HomeMy WebLinkAbout07-02-1987 Meeting
LA PORTS AREA WATER AUTHORITY
C~IINUTES
JULY 2, 1987
1. The meeting; was called to order at 12:05 P.M.
MEMBERS PRESENT: President Cary Burnley, Secretary Rick
Matthews, Member Jerry Bramlett, t•lember Elect Claude Graves.
OTHERS PRESENT: Frank Frankovich of Dannenbaum Engineering
Company, City 141anager Bob Herrera, Assistant city Manager John
Joerns, Authority Attorney John Armstrong, Director of Public
Works Steve Gillett, Buddy Jacobs TrJater/Wastewater
Superintendent
2. The minutes of the May 12, 1987, meeting were read and approved
with one change.
3. The Oath of Office was administered to Claude Graves,
member-elect by John Armstrong.
4. Bob Herrera updated the Board members on the progress with the
City of Houston.
Bob Herrera discussed a letter sent to Cary Burnley from CWA.
The letter stated Sam Clark will be negotiating the use of the
CWA property for an easement for our supply line, written
application procedures, and approximate cost. (See Attached).
Bob Herrera held discussion on surveying proposals received
from Vii. Carlos Smith and Baseline Corporation for ten (10) foot
waterline easement along the CWA corridor. (See Attached).
City of Houston provided a take-point at the CWA R.O.ti~J.and Red
Bluff Road. Steve Gillett recommended we use $aseline if
take-point at CWA R.O.W.at the east property line of Southeast
tiiater Plant .
Rick Matthews made a motion that Steve Gillett"s recommendation
be accepted. Jerry Bramlett seconded. Passed unanimously.
Rick Matthews made a motion that Bob Herrera be authorized to
enter into a contract not to exceed $10,500. Seconded by Jerry
Bramlett. Passed unanimously.
s
PAGE TWO
MII~?UTES
JULY 2, 1987
5. The report made by the RFP Committee was distributed to the
board and Cary Burnley explained how the RFP Committee worked
on selecting; the four (4) top firms that is recommended to be
interviewed. The firms are Espey/Huston, Turner Collie &
Braden, Dannenbaum Engineering, and CRS Sirrine. After a brief
discussion, Cary Burnley, Claude Graves, Bob Herrera, Steve
Gillett and Pat O~Malley, CIP Manager were appointed to be on
the interviewing panel. Interview meeting times were discussed
with the following times being agreed upon tentatively, until
firms were contacted. The times agreed upon are Thursday, July
g, 1987 at 6:00 and 7:30 P.M. and Friday, July 10, 1987 at 2:00
and 3:30 P.M. Jerry Bramlett made a motion that the RFP
Committees recommendation of the four (4) firms, the panel of
four (4) persons, the tentative interview times, and the
recommendations that the panel will make be accepted. Rick
Matthews seconded. Passed unanimously.
It was recommended a letter be sent to those companies not
included as well as those who were successful and are to be
interviewed.
6. There being no further business, the meeting was adjourned at
1:3o P.M.
Respectfully Submitted,
Rick Matthews, Secretary/Treasurer
PASSED AA?D APPROVVED
ON THIS THE 1 ~ DAY OF , .19~
JER TT, AC ING PRES DENT
N
OATH OF OFFIr,F
M
I, CLAUDE GRAVES do solemnly swear (or
aff9.rml, that I wi].1 faithfully and impartially execute the duties
imposed upon me by law as a member of the La Porte Area taater
Authorif.y, and _T furthermore solemnly swear (or affirm), that I
have not directly or indirectly paid, offered, or promised to
contribute any money or va]_uab_le thing, or promised any public
off~.ce or employment, as a reward to secure my appointment. So
help me God.
Subscr be and sworn to.b`efore me, by the said CJ_aude Graves.
this the ~ day of ~ ~ , 1987, to certify which
witness my hand and Seal of Office.
rotary ub,Yi~ in and 'for Ha i County, Texas
a~'°p~ ~~~~~ ..,~ JOHF,d !J. ARMSTRO
-'c:•' ~~ ~~ `a~- Notary Public ~:~ ar9~ far a
Y ~°' ~',; Sfafa of Texas
'~'+Tf ~. ..~-* ••' My Cortur~i~.sion .fix-ltf~;3 06-09-90
''..o QF p,..`
"•swaw~'
• •
CWA COASTAL WATER AUTHORITY
CITICORP CENTER, SUITE 2260 HOUSTON. TX. 77002-4482
1 200 SMITH STREET 71 3 658-9020
June 29, 1987
LaPorte Area Water Authority
P. 0. Box 1115
LaPorte, Texas 77571
Attn: Mr. Cary L. Burnley, President
Re: Request for Easement in CWA R.O.W.
