HomeMy WebLinkAbout04-12-1988 Meeting
LA PORTE AREA WATER AUTHORITY
MINUTES
APRIL 12, 1988
1. The meeting was called to order at 6:00 P.M, by President, Jerry
Bramlett.
MEMBERS PRESENT: President Jerry Bramlett, Vice President Rick
Matthews, Secretary Claude Graves, Member Mike Wadsworth
OTHERS PRESENT: John Joerns, Assistant City Manager; Steve
Gillett, Public Works Director; Buddy Jacobs, Assistant Public
Works Director; Authority Attorney John Armstrong; Dale Conger of
Espey/Huston
2. The minutes of the meeting held on March 15, 1988 were read.
Motion was made to approve minutes by Mike Wadsworth and seconded
by Claude Graves. Motion was unanimous.
3. Invoice from Espey Huston dated April 12, 1988 in the amount of
$38,588.05 was discussed. Motion was made by Claude Graves to pay
the invoice in the stated amount. Seconded by Mike Wadsworth.
Motion was unanimous.
4. Application to Texas Water Commission for approval of project and
bonds was discussed. Authority Attorney John Armstrong stated
this should be the last item needed for their approval. Motion
was made for a resolution to authorize application to Texas Water
Commission for approval of project and bonds was made by Rick
Matthews and seconded by Claude Graves. Motion was unanimous.
5. La Porte Area Water Authority Bidder Pre-qualification procedure
was discussed. John Armstrong read a letter from the Texas Water
Development Board stating their approval of pre-qualification
procedures. He discussed the addition of a clause allowing
contractors already pre-qualified for City of La Porte projects to
be considered pre-qualified for Authority projects. He stated
this would not force these contractors to repeat a process already
gone through. John Joerns discussed the success realized by the
City of La Porte in using a pre-qualification procedure on all
City projects in excess of $300,000. Motion was made by Claude
Graves for a resolution adopting a bidder pre-qualification
procedure for contractors desiring to bid on Authority projects as
recommended by staff. Seconded by Rick Matthews. Motion was
unanimous.
• •
Page Two
La Porte Area Water Authority
Minutes for April 12, 18886.
6. Waterline easement from Height Savings to serve the City of
Shoreacres was discussed. Steve Gillett and John Armstrong went
over the sections of the offered easement that they felt could
cause operational and/or legal problems to the Authority. Steve
said that any references in the easement concerning the Authority
furnishing water to Heights Savings" property should be deleted.
The Authority will furnish water to the City of Shoreacres only
from this easement. Additionally, restrictions placed on the
Authority"s use of the easement was not acceptable and should be
changed. Retained rights by Heights Savings should be cut to
surface use only. John Joerns stated that this was an
informational item only. No action is required from the Board at
this time. Negotiations are continuing with Heights Savings on
this easement.
7. Payment of $300.00 permit fee to Southern Pacific Transportation
Company for permits to bore under their tracks was discussed.
John Joerns stated this was usual practice and recommended
payment. Motion was made by Rick Matthews to pay the $300.00
permit fee as recommended by staff. Seconded by Mike Wadsworth.
Motion was unanimous.
8. Dale Conger discussed progress of final design. He stated that he
should be able to begin bringing plan sheets for Board review in
the near future. He requested a letter authorizing Espey Huston
to begin the additional aerial and ground survey required by the
change in the route of the BayMUD line. This was authorized in
the March 15, 1988 meeting; but, they had not received written
authorization to do this. Steve Gillett stated he would get a
letter to them. Steve stated that the meeting with CWA was
productive. A possible hinderance to acquiring the right-of-way
could be the fact that they were told all right-of-way requests
must go through the City of Houston Right-Of-Way and Legal
Departments. He stated this could possibly cause some slowdown in
acquiring the right-of-way. Jerry Bramlett asked for approximate
cost of right-of-way. John Joerns stated that Sam Dixon had sent
a letter earlier stating a cost of approximately $40,000.
Approval of the easement has been entered into the minutes of the
CWA Board meeting. Total cost has yet to be determined.
Problem of pipe material was discussed. Dale stated that a lower
class of PVC pipe may have to be specified due to unavailability
of C-900 PVC pipe in larger sizes. This would have to be done or
PVC pipe would have to be eliminated in the sizes above 12rr,
Page Three
La Porte Area Water Authority
Minutes for April 12, 1988
9• John Joerns updated Board on status of acquiring an easement from
the Harris County Flood Control District along Big Island Slough.
He stated that staff has established a good relationship with them
and are close to finalizing an agreement on the sections needed.
He stated that a meeting with the Grays has been held on the
possibility of acquiring the remainder of the easement required in
Fairmont Park. He discussed the possibility of an existing
easement in this area and that this possibility was being
researched.
He discussed a meeting held with the PPG Plant Manager. The Plant
Manager requested information to take with him to the corporate
offices for a meeting and stated that he would support the
granting of a;proposed easement along Bay Area Blvd. to the.
