HomeMy WebLinkAbout1987-07-16 Meeting•c • t.A PORTL: l:RE:r, i:A'TLR AUTHORITY f~,I?dUTr S JULY 16, 1987 1. The meeting- was called to order at 12:14 P.t9. ;fE;fEERS PRESENT: President Cary Burnley, Secretary Rick ~~atthews, ;•;ember Jerry Bramlett. MEMBERS ABSENT: I~tember Claude Graves OTHERS PRESENT: City Manager Bob Herrera, Director of Public tt'orks Steve Gillett, hater/Wastewater Superintendent Buddy ..;acobs. 2. Cary Burnley distributed a memorandum from the Final Evaluation Committee regarding the interviews and their final selections (copy attached), he also advise those present that all the ratings were completed individually. Discussion was held on the final selection of civil engineering proposals for the design and construction of a potable water transmission line and distribution system. Bob Herrera commented that the selection process was not very complex and he feels the selection process was fair with the final ratings being close. Cary Burnley stated any of the applicants would have done the job but the committee felt that Espey Houston is the very best selection for this job. Rick Matthews made a motion to accept the Final Evaluation Committee"s recommendation of Espey/Houston. Seconded by Jerry Bramlett. Passed unanimously. Rick Matthews and Jerry Bramlett complimented the committee members for an excellent and very thorough job. Rick Matthews made a motion to create a committee for negotiations with Espey/Houston. Seconded by Jerry Bramlett. Passed unanimously. After discussion it was decided that the committee members for negotiations would be: Bob Herrera as General Manager, Steve Gillett, Rick Matthews and Jerry Bramlett. Bob Herrera stated he would schedule a meeting with Espey/Houston. ~ .~'.rr (':n '. ~. 1"'. •~ (.i ~; n, !' ~ 1 ~](') •7 ~s ~'{. r' .. . S•s ,l Tl , sc. i j T ' r:: . r, ~ J. t. ~ ~ r'., . r ~ i • ~ ~~ ,• , , r e. , G (~ r~ ~; f • r• r y i'iC'.}:qt-I+';T~,i }~}?^~F~;~:1'I': ~'r'~SlC'i('nt: c~C?rC'~/ i•r'=:fiil.F?tt, ',!',.C?E? ~re$1(:}rTlt I~I.C;~' i`c!f;t;}'iC:S:;;, :~C:C:rE'.t~r•,.1, C'i.F;11(;E? '?.,Vf!:. , i'G'i:.t) :'r i'' I•: ii rct kt. _ c"": r i ~: ~. c. ~~ c r t. ()fit'}'I"}?S ,~i',r~~'~'~.,1'. ~,S;:i:?t:c:r';t ~.itl+ i'il:1:`'~~,{'c'.'1" ..10~':r, Jo;rns, 1''Uf)].iC ;:'or;; ~'i.r'ec:tcr' :it•.r?'•rr-• .~:;.1.] Ft t: , ~',<;.t;,;r'/;•'a ~:t:.c;vr~^f,e;" ~;l~r,(~r'i?ltender;t:• i?1JCi~'•y .T;;C•ok%~, ,"•t,r};ar:i~ .; p,t ;or•nr,t- ~Tnt.~n i',r•..:~:tron~. ','- F i 'lut. :~f' t'.,~r F. t.; G i-,. n i:u,;ll t-. 1 , , 1~: 7 Ldt.re rep nd ,~,pt:;roved . 3. ,Jo:n .?cF:r'ns cistr•it~!;*.rc! an(? di_sclissei -~ l.c?ttE:r' t,r?~t :;ins received f.r'or^ i'~: -:e .'r~ir'c.~o`.t.n c, f' ~:k•.e C'~.*'.i o; .ior'stc',t~. 7.'!';i.^ :Letter i.s in rFSt)or::~(:: to t•he :~~E:nti.r,~': :,eJ.d .•, i. t; !•: t' ?. 1: 6• i•'.r~.r'cotte, Rol, t:Prrer'e, J~Thr! A.r~~;tron~, ctF':•l= ~~i.-iJ.!'t _, rr?:: Jerry Fr?rnl.ett rel=ardinr~' the contract 1•~i.th the c',~.ty of. 5ousron. 7'k:e areas of chan7e t:ere k,ro1.1TYi~t to ar.r,ent,i.or; ~/ "tr':c ('i1l~~Y.t-. ~+r•;c ~!isnllf:~:i.on ~•aas ~~Erld. John %=rr~'St-.rCirl~; ,L'•"'"°Sr.E'C~ !."' CF'V1.5`; t!?C C'nritr£iCt', f?r1C1. Cle~.].Ver t0 f17_S Ci:"i'1CG-' Or' rt'Vl.!~:: i3" Cil)iC;~:l_y 8:i r!~:~:3J.~!i8. 'Ti'lls Li].J.J i;J.:iO kiE? an al~-~r•(.':.a item ~,t. i.tit nE':: r ^-;ne:ta_r.,-~, .TUk',r: •TC)Pr1~S :::tatC%; ~}1?t:• t:~OC: !(?r'C'C.'.r~3 h%l:i ;'•I.1rSl.lE?.C: the ].nter].m .(:' ] rr .`.•.'• n ! : l ri ~% ~...:"1 d t h J. r ~ :. °' ~?. I'' E; [:O .i. "! `'' ins C J. ~.. ti Jerry t~rc'l-•.!]tett C+iSC.:t.S C?C.'; 1".klt? !r:~?('t lnf% il.~'J.() ~•rir..h }~°()E?V/~iUStOrI Cn t:~r:,ir' core*,rar:t, ar:d v~~,ricus t~oil~~.i ti'E=rc~ hrou~ht to attention. k?e fe).i, tk;(=v :•;r~irl.c'. do an ~::nFi J.er,` ~o`?. ..Jol~r? ftrrr,stron;?; ste.tc,:.i k~e k;F:`~ r'FV i r:t+iE': tt'iiS COnt.r~+.Ct e'.infl C:VC?rJ/tliiri,, ]..