Gentlemen:
As I indicated to you in our various meetings, the
Board of Directors of CWA has authorized me to negotiate
the use of our property for an easement for your supply
line from Houston's South East Water Purification Plant.
You need to apply for the easement accompanied by metes
and bounds descriptions and plats by a licensed land surveyor.
After we receive these documents,and after Board approval,
the Real Estate and Legal Departments will prepare the
necessary documents so that the easement can be filed.
The approximate cost of the easement will be on the order
of $40,000 according to the appraised value. If there are
any further questions, please contact me.
Very truly yours,
Sam B. Dixon, P.E.
Executive Director
SBD/ rs
H. CARLOS SMITH
ENGINEERS AND SURVEYORS, INC. PHONE A/C 71 3 471-4226
718 SOUTH BROADWAY
P. O. BOX M
LAPORTE,TEXAS 77571
~7une 8, 198?
Mr. Steve Gillett.
Director of Public Works
City of La Porte
La Porte,-•~ Texas 77571
Re: Surveying Proposal .fo.r LPAWA 10.00 feet wide Easement
in CIWA right-of.-way
Dear Mr. Gillett:
We have reviewed the instructions and project information
furnished to us on June 4, 1987, concerning the proposed 10.00
feet wide LPAWA easement. It is our understanding that this
easement is to be located inside the existing CIWA right-of-way
and along the Westerly and Northern boundary line. The easement
will begin at tree SEWPP site and will terminate at Spencer
Highway as follows:
A. From SEWPP to the South R.O.W. line of Genoa Red Bluff.
B. From North R.O.W. line of Genoa Red Bluff to the
Southwest R.O.W. line of Red Bluff Road.
C. From the Northeast R.O.W. line of Red Bluff Road
to the South R.O.W. line of Fairmont Parkway.
D. From the North R.O.W. line of Fairmont Parkway to
the South R.O.W. line of Spencer Highway.
The survey will be a retracement of the CIWA right-of-way
indicating existing monumentation with no new monumentation
requfred. The survey is to be tied into the City of La Porte
Horizontal Control Network at Underwood Road.
Upon completion of the field survey; maps are to be prepared on
17" x 28" sheet at a scale of 1" = 200 feet indicating the 10.00
feet easement inside the CIWA easement. These maps are to be
reduced to 8 1/2" x 14" size for inclusion with the metes and
bounds descriptions we are to prepare.
Page 1 of 2
•
Ac, per your i.natructi.ons we i--ave quoted this professional Ce.rvicF
in two parts. Part onr is for tl-~f. total project .Length.;
beginning at. the SEWPP and t.erminat,ing at the South right-of-way
ling: of Spencer Highway. Part two will commence at the Northeast
right--of-way line of Red E3l.uff Road ar~d would terminate at, the
Soutl-, right-~of.-way line of Spencer Eiighway.
The fee .for this p.rojec:t is to be based ors an hourly charge
according to the attached rate scl-~edule. The total fee, based on
these rates, shall not. exceed $10,500.00 for part one as
described in this letter and shall not exceed $5,500.00 for part
t.wo as described in this .letter. Terms of payment will be net 10
days from date of ir,voi.ce.
We would he able to proceed immediately; allowing a one week
period for sched+.iling planning and mobilization; upon receiving a
signed copy of this letter of agreement and a notice to proceed.
If the entire project (Part One) is selected; it will req+aire 42
caler~da.r days from the date we receive the notice to proceed. We
estimate 2.3 to `L5 working days. The 42 calendar days represents
week-ends, holiday's and tr,e one week for planning, scheduling
and mobilization.
If Part. Two is selected; i.t will require 28 calendar days from
the date we receive tree notice to proceed. We estimate 15
working days. The 28 calendar days represent week-ends, holidays
ar~d the one week for planning, scheduling and mobilization.
We wish to thank you for allowing us the opportunity to provide
you with a quotation for this professional service. If the
terms, conditions and scope of work in this letter meet with your
approval and you select our firm for the project, please sign and
return to our firm. It shall be the basis for our understanding
and contract with you far this project.
Sincerely,
1~ ~
C ~ ~ .v
,'James F.~~-JJBeck
,. Vice-President
Mr. Bob Herrera
City Manager
All complaints regarding surveying services should be forwarded
to the Texas Baard of Land Surveying, 7703 North Lamar, Suite
304, Austin, Texas 78752.
