HomeMy WebLinkAbout03-30-15 Drainage and Flooding Committee Meeting minutes MIKE CLAUSEN OF, L A
Chairman O DARYL LEONARD
JAY MARTIN 169� Member
Vice-Chairman v m
DANNY EARP
i
CHUCK ENGELKEN Alternate Member
Member ram®
MINUTES OF DRAINAGE AND FLOODING COMMITTEE
March 30, 2015
The Drainage and Flooding Committee of the City of La Porte met on Monday, March 30, 2015, at
the City Hall Council Chambers, 604 West Fairmont Parkway, La Porte, Texas, at 5:00 p.m. to
consider the following items of business:
1. Call to Order
Vice-Chairman Mike Clausen called the meeting to order at 5:04 p.m. The following members of the
Drainage and Flooding Committee were present: Councilmembers Chuck Engelken, Daryl Leonard,
Jay Martin and Danny Earp. Staff Present: Traci Leach, Tim Tietjens, Sharon Harris and Bob Eng.
2. Authorizations
(a) Consider approval or other action regarding minutes of the Drainage and Flooding Committee
Meeting held on January 16, 2012—S. Harris
Committee Member Engelken moved to approve the minutes as presented. Committee Member
Leonard seconded. MOTION PASSED.
Ayes: Vice Chairman Clausen and Committee members Engelken,
Martin, Leonard and Alternate Member Earp
Nays: None
Absent: None
(b) Consider appointing a Chairman of the City of La Porte Drainage and Flooding Committee — S.
Harris
Assistant City Secretary Sharon Harris presented a summary.
Committee Member Engelken moved to appoint Vice-Chairman Clausen to Chairman and Member
Martin as Vice-Chairman of the Drainage and Flooding Committee. Committee Member Leonard
seconded. MOTION PASSED.
Ayes: Vice-Chairman Clausen and Committee members Engelken,
Martin, Leonard and Alternate Member Earp
Nays: None
Absent: None
3. Staff Reports
(a) Discussion of Drainage Projects in the City of La Porte—B. Eng
City Engineer/ Inspection Service Manager Bob Eng provided a summary for discussion of
Drainage Projects and Administrative Drainage Projects in the City of La Porte.
Page 1 of 4
March 30,2015
Drainage and Flooding Committee Minutes
i
F216 Phase II —Watershed Improvements (W. Madison St. to 450' South of W. Main St.)
City Engineer/Inspection Services Manager Bob Eng provided an update on the F216 Phase II —
Watershed Improvements (W. Madison St. to 450' South of W. Main St.).
Vice-Chairman Martin asked the timeline for completion of the project. Mr. Eng responded he does
not have a completion date and will have to advise the Committee at a later date.
N. P Street Culvert Replacement Project
City Engineer/Inspection Service Manager Bob Eng provided an update on the N. P Street Culvert
Replacement Project. Alternate Member Earp asked how long it will take to provide the 20'
maintenance easement on the east side of the existing ditch as per the request of Harris County
Flood Control District. Mr. Eng responded a purchase order has been received recently and it will
be done within the next two weeks.
N. D Street to Sens Road Ditch De-Silting Project
City Engineer/Inspection Service Manager Bob Eng provided an update on the N. D Street to Sens
Road Ditch De-Silting project. There were no questions from Committee Members.
Browning/Golden Drainage Improvements Project
City Engineer/Inspection Service Manager Bob Eng provided an update on the Browning/Golden
Drainage Improvements Project. Committee Member Leonard asked after re-grading the ditch and
replacing culverts to facilitate drainage to N. P Street are there any foreseeable downstream or
flooding problems with additional water flow in the area. Mr. Eng responded he does not anticipate
any issues.
D Street Ultimate Outfall Project
City Engineer/inspection Service Manager Bob Eng provided an update on the D Street Ultimate
Outfall Project. Committee Member Martin asked if there are any plans for the empty acreage
surrounding the project. Planning and Development Director Tim Tietjens responded the City has
plans to partner with Trees for Houston and plant trees along the D Street ditch.
TX Dot/Broadway Remote Maintenance Contract
City Engineer/Inspection Service Manager Bob Eng provided an update on the TX Dot/Broadway
Remote Maintenance Contract. Committee Member Martin asked if the culverts will be replaced.
