Loading...
HomeMy WebLinkAbout11-18-1987 Meeting'~- ~ -,. t ,.. • GOLF COURSE ADVISORY BOARD MINUTES OF MEETING NOVEMBER 18, 1987 THOSE PRESENT Advisorv Board David Brady Dr. Reed Tolles James Longnecker Dennis Dunham Lloyd Roper Dr. Rudee Wheeler Others Rey DeLa Reza, AIA City of La Porte Bob Herrera John Joerns Joel Albrecht Pat O~Mally Meeting was opened by David Brady, Chairman at 12:00 Noon. ITEM 1 Mr. DeLa Reza was introduced to the Board and he went over the changes that had been made to the golf course club house floor plan as requested by the Golf Course Advisory Board. After hearing the changes, the Board approved and it was decided that the plans were ready to be presented to the City Council for their approval. The plans will be presented by David Brady at the next council meeting. MEETING ADJOURNED /nb • GOLF COURSE CONSTRUCTION STATUS CARTER CONSTRUCTION Should be complete this week with all the sprigging (will hold of until Thursday and then work till finish sprigging). Clean-up taking place now. ALLGOOD CONSTRUCTION Effluent System - Complete except for final walk-thru Tunnel - Lacking: 1. Setting of pumps to drain tunnel 2. Lights - (HL & P is setting poles this week) 3. Gates - being made 4. Hydromulching the sides Wharton-Weems opening - Brush road and stripe. CLUB HOUSE Design completed - Construction drawings in process • MAINTENANCE BUILDING Design build contract in draft stage ENTRANCE ROAD AND PARKING Plans complete - 1 week Revision - 1 week Go for bids - January Pre-Bid - After January 1st Award bid - January 25, 1988 PERSONNEL Introduce Alex Osmond - Golf Course Manager • '~ ~ • • • A. NOTES GOLF COURSE ADUISORY BOARD MEETING NOVEMBER 18, 1987 CONSTRUCTION CONTRACT OF LA PORTE'S BAY FOREST GOLF COURSE CARTER CONSTRUCTION COMPANY Construction of an eighteen (18) hole golf course complete with a putting green, a chipping green, and a driving range. The contract also calls for the construction of lakes to hold treated water for the irrigation of the facility PERGENT COMPLETE Greens 100% Include eighteen (18) greens, one putting green and one chipping green Fairways 100% • Driving Range 100% Cart paths - (6 foot wide paths) 98% -_.. Grass 75% Greens ( holes 3-8 left) Fairways (3 - 8 left) Irrigation (replacement of control box lift) 99.5% B. EFFLUENT LINE Allgood Construction Company Construction of a line running from the sewage treatment plant to the holding lakes on the golf course PERCENT COMPLETE Effluent line 100% C. TUNNEL Allgood Construction Company Construction of a tunnel under Wharton-Weems Road to connect the two parts of the golf course PERCENT COMPLETE Tynnel (lacking flexible base and asphalt 94% . ~ .-~ • • D. FENCING • Erection of fences around certain parts. of the golf course to prevent entry by automobiles and other vehicles that could cause vandalism PERCENT COMPLETE Fencing (lacking Wharton-Weems Road frontage 80% E. CLUB HOUSE "" Construct a club house complete with a restaurant and pro shop facility PRECENT TARGET COMPLETE DATE Design Construction Drawings... 100% ~ Dec. 15, 1987 0 May 1, 1987 ~. PARKING LOT AND ENTRANCE ROAD, Construct a boulevard type entrance road and a parking lot for the golf course PERCENT TARGET COMPLETE DATE Design Construction (90 days) 95% Dec. 1, 1987 0 April 1, 1988 G. MAINTENANCE BUILDING AND CART STORAGE FACILITY Design and construct a building that will provide a maintenance area facility for the golf course equipment and a storage facility for the golf carts PERCENT TARGET COMPLETE DATE Design 50% Dec. 14, 1987 Construction (60 days) 0 Mar. 15, 1988