Page 2 of 2
., - •
BASELINE
CORPORATION
Mr. Robert Herrera
City Manager
City of La Porte
P. 0. Box 1115
La Porte, Texas 77511
•
~,,
,~~~,~ 3 1987
~~~~
JUN 2 517 D
w-~
June 3, 1987
RE: PROPOSED 10 FOOT WATERLINE EASEMENT ALONG C.W.A. CORRIDOR
~' ~~~
Dear ~Mr. Herrera:
It is with pleasure for Baseline Corporation to submit this proposal to you
on the above mentioned project. Referring to our conversation in your
-;i.;`,~ office last week and after talking with Mr. Sam Dixon, with C.W.A., I would
;~',.,;,. like to outline the scope of work as we understand it to be, as follows:
rw ~
'~If; We will prepare easement maps along with metes and bounds descriptions
r ;.:;~ within the existing c.w.N. rignt-or-way as rollows:
°h~ r
'~ A). From the Southeast Water Purification Plant to the south
~~f, ~, .i~'"' ' ri ht-of-wa line of Genoa-Red Bluff Road.
~~ -~ 9 Y
`~~ ~ B). From the north right-of-way line of Genoa-Red Bluff Road to
r ~
'i ~, , ~ {, , the southwest right-of-way of Red Bluff Road.
~, ~~~
.,~~~~' C). From the northeast right-of-way line of Red Bluff Road to the
~~~ ~~,
" ' .'~~'~~:~ south right-of-way line of Fairmont Parkway.
,r~a~-;-
;; ti I~~~a~ ,,, D). From the north right-of-way of Fairmont Parkway to the south
r 1 right-of-way of Spencer Highway.
i I ':i~ l
~F Our fee for this service will be invoiced on an hourly basis in accordance
`~"~", 'with the attached "1986-1987 RATE SCHEDULE", with anot-to-exceed amount of
f ~`~;~~~8,900 (Eight Thousand, Nine Hundred Dollars).
'~' _ ~~:
d.ri~We can begin work within two (2) working days after our receipt of notice to
.'±, 1'u+~~ `proceed, and will have the survey completed within 30 calendar days.
}; ;.
-~ ~ry`~'` `~' In case the City of Houston constructs the proposed waterline to Red Bluff
~~,~~.,~ ~ Road,. we will prepare easement maps along with metes and bounds descriptions
on items "C" and "D", as described above. This not-to-exceed amount will be
$5,900 (.Five Thousand, Nine Hundred Dollars).
;.:.;.
We can also begin work within two (2) working days and complete the survey
in 21 calendar days.
PROFESSIONAL SURVEYORS
1706 SEAMIST DRIVE ^ HOUSTON, TEXAS 77008 ^ 713/869-0155
Mr. Robert Herrera
City of La Porte
June 2, 1981
Page 2 of 2
Regardless which scope of work is decided on, the price will include, tieing
the horizontal control into the City of La Porte's control system at
Underwood Street.
The maps will be drawn to a scale of 1"=200' on a sheet size of 17"X28".
These will be reduced in half for convenience, on 8~"X14" maps.
~~~~,, All existing monumentation will be shown, although no new monumentation will
'~ ~ `'' ~!be set defining the new 10 foot easement.
~~ } ~ ~,
- ~, ~,,
We thank you for this opportunity to be of service, and look forward to
working with you on this and future projects.
Sincerely,
;;,,:
BASELINE CORPORATION
Professional Surveyors
.. 1 ~ ~r
Hu W. Clarkson, R.P.S.
,,,
'''+'"' ~ Executive Vice President
encl: rate schedule
~.w' ~~~~ ~ cc: Mr. Sam Dixon
~f , ~~r :` `_ HWC:bgb
~,,
'~~ ~ ~ ~" 87 . pro16
r x ~~
,, ~ ~.,
a` 41~ ~ .~
.~r ~ ~ '
~I~
~;
T~ ~ to
~;~
'f V `I {
SS9 .~i~y{F: J1'
~.
F .'.
• •
e.
BASELl~1E
CORPORATION
RATE SCHEDULE
CITY OF LA PORTE
Surveying & Drafting
A. 2-Man Field Party $ 55.00 per hour
;, 3-Man Field Party $ 68.00 per hour
~~,~r~.~~' 4-Man Field Party $ 78.00 per hour
oM11~
1
Registered Public Surveyor $ 55.00 per hour
Survey Technician $ 38.00 per hour
Draftsperson $ 32.00 per hour
Clerical $ 24.00 per hour
The above rates forfield parties include vehicle and usual surveying
equipment and are charged portal-to-portal from our office.
B. All time over eight hours per day, and Saturdays, Sundays. and Holidays
shall be billed at 1.30 time the above rates.
