . e ( ( PAGE T01ALS 867.52 ( .. Ce ( ( , ( AUTHORIZeD DISBURSEMENTS ( PAGE 8 12-'17-76 ( MOORE PAPER co. TOWELS ( 001-'115-000.00 52.99 ( 12-17-76 2397 $52.99 ( ( MUSTANG TRACTOR FITTINGS 001-709-402.00 420.84 C C 00 '1- '109-404.00 40.56 C 12-17-76 2398 $461.40 ( OXFORD CHEMICALS HTH C 002-600-'135.00 167.13 ( 12-17-76 2399 $'167.13 ( .. ( e PITNEY BOWES MACHINE RENTAL 001-700-509.00 33.00 I ( 12-17-76 2400 $33.00 PRUITT BROWNING CONCRETE PIPE (, 001-709-302.00 902.70 12-1-7-76 2401 $902.70 ( POLKER WELDING OXYGEN, RODS '. 001-709-404.00 10.20 ( 001-710-205.00 36.30 \ ( 001-710-206.00 9.50 l 12-17-76 2402 $56.00 ( THE ROHAN CO. CURBS, SADDLES ( 002-115-000.00 2415.27 ( 002-600-135.00 148.96 ( ( 002-775-413.00 222.91 le 12-17-76 2403 $2,787.14 ,- \. SKYLARK CAMERA CAMERA SUPPLIES ( 001-707-209.00 117.93 ( 12-17-76 2404 $117.93 ( \ SAFETY KLEEN CORP. MACHINE SERVICE ,. -. -- -" - . --~ - . - - -- ._'*" --.... ~~ . - .- -.... -. - _. -. ~- ------- --- __:;';_-'_~___ _~; 'W ___...~..__~--....c-__-,.."..,._~__,......_____,-_,;'~_.:.-_. 001-710-404.. 18.00 . ( e ( ( ( 12-17-76 2405 $18.00 \ Ce ( PAGE T01ALS 4596.29 ( ( ( ( AUTHORIZED DISBURSEMENTS ( PAGE 9 12-17-76 ( SOUTHERN BUILDING CODE MEMBERSHIP, CODES ( 001-'('04-204.00 89.40 ( 001-750-751.00 55.00 ( C 12-17-76 2406 $144.40 C SOUTHWESTERN BELL SERVICE ( 001-707-511.00 96.11 C 12-17-76 2407 $96.11 ( SOUTHWESTERN BELL SERVICE Ce 001-703-51'1.00 56.05 ( 001-706-511.00 81.68 ( .. (, 001-707-511.00 255.98 12-17-76 2408 $393.71 ( STANDARD COFFEE COFFEE SUPPLIES ( 001-700-201.00 48.61 ( 001-('07-201.00 81.05 I ( '. 12-17-76 2409 $129.66 k 3M BUSINESS PRODS. MISC. SUPPLIES { 001-707-510.00 7.45 \. 001-709-304.00 222.45 ( 001-('10-203.00 86.46 ~.. ( 001-710-404.00 150.00 l 12-17-76 2410 $466.36 ( le UNDERWOOD EGUIP. & SUPPLY ALTERNATOR PARTS 002-776-501.00 45.01 ( 12-17-76 2411 $45.01 l. ( UNIVERSAL JOINT FITTINGS 001-708-402.00 52.97 ( , C 12-17-76 2412 $52.97 .. ,. ~ - - - - - _._ "__ __ - __ __. __ _._._~__ ..:--- _~ ____._ ~ - ~. - --:..-.__ ~~__.--,- .___ -:--- ._.0 _ _.___ ( UTILITV SUP~ co. PIP~LEEVES, LOCKS ( 002-600-134.00 3204.24 l 002-775-413.00 244.66 ( , C. 12-17-76 2413 $3,448.90 ( ( PAGE TOTALS 4777.12 ( C C AUTHORIZED DISBURSEMENTS ( PAGE 10 12-17-76 ( WILSON-MOHR, INC. PRESSURE TROLL C 001-228-012.00 77.90 ( 12-17-76 2414 $77.90 ( ( BOB WILLIAMS wHOLESALE AUTO PARTS 001-115-000.00 61.30 C $61.30 C 12-17-76 2415 C WARREN ELECTRIC to. PRESSURE SW. ( 002-775-416.00 74.98 C. 12-17-76 2416 $74.98 C WEST CHEMICAL CO. WASHROOM SANITATION ( 001-700-509.00 22.00 ( . ,001-710-509.00 59.80 ( 12-17-76 2417 $81.80 ~ XEROX CORP. SUPPLIES, RENTAL ( 001-707-203.00 167.45 \ 001-707-51"1.00 43.65 ( 12-'17-76 2418 $211.'10 \ ,- " \. PAGE TOTALS 507.08 "- ( ( <- l ( ! \.. ( \.. , I I ( _ r ... , . ( -------_._-~ - - ---'------ -., - ---, -" ..' '-.~ '~--- "'----' -- . -. . -." ,- < ( e e ( \ '. C l..- ( ( ( " ( ( AUTHORIZED DISBURSEMENTS C PAGE 1 1 '12-17-76 ( ( ( TOTAL DEBIT POSTED EXPENDITURE 26124.34 C G/L DEBIT 6362.19 (~ TOTAL GROSS - DISCOUNT = NET CHECK ( ( 32486.53 .00 32486.53 ." 