Authority.
He stated that the La Porte City Council authorized the City
Manager to enter into negotiations with the Authority for use of
office space at Public Works Building. Bob Herrera will approach
the Board soon to negotiate this item.
10. President Jerry Bramlett stated he had nothing to report at this
time.
11. There being no further business to discuss, the motion to adjourn
was made by Rick Matthews and seconded by Mike Wadsworth. Motion
was unanimous and the meeting was adjourned at 7:00 P.M.
Respectfully Submitted
_ ~ ~,
Claude Graves, Secretary/Treasurer
PASSED AND APPROVED:
ON THIS DAY s \, , 19 ~~
(! ~ ,. •
LA PORTE AREA WATER AUTHORITY
Certificate for Resolution Authorizing
Application to the Texas Water Commission
for Approval of Project and Bonds
I, the undersigned, Secretary of the Board of
Directors of La Porte Area Water Authority (the "Author-
ity"), hereby certify as follows:
1. The Board of Directors of the
"Board") convened in special session, ope
and duly noticed in accordance with
V.A.T.C.S., as amended, at its regular
inside the Authority on April 12, 1988,
duly constituted officers and members of
wit:
Authority (the
n to the public
Art. 6252-17,
meeting place
and all of the
the Board, to-
Jerry Bramlett President
Rick Matthews Vice President
Claude Graves Secretary
Mike Wadsworth Director
were present, constituting a quorum.
2. Among other business transacted at such
meeting, a written
RESOLUTION AUTHORIZING APPLICATION
TO THE TEXAS WATER COMMISSION
FOR APPROVAL OF PROJECT AND BONDS
(the "Resolution") was duly introduced for the con-
sideration of the Board. It was then duly moved and
seconded that the Resolution be adopted; and, after
discussion, said motion, carrying with it the adoption
of the Resolution, prevailed by the following votes.
AYES: All Present NOES: None
3. A true, full and correct copy of the Resolu-
tion adopted at such meeting as the same appears of
record in the official minutes thereof on file in the
offices of the Authority is attached to and follows this
Certificate; and the above and foregoing is a true, full
and correct excerpt form the minutes of said meeting
relating to the adoption of the Resolution.
~_~ ~~~
4. The persons named in the first numbered
paragraph of this Certificate were, on the date of said
meeting, the duly chosen, qualified and acting officers
and members of the Board, and each was duly and suffi-
ciently notified in advance of the time, place and
purpose of such meeting.
WITNESS MY HAND AND THE OFFICIAL SEAL OF THE
AUTHORITY this the 12th day of April, 1988.
Secretary, oard of Directors,
La Porte Area Water Authority
[SEAL)
~~ r•
RESOLUTION AUTHORIZING APPLICATION TO THE
TEXAS WATER COMMISSION
FOR APPROVAL OF PROJECT AND BONDS
WHEREAS, La Porte Area Water Authority (the "Au-
thority") is in the process of purchasing an undivided
interest in the Southeast Water Purification Plant (the
"Southeast Plant") under construction by the City of Houston
and is planning the construction of a transmission system
(the "Transmission System") and a distribution system (the
"Distribution System") to transport water from the Southeast
Plant to the customers of the Authority; and
WHEREAS, the Board of Directors of the Authority
desires to issue bonds to pay for its undivided interest in
the Southeast Plant and additional bonds to pay the costs of
acquisition and construction of the Transmission System and
the Distribution System; and
WHEREAS, pursuant to Section 54.516, Texas Water
Code, as amended, the Authority is required, when it desires
to issue bonds, to submit in writing to the Texas Water
Commission an application for the investigation of the pro-
ject proposed to be purchased or constructed and of the
Authority's bonds proposed to be issued, together with a
copy of the engineer's report and a copy of the data, plats,
profiles, maps, plans and specifications prepared in connec-
tion with such project; and
~~ •
WHEREAS, the Board of Directors of the Authority
desires to secure the approval and consent of the Texas Water
Commission to (i) the construction of the Southeast Plant
and the purchase by the Authority of an interest therein,
(ii) the acquisition and construction of the Transmission
System and the Distribution System and (iii) the issuance of
said bonds to provide for the payment of the costs thereof;
therefore,
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF LA
PORTE AREA WATER AUTHORITY:
Section 1: That the President and Secretary of
the Board of Directors of the Authority are hereby autho-
rized and directed to make application to the Texas Water
Commission (the "Commission") pursuant to Section 54.516 of
the Texas Water Code, as amended, for an investigation and
report upon the feasibility of the Authority's purchasing an
undivided interest in the Southeast Plant and acquiring and
constructing the Transmission System and the Distribution
System, and to request the Commission to approve the bonds
of the Authority in the aggregate principal amount of
$9,800,000 to be issued for the purpose of paying the above
costs and for other proper purposes.
Section 2: That the Authority hereby assures the
Commission that the Authority will abide by the terms and
conditions prescribed by the Commission.
