HomeMy WebLinkAbout11-24-1987 Meeting-- ~ • •
LA PORTF AREA WATER AUTHORITY
h9IriUTES
ATOVEMDER 2~4 , 1987
1 . The meeting; 4tas called to order at Fi :00 P .hl. by President Jerry
F,ramlett .
P~EP~I3ERS PRESEPIT: President Jerry Bramlett, Vice President Rick
Matthews, Secretary Claude Graves, Member ifiike GJadsworth
OTHERS PRESENT: Robert Herrera, General Manager, John Joerns,
Assistant City Manager, S`eve Gillett, Public 6~'orks Director,
Buddy Jacobs, Assistant Public ~;lorks Director, Authority Attorney
John Armstrong, Project Manap;er Dale Conger
2. The minutes of the meeting held on October 10, 1987 were read.
h"otion was Made to approve minutes by Rick Matthews and seconded
by Mike G?adsworth. Notion was unanimous.
3. Due to a another meeting, the General Manager"s Report was moved
forward from Item 5 on the agenda.
Bob Herrera, General Manager, gave an update on the contract with
the City of. Houston. The City of Houston has accepted the
contract as it was .last drafted. Bob thanked everyone for all
their help in getting this contract executed.
Bob Herrera discussed the signing of the entity contracts with the
.!embers of the Board. He stated these have been signed by the
entities, each individual council, and reviewed by our city
council. At this time, the President and Secretary-Trea::urer need
to sign the contract and they will be forwarded to the Niayor for
his siP;nature along with the proper seal.
Bob Herrera informed the Board that the City of La Porte is
currently performing a Feasibility Study Five (5) Yesr Update
Utility Financial Plan and he has arranged for a Five (5) Year
Forecasting Plan to be done for the La Porte Area G7ater Authority.
A copy will be forwarded to the Board for their review. It was
stressed this was a planning; tool only.
Bob Herrera introduced Dale Gonger of Espey/Huston Engineers to
the Board. A Corrosion Study by Espey/FIuston was discussed. The
study will determine what type of preventative maintenance or
preventative needs .required in order to maintain 17 !piles of
pipeline.
• •
Page Two
Niinutes
P7ovember 24, 1987
Dale Conger discussed properties of different pipes and corrosion
techniques, costs of various types of pipe in the larder sizes,
costs of various types of corrosion control. systems and savings of
different types of corrosion control systems. Reasons .for doing a
Corrosion Study are:
a. defense against protest by pipe suppliers.
b. allows for competition among; pipe suppliers.
c. allows determination of type protection needed for
ferrous fittings.
{~uestions~were raised as to whether study is needed until pipe
material is determined and if. study is covered under basic
services, and could FiP, obtain this information from C~nIA.
Bob Herrera stated more study needs to be done on the necessity of
the Corrosion Study, that he was not completely comfortable with
the need of a study.
4. Bob Herrera discussed invoices for Espey/Huston and Baseline
Corporation. Staff recommends payment of 41?_,383.33 to
Espey/Huston, however, invoice for $5,181.90 is questioned and
needs further backup information from Espey/Huston, he recommends
not paying this invoice at this time. Dale Conger brought the
Board up to date on the progress made on design of rotate. (copies
of proposed route distributed). Recommendation was made to pay
Baseline Corporation"s invoice in the amount of $8,853.6. A
motion was made by Rick (~atthews to pay invoices as recommended by
staff. Seconded by Mike 4:adsworth. Notion unanimous.
5• Discussion was-held on Board meeting times. Mike t~?adsworth made a
motion to set monthly meetings on the second Tuesday of each month
at a place to be designated in agendas. Seconded by Claude
Graves. Motion unanimous.
6. Jerry Bramlett stated he has a copy of the letter to Cti~~A. from the
La Porte Area Gdater Authority concerning R.O.f~1. usage, along with
letter from Espey/Huston concerning Morgan"s Point take point.
• •
Page Three
P-Iinutes
November 24, 1987
7. There being no further business to discuss, a notion was made by
Ric)t t9atthews to adjourn. Seconded by Claude Graves. h:otion
unanimous.
