HomeMy WebLinkAbout09-21-09 Drainage and Flooding Committee Meeting
MINUTES OF THE DRAINAGE AND FLOODING COMMITTEE
SEPTEMBER 21, 2009
1. Call to Order
The meeting was called to order by Chairman Mike Mosteit at 5:00 p.m.
Committee Members Present: Chairman Mike Mosteit, Vice Chairman Mike Clausen, Louis Rigby
and Daryl Leonard
Committee Members Absent: Chuck Engelken
Other Council members Present: None
Members of City Employees Present: City Manager Ron Bottoms, Assistant City Manager John
Joerns, City Secretary Martha Gillett, Public Works Director Steve Gillett, Assistant City Secretary
Sharon Harris and City Engineer Rodney Slaton, Mike Boaze and Donald Ladd.
Others present: Barbara Norwine, Mr. Duson, Kim Still, Cheryl Westmoreland, Richard Winn,
Ellen Winn, Margaret Compton, Mr. Rothman and a number of other citizens.
2. Consider approval of Minutes of Drainage and Flooding Committee Meeting held on August 19,
2009.
Motion was made by Committee member Leonard to approve the minutes as presented. Second
by Committee member Clausen. The motion carried.
Ayes: Mike Mosteit, Mike Clausen, Daryl Leonard and Louis Rigby.
Nays: None
Abstain: None
Absent: None
3. Petitions, Remonstrance's, communications, and citizens and taxpayers wishing to address the
Drainage and Flooding Committee.
Barbara Norwine - 202 South Lobit, La Porte, Texas 77571 - addressed the committee concerning
drainage issues on the East side of town regarding flooding at the corner of Lobit and A Street.
Additionally, Ms. Norwine provided the committee with a pictures. Those pictures will be forwarded
to the City Engineer Rodney Slaton.
4. Receive Fire and EMS Presentation- M. Boaze/ D. Ladd
Fire Chief Mike Boaze and Assistant Fire Chief Donald Ladd delivered a Fire/EMS presentation
emergency response.
5. Administrative Reports- Staff
Receive reports from City Staff, Harris County Flood Control District and Harris County
Precinct Two regarding city drainage issues.
Director of Public Works Steve Gillett updated the committee on the Fleetwood Drive area
preliminary engineering study. He advised the committee it will take approximately four
months or more for the study to be complete. He also noted there will be a no impact
study for the flood control district.
Mr. Gillett also informed the committee with an update on the following in house projects:
Creekmont project is scheduled to be finished this week.
Bay Oaks and Dwire will be finished in the near future.
Once the Bay Oaks project is complete, the next project will be the Bay Colony project.
In addition, there is a meeting scheduled next week to discuss the pre-check facility with ' .
the Port of Houston.
The Park Street area will be addressed as well and that will include the Lobit and A
flooding that Ms. Norwine was referring to earlier in the meeting. There will need to be a
joint effort with the Port of Houston, Harris County and the City on this project.
The survey for the Glen Meadows project is near completion.
Harris County Flood Control District representative Mr. Randolph updated the committee
on the city drainage issues. He informed the committee the F101-6 structure is out and
the concrete work has begun.
He further noted there had been 18 home buyouts in the Brookglen Subdivision and 2
pending. There may be an additional 30 hours tied to the grant application and those
homeowners have been notified.
In addition, Mr. Clark of Harris County Flood Control provided a brief update on the
continued efforts for improvements on Valleybrook Street.
6. Set date for next meeting
The Drainage and Flooding Committee will not set the next meeting until the Preliminary
Engineering Report is finalized. It should take approximately 4 or more months for the
report to be completed.
7. Committee Comments
A. Matters appearing on agenda
B. Inquiry of staff requiring a statement of specific factual information or a recitation of
existing policy.
Committee members Leonard, Clausen and Rigby brought items to the table.
8. Executive Session - pursuant to provIsion of the Open Meetings Law. Chapter 551 Texas
Government Code, Sections 551-071 through 551.076, 551.087 (consultation with attorney,
deliberation regarding real property, deliberation regarding prospective gift or donation, personnel
matters, deliberation regarding security devices, or excluding a witness during examination of another
witness in an investigation, deliberation regarding Economic Development Negotiations.)