C. All direct non-labor expenses, including, but not limited to, iron rods,
stakes, laths, flagging, telephone calls, reproduction,. out-of-town tra-
vel and subsistence as may be required for the proper execution of the
work shall be billed at cost plus ten percent (10~).
D. Computers shall be charged for as follows: Wang 2200 MVP with
:,,,~"~
~ plotter--Twenty-Four Dollars ($24.00) per hour.
,
E. Total Station, with Data Collector shall be charged for at the rate of
"~' ~ ~ ~- Ten Dollars ($10.00) per hour (4 hour minimun).
_,, ~f~~
+°
~~,.
?
:
F.
Word Processing Equipment with operator shall be charged for at the rate
,
,
:
I'I`I ~~1`, ;~ .
~„ x_
~
~ of Thirty Dollars ($30.00) per hour.
~
'x
~~'~~`
G.
Mileage shall be charged for at the rate of Thirty Cents ($0.30) per
,.n, { .
„~n;,~},~„~,;
mile, portal-to-portal from our office. .
The above rates will be in effect from July 1, 1986 through June 30,
1987.
PROFESSIONAL SURVEYORS
' 1706 SEAMIST DRIVE ^ HOUSTON, TEXAS 77008 ^ 713/869-0155
j OWNER ~~ ~SWOOD DEVELOPMENT COMPANY
'I~ COUNTY Hill~15
SURVEY WM. JONES, A-482;GEO. 6. McK INSTRY A-4T;
JAMES LINDSEY,A-43
ACREAGE 22.763 AC. IN 2 PARCELS
CURVE DATA
CURVE D RAD. ARC
C-1 54' 27'7 I' 450.00' 421.12'
C•2 26.57']4' 371.41' 174.16'
C•3 21•]9'34' 200.00' 96.55'
C-4 36.19'31' 400.00' 257.61'
C-5 41.29'01 100.00' 144.81'
C•6 46'11']9' ST0.00' 459.56'
^•T 14•]9'08' 450.00' 115.08'
ryh
• 4
ti
HI.AP.
FAIRMONT PARKWAY (250' WIDE)
VOL. 3942, PG. 4 F
fH.C.D.R.}
ca s]4e
CJ., FENCE-
1.0861 AC.-
-- H.L.dP. CO.
SOS•OT'00'E FILE N0. F6]T2BT
N,41' 1LM COOS N0. 191-14•
yl 7s 3749 IH.C.O.PA.R,P.1
400 0 400 800
N•
~` 711'7!'11.1
SCALE IN FEET ,ti ITaa
y
WM. JONES SURVEY
A-482
1,740.521 AC.
RED BLUFF DEVELOPEMENT COMPANY pARCEL A
TD 191,069
FRIENDSWODD DEVELOPMENT COMPANY
FABR ICUS REYNOLDS SURVEY ~ voL. 7946, PG, 364 4' B/W FENCE
A-64 3 ~ fH.c,o.R.)
~B AC.
F T.
STEEL H.L.P.
FND. N. 10N. 777 ~ C'
NOTE: ALL BEARINGS REFERENCED •204 sermn'1 nlT.1r _
TO THE TEXAS CDODINATE SYSTEM 11,196 AC. HAHR1c f nurv - - 77si
I SUUTN CENTRAL LONE -PL~OD'•CDNTROC DISTRICT S]SS
6 FILE N0. EIB9514 - 773 S7e~
O N11.21'SI'[ I2q.71' !~
SET COPPERwELD ROD \FIIM CODE N0. 860-12.0813 yoh s71T /y /.
UNLESS DTNERwISE NOTED FNO. to + IH.C.O.P.RJT.P.1 '~ „1 //$ •"/oe
•211 \rsc7rr M'-'+ E---20' WIDE /P~°o~~~
! _ + 42 ~ to ~~~ ~ 1 TEXAS EASTERN TRANS. 00.4'~`~
t 1111 yo / T CORP. EASELENi ~' ? .
-----~--""-'-- SS OT'21'1 SSS }
a JAMES L INDSEY SURVEY t2F 't/. ~~ », +,`' H~CD,R.96, PG. 292 W} 4Y?°
' 71:! ~
SSI
A-q 3 ~ s7ru' •E +
111.00' FND t/1
,121 1740.521 AC.
230' WIDE FNa%•/ a71 ~•a•orE RED BLUFF DEVELOPMENT CO.