023DESAP/024C01 _2_
• /.
Section 3: That Authority's engineers are
authorized and directed to prepare and engineering report in
such form as may be required by the Commission and submit
the same to the Commission in support of such application
and to do any and all things necessary and proper in
connection therewith.
Section 4: That the President and Secretary of
this Board of Directors, the Authority's General Counsel,
Knox W. Askins, J.D., P.C., and the Authority's Bond
Counsel, Baker & Botts, are hereby authorized and directed
to do any and all things necessary and proper in connection
with such application.
PASSED AND APPROVED this the 12th day of April,
1988.
Pr si n , Board of Directors
La Porte Area Water Authority
ATTEST:
Secretary, Board of Directors
La Porte Area Water Authority
[SEAL]
023DESAP/024C01 -3-
~~ ,•
LA PORTE AREA W:yTER AUTHORITY '~-
APPLICATION FOR APPROVAL B1 TEXAS WATER COMMISSION
OF AUTHORITY'S PROJECT AND BONDS
TO THE HONORABLE TEXAS WATER COQ'-MISSION:
La Porte Area Water Authority (the "Authority") in
Harris County, Texas, files and presents this application
pursuant to Section 54.516 of the Texas Water Code, and re-
quests the Commission to take such action thereon as provid-
ed by said Section and other appropriate laws of this State.
The Authority seeks approval of $9,800,000 aggre-
gate principal amount of its re~•enue bonds (the "Bonds"),
to be issued without the holding of an election pursuant to
the special act creating the Authority, Chapter 729, pages
2,678 et seq., Acts of the 67th Legislature of the State of
Texas, Regular Session, 1981, (the "Act") for the purpose of
(i) purchasing an undivided interest in the Southeast Water
Purification Plant (the "Southeast Plant") under construc-
tion by the City of Houston, Texas, and paying expenses
incidental thereto, (ii) paying the costs of acquisition and
construction of a transmission system and a distribution
system to transport water from the Southeast Plant to the
customers of the Authority and (iii) paying such other
expenses of the Authority as may properly be paid from the
proceeds of the Bonds. The BonCS will bear interest at a
net effective interest rate not exceeding the maximum rate
~~ ~ ~ ~
permitted by law and will mature serially in accordance with
the schedule annexed hereto as Exhibit A. In connection
therewith, the Authority submits in writing this application
for investigation, together with a copy of its Engineer's
Report, copies of data, profiles, maps, plans and specifica-
tions prepared in connection therewith and copies of other
pertinent documents required by the Rules and Regulations of
the Commission.
The Authority was created on or about June 16,
1981, pursuant to the Act, and embraces the territory de-
scribed in the Act.
Upon completion of the Southeast Plant, and the
construction of certain transmission and distribution lines,
surface water will be the primary source of supply for
customers of the Authority. Currently, groundwater is the
source of supply for customers of the Authority.
Currently herewith, the Authority is filing with
the Commission a certified copy of the Act. The Authority
covers substantially the same territory as the City of La
Porte, Texas. Because the Authority was created pursuant to
the Act, which was supported by the City of La Porte, an
ordinance of the City Council of the City of La Porte
consenting to creation of the Authority was not required.
Partial payments to any contractor or contractors
performing the work to be financed with the proceeds from
023DESAQ/024C01 _2_
. ~ •
•
the Bonds (and with whom the Authority has a contract) will
comply with the requirements of Section 54.228 of the Texas
Water Code, as amended. ~-
It is essential to the Authority's improvement
program and progress and is in the best interest of the
Authority that the Bonds be approved by the Commission at
this time.
WHEREFORE, the Authority prays that the Commission
investigate, report upon and approve (1) said Engineer's
Report and the data, profiles, maps, plans and specifications
prepared in connection therewith; (2) the Engineer's and
Authority's estimates of costs; (3) the issuance of the Bonds
described above; and (4) the Authority's proposed improve-
ments and project. The Authority further prays that the
Commission make a full written report thereon, file the same
in its office and furnish a copy of same to the Board of
Directors of the Authority, that the Commission do all other
things required of it by law and particularly Section 54.516
of the Texas Water Code in connection with this Application,
023DESAQ/024C01 _3_
•
~Y
and that the Authority have any other relief to which it may
be entitled.
DATED this 12th day of April, 1988.