1 22139.10 ( ( 2 '10339.52 8 7.91 ( ( -.~ 32486.53 I. . 001-101-000.00 32486.53- ( .00- I ( ~ I ( , C ( - \ (, (, C ( l ( l'.- ( l. ( ( " ( \' . . .. ~ ,.....-...---..- .. " e e BUSCH. HUTCHISON & ASSOCIATES. INC. COl'(lIULTll'(G II: I'(Q 1 1'(11: II:"S ---.. ~- -- --------_._~~~ - --~- .----...."-.-- .. .----...-. - _.~._..-.__._-~'.- --- _.- ------ ----------..------------ - ~._._----_._' 1107 P'LltllTWOOO I.)AIVIl - .....VTOWI'(. TIlX..... 77120 - ,.HOt.1l PHI .12-12" ~cember 2, 1976 ESTIMATE NUMBER: Jwo (2) of Chanqe Order # 1 - PROJECT: City of La Porte - North 16th Street Water Main - Job No. 76-1351 CONTRACTOR: BEN FELTS UTILITY CONTRACTING CO., P. O. Box 1249, Pearland, Texas 77581 AMOUNT OF CONTRACT: $21,972.07 CONSTRUCTION TIME: 30 Working Days 1 Item ") I No. Item Quantity Unit Unit Price Total 1- 8" Class 150 Asbestos-Cement QSfl 6.66 6.366.96 Water Line, Open Trench Con- struction, Comolete in place 1,740 L.F. 5.86 10,196.40 ., , . 2. 8" Class 150 Asbestos-Cement Water Line, Augered Con- struction, Comolete in place 142 L.F. 19.36 2.749.12 3. 6" Class 150 Asbestos-Cement Water Line, Open Trench Con- I struction, Complete in place 50 L.F. 4.40 220.00 ! ; 4. 8" x 8" Tapping Sleeve and Valve w/ValveBox, Complete in place 2 Each 697.02 1,394.04 5. 8" Gate Valve w/Valve Box, Complete in place 2 Each 297.60 595.20 6. 8" x 6" C. 1. Tee, Complete in place' 3 Each 116 . 30 348.90 --~-- 7. 6" Gate Valve w/Valve Box, . Complete in place 4 Each 231.00 924.00 8. Fire Hydrant, 41 Bury, with "Hydro1ok Connector, Complete in place 2 Each 581.32 1,162.64 9. 6" Plug, Complete in place 2 Each 29.00 58.00 lEaCh ---- ~_.- 10. 8" Plug, Complete in place 1 31.00 31.00 - ~ . .~ -.---- -- - ---_.._~._._. ----- -- -- ,. Page Two - City of La ~e - North 16th Street Water ~ Den Felts Utility Contracting Co. - Job No. 76-1351 - Estimate Item No. Item Quant ity Unit Unit Pri ce Total 11- Remove and Replace Flexible Base Pavement with 6" Cement Stabilized Shell Base and 1-1/2" Type "F" . Hot Mix Asphaltic Concrete 111 2 ,481. 96 Surface, Complete in place S.Y. 22.36 -12. Road Shell for Repair of Shoulders, etc. (Oelivery Ticket Basis) Complete - 0 - C.Y. - 0 - in place 14.00 , TOTAL WORK COMPLETED $26,528.22 EXTRA WORK: 2" PVC Service Lines across N. 16th Street Cost $453.05 plus 15% $521.00 . Locate and plug existing 8" A.C. Water Main Cost $370.95 plus 15% 426.59 5 C.Y. Concrete for extra blocking @ $30.40/C.Y. 152. 00 TOTAL EXTRA WORK $1,099.59 TOTAL WORK COMPLETED PLUS EXTRA WORK $27,627.81 Pay 90% of $27,627.81 = $24,865.03 less Previous Payments = 22,629.74 >~= $2,235.29 Hutchlson, P.E. , .' . ' . ---~-----, ~ Q et. 0 e ~'i)E'R' ~.' .... '. ~ ;...~:' . ,,'. . " '~-' .-. ~ , - I .. /;/,~ d~/;- 'j ... /) # . ~ fU ~g~~~ ~~'t:~~ f,\t'iff.if l~~~fl e n~p;,r. Y '0 -.I ,..~~ _H-"" ,. t.." ,... ,", t',fv~!t" . "., "'I, i: S.,,!' ~"':f:"''' ' ~f.. ,,~.~.~ 60~&. #If - i,.':';!J;( ,:t...:.::.': ...;;.::~{,"",~ ss.:<$iJ ;.i, ~.. _. . PIlOn.: 331-1521 2220 ,', C '~orth 11\ ,35 . ALVIN. 