HARRIS CDUNIY FLOOD CONTROL IA SSS 417.41'
DISTRICT EASEMENT ~ P,OJS. ~ N!!•14'I2.1 TD
1 voL. 1416, Pc. 316 ~ 'S17 `~ 1eS'~' FR IENDSWOOD DEVELOPMENT CO.
i 720.172 AC cH.c.D.RJ / d 6~ +~
FRANK 0. BARNES / ~~,> ( ~~ VDL. 7946, PC.364
FRIENDSWOOD DEVELOPMENT CU. / ,; .S~ ~~~ ~~4'InrENCE
F(LE E74(3222 FILM CURE N0. 140-01-2480 " ~ ~
A
(H.C.O.P.R.R.P.) t•T ``I V` ~y" ~ C \ 5U' WIDE PIPELINE EASEMENT
4' 1/1 FENCE
sso•a•Ir1 71 ,) `~ S ~'~ RESCRVED BY HUNBLE OIL
100' WIDE u1./r ~ PARCEL B 4.164 AC S/~ ~ AND REFINING CO.
HARRIS COUNTY FLOOD CL'NiRUL 1194,168 SOFT.1 ~ FILE N0, D758169
DISTRICT EASEAENT 731 77e SSi + FILM CODE N0. 154-29-2085
vOL. ITSU, PC. TO] INr1T2!•E Nsau'IT, ~j IH.C.O.P.R.R.Pd
IH.C.D.Rd O
132.11' SS,!/' (nj
) 11,434.66 AC. HARRIS COUNTY FL000
CONTROL UISTAICT EASEMENT
RED BLUFF DEVELOPMENT CO. FILE N0. J0946D8 IH.C.D.P.R,A.P.1
VOL. 5860, PC. 226 IH.C.D.R.)
x
FND.
C/1 S
~_I S 0]•OT'DO'E STOAO'
~a~~
Sao A; SS/ , 2T•11'2S't fli22'
D
•
WP
p,
~_ /
'
/
~ ~ N 07.01'00'1 !!T.l1
x ~-
X V, / /
!!~~
N 72.0!'00'[ 231.17
wER I I .. .. PULER TOLE
I I /
EASE
'~
~ ~ ~ .
N. EUTSTi
i
'
~ /
4
~ ,~~~ ~ I lulu ~ .
60' Nd.IP.
~
` / I (~ ~ I III
F.N.IJI)IIQS I
II I
/ 1 N,
ti
z a W
$ I I I 1 1
I H I I II I
~ ' I II II III
i
/ I loo ~
u I
I II I I III
II I
/ I I~ n
/ I I .
-
~ I 11 I I
I II I I
•
-
I I->
~-
/ 1 I
I I 1 a
s° •t
W N1,IP. 1 II I I II I
II I
5' ACRIAt I II ~ ~ II I
~
I I
I I m
~
R i a EASE~
II I
F.N. EITIIOJ ~ II I I II I
o
W II I I
III
11 U
e 1 II II
I I - 3 ISU' H.L.AP.
1 I
II VDL. 240], PG. IBB
GEO. B. McK INST RY SURVEY
A-47
lo• wnArea
EASC.
FJI. Ell~SI75
lo' DoTCNEu
EASC.
fA. i1TUi2
r
1 HEREBY CERTIFY THAT THIS PLAT CORRECTLY
REPRESENTS THE RESULTS OF A SURVEY MAOE ON
THE GROUND UNDER MY SUPERVISION IN JULY OF 1966
,. ~ '••,. NE~SDN L. SMITH 111
"iriiasi~'aimlp~ REGISTERED PUBLIC SURVEYOR •3961
°<;~ su;~;4''~ COASTAL WATER AUTHORITY
OF TEXAS
LAND ACDUIBITION FOR
TRINITY WATER CONVEYANCE SYSTEM
HARR19- CNAMBERS-LIBERTY-CDUNTIEB,TE1fA1
Brownf9'Root, Inc. ~
MOUITON , TIlIA1
••••••* cAO • Rw-2vo
"~"~"1°•~ C.E. NEARNET M.w•
°"~~ 09.08-/1 •""0'"• N, L. SNITN
TRACT NQ, pS ..91. I_'. PAItCCI"51
OWNER RED E3LUFF DEVELOPM1:Ni Ci),
COUNTY HARk1S __
,SURVEY JAMES t.lNDSEY.R-~137WM. OUBIE,A-16;
SYLUF.STER MURPHY R-53,-__
ACREAGE X9.395 AC. 1N Ak ~_._
CURVE DATA
CURVE p AAD. ARC
C I 36'25'01 450.00' 286.02'
C-2 9'0 ' ' 450 00' 38 '
C-3 0'35'48 ISO.DO' 318.85'
1
JAMES
20' NIOE
UNITED CAS
PIPE ,.~. ~........,.
VOL.
IN.C
NOTE: All BEARINGS REF F.NENCED TO
THE lExAS r.DOR0INAIF. SYS'EM.