LA PORTE AREA WATER AUTHORITY
By
Pr Board of Directors
ATTEST:
~- .~~~~-
Secretary, Board of Directors
[SEAL ]
~023DESAZ/024C01 -4-
:'. • ~•
LA FORTE AREA WATER AUTBORITY
' 59,800,000 HATER SUPPLY CONTRACI REVENUE BONDS
• SERIES 1997 AND 1988 CO?~INED
DEBT SERVICE SCHEDULE
~~~d
DATE PRINCIPAL COUPON INTEREST PERIOD TOTAL FISCAL TOTAL
r
Y~
6/ 1/16 27,671.23 27,671.25 ~
12/ 1/16 __--785000_00 27,671.25 812,671.25 840,342.50
-------------- --------------
9,600,000.00 13,493,089.17 23,295,089.17
ACCRUED
• 9,800,000.00 13,495,089.17 23,295,089.17
~~ ..~~~~
DATED 12/ 1/87 HIl'H DELIVERY OF 12/ 1/87
BOND YEARS 199,590.000
AVERAGE COUPON 6.761
AVERAGE LIFE 20.366
N I C ; 6.761405 Z USING 100.0000000
PREPARED BY HORONEY, BEISSNER ~ CO., INC.
RUNDATE: 11-24-1987 9 10:15:11 FILENAME: LPAHA KEY: SER 87&88
• .
L_ri !-'t~lh::'1' k~~ f~F:~~^~ WA"f'~F ~Ul'~f-IC.~fr::I ~'C`r'
i:~~Cl='Iwi~IL' ~: °fUf~:L~ IT:I'~1='i:]i~~:"i°
fMxf-'~t~iU T'1"l.JF::f.:_~ "I"(:] T?r'~'TE e
t~i~:::~ ~ Flu ~i-~~t~ ~ r~le:c-wry: }: I~Ir~,
iw W~'~ i~::. C:1 .. W . k~Uf~::t1G:`~
~f='f.~iw I F~L :al::F~:V T ~~ f.~;3 is ~
I I4i..1..~:E.~..1..
i"•'ir:fJh='CiSETi f='~=~`~'t'iL:l'~I..( a
F~.. I t~l ~ L Li C ~a T ~~~ i`~I
:~3F'~~i:~ I ~L ~L1=:U 1: ~:;fwt:~ o
`~c3, £3Ci:. F,,.~.
_t~_{..{~'~:~ r-1 ~?, faUf~:4'I~~Y ? ~~i:i, ':9[.,:.i . ' 'T
1~ 1 C-3 . i
`~~iUhUE~`v
~•i•-
ii~_.,.1'~.tr~_-~8
:~~', a, i'~::~,q.. C3t:3
_I..[l..f.~'~i._ E~kF='LI~I1) r`91= "f~:-•~: f='I'T:C~F'(:7;~Iwt:i f°'Fi`rl"il'~I~I"I° ;~.~'.`:,t,, t3t3:i .::•'_'Ci
•
ESPEY, ~~~
HUSTON &
ASSOCIATES, INC. ,
5 ` :~
Engineering & Environmental Consultants ti ~ ; 1„ '`~`'~, tk ~,`
27 April 1988
Invoice No. 88-03-0376
Job No. 10790
Terms: NET 30 Days
LA PORTE AREA WATER AUTHORITY
ATTN: BOB HERRERA
GENERAL MANAGER LPAWA
P.O. BOX 1115
LA PORTE TX 77571
LA PORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
REMITTANCE PAGE
TOTAL -Current Invoice: $37,300.29
TOTAL -ACCOUNT BALANCE: $37,300.29
TOTAL AMOUNT ENCLOSED: $
(50110)
MAY ' 719~d
Please return this page with payment to ensure prompt & accurate credit.
888 West Belt Drive South, Suite 200 Houston, Texas 77042 (713) 781-8800
~EY, HUSTON & ASSOCIATES, IN~
27 April 1988
Page 1 of 4
Invoice No. 88-03-0376
Job No. 10790
Terms: NET 30 Days
LA PORTE AREA WATER AUTHORITY
ATTN: BOB HERRERA
GENERAL MANAGER LPAWA
P.O. BOX 1115
LA PORTE TX 77571
(50110)
LA PORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
INVOICE SUMMARY
(From 03/27/88 to 04/23/88)
Task 11 -LPAWA FINAL DES
Task 21 -SURVEY
Task 23 - GEOTECHNICAL
TOTAL DUE THIS INVOICE
Amt Due: $ 30, 844.04
Amt Due: 1, 800.00
Amt Due: 4, 656.25
TOTAL -Previous Invoices
TOTAL -Billed to Date
Less Payments/Credits as of 4/25/88
NEW BALANCE DUE:
$ 37,300.29
181,616.42
$218,916.71
181,616.42
$ 37,300.29
Please retain this page for your records
~EY, HUSTON & ASSOCIATES, IN~
Invoice No. 88-03-0376
Project 10790 -CONGER, DALE D. 27 April 1988
LA PORTE AREA WATER AUTHORITY Page
DISTRIBUTION SYSTEM
2 of 4
TA5K 11
LPAWA FINAL DES
Total Contract Amount $114, 661.00
Percent Complete - (72%) $ 82, 555.92
Less Previous Invoiced Amount 51,711.88
TOTAL DUE This Phase $30, 844.04
~EY, HUSTON & ASSOCIATES, IN~
Invoice No. 88-03-0376
Project 10790 -CONGER, DALE D. 27 April 1988
LA PORTE AREA WATER AUTHORITY Page 3 of 4
DISTRIBUTION SYSTEM
TASK 21
SURVEY
LABORCosts
Salary Costs -TOTAL $ 0.00
X Contract Multiplier 2.50000
Labor Costs -SUB-TOTAL 0.00
Survey Costs
3-man Crew - 24.0 hrs @ $75.00 1, 800.00
Labor costs -TOTAL $ 1, 800.00
TOTAL DUE This Task $ 1, 800.00
~EY, HUSTON & ASSOCIATES, IN~
Invoice No. 88-03-0376
Project 10790 -CONGER, DALE D. 27 April 1988
LA PORTE AREA WATER AUTHORITY Page 4 of 4
DISTRIBUTION SYSTEM
TASK 23
GEOTECHNICAL
LABORCosts
PURCHASED SERVICES
Other Services -TOTAL
Purchased Services -TOTAL
TOTAL DUE This Task
4,656.25
4,656.25
$ 4,656.25
ESPEY,
HUSTON &
ASSOCIATES, INC.