'I'E . 77511 ., . , \. ' CUSTOMER A .;:p .m 11-24-76 ACCT. NO, City of La , ~ NAME ADDiII'ES5 . I (;; / CITY STATE ZP 'AID OUT I OTY. .PRICI, >,;t' AMOUNr;i!;t~~~ -- 1 580C Power Shuttle Backhoe/Load r 14350'rO SiN 8955492 I I I I I I (As per bid) I \ I I I i I I I I I I I I I I I , I I " . I I, I " j I I ; I I I i I I .. I. I I ! l I ''-''It f ~.. I . . L. ...--.:~~ .. it, . (1;;,iJ,..,.,? , . ,.11, I d'o."e' ..~ . sI~ I !i~." . 076298 I I df ~ I , "GNATIl",' _$ 1435 ~ 0 :Atl CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS BIll. .. . 0 0 ftR '~TE Nr''''NAL FARM & 'OWER EOlnPMENT DEAlERS ASSOCIATION ST, LOUtS. MISSOURI 63139 , '_'n____ _ .______,__ J -.----r I I i ~ . - e e I : BUSCH, HUTCHISON & ASSOCIATES', INC. , I CO""'V"T'''''O ."01".''''' I : --,._..~.._'_. ...'--. ,.-- --.- - -----_.- . ____'.__.0__ __ __ . _____..._...__.________..__._ I ' , 1107 ......TWOOD D"'V. - aAYTOW"". T.,.Aa 7'11' - ....0,.. "III .U.I.U . . i .. . ecember 9, 1976' I : I ' ESTIMATE NUMUER:One (1), November 15, 1976, through December 8, 1976 I . ,-.- PROJECT: City of La Porte-- Air Development Aid' Project 5-40-0127-02 - Sob No. 73-997' : CONTRACTOR: SKRLA, INC., P. O. Uox 12301, Houston, Texas 77017 ) <J AMOUNT OF CONTRACT $182,795.00 CONSTRUCTION TIME: 180 Work1nQ Da~ I Item No. Item Quantity Unit Unit Price Total' l. Site Work -Excavation and Fill ~ 11 .583 C.Y. 1.00 11 .583.00 . 2. Lime Treated SubQrade 7,200 S.Y. 1.25 9,000.00 3 ~ ' . Crushed Aggregate Base Course -0':' C. Y . 20.25 - 0 - 4.1 Bituminous Surface Course '- -0- Ton. 19.90 - 0 - ,- ' 5.1 Bituminous Prime Coat -0-/ Ga 1 . I \ '. 0.50 - 0 - 6.1 Bituminous Tack Coat -0-IGa1. I i .' 0.50 - 0 - .1 7.1 Runway and Taxiway Painting I -0-1 S.F"/ 0~35 , - 0 .~ : 8.1 Culverts J 120 I L". F .1 17 .00 - 2,040.00 . 9i Electrtcal to.fnstall one taxiway light and relocate Lump one tax1wa~ 11Qht -0- Sum . '"- - 0 - 4.800.00 TOTAL WORK COMPLETED J $22,623.00 " '. ., . . - " . ~'.. '. - . . ".-. paga Two ~ City of La P~te - Air Development Aid proj~ 5-48-0127-02, Job No. 73-997 .. . SKRLA, INC.. Estimate No. ne (1) -- . Pay 90 % of $22,623.00 . $ 20,360.70 Less Previous Payments . - 0 - PAY THIS AMOUNT $ 20,360.70 Work Day Analysis Contractor's first day of work - Novemb~r 15, 1976 Inclement weather days in November - 6 TOTAL 6 . Total work days since start -------- 17 Days lost due to inclement weather - 6 Days actually worked 11 - .. Days left forcompletion- 180- 11 . -169 '\ Proqress Number of days charged: 11 . 6 % Work performed to date: $22,623.00 . Il S -- Position 6 S or 11 days ahead . ~P.'LJ'~ . mes P. Hutch'son, P.E. JPH/dle . '"., . . , ,- , . . . e e BUSCH. HUTCHISON & ASSOCIATES. INC. CONSUL TINa [NO ,,.U (11'. :..: ._~_,'::.':J'_-'_ 1107 FLIf:TWOOO O"'Vf: - 6AY10WH, TtXAB 77~20 - P'HON[ 1713) 0422.112IS . . i December 8, 1976 ) Four (4) - October 15, 1976, through December 8, 1976 ESTIMATE NUMBER: ; Job fRQJ ECr: City of La Porte- Construction of Fairmont Park Recreational Facilities -No. 74-1H CONTRACTOR: Chatham