SOUTn CEH1RRl IONF.
O =SEf CL'PPERtELO RDD
UNLESS NOTED OINERRISE
a
m
Q
..
zoDD-'
omma
Hln l ~
ii°~
.a
OOZ~
Z
} wu
FWO
JOI
u-»u-
LL
I
J
W
707• IISI' E
I
.I
!I
.I
'-1
.'
N I
-I
~i
RED BLUFF DEVELOPMENT'C0.
VOL. 5860.PG•226
1H.C.O.R.1
FRANK 0. BARNES
TO
Fk1ENDSw000 DEVELOPMENT CO.
FILE N0. E748222
FILM COOS N0. 140-01-2480
(H .C .O .P,R.R•P.1
FND. 1h • IA.
tA1.
iND. C/t
Roo :a7
r~
771 ti~y~
NIT•01'11•E i2~1~.17~ ~~
SIT'07'll't 20131' J
HARNI = SE[ INS[TJ
FLOOD
D~Ti s RIENDSW00D DEVELOPMENT
IH.c.i ~ TO
IS' MI DE
COASIRL STR1E5 CRUOE CA1nERINO COMPANY
FILE N0. H481931
FILM CODE N0. 016-94-1622
IH.C.O.P.R.R.P.1
4U0 0 ,400 800
E~Ei:
SCALE IN fEEi
80' N1DE
HARRIS COUNTY FLOOD CONTROL
DISTRICT EASEMENT
VOL. 6124.PC. S
IH.C.D.R,I
CO.
;~ `.\ x REDBIUFF DEVELOPMENT CO.
•~` ~ VqL . 5860. PG .226 . ~
fH•C.D.R.I
/
i TRACi 8-201E-2 X ~\
// 334.31 CLEARANCE
/ EASEMENT. U.S.R. ~ ~~`
/ 10 CITY DF HOUSTON
/ fILE N0. X167531 ~~
~ FILM CODE 098-92-199 `
/ IH.C,O.P.R.R.P.1 ~~
/ ~.
/
/
/ \~
/
/ X ~•~~
S/1'71'41•t 71tIJ1'
/
/ NII.71'41'E 147o3a
x
FRIENDSWOOD DEVELOPh~NT CO.
I TO NI
REDBLUFF DEVELOPME T CO.
/
/
PARCEL B 21.2!! AC. /
1,229,111 S0. FT. /'
/
SYLVESTER MURPHY SURVEY
R-53 /
~I I
1
( SO' WIDE -~ 74
011tH ~ ~~ II
1 d~ II
~ ~ / II
~~ ~~ I1
~ ~~ 11
~~ ~ 4,-~/ [ 40' t 144
s7u ,DITCH II
,~
_ -----1f
11
11
7711 \\` I!
VOL. 5860.PG.226
IH.c.D.R.I
WM. DUBIE SURVEY
A-15
L(N~SEY SURVEY
R-43
sIr u'»•t
:u~1' 1
g'~ pC
`,~~~ Q'y~4rG
•~ `~~~~ ~~~~~~~Z
~~
-~~~{ p~ P~~1Q~~
~,' `~Q pti a9G ~
~.~g~~Ov • ~~
~J
`:J ,..... TNU.
7~ .
-MIT•10'41'E T 41' --.. - --~ IJI.
_:,___
•x -- ~ EzxON PIPELINE CO-PAHT
CORRIDOR 500 1!S' ti0E1
Nlrar4r
Ii0.T7'
I HEREBY CERTIFY THAT THIS PLAT CORRECTLY
REPRESENis THE RESULTS OF A SURVEY 11ADE ON
THE GROUND UNDER DIY SUPERY1510N IN JULY DF
a
y' ~~~~-
"iiiioi - rig ~~ _
si~~.:~,
~~~'''~'~~~~ NELSON L.~~1If
REGISTERED PuBLlC SURVEYOR •3981
I COASTAL WATER AUTHORITY
OF TEXAS
LAND ACOUIOITION fOR
TRINITY WATER CONVEYANCE tY~TEM
MARR11- CHAYBERB-lllERTY-COUNTIEI,TExAI
L' _ &own~od~ k,c. ~
NOY110M , 11xA1
'°•' CAO _
uuir C E-Mf ANN
R M 111
t lY • •
T0: Board of Directors
La Porte Area Water Authority
FROM: Initial Evaluation Committee
•
July 1, 1987
SUBJECT: REVIEW AND INITIAL EVALUATION OF PROPOSALS
FOR CIVIL ENGINEERING PROPOSALS
(DESIGN OF POTABLE WATER TRANSMISSION AND DISTRIBUTION
SYSTEM)
Gentlemen:
An Initial Evaluation Committee composed of Cary Burnley (LPAWA
Board), Steve Gillett (City of La Porte, Director of Public Works),
and Bob Speake (City of La Porte, City Engineer) was appointed to
make the Initial Review and Evaluation of the thirteen (13)
proposals received for the subject task.