Engineering & Environmental Consultants
26 May 1988
Invoice No. 88-04-0369
Job No. 10790
Terms: NET 30 Days
LA PORTE AREA WATER AUTHORITY (50110)
ATTN: BOB HERRERA
GENERAL MANAGER LPAWA
P.O. BOX 1115
LA PORTE TX ?7571
LA PORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
REMITTANCE PAGE
TOTAL -Current Invoice: $28, 534.59
TOTAL -ACCOUNT BALANCE: $65, 834.88
TOTAL AMOUNT ENCLOSED: $
•
Please return this page with payment to ensure prompt & accurate credit.
888 West Belt Drive South, Suite 200 Houston, Texas 77042 (713) 781-8800
~EY, HUSTON & ASSOCIATES, IN•
26 May 1988
Page 1 of 4
Invoice No. 88-04-0369
Job No. 10790
Terms: NET 30 Days
LA PORTE AREA WATER AUTHORITY
ATTN: BOB HERRERA
GENERAL MANAGER LPAWA
P.O. BOX 1115
LA PORTE TX 77571
(50110)
LA PORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
INVOICE SUMMARY
(From 04/24/88 to 05/21/88)
Task 11 -LPAWA FINAL DES
Task 21 -SURVEY
Task 23 - GEOTECHNICAL
TOTAL DUE THIS INVOICE
Amt Due: $ 22,932.20
Amt Due: 4,450.32
Amt Due: 1,152.07
TOTAL -Previous Invoices (Incl. Credit Amounts)
TOTAL -Billed to Date
Less Payments/Credits as of 5/26/88
NEW BALANCE DUE:
$ 28,534.59
218,916.71
$247,451.30
181,616.42
$ 65,834.88
Please retain this page for your records
~EY, HUSTON & ASSOCIATES, IN~
Invoice No. 88-04-0369
Project 10790 -CONGER, DALE D. 26 May 1988
LA PORTE AREA WATER AUTHORITY Page 2 of 4
DISTRIBUTION SYSTEM
TASK 11
LPAWA FINAL DES
Total Contract Amount GEC.
Percent Complete - ~ 2 ~ ~d~
Less Previous Invoiced Amount '~'
$114,661.00
$105,488.12
$ 82,555.92
$ 22,932.20
TOTAL DUE This Phase $22,932.20
~EY, HUSTON & ASSOCIATES, IN~
Project 10790 -CONGER, DALE D.
LA PORTE AREA WATER AUTHORITY
DISTRIBUTION SYSTEM
Invoice No. 88-04-0369
26 May 1988
Page
3 of 4
TASK 21
SURVEY
LABORCosts
Salary Costs
-TOTAL
X Contract Multiplier
Labor Costs
-SUB-TOTAL
Survey Costs
3-man Crew - 56.0 hrs @ $75.00
Labor costs -TOTAL
$ 100.13
~~~~~
250.32
4,200.00
$ 4,450.32
TOTAL DUE This Task $ 4,450.32
~'EY, HUSTON & ASSOCIATES, INi
Invoice No. 88-04-0369
Project 10790 -CONGER, DALE D. 26 May 1988
LA PORTE AREA WATER AUTHORITY Page 4 of 4
DISTRIBUTION SYSTEM
TASK 23
GEOTECHNICAL
LABORCosts
PURCHASED SERVICES
Other Services -TOTAL
$ 1,152,0?
Purchased Services -SUB-TOTAL 1,152.07
Purchased Services -TOTAL $ 1,152.07
TOTAL DUE This Task $ 1,152.07
Project 10790 -TOTAL AMOUNT DUE $ 38,395.29
• •
KNOX W. ASKINS, J. D., P. C.