Construction Company, 1309 Jefferson, Bay town, Texas 77520 AMOUNT OF CONTRACT: $213,869.04 CONSTRUCTION TIME: 120 Working Days 'No. Item Quantity Un i.t Unit Price Total 1. Concesston/Scorekeeper/Rest- room Bui.1dtng, including site ~re~aratton, slab, plumbing, tx ures, totlet partitions, cabtnets, signs, concrete .. , walk, patnttng, Complete to 98% Lump 25,676.00 place Sum 26,200.00 l. Bal1fte1ds, i'ncluding 100 C.Y'. tnfte1d fill, final dressing, preparatiun for seedtng, seedtng, concrete dugout, pads, benches and - 0 - 3,557.00 - 0 - roofs, Complete i~ place Each I 3. Backstops as shown on the Drawing, Complete in place - 0 - Each 1,892.00 - 0 - 4. Ballfield Fence; 6' High, Complete in place - 0 - lo F. 4.30 - 0 - 5. Ballfield Fence, 10' High, Complete in place - 0 - loF. 7.75 - 0 - 6. Ballfield Fe~~e, 15' High, Complete in place - 0 - L.F. 10.19 - 0 - 7. Gate, 3', Complete in place - 0 - Each .152.25 - 0 - 8. Gate, 15' Double, Complete in place - 0 - Each 275.73 - 0 - . 9. Electrical, including, t wire conduit, fittings, fixtures. poles, switch- gear, service to building, complete in place 99% Lump 93,139.20 BASE BID (Ouartz L1Qhts) Sum 94,080.00 -. f . ';: Page T~o - City of La 4IJte - Construction of Fairmont~rk Recreational Facilities ~ Chatham Construction Com y - Estimate Ho. 4 , i .. J No. Item I Quanti t~l ~ni ~r Unit Price Total 10. Water Service, 2" PVC Pipe and Tap to main, tomplete in place 390 l.F. 1.58 616.20 . . 1l. Sanitary Sewer Service, ~" PVC Pipe and Manhole Tap 440 4.25 1,870.00 tomplete in place L. P. I . 12. Limestone Parking Lot, 6" Compacted Thickness including Lime Stabiliza- 99% of tion of Subgrade, Complete in place 4,700 S.Y. 6.81 31,686.93 13. Base Sets, including three Field Bases and Home Plate, ^) as specified on the draw- inQs, Complete in place - 0 - Each 401.40 - 0 - I - 14. I Portable Pitching Mound - 0 - I - 0 - . ,as speci fi ed on drawi ngs Each 643.50 I 15. Spectator Bleachers as specified on drawings, complete in place - 0 - Each 741.75 - 0 - 16. Asphalt Surface Drive including lime stabiliza- tion of subgrade, 8" cement stabilized shell base and 1-1/2 thick asphalt concrete surface, 95% of Complete in place 580 S.Y. 7.81 4,303.31 17. Break out existing curb and construct concrete ramps and curb returns at 3 locations, including lime stabi1itation of subgrade, Complete in Lump place All Sum 2,400.00 2,400.00 18.1 Project S1gn as shown on - 0 -I Each plans, Complete in place 2,112.00 - 0 - - TOTAL WORK COMPLETED $159,691.64 " MATERIAL ON HAND , - l- . Spectator Bleachers @ Invoice Price ............. ............ 4,040.00 TOTAL WORK PLUS MATERIAL ON HAND ...... $163,731.64 -...-... ,. . . It,.,-" . .. . Page Three - C1.f La Porte- Construction ofl-rmont Park Recreational Ftc111t1es . Chatham Construct on Company ~ Estimate Ho. I I . ! ~ Pay 90 % of $163,731.64 . $ 147,358.48 Less Previous Payments 117,699.44 , PAY THIS AMOUNT $ 29,659.04 - Work Day 'Analysis J Contractor's first day of work - July 27, 1976 " Inclement weather days in July ------- 0 August u___ 2 September -- 2 October _u_ 4 November --- 15 TOTAL 23" . '. Total work days since start ------- 84 . Days lost due to inclement weather - 23 Days actually worked -.