Mr. Eng responded yes. Committee Member Martin requested staff to investigate the process of
filling the ditch from Pine Bluff south to Bayside Dr., and report back to the Committee.
CLP Bulkhead
City Engineer/Inspection Service Manager Bob Eng provided an update on the CLP Bulkhead at
Happy Harbor. Committee Member Martin asked the total length of the waterfront property.
Planning and Development Director Tim Tietjens responded roughly 300 or more feet not including
Klein Retreat or any other property south.
Page 2 of 4
March 30, 2015
Drainage and Flooding Committee Minutes
S. 31 Street Project(Fairmont to Main)
City Engineer/Inspection Service Manager Bob Eng provided an update on the S. 3rd Street
(Fairmont to Main) Project. Chairman Clausen asked the expected completed date for the project.
Public Works Director Dave Mick responded the end of summer 2015.
W. D Street Channel Improvements.
City Engineer/Inspection Service Manager Bob Eng provided an update on the W. D Street
Channel Improvements Project. There were no questions from Committee Members.
W. D Street Channel Protection
City Engineer/Inspection Service Manager Bob Eng provided an update on the W. D Street
Channel Protection Project. There were no questions from Committee Members.
F101 Drainage Channel (at Pipeline Corridor)
City Engineer/Inspection Service Manager Bob Eng provided an update on the F101 Drainage
Channel (at Pipeline Corridor) Project. There were no questions from Committee Members.
Brookglen Detention Basins
City Engineer/Inspection Service Manager Bob Eng provided an update on the Brookglen Detention
Basins Project.
Committee member Engelken asked for an update on the Brookglen Buy-Outs. Planning and
Development Director Tim Tietjens responded all of the section in Gladewyne Court has been sold
with the exception of one lot, and roughly thirteen other lots remaining north and south of
Oakhaven; south of Ashwyne and east of Somerton. Committee member Engelken commented the
maintenance issue of lots not being mowed by Harris County Flood Control District still exist and
advised he has heard from several citizens regarding the issue. Committee member Engelken also
commented he has concerns with Harris County Flood Control not complying with the City's local
ordinances or FEMA's rules and. directed staff to send a letter to the Department of Justice. In
addition, Committee member Engelken advised a homeowner at 3315 would like to install a fence
at their expense on Harris County Flood Control property in order to keep their property from being
vandalized. Public Works Director Dave Mick advised he will contact Hams County Precinct 2
regarding the Interlocal Agreement for eight (8) mowing cycles to the Brookglen Subdivision parcels
owned and maintained by Harris County Flood Control District.
Chairman Clausen agreed with Committee member Engelken and directed staff to add an item to a
future City Council meeting to discuss sending a letter to the Justice Department regarding
maintenance concerns of the Brookglen Buy-Out lots.
Sens Road Reconstruction
City Engineer/Inspection Service Manager Bob Eng provided an update on the Sens Road
Reconstruction. Committee member Leonard asked if the relocation of utility lines are near
completion. Mr. Eng responded he will get a projection date for completion and report back.
Pedestrian Bridge at Lakes at Fairmont Greens
Page 3 of 4
March 30,2015
Drainage and Flooding Committee Minutes
City Engineer/Inspection Service Manager Bob Eng provided an update on the Pedestrian Bridge at
Lakes at Fairmont Greens Project. Vice-Chairman Martin asked when the bridge is scheduled to
arrive for construction. Mr. Eng responded he will confirm the arrival date for the bridge.
MS4 Permit
City Engineer/Inspection Service Manager Bob Eng provided an update on the MS4 Permit.
There were no questions from Committee Members.
4. Set date for next Drainage and Flooding Committee Meeting
Chairman Clausen advised the Committee members they need to meet on a regular basis and
asked how often they wished to begin meeting. The Committee members agreed to meet quarterly
and set the next meeting date tentatively for June 29, 2015 at 5:00 p.m.
5. Committee Comments
Chairman Clausen and Committee member Engelken thanked City Engineer/ Inspection Service
Manager Bob Eng for the update on Drainage Projects.
6. Adjourn
There being no further business the meeting was adjourned at 6:22 p.m.
Respectfully submitted, ,
Sharon arris, Assistant City Secretary
Passed and approved o his 29th day of June 2015.
Cha' an, Mike Clausen
Page 4 of 4
March 30,2015
Drainage and Flooding Committee Minutes