This committee met on June 22, 1987 to agree on the procedure for
evaluating the proposals and adopted one prepared for Mr. Robert T.
Herrera (LPAWA General Manager) in May, 1987, (copy attached).
During the ensuing week each of the committee members independently
reviewed and evaluated the thirteen (13) proposals ( a total of 51
hours were spent during this period). The committee then met on
June 29, 1987 to compile and review the results of the individual
evaluations and to establish weighting factors for the three (3)
principal categories used in the evaluation (2 1/2 hours in this
meeting).
The results of the combined evaluations are shown on Exhibits A, B,
C and D, copies of which are attached.
Exhibit A shows ratings by individual committee members, the
average rating, the agreed weighting factor and the "Final Rating"
for the category "Personnel Qualifications."
r ,, .
Page Two
•
Exhibit B shows the same items as Exhibit A for the category
"Experience of Firm."
Exhibit C shows the same items as Exhibit A for the category
"Methodology."
Exhibit D summarizes the "Final Ratings" from the other exhibits,
totals them and ranks the thirteen (13) firms based on the total of
the "Final Ratings."
The ratings by the individuals which result in the ultimate "Total
Ratings" are based on guidelines on pages A-6, A-7 and A-8 of the
procedure previously adopted.
The committee has not interviewed any of the firms who submitted
proposals nor have they contacted any references. It is the
feeling of the committee that it would be a waste of time to
interview more than the top ranked (3 - 5) firms. Due to the
caliber of these firms the committee feels no need to check
references.
Based on these evaluations, the committee submits the following
summary and recommendations:
A. The five (5) highest ranked firms (in order of ranking)
are as follows:
1. Dannenbaum Engineering Corporation
2. Espey, Huston & Associates, Inc.
3. CRSS Sirrine
~. Turner, Collie & Braden
5. Black & Veatch
B. That Black & Veatch not be considered further because they
propose to provide these services from their Austin, Texas
office.
C. That the other four (4) top ranked firms be interviewed by
the LPAWA Board or a committee appointed by that Board.
D. That a committee of not more than three (3) members of the
La Porte City Council be invited as observers at these
interviews.
E. That a final report from the committee (or the Board),
with a final preference ranking, be the basis for
initialing a firm contract proposal from the highest
ranked firm.
` - • •
Page Three
The committee feels that the evaluations submitted are fair and
impartial and certainly reflect the members combined and unanimous
judgement. We will be happy to respond to questions from the Board
regarding details of the proposals.
Respectfully Submitted,
Car Burnley ~ Stev Gillett
Chairman Dire for of Public Works
Bob Speake
City Engineer
CB/lw
xc: Bob Herrera, City Manager
John Joerns, Assistant City Manager
• Steve Gillett, Public Works Director
Bob Speake, City Engineer
•
WORKSHEET 1
DETERMINATION OF WEIGHTING FACTORS
IN SELECTION OF CONSULTING FIRM
PERSONNEL EXPERIENCE
QUALIFICATIONS OF FIRM METHODOLOGY
RATER 1 35 25 40
2 30 40 30
3 35 45 20
TOTALS 100 92 90
CONSENSUS 33.33 36.67 30
~ All 3 factors based on total scoring of 100 points.