- 61 Days left for completion - 120 - ~l _ = 59 Progress Number of days charged: 61 = 51 %. Work perfonned to date: $163,731.64 · -77-% Position 16 % or 19' days ahead . p~~ "" mes P. .]-lutc son, .. l\. t ~. ., . , . r ..~. . - "I . e e BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS --_.. ,~..,,--_..~......- . ------. -~ -- -- .-- ~,- . I I 07 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (7131 422-8213 December 16, 1976 Honorable Mayor And City Commission City of La Porte P.O. Box 1115 La Porte, Texas 77571 FINAL ESTIMATE - NORTH 16TH STREET WATER LINE All construction is complete on this project including that under the original contract and that authorized by Change Order No.1. The total cost of the work is $30,242.11. Deducting previous - . payments in the amount of $24,865.03 leaves a final payment of $5,377.08. We recommend that the final payment be made at this time. Attached is the list of bid item costs and an affidavit from the Contractor declaring that all labor and material bills associated with the work -- have been paid. JPH/dle Attachments . . - . . CO.CTOR' S AFFIDAVIT TO LOCAL 4NMENTAL UNIT TIlE STATr. OF TeXAS COUNTY OF HARRIS . llf:FORP. ~m, a Notary Public in nnd for Harris . County, . Texas, on this day pcrsonnlly oppeared Ben Felts ' who, aftcr having bcen by me duly sworn, upon hh oath depose, and says: i TIlat certain buildings, facilities, or improve~cnts werc cQnstructed upon I North 16th Street from Crest lane tQ the South rlght-of-way llne of , Spencer Highway under contract executed bctwden BEN FELTS UTILITY CONTRACTING CO. . as contr~ctor, and . City of La Porte as ownor, and datcd July 9, 1976 . 111at said buildings, facilities or improvements have been fully completed, and that all subcontractors, materialmen and labor contractors furnishing material and labor for the construction of the buildings, facilties or improvements, have been fully paid and that thero arc nb disputed or unpaid labor or matcrial claims again5t said buildings, facilities or improvements or the property upon which said buildinc" facilities or improvements are situated. Affiant warrants that he is authorized to make. this .af fidavi t . ~~~ ---- jr--./f.., {..-- Affiant _ [jen I-elts ~ . . President ,.! _ Title - SWORN TO AND SUBSCRIBED BEFORE ME by the said Ben Felts.. . on this / h fJv day of' De.cember , 19 /6 . l d9~ ~~~'L ' J Notary Pu\':h c in and for 11/1- B.€/S BARBARA MOORING Harris County, Texas TIlE STATE OF TEXAS COUNTY OF HARRIS . BEFORE ME, the undersigned authority, on this day personally appeared Ben Pe~ ts known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed'tho same for the purposes and consideration therein expressed and in the capacity stated therein. GIVEN UNDeR MY HAND AND SEAL OP OFFICE, this 16th day of December A.D., 1916 . ...;,,' ~ J.