Loading...
HomeMy WebLinkAbout07-11-11 Drainage and Flooding Committee Meeting MIKE MOSTEIT, CHAIRMAN O F ,p JOHN ZEMANEK, MEMBER Councilmember District 1 , 0 Councilmember At -Large A MIKE CLAUSEN, VICE CHAIRMAN 5 / '\ CHUCK ENGELKEN, MEMBER Councilmember District 6 �J Councilmember District 2 "4 •r DARYL LEONARD, ALT. MEMBER Councilmember District 3 AMENDED MINUTES OF DRAINAGE AND FLOODING COMMITTEE MEETING ON JULY 11, 2011 The Drainage and Flooding Committee of the City of La Porte met on Monday, July 11, 2011, at the City Hall Council Chambers, 604 West Fairmont Parkway, La Porte, Texas, at 5:00 p.m. to consider the following items of business: 1. Call to Order Chairman Mike Mosteit called the meeting to order at 5:09 p.m. Members of the Drainage and Flooding Committee present: Vice Chairman Mike Clausen and Committee Member Chuck Engelken, John Zemanek, and Alternate Member Daryl Leonard. Absent: None. Members of City Executive Staff and City Employees Present: City Manager's Office: Traci Leach City Secretary's Office: Patrice Fogarty Planning Department: City Engineer Julian Garza 2. Consider approval of Minutes of the Drainage and Flooding Committee Meeting held on May 2, 2011 — P. Fogarty Committee member Engelken moved to approve the minutes as presented. Vice Chairman Clausen seconded. MOTION PASSED. Ayes: Chairman Mosteit, Vice Chairman Clausen, Committee members Engelken and Zemanek, Alternate Member Leonard Nays: None Absent: None 3. Receive and discuss Proposals for Engineering Services for future Drainage Projects authorizing staff to present proposals for Engineering Services for Preliminary Engineering Design to City Council — J. Garza o Battleground Estates o Northwest Park Diversion Basin (Redirection of F101 -06) o Channel Improvements to B112 o Shady River City Engineer Julian Garza provided proposals for Engineering Services for future Drainage Projects in regards to Battleground Estates, Northwest Park Diversion Basin (Redirection of F101- 06) Channel Improvements to B112 and Shady River in addition to requesting authorization of staff to present the proposals for Engineering Services for Preliminary Engineering Design to City Council. Page 1 of 3 July 11, 2011, Amended Drainage and Flooding Committee Minutes Committee member Zemanek asked questions as to cost, and the restriction is at the Battleground Estates project at "P" Street and asked whether the 48 inch pipe would alleviate the current problems. He also inquired as to the cost to move water in the direction it is currently moving in reference to the redirection of F101 -06. City Engineer Garza commented gravity is the best direction rather than redirecting the flow. He asked whether the problem was getting water out of the Shady River sub - division or if it was "tidal" influenced. Alternate Member Leonard voiced his concerns with the redirection of water flow from F101 -06. He said that this may create additional problems to those that currently exist in this area and could reverse some of the improvements that have already been made. He is also concerned with a possible detention pond placed in the area that is currently used for parking area during events at the Lomax Rodeo Arena, which would adversely affect the entire city. Danny Earp, 1827 Lomax School Rd., addressed the Drainage and Flooding Committee suggesting it would be best to use money to resolve the issue rather than for an Engineering Survey. Mike Cobb, 109 Summer Winds Dr., addressed the Drainage and Flooding Committee with concerns of the proposal and the effects on the parking space at Lomax Arena during events. Joe Smith, 10802 North H Street, addressed the Drainage and Flooding Committee with concerns of pipelines and requested water not be redirected the opposite direction, but to use gravity to send it to the Bay. The Drainage and Flooding Committee directed staff to exclude the proposal and to work on other alternatives and come back with another plan regarding Northwest Park Diversion Basin (Redirection of F101 -06). Committee member Engelken commented there have been too many studies, and it is now time to resolve the issues. City Engineer Julian Garza responded he is not proposing to do work that has already be done and informed drainage studies have to be performed before Harris County Flood Control District will provide assistance. Committee member Engelken responded he had heard the word "study" enough. The Drainage and Flooding Committee directed staff to not have any more studies done other than the minimum standards to meet with the standards of Harris County Flood Control. City Engineer Garza was directed to postpone the Channel Improvements to B112 project until the next meeting. 4. Set date for next Drainage and Flooding Committee Meeting Chairman Mosteit set the next Drainage and Flooding Committee Meeting on a date prior to the August 8 City Council Meeting. 5. Committee Comments — The Committee did not have additional comments. 6. Executive Session — There was no executive session. Page 2 of 3 July 11, 2011, Amended Drainage and Flooding Committee Minutes 7. Adjourn There being no further business, Committee member Engelken moved to adjourn the meeting. Alternate member Leonard seconded. Motion Passed. Meeting was adjourned at 6:05 p.m. Respectfully submitted, atrice Fogarty, City Secretary 9 Passed and approved on this 5 day of December 2011. y., / C airman Mike Mosteit Page 3 of 3 July 11, 2011, Amended Drainage and Flooding Committee Minutes