_ ATTORNEY AT LAW
702 W. FAIRMONT PARKWAY
P. O. BOX 1218
JOHN D. ARMSTRONG, J.D. LA PORTE, TEXAS 77571-1218
ASSOCIATE June 3, 1988
Mr. Bob Herrera
General Manager
La Porte Area Water Authority
P.O. Box 1115
La Porte, Texas 77572-1115
TELEPHONE
713 471-1886
RE: La Porte Area Water Authority Annexation of Bayshore Municipal
Utility District (BAYMUD)
Dear Bob:
You have asked that I advise you concerning the authority of the La
Porte Area Water Authority to annex the Bayshore Municipal Utility
District.
As you know, BAYMUD some time ago submitted a petition tc the La Porte
Area Water Authority that requested annexation of the District by the
Authority. The petition in my estimation complies with V.T.C.A., Water
Code, Section 54.711 through 54.721.
The question has been raised in my mind regarding the validity of the
annexation procedure, due to the fact that a Texas Water Commission
lawyer that I spoke to in Austin indicated to me in the past that the
La Porte Area Water Authority would not have the power to proceed to
annex a freshwater supply district. However, I have spoken with other
specialists in the field, including another Texas Water Commission
lawyer, who indicated to me that the La Porte Area Water Authority
would have the authority, pursuant to State law, to annex the territory
encompassing BAYMUD.
In my opinion, Chapter 54 of the Water Code, and the La Porte Area
Water Authority enabling act, Vernon's Texas Session Laws, 67th
Legislature, Chapter 729, Page 2678 (the "Authority Act") clearly
provide that the La Porte Area Water Authority has the power to annex
the territory encompassing BAYMUD, and clearly sets forth a procedure
for the annexation. I have, by previous opinion letters submitted to
you, spelled out the steps required in the Water Code and in the
Authority act.
I understand that the sole reason for adding the land encompassed
within BAYMUD to the boundaries of the La Porte Area Water Authority,
is to provide that BAYMUD would have a Director seated on the Board of
the La Porte Area Water Authority, said Director qualifying under
Section 10(b) of the Authority Act. Even if a Director qualified from
the territory to be added to the boundaries of the Authority by the
Authority's annexation of BAYMUD, if the City of La Porte subsequently
annexed BAYMUD, then the Director added would automatically be dis-
qualified from continuing his service on the Board of Directors.
• •
Page 2
Mr. Bob Herrera
June 3, 1988
I am informed that the City Council of the City of La Porte has
expressed an intent to annex BAYMUD on or about January 1, 1989. Thus,
the benefits of seating a Director on the La Porte Area Water Authority
from BAYMUD would be short lived at best.
In addition, if I am incorrect in my assessment of the La Porte Area
Water Authority's ability to annex BAYMUD, and a Director is seated on
the Board of the La Porte Area Water Authority, without appropriate
legal qualification, such an act could cloud the ability of the
Authority to appropriately enter into contracts, sell bonds, or take
other powers consistent with the Authority act. Thus, I conclude that
the La Porte Area Water Authority is empowered by law to annex BAYMUD,
but I further conclude that the benefits of such an action are to the
La Porte Area Water Authority, the City of La' Porte, and BAYMUD,
dubious at best, and I submit that the potential disadvantages outweigh
the potential advantages of such an action.
Finally, the status of the City of Shoreacres comes into question, and
depends on the actions' of the La Porte Area Water Authority regarding
the annexation of BAYMUD. The Authority boundaries are set forth in
Section 3 of the Authority Act. It takes an act of annexation by the
La Porte Area Water Authority, consistent with Section 8 of the
Authority Act, to add land to said boundaries. BAYMUD will not be
added to the boundary of the La Porte Area Water Authority if and when
the City of La Porte annexes BAYMUD, until the La Porte Area Water
Authority annexes BAYMUD. The City of Shoreacres will not be eligible
for annexation into the boundaries of the La Porte Area Water Authority
until a boundary of the Authority and a boundary of Shoreacres are
contiguous and adjacent, pursuant to Section 8 of the Authority Act.
Thus, for Shoreacres to be annexed into the La Porte Area Water
Authority, BAYMUD would first have to be annexed into La Porte Area
Water Authority, extending a boundary of the La Porte Area Water
Authority to a point adjacent to the City of Shoreacres boundaries.
Respect~ull~ ~.y~bmitted,
JoB~ D. ~rmstrong
JDA:rad
BAYMUD ANNEXATION PROCEDURE
LA PORTE AREA WATER AUTHORITY
1. BAYMUD submits annexation petition to La Porte Area Water Author-
ity Board of Directors.
2. La Porte Area Water Authority Board accepts petition and certifies
it at regular called meeting, annexation hearing called by the
Board to be held within thirty (30) days.
3. La Porte Area Water Authority Board posts notice of the public
hearing on annexation:
a. Notice of the hearing posted in three (3) public places
within the current boundary of the La Porte Area Water
Authority at least fourteen (14) calendar days prior to
annexation hearing.
4.
5.
6.