-YJ - · ,". ~~~//~~ , fa'ry Public in and for #BBARA MOORING - . Harris County. Texas . - .- - ~ e . .... BUSCH. HUTCHISON & ASSOCIATES. INC. CONSULTING ENGINEER. - - 1107 I"LEIITWOOD D RIVII - ""'VTOWN. TEX.... 771120 - ,.HONE (713) "22-1211 ~ece~ber 16, 1976 ESTIMATE NUMBER: FINAL PROJECT: City of La Porte - North 16th Street Water Main - Job No. 76-1351 CONTRACTOR: BEN FELTS UTILITY CONTRACTING CO., P. O. Box 1249, Pear1and, Texas 77581 AMOUNT OF CONTRACT: $21,972.07 CONSTRUCTION TIM~: 30 Working Days Item Quantity!unlt No. Item Unit Price . Total l. 8" Class 150 Asbestos-Cement 9Sfi 6.66 6.366.96 .Water Line, Open Trench Con- struction, Complete in place 1 ,740 L.F. 5.86 10,196.40 2.. 8" Class 150 Asbestos-Cement . Water Line, Augered Con- struction, Complete in place 142 L.F. 19.36 2.749.12 ~ 3. 6" Class 150 Asbestos-Cement Water Line, Open Trench Con- struction, Complete in place 50 L. F. 4.40 220.00 4. 8" x 8" Tapping Sleeve and Valve wjVa1ve Box, Complete in place 2 E"ach 697.02 1.394.04 5. 8" Gate Valve w/Valve Box, Complete in place 2 Each 297.60 595.20 6. 8" x 6" C. 1. Tee, Compl ete in place 3 Each 116.30 348.90 7. 6" Gate Valve w/Valve Box, Complete in ~lace 4 Each 231.00 924.00 8. Fire Hydrant, 4' Bury, with "Hydrolok Connector, Complete in place 2 Each 581.32 1 .162.64 9. 6" P1 ug , Complete in place 2 Each 29.00 58.00 10. 8" Plug, Complete in place 1 Each 31.00 31.00 , .. ------- . - ~~ ..>- .........- Page Two - City of La Ptlte - North 16th Street Water M~ Ben Felts Ut ty Contracting Co. - Job No. 351 - Estimate - Final - Item No. Item Quantity Unit Unit Price Total 11. Remove and Replace Flexible Base Pave~ent with 6" Cement Stabilized Shell Base and 1-1/2" Type "F" . Hot Mix Asphaltic Concrete 201 4,494.36 Surface, Complete in place S.Y. 22.36 12. Road Shell for Repair of Shoulders, etc. (Delivery Ticket Basis) Complete 32 in place C.Y. 14.00 448.00 TOTAL WORK COMPLETED $28,988.62 I EXTRA WORK AND MATERIAL: Two (2) 8" x 450 Bend @ $76.95 each $153.90 . .. 2" PVC Service Lines across N. 16th Street Cost $453.05 plus 15% ~ 521.00 . Locate and plug existing 8" A.C. Water Main 426.59 Cost $370.95 plus 15% Five (5) C.Y. Concrete for extra blocking Cost $30.40/C.Y. _ 152.00 TOTAL EXTRA WORK AND MATERIAL $1,253.49 TOTAL WORK COMPLETED PLUS EXTRA WORK AND MATERIAL $30,242.11 Pay 100% of $30,242.11 = $30,242.11 Less Previous Payments 24,865.03 . . PAY THIS AMOUNT $ 5,377.08 1~ueh1 J Idle .- ,. " . - ~ _"M'_~ ,,__ e e INVOICE NO. 1493 ~ ~ BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS .- .--.--. 1107 FLEETWOOD DRIVE - BAYTOWN, TEXAS 77520 - PHONE (713) 422-8213 . Date:Dec~lber 7,1976 City of La Porte P.O. Box 1115 La Porte, Texas 77571 Attention: Mr. Larry Broussard Contract or Purchase Order No. Our Job No. 74-1155 Ordered Payments Balance Date Reference Description of Work By Charqes Received Due PARK PACI'Ll'TI'ES AT PAtRMONT PARK . . '. Restdent tnspectton for NQvemlier, 19]6 . Harold H:amtlton - $l19.,7Q 9...1/2. Errs. @ $6.30 x 2.,0. 119.70 . . - ---~---~. -- ------- -----.