9. There was not an executive session held.
10. Adjournment
There being no further business to come before the Committee, the meeting was adjourned
at 5:42 p.m.
Respectfully submitted,
'--1VJAd/. Add
Ma~h~ ~MC, CMC
City Secretary
Approved this JJi!-day of fP ~rU A 'Y 2009.
Cha.. irP.erson r.Mike MO(Jit
.. /}k~ YI
FAIRMONTPARKEAST
FLEETWOOD DRIVE
PRELIMINARY ENGINEERING REPORT
CITY OF LA PORTE
FEBRUARY 12, 2010
_....'~~"....
--t:.. OF T 'l~h.
~ ",-",\ ........ ~'v \I"
..." r: .' ',"'"" I!~
, c:, .... * '.;;.J. OJ i
, .,,- " , -. .J
, *.Q ;:;~o!-~, ..'~ ,~"
". . r~ . . . ''''I
, : . ~'";\'" b,
it' ........ ........ of CQ..' '1~" ....... 'it!);~
1. CYNTHIA L. KELSCH
~........ "........" al" 0'19 .!to!)...' .
l,~.. 80224 l . .0
,~O' .8./ \
,,~";:.~CENS~;:?("<~ i'\.'
'\~~~~t'" ~,\ I
k lot z 4~~ ass 0 cia t e 5
KLOTZ ASSOCIATES, INC.
PROJECT NO.: 0127.012.000
Texas PE Firm Registration No. F-929
I
t:
k lot z .~. ass 0 cia t e s
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARy........................ ................................... ............ ... ES-l
SECTION 1
1.1
1.2
1.3
1.4
1.5
SECTION 2
2.1
2.2
2.3
2.4
2.5
2.5.1
2.5.2
2.5.3
2.6
SECTION 3
3.1
3.2
3.3
3.4
SECTION 4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
INTRODUCTION
Authorization................................................................. .
Project Location................................................... ..........
History and Background..................................... ............
Purpose.......................................................................... .
Alternative Analysis on the Proposed Recommendation
EXISTING CONDITIONS
Existing Conditions........................................................
Existing Utilities.............................................................
Existing Right-of-Way and Alignment ..........................
Existing Street Section and Pavement............................
Geotechnical Investigation......................... ....................
Existing Soils and Pavement ..........................................
Groundwater............................................. ......................
Geologic Hazards....................................... ....................
Inter-Agency Coordination.............................................
DRAINAGE AND IMP ACT ANALYSIS
General............................................... ..... .......................
Hydraulic Modeling ofthe Existing Conditions ............
Hydraulic Modeling of Proposed Conditions.................
Impact Analysis.................................... ..........................
PRELIMINARY DESIGN
General.......................................................................... .
Criteria........................................................................... .
Pavement Structure.................... .....................................
Geometric Design Standards ..........................................
Drainage Improvements.................................................
Utilities and Other Surface Facilities .............................
Traffic Control................... .............................................
SWPPP and SWQMP .. ...................................................
Inter-Agency Coordination.............................................
Permits and Approvals...................................................
1-1
1-1
1-2
1-3
1-4
2-1
2-1
2-3
2-4
2-4
2-4
2-5
2-5
2-5
3-1
3-2
3-3
3-5
4-1
4-4
4-5
4-6
4-9
4-10
4-12
4-12
4-13
4-13
TOC - 1
Klotz Associates Project No. 0127.012.000
February 2010
City of La Porte
Fairmont Park East PER
k lot z 4~. ass 0 cia t e s
TABLES
Table 1
Table 2
Table 3
Table 4
Preliminary Costs and Quantities
Applicable La Porte Technical Specifications
Preliminary Street Cut Data Alternative ?a
Preliminary Street Cut Data Alternative 5b
TOC-3
Klotz Associates Project No. 0127.012.000
February 2010
City of La Porte
Fairmont Park East PER