7.
b. Notice of the hearing posted at the offices of the
Bayshore Municipal Utility District at least fourteen
(14) calendar days prior to annexation hearing.
c. Notice of the hearing published in the Bayshore Sun at
least fourteen (14) calendar days prior to the hearing.
Hearing on annexation held in the City Hall of the City of La
Porte.
At close of hearing, La Porte Area Water Authority Board enters an
order in the minutes of the meeting annexing the land described in
the petition.
a. Majority of La Porte Area Water Authority Board signs
the order. Secretary of the Board attests the order.
Order annexing BAYMUD filed and recorded in Harris County Deed
Records.
La Porte Area Water Authority Board sends copy. of order to Texas
Water Commission within thirty (30) days of annexation hearing.
~~ •
RESOLUTION NO. 88- 2
A RESOLUTION REQUIRING THE PRE-QUALIFICATION OF CONTRACTORS ON
LA PORTE AREA WATER AUTHORITY CONSTRUCTION PROJECTS HAVING AN
ESTIMATED COST OF GREATER THAN THREE HUNDRED THOUSAND DOLLARS
($300,000.00); REQUIRING FILINGS OF CONTRACTOR'S STATEMENTS WITH THE
LA PORTE AREA WATER AUTHORITY; PROHIBITING CONTRACTORS FROM SUB-
CONTRACTING MORE THAN FIFTY PERCENT (50$) OF WORR ON LA PORTE AREA
WATER AUTHORITY PROJECTS WITHOUT PRIOR WRITTEN CONSENT; REQUIRING
ATTENDANCE AT A PRE-BID CONFERENCE AS A PREREQUISITE TO SUBMITTING A
BID; PROVIDING FOR PUBLICATION OF NOTICE; APPROVING AND ADOPTING
FORMS FOR THE PRE-QUALIFICATION OF CONTRACTORS; DEFINING "BIDDING
CAPACITY"; ADOPTING DISQUALIFICATION STANDARDS; FINDING COMPLIANCE
WITH THE OPEN MEETINGS LAW; AND PROVIDING AN EFFECTIVE DATE HEREOF.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE LA PORTE AREA
WATER AUTHORITY:
Section 1. The Board of Directors of the La Porte Area Water
Authority has determined, and does hereby find, determine, and
declare that it is in the best interest of the La Porte Area Water
Authority that all Contractors desiring to bid on La Porte Area
Water Authority construction projects having an owner's estimated
construction cost of greater than Three Hundred Thousand Dollars
($300,000.00), must pre-qualify by filing a satisfactory
Contractor's Statement, on the forms attached hereto, with the
Construction Project Manager, La Porte Area Water Authority, no
later than thirty days prior to the date bids are to be opened, if a
Contractor is to be eligible to bid. Thereafter, a new contractor's
Statement shall be filed with the Authority annually. Contractors
who are pre-qualified in accordance with City of La Porte Ordinances
1476 and 1476-A do not need to additionally pre-qualify under the
terms of this resolution. The financial information contained in
such Contractor's Statement is deemed confidential; shall not be
disclosed by Authority to the public or to other contractors; and
shall be deemed exempt from disclosure under the Open Records Act,
Art. 6252-17a, V.A.T.S., in accordance with Texas Attorney General's
Opinion No. ORD-309, 1982. The Board of Directors of the La Porte
Area Water Authority finds that disclosure of the financial
information is likely to have either of the following effects:
(1) to impair the Authority's ability to obtain necessary
information in the future; or
(2) to cause substantial harm to the ,competitive position of
the person from whom the information was obtained.
`• •
RESOLUTION N0. 88-_, Page 2
Section 2. Contractors entering bids on La Porte Area Water
Authority construction projects shall not subcontract more than
fifty percent (50$) of the work on the project, without first
obtaining the express written consent of the La Porte Area Water
Authority.
Section 3. All Contractors (or a representative of the
contractor) desiring to bid on La Porte Area Water Authority
construction projects must attend a pre-bid conference; otherwise,
such Contractor's bid will be returned by the Authority unopened.
Section 4. Public notice of prequalification of bidders by the
La Porte Area Water Authority, shall be published in like manner as
invitations to bidders, and shall not be a substitute for publishing
the actual invitation to bidders on each project.
Section 5. The Board of Directors of the La Porte Area Water
Authority approves and adopts the forms for Contractor's Statements,
attached hereto as Exhibit "A", incorporated by reference herein,
and made a part hereof for all purposes.
Section 6. The La Porte Area Water Authority is interested in
determining a Contractor's "Bidding Capacity" for the purpose of
issuing proposals and awarding contracts. "Bidding Capacity" is
determined by multiplying the positive net working capital, as
hereinafter defined, by a factor determined by the La Porte Area
Water Authority. Only those statements reflecting a positive net
working capital position will be considered satisfactory for
prequalification purposes. "Positive Net Working Capital" generally
is represented by the excess of current assets over current
liabilities, as shown by a balance sheet examined by an independent
Certified Public Accountant.