------..-- DATE BILLED = . , e e INVOICE NO. 1492 . ~ ~ BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS . 1107 FLEETWOOD DRIVE - 9AYTOWN, TEXAS 77520 - PHONE (713) 422-8213 Date: December 7, 1976 City of La Porte P.O. Box 1115 La Porte, Texas 77571 Attention: Mr. Larry Broussard Contract or Purchase Order No. Our Job No. 73-997 I Da te Ordered I Payments Balance Reference Description of Work By Charges Received Due LMPROVEMENTS f'OR LA PQRTE MUNrcIPAL AtRPORT f'AA ADAP j 5~48-01Z7~QZ . . '. Restdent Representattve for on~tn:e.-stte oose.rvatton for -- Novemoe.r, 1 ~76: 16:Z ttrs. @ $14.aCI/fir. Z,Z68.au $Z,Z68.QO .. . . y~~ 3/~ - -- ---- o(~ /~q/Jvv DATE BILLED = . e e INVOICE NO. 1496 ~ BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS 1107 FLEETWOOD DRIVE - BAYTOWN, TEXAS 77520 - PHONE (713) 422-8213 . Date: December 7, 1976 City of La Porte P.O. Box 1115 La Porte, Texas 77571 Attention: Mr. Larry Broussard Contract or Purchase Order No. Our Job No. 76-1351 Ordered Payments Balance Date Reference Description of Work By Charges Received Due 16TH STREET t.JATER MAUl Re.stdent tnspe.ctton for . Noveml5.e.r,1976 .. . ~ Haro 1 d Hamt1 ton .., $863 . 1 0. 68-1/2. Hrs. @ $6,3G.X",,2..a 863. 1 G. - . - ....... DATE BILLED . .- - -- .. ~.-- ------ e e INVOICE NO. 1.495 ~ BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS . 1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 0422-8213 Date: December 7, 1976 Clty of La Porte P.O. Box 1115 La Porte, Texas 77 571 Attention: Mr. Larry Broussard Contract or Purchase Order No. Our Job No. 76-1351 Ordered Payments Balance Date Reference Description of Work By Charges Received Due 16TH STREET vIATERMAtN. SURVEY'r:~~ .- . , '- 3-Ma.n pa,rty- 5" Errs. @ $2.8. (ill 143.Ua. ~ 2....Ma.n pa.rtt 1 Err. @ $2.2..2.0. 2.2.~2.0. $165,2.U - . . ------------ --------- ---~ DATE BILLED _._.~-.... ...~._. --~~~ - - -.,-....---- -~---~..__..-- ...-.- ...-.- .- .__, _._________.u_" _'_ --~..---,--_._----._-,_.._-_. -. - - .~-- e. e INVOICE NO. 1494 BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS . 1107 FLEETWOOD DRIVE - BAYTOWN, TEXAS 77520 - PHONE (713) 422-8213 Date: DecemBer 7, 1976 ctty of L~ Porte P. 0, Box 1115 La Porte, Texas 77571 Attention: Mr. Larry B"rouS'Sard Contract or Purchase Order No. Our Job No. 76-1307 - Ordered Payments Balance Date Reference Description of Work By Charges Received Due SANITARY'S8m{ '" ~UTf:[ 14TE( . SOUTH.' 15JEr, $GUTf:[ 1 UTE(, .. .... wt..;) I uA II AriD NEST ItB\\ ~ Re~tdent tn~ectton for ~toVell)Qe.r, 1 6: ffqrold ffa,mt1ton '" 78 ErrS'. @ $6.3o.~ 2.,0. gE2..8U - E1vte. Sexten '" 9. Errs. @ $4.0.0. x 2.. <1 72..00 Leonard Loutvera ~ 14 ffr~. @ $5.5IT x' 2..<1 . 1 54 ~ OIT $1 ,2.OB .80. .. . ~j~' > :: 7i /~~ -~-- --_.