•
EXHIBIT A
PERSONNEL QUALIFICATIONS
FIRM RATER 1 RATER 2 RATER 3
Brown & Root 84 88 90
Lichliter/Jameson 83 87.5 69
Binkley/Holmes 79 80 80
Walsh/Bovay 80 82.5 85
TC&B 85 87.5 95
H. Carlos Smith 80 85 65
CRSS 85 87.5 93
Pate 79 92.5 85
PRC 81 87.5 60
Blaek/Veatch 85 90.5 90
Espey/Austin 86 92.5 90
Dannenbaum 84 92.5 98
Bayshore 77 60 60
WEIGHTING FINAL
AVERAGE FACTOR RATING
87.33 33.33 29.11
79.83 26.61
79.66 26.55
82.50 27.50
89.16 29.72
76.60 25.53
88.50 29.49
85.50 28.50
76.16 25.38
88.50 29.50
89.50 29.83
91.50. 30.50
65.66 21.88
'~ ~ ~ . i
FIRM RATER 1
Brown & Root 75
Lichliter/Jameson 80
Binkley/Holmes 80
Walsh/Bovay $0
TC&B 90
H. Carlos Smith 80
CRSS 90
Pate 75
PRC 80
BYack/Veatch 85
Espey/Austin 90
Dannenbaum 90
Bayshore $0
•
EXHIBIT B
EXPERIENCE OF FIRM
WEIGHTING FINAL
RATER 2 RATER 3 AVERAGE FACTOR RATING
85.2 85 81.73 36.67 29.97
80.4 65 75.13 27.55
85.2 82 82.40 30.21
82.8 g0 84.26 30.89
87..6 95 90.86 33.31
80.4 60 73.46 26.93
87.6 95 90.86 33.31
92.4 92 86.46 31.70
80.4 60 73.46 26.93
85.6 95 88.53 32.46
90.0 92 90.66 33.24
92.4 98 93.46 34.27
60.0 60 66.66 24.44
,• ., • •
EXHIBIT C
METHODOLOGY
FIRM RATER 1 RATER 2 RATER 3 AVERAGE MULTI
Brown & Root 86 84 90 86.66 30
Lichliter/Jameson 86 80 80 82.00
Binkley/Holmes 81 82 81 81.33
Walsh/Bovay 84 78 80 80.66
TC&B 89 84 95 89.33
H. Carlos Smith 84 80 80 81.33
CRSS 90 88 93 90.33
Pate 80 92 92 88.00
PRC 84 84 60 76.00
Black/Veatch 81 88 85 84.66
Espey/Austin 92 88 95 91.66
Dannenbaum 79 90 98 89.00
Bayshore 67 60 60 62.33
.. . , . • •
v
EXHIBIT D
SUMMARY
FIRM
PERSONNEL
FIRM
METHODOLOGY TOTAL
RATING
RANKING
Brown & Root 29.11 29.97 26.0 85.08 7
Liehliter/Jameson 26.61 27.55 24.6 78.76 10
Binkley/Holmes 26.55 30.21 24.4 81.16 9
Walsh/Bovay 27.50 30.89 24.2 82.59 8
TC&B 29.72 33.31 26.8 89.83 4
H. Carlos Smith 25.53 26.93 24.4 76.86 11
CRSS 29.49 33.31 27.09 89.89 3
Pate 28.50 31.70 26.4 86.60 6
PRC 25.38 26.93 22.8 75.11 12
Black/Veateh 28,50 32.46 25.4 87.36 5
Espey/Austin 29.83 33.24 27.5 90.57 2
Dannenbaum 30.50 34.27 26.7 91.47 1
Bayshore 21.88 24.44 18.7 65.02 13
~ .. ; ~,
`~ ~,~.-w``~
Dear
j- ~ i
:,, ' . g
rr~ S
Thank you for your proposal of June 15, 1987 concerning
engineering services for the La Porte Area Water Authority.
A selection committee appointed by myself, as General Manager,
was appointed for reviewing the proposals and ranking them
according to compliance with the Request for Proposals.
Attached is a report outlining the selection committee"s work,
a final ranking based on personnel qualifications, experience
of firm, and methodology based on committee tabulations, along
with the selected top four (4) firms:
1. Dannenbaum Engineering Corporation
2. Espey, Huston & Associates, Inc.
3. CRSS Sirrine
4. Turner, Collie & Braden, Inc.
Your interview is set for Friday, July 10, 1987 at 3:30 P.M.
We request the Project Director and/or Project Engineer be in
attendance, and that you limit attending personnel to three
(3). The interviews are set up to be held at the Public Works
Service Center, 2963 North 23rd Street, La Porte, Texas.
Thank you for your interest in this matter.
Sincerely,
Robert T. Herrera
General Manager
RTH/lw
xc: La Porte Area 4a'ater Authority Board Members
Steve Gillett, Public Works Director
File
~ ~
Dear
Thank you for your proposal of June 15, 1987 concerning
engineering services for the La Porte Area Water Authority.
A selection committee appointed by myself, as General Manager,
was appointed for reviewing the proposals and ranking them
according to compliance with the Request for Proposals.
Attached is a report outlining the selection committee"s work,
a final ranking based on personnel qualifications, experience
of firm, and methodology based on committee tabulations, along
with the selected top four (4) firms:
1. Dannenbaum Engineering Corporation
2. Espey, Huston & Associates, Inc.
3. CRSS Sirrine
~4. Turner, Collie & Braden, Inc.
Thank you for your interest in this matter.
Sincerely,
Robert T. Herrera
General Manager
RTH/lw
xc: La Porte Area Water Authority Board Members
Steve Gillett, Public Works Director
File
~~f;~