Section 7. The Board of Directors of the La Porte Area Water
Authority adopts following standards for disqualification of
Contractors:
I. AUTOMATIC DISQUALIFICATION
A. Company has no Positive Net Working Capital.
B. Company submits consolidated Statements.
• ~ •
RESOLUTION N0. 88-_, Page 3
C. Failure to complete Statements in all detail.
D. Company or personnel on Federal Job Debarment list.
E. Company or personnel on Justice Department list of
unacceptable contractors; i.e. convicted of anti-trust
violations.
F. Failure to complete Statements in a truthful manner.
II. OTHER CONSIDERATIONS FOR POSSIBLE DISQUALIFICATION
A. Companies with pending litigation may be disqualified for
duration of litigation as deemed to the advantage of the
Authority by the Authority's Construction Project Manager.
B. Default on contract, or forfeiture of bid bonds or
performance bonds.
C. Performance record of poor workmanship on previous
projects.
D. Performance record of failure to complete warranty work.
E. Bankruptcy or financi al reorganization.
Sec tion 8. The Board of Directors of the La Porte Area Water
Authority officially finds, determines, recites and declares that a
sufficient written notice of the date, hour, place and subject of
this meeting of the Board of the Authority was posted at a place
convenient to the public at the City Hall of the City of La Porte,
Texas for the time required by law preceding this meeting, as
required by the Open Meetings Law, Article 6252-17, Texas Revised
Civil Statutes Annotated; and that this meeting has been open to the
public as required by law at all times during which this resolution
and the subject matter thereof has been discussed, considered and
formally acted upon. The Board further ratifies, approves and
confirms such written notice and the contents and posting thereof.
Section 9. This Resolution shall take effect and be in force
from and after its passage and approval
PASSED. AND APPROVED this the 1~., day of , 1988.
ATTE ~T:
~ ~~ ~~ ~~c~~z~
Claude r es, ecretary
APP
~O~ G
L PORTE AREA WATER AUTHORITY
By:
Jerr Br e , President
Jt~fn~ D. Armstrong, At~tor
WARNING TO BIDDERS
The signatory of this Contractor's Statement guarantees, as
evidenced by the sworn affidavit required herein, the truth and
accuracy of all statements and of all answers to the interrogatories
hereinafter made.
Before a contractor shall be considered eligible to bid on
owner's work of estimated construction cost of greater than ,
he must have filed a satisfactory contractor's statement on this
form, with the La Porte Area Water Authority. This statement shall
be made as of the last day of any month, and must be on file in the
offices of the La Porte Area Water Authority, at least thirty (30)
days prior to the date bids are to be opened, if a contractor is to
be eligible to bid.
A new Contractor's Statement shall be made annually. If a
contractor has a satisfactory Contractor's Statement on file, he
will be eligible to bid for a period of twelve (12) months from the
date of the Contractor's Statement; however, the La Porte Area Water
Authority reserves the right to require a new contractor's statement
at any time. A contractor will be granted a three month grace
period to prepare and submit a new Contractor's Statement, provided
he notifies the construction manager in writing, prior to the date
his Contractor's Statement expires, of his intention to requalify.
It is clearly understood that if discrepancies are found in his
Contractor's Statement, the same will be considered unsatisfactory,
and the contractor will be ineligible to bid until such
discrepancies are satisfactorily explained to the construction
project manager.
In compiling the Contractor's Statement, all items must be
filled in and all schedules must be completed in detail. If
separate schedules are used, they must be specifically identified as
to which schedule in the Contractor's Statement they support.
FAILURE TO COMPLETE ALL ITEMS AND ALL SCHEDULES IN DETAIL WILL
DISQUALIFY THE CONTRACTOR, AND THE CONTRACTOR WILL BE INELIGIBLE TO
BID UNTIL A PROPERLY COMPLETED CONTRACTOR'S STATEMENT HAS BEEN FILED
WITH the La Porte Area Water Authority. If there is nothing to
report in certain items or schedules, then make the notation "None".
The amount as shown for each item must be actual, as taken from
company's books and verified, and must not be "approximate" amounts.
A CONTRACTOR SUBMITTING A BID ON OWNER'S WORK SHALL ENTER A BID
WHICH STRICTLY CONFORMS TO THE PLANS AND SPECIFICATIONS OF THE
PROJECT AS ISSUED BY THE PROJECT'S ENGINEER(S).
CONTRACTORS ENTERING BIDS ON OWNER'S WORK SHALL NOT SUBCONTRACT
MORE THAN 50$ OF WORK ON THE PROJECT, WITHOUT FIRST OBTAINING THE
EXPRESS WRITTEN CONSENT OF THE LA PORTE AREA WATER AUTHORITY.
All contractors (or a representative of the contractor)
desiring to bid on owner's work must attend a pre-bid conference;
otherwise, their bid will be returned unopened. No plans and
specifications shall be issued by the engineer(s) after the pre-bid
conference.