- - - ~n,,:14/~ DATE BILLED ~ :r q I~ '" .. .... e e . La Porte Bayshore Neighborhood Center December 16, 1976 To. La Porte City Council From. La Porte Bayshore Neighborhood Center As we understand from~ommissioner Love and Mr. Sherwood The La Porte Bayshore Neighborhood Center will be allowed to use the Civic Center on San Jacinto Avenue, without cost, for our ongoing programs through the month of May, 1977. We would like to submit the attached schedule for your confirmation. If at any time this conflicts with your scheduling we would appreciate your letting us know well in advance so we can make other arrangements. . We would also like to request that we be allowed some storage space in the Civic Center for equipment and supplies for these ongoing programs. Attached is a list of items we will leave in the Civic Center. Our Northside personnel will terminate on December 31, 1976. At that time we will no longer assume the responsibility for the Civic Center buildings on San Jacinto Avenue or North Fourth st, or the baseball diamonds. ~ We again wish to assure the council of our sincere coo- peration in this effort to provide the citizens in our community with a bigger and better program. Sincerely, .. (Mrs.) Florence A1~orth . President. . " , -- -- .-------._.'._.~- -- --- .. ... e 'e . LA PORTE BAYSHORE NEIGHBORHOOD CENTER December 20, 1976 . Items being left in Civic Center for use during Spring Program. 1 Pool Table 3 Ballet Bars 12 round card tables 60 metal folding chairs assorted pots and pans assorted dishes and silverware 1 large coffee pot Playschool Equipment; including 3 tables 4 benches 15 stools 6 small chairs . Bulletin Board Plus various miscellaneous items. -- - . . . - - ---.-- ~ .. :c '. ," ~B . COMMISSION ST ATE DEPARTMENT OF HIGHWAYS ENGINEER-DIRECTOR AND PUBLIC TRANSPORTATION B L DEBERRY REAGAN HOUSTON. CHAIRMAN DEWITT C. GREER CHARLES E SIMONS P.O. Box 1386 Houston, Texas 77001 November 24, 1976 IN REPLY REFER TO FILE NO Hon. J. J. Meza Mayor, City of La Porte P. O. Box 1115 La Porte, Texas 77571 Dear Mayor Meza: Litter along the highways in this District is becoming an increasingly .-.evere problem. At a time when population, traffic, and litter deposits ~e increasing in this area, a reduced budget has decreased the resources we can devote to litter pickup. Even so, litter cleanup is expensive. In District 12, litter pickup along state highways cost $478,212 in fiscal year 1975 and $439,368 in fiscal year 1976--money sorely needed for other far more productive purposes. With more litter and fewer dollars to cope with it, the amount of trash along our roads is reaching epidemic proportions. This has resulted in more adverse comment from individuals, elected officials, and the news media. With the limited resources at our command, we are trying to keep our roadways clean as best we can--but it appears to be a losing battle. The most obvious way to improve the situation is to reduce the amount of litter thrown on the roadside in the first place. It is toward this end that we earnestly ask your help. Education, publicity, and law enforce- ment can all contribute to reduced litter. We request your increased emphasis in these areas--particularly law enforcement. With your help, this problem might be brought down to manageable proportions. .