~ ir• order. ~, "lOtl.On 4:?`~ "'%~ClP_ l;', l'1_^~::(:C i~r?V(',:; t0 _i':Yt;^OV:; tklc ~aSpg`~/~+`l1Sf;.or1 COI:tr~Ct ~L+n?E:Ct t0 f'!l.r'1C~C' Ct:%:n~*e?:,. ~:e(":()r:C~E?C: ::~; ~1.Cn !":dtt!"leLJS. i'~OtlOCI ~. :'hP.rE'. t'C'.].!'?~: t)q f'l:rt!"E?r til.i`::i.l'?(?SS, tk:e E'~er.'.tln?; 41c'!~ ?C'~'.CUrrI::L at j :~, t''.tii. respect ruJ.>_y .`.';ut);:;i tt.e;t , ~~c~c:~E=t.~:.r;:/7'r'eacurtr . , . ~~ 1~~ ~ ~ A ~, ' # • • ~~~~~ ~''~ L~ forte Are~W~terAuthorit ~~ ./ Y "~\ 1 PHONe ~ 713 ~ 471 .5020 • P. O. Box 1 1 15 • Lw PORTE. TERAS 77571 July 15, 1987 T0: Board of Directors La Porte Area Water Authority FROM: Final Evaluation Committee SUBJECT: INTERVIEW AND FINAL SELECTION OF CIVIL ENGINEERING PROPOSALS FOR THE DESIGN OF POTABLE WATER TRANSMISSION AND DISTRIBUTION SYSTEM A final evaluation committee, appointed by the Board of Directors of the La Porte Area Water Authority at a meeting held July 2, 1987, was directed to conduct interviews and make recommendations on the selection of an engineering firm to design the above referenced project. The committee is composed of Cary Burnley (LPAWA Board), Claude Graves (LPAWA Board), Robert T. Herrera (LPAWA General Manager), and Steve Gillett (City of La Porte Public Works Director), and Pat 0"Malley (City of La Porte CIP Coordinator). This committee met on July 7, 1987 to discuss the format and procedures to conduct interviews with the four (4) firms selected as finalists by the Initial Evaluation Committee. The four (4) firms selected for interviews were Dannenbaum Engineering, Espey Huston & Associates, CRS Sirrine, and Turner Collie & Braden. The following format was adopted: 1. Brief introduction and opening statement by LPAWA Board President Cary Burnley. 2. Brief introduction and opening statement by a principal of the firm on the firm"s philosophy. 3. Brief discussion of the firm"s understanding of the project and the proposed methods and scope of work to accomplish the project by the proposed Project Manager. 4. Question and answer session by committee members on a rotating basis. Questions were individually formulated by each member. 5. Brief closing statement by the firm clarifying and expanding on any perceived area of concern. ~` Page Two Interview and Final Selection July 15, 1987 The entire process was limited to one and one-half (1 1/2) hours. Parts 1, 2, and 3 were limited to twenty (20) minutes, Part 4 approximately one (1) hour, and Part 5 approximately five (5) to ten (10) minutes. The interviews were conducted as an executive session of the LPAWA. Copies of the necessary legal certification are attached. In addition, all interviews were taped. Interviews were held on July 9, 1987 with the firms CRS Sirrine (6:00 to 7:30 P.M.) and Turner Collie and Braden (7:30 to 9:00 P.M.). On July 10, 1987, interviews were held with Dannenbaum Engineering (2:00 to 3:30 P.M.) and Espey Huston (3:30 to 5:00 P.M.) After the final interview on July 10, 1987, the committee briefly met, and decided to use the same evaluation and rating system developed and used in the initial selection process. It was agreed to meet again on July 14, 1987, at 6:30 P.M., to tabulate the findings. The committee met on July 14, 1987, and compiled the results of the individual committee members, and established weighting factors for the three (3) categories used in the evaluation. The results of the combined evaluations are shown on Exhibits A and B, copies of which are attached. Exhibit A shows the determination of weighting factors for each category. Exhibit B shows the ratings by individual committee members, the average rating, the agreed weighting factor, and the final rating for each of the three (3) categories, "Personnel Qualifications", "Experience of Firm", and "Methodology", as well as the final tabulation of all three (3) categories with a ranking of the firms. Based on the interviews and evaluations, the committee submits the following summary and recommendations: A. The final ranking of firms, from highest rated to lowest, are as follows: 1. Espey Huston and Associates 2. Dannenbaum Engineering 3. CRS Sirrine 4. Turner Collie & Braden B. The LPAWA Board appoint a committee to conduct negotiations with Espey Huston and Associates on scope of work and professional compensation. ~ ! Page Three Interview and Final Selection July 15, 1987 C. If a mutually satisfactory contract cannot be negotiated with that firm, the committee terminate negotiations and initiate negotiations with Dannenbaum Engineering. This procedure is followed until a satisfactory contract has been negotiated. D. When successful negotiations are completed committee develop, in conjunction with the to be presented to the LPAWA for approval. of the LPAWA will prepare a recommendation to the La Porte City Council, along with t contract, for approval. with a firm, the firm, a contract The President to be presented he proposed The committee feels that the evaluation and recommendation submitted is a fair and impartial selection, and reflects the members" combined and unanimous judgement. It is felt that all four (4) firms interviewed are capable of performing the work. We will be happy to respond to questions from the Board regarding details of the interviews and the final recommendation. Respectfully Submitted, ~ c^~i~ • Cary rnley Cla a Graves LPAWA Board President LP W Board Member ~' Robert T. Herrera at 0 Malle LPAWA General Manager La Porte C P Coordinator. Steve Gil e t La Porte ublic Works Director REQUEST FOR CITY COUNCIL AGENDA ITEM Agenda Date Requested: Se 7 Requested By: X S. Gillett epartment: Report Resolution Exhibits: July 2, 1987 Minutes - La Porte Area Water Authority Recommendation for Survey Services Survey Proposal Letter from Coast Water Authority SUMMARY & RECOMMENDATION On July 2, 1987, the Board of Directors of the La Porte Area Water Authority authorized the City Manager to enter into a contract, not to exceed $10,500, to have the necessary surveying performed in order to apply for an easement in the Coastal Water Authority R.O.W. between West Main (Spencer) and the proposed Southeast Water Purification Plant. This easement is necessary to deliver water from the plant to the Authority's customers. Because the "take-point" at the Southeast Water Purification Plant was not established at ,that time, the Board authorized the City Manager to enter into a contract with the firm that was the lowest price for the given scope of work. The "take-point" has been clarified with the City of located at the east property line of the plant at its the C.W.A. R.O.W. As recommended and approved by the Authority, the firm selected to perform the work with located at the property line of the plant is Baseline the amount of $8,900.00. Action Required by Council: Authorize the City Manager to Corporation, in the amount of in the Coastal Water Authority Availability of Funds: 3ouston to be intersection with La Porte Area Water a "take-point" Corporation, in enter into an agreement with Baseline $8,900.00, to perform necessary survey work R.O.W. as required to obtain an easement. General Fund Water/Wastewater Capital Improvement General Revenue Sharing X Other Account Number: Funds Available: YES NO Approved for City Council Agenda Robert T. Herrera DATE City Manager Ordinance Public Works