Respectfully Submitted
aude Graves, Secre ary/Treasurer
/~~~~C'~---
PASSFT' A.r]n APPROVLhr
OT' TIiIS DAY ~ O~ ~ ~ , 19
)J~C: 3 '87 16:11 FROM ESPEY-HI_ISTON-RUSTIN TO HOUSTON PAGE.~~~
• •
ESPEY,
NUSTC7N &
ASSf7~lATES, 1 N C.
engineering & Environmental Consultants
03 Aecember x.987
Invoice No. 87-1i.-0001
Uab Na. 10790
Terii<tS : NET 30 Days
LA POItTE AREA WATER AUTHORITY (50110)
1~1TTN : BOB HERRERA
GENERAL MANAGER 7rPAWA
P.P. SOX 1115
LA FORTE TX 7757.
LA FORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
REMITTANCE PAGE
TOTAL - Current Invoice: $33,$70.95
TOTAL - ACCOt7NT BALANCE; $39,0~2.$S
TOTAL AMOUNT ENCLOSED; ~
Please return this page with payment to ensure prompt & accurate credit.
916 Capital of Texas Highway South • P.O. Box 519 + Austin, Texas 7$767 • 15121 327~i840 + Telex 1561232
DEC 3 '87 16: 1S FROhI ESPEY-HUSTUN-RLISTIh•J
•
ES~~Y,
N U STC~N &
ASSQCIATES, INS.
Engin~erir~g & Environmental Consultants
$~ December 1987
Invoice Nc~, 87~i1-DO(}1
Jc~b No. IO'~g0
Terms: NET 30 Days
LA PORTS AREA WA'V'ER AUTHORITY (50110}
A7,'TN : BOE HERRERA
GENERAT• MANAGER LPAWA
~.p. aox 1115
LA PORTS TX 77571
LA PORTS A1~EA WATER AUTHORITY
pISTRIHUTION SYSTEM
INVOICE SUMMARY
(From li 1 87 to 12 3/$7)
Task O1 - LPAWA DER
Task 21 - SURVEY
TOTAL DUE THIS INVOICE
TOTAL ~- Previous Invoices
TOTAL - Ri11ed to Date
Less Payments/Crer]its as of 12/03/87
NEW $ALANCE DUE;
Please retain this page .far yat~r records
TO HOUSTGh•I PRGE . ~~3
•
Fa~ge 1 of 3
Amt Due: $ 15,$23.15
Amt Due: 1$,047.$Q
~ 33,870.35
W-
17,SbS.23
$ 51,435.18
12.3$3.33
rn.
$ 39,t?52.85
91C> C~pil¢I of Texas Highway 5~uth • P.O. Bqx 519 • Austin, Texan 78767 • t512f 327-6840 • Teiex 1561212
L?~~~ 3 '87 16: 12 FR~h1 ESPE1'-HUSTC?N-AU6TIN TO HC?USTC?N
' ~EY, HUSTON & A$$aCIATES, INCi
Project 10790 ~- Mgr. CONGER, Y7AT,E D.
LA PdRTE AREA WATER AUTFlORITY
pISTYt1H[~TION SYSTEM
PAGE.a64
InvoiC~ No. 87-11-004.
43 December 1987
Page 2 of 3
'SAS R 41
LPAWA A$R
Total Cantr~Ct Amdttrit
percent Complete - (41~)
Less Prevfous Invoiced Amount
TOTAL, DUE This Phase
TOTAL DUE This Phase
$68,796.30
$28,,206.48
x].2.,383.33
$11 r5,a82~3y.15
$15,823r15
DEC 3 '87 16: 1~ FR~h1 ESPE1'-HUSTUN-AUSTIPd T~? H~?UE~TOhJ
~•
' ~EY, HUST~N & A55QGIATES, 1NC~
Fro~ect 10790 - Mgr. Coi~GER, DALE D.
I,A PQRTE AREA WATER A[TTAO~2ITY
1~ISTRIBUTION SY~^TEM
PAGE.~~S
Invoice No. $7-~.1-0001
03 December 19$7
Page 3 of 3
TASK 2l
SURVEY
L A B O R Casts
Salary Costs w TOTAL
x Contract Multiplier
Labor Costs
- SUB-TOTAL
$ 3,769.12
2.5004
$ 9,422.$0
Survey Costs
3--Man Crew - 115.0 hrs @ $75.00 8 625.40
Lobar costs - TOTAL $18,047.80
~'OTAL AUE 'This Task $18,04~.8Q
Pra~eet 10790 - TOTAL AMOiTN'r DUE:
~:~ TOTAL Pi~iaE . Etk~S ~~: