HomeMy WebLinkAbout11-10-08 Special Called Meeting of the La Porte Development Corporation Board of Directors
2
MINUTES OF THE SPECIAL CALLED MEETING OF THE
LA PORTE DEVELOPMENT CORPORATION
BOARD OF DIRECTORS
NOVEMBER 10, 2008
1. Call to order
President Pat Muston called the meeting to order at 5:00 p.m.
Members Present: Muston, Clausen, Matuszak, Moser, Love, Beasley and Engelken
Members/Officers Absent: None
Staff Present: City Manager Ron Bottoms, Assistant City Manager John Joerns, Director of Finance Michael
Dolby, City Secretary Martha Gillett, and Assistant City Attorney Clark Askins.
Others Present: Barbara Norwine, Barb Fernandez, Maggie Anderson, Katherine Aguilar, David Janda and
Debora Westbeld.
2. Consider approval of the September 22, 2008 minutes of the Special Called Regular Meeting of the La Porte
Development Corporation Board, October 6, 2008 minutes of the Special Called Regular Meeting of the La
Porte Development Board and the October 27, 2008 minutes of the Special Called Regular Meeting of the La
Porte Development Corporation Board - M. Gillett
A motion was made by Board Member Engelken to approve the September 22, 2008, October 6, 2008 and
October 27, 2008 minutes of the La Porte Development Corporation Board. The motion was seconded by
Board Member Clausen. The motion carried.
Ayes: Muston, Clausen, Matuszak, Moser, Love, Beasley and Engelken
Nays: None
Abstain: None
Absent: None
3. Receive update on the Town Plaza Project- R. Bottoms
City Manager Ron Bottoms provided an update on the Town Plaza Project.
He informed the board construction should begin in February 2009. The underground storage tanks will be
removed prior to that time. In addition, Mr. Bottoms noted Reagan McPhail will be assisting him in the
construction inspection of the project.
4. Executive Session- pursuant to provision of the Open Meetings Law. Chapter 551 Texas Government Code,
Sections 551-071 through 551.076, 551.087 (consultation with attorney, deliberation regarding real property,
deliberation regarding prospective gift or donation, personnel matters, deliberation regarding security
devices, or excluding a witness during examination of another witness in an investigation, deliberation
regarding Economic Development Negotiations).
A. Section 551.074 (Personnel Matter)
Meet with City Manager to interview candidate for
Economic Development Coordinator Position
The Board Adjourned to Executive Session at 5:11 p.m.
~)
La Porte Development Corp. Board
2
The Board reconvened to Special Called Meeting at 5:39 p.m.
There was no action taken in the Executive Session.
5. Announcements! Administrative Reports - R. Bottoms
6. Board Comments
There were no comments from the Board members.
7. There being no further business to discuss, the La Porte Development Corporation Board adjourned the
Special Called Regular Meeting at 5:40 p.m.
Respectfully submitted,
~~
Martha Gillett,
City Secretary TRMC, CMC
day of December 2008.
3
LA PORTE DEVELOPMENT CORPORATION AGENDA ITEM
Agenda Date Requested:
December 1.2008
ADDroDriation
Requested By: .John .Joerniil
Source of Funds:
4B
Department:
4.ssidaat City Maaager
Account Number:
Report:
Resolution:
Ordinance:
Amount Budgeted: $325,000
Exhibits: Professional Services Agreement with
Attachment B-4 and C
Amount Requested: $88,034
Budgeted Item: YES NO
Exhibits: Attachment A - ScoDe of Services
Exhibits Exhibits A-I and A-2
SUMMARY & RECOMMENDATION
We have negotiated a contract for professional service with Knudson and Associates for the Gateway Project at
West Main and SH146. The major components of the scope of work are design of the gateway towers and lighting,
landscaping and irrigation, ornamental iron fencing and brick columns, the parking lot design, and fa9ade demolition
and design. The design is based on the conceptual design reviewed and approved by City Council on August 18,
2008. Also note that there is an anticipated contribution of$88,000 from Economic Alliance Port Region.
The current estimate for construction is $486,950. The professional design service is based on time and materials,
not to exceed $58,434, without further authorization. This is approximately 12% of the estimated construction cost.
The agreement also includes a termination for convenience and budget reviews at 30%,60% and 100% submittals.
The estimated professional services, additional services (sitelbuilding feasibility), and reimbursables are as follows:
. Professional Services $58,434
. Investigative/F easibility 12,500
(drainage & building)
. Reimbursables
. Geotechnical 5,600
. Other 3.000
$79,534
The surveying could either be acquired through Knudson or furnished by the City and is estimated at $8,500.
fblJ~ !il6
Date
Knudson # 0080990
081125
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement (Agreement) is made this Pi' day of December,
2008, between Knudson, LP, a Texas Limited Partnership (Knudson) and the La Porte
Development Corporation (Client). In consideration of the mutual promises set forth herein, the
parties agree as follows:
SCOPE OF SERVICES / SCHEDULES AND DELIVERABLES
Knudson will provide professional consulting services for the (Project), more fully described in
the Scope of Services, Schedule and Deliverables attached hereto and made a part of this
Agreement (Attachment A).
GENERAL TERMS AND CONDITIONS
BILLING AND PAYMENT
Knudson will invoice monthly in accordance with the A TT ACHMENT B-1 - HOURL Y RATE
BASIS OF COMPENSATION. The Client hereby agrees to pay upon receipt of such invoice. A
service charge of one and a half (1 12) percent per month will be charged on all balances
remaining unpaid beyond thirty (30) days following receipt of invoice. In the event any portion
of an invoice remains unpaid forty five (45) days after the invoice date, the Client agrees to pay
the entire unpaid amount plus any and all actual and reasonable costs incurred to collect the
outstanding balance, including collection costs and attorney fees. Knudson may stop all work
(Stop Work Order) if the Client fails to pay invoices within forty five (45) days after Client's
receipt of invoice. In order for Knudson to proceed with any further service or release any work
product, Client will need to pay the entire balance on the Project in order to lift the Stop Work
Order. It will also be necessary for Client to pay Knudson an additional fee for costs incurred by
Knudson in mobilizing to complete the work.
ADDITIONAL SERVICES
Knudson will initiate regulatory reviews at the 60% and 90% stages of the Construction
Documents Phase. Knudson will use best efforts to assist the Client to obtain approvals from
regulatory authorities and necessary permits; however, Knudson does not guarantee or warrant
approval by regulatory authorities or that all permits will be approved. Should changes be
required to the Construction Documents after acceptance by the City in order to obtain the
approvals or permits, this will be considered additional services and Knudson will be reimbursed
by the Client for additional time or services required in connection therewith.
After acceptance of the 60% Construction Documents, if the Client make changes to the Project
Scope or Schedule resulting in additional work required of Knudson, these changes will be
considered additional services for which Knudson will be reimbursed by the Client.
TERMINATION
This Agreement may be terminated at any time by Knudson or Client should the other party fail
to perform any material obligations hereunder, or by the Client for its convenience, by giving
thirty (30) days written notice of such termination by registered or certified mail or
10f7
Knudson # 0080990
081125
nationally/regionally recognized overnight courier or delivery service to the either party's
principal place of business. Upon receipt of Termination Notice, Knudson will immediately stop
work and incur no further charges or expenses related to this Agreement. If this Agreement is
terminated, Knudson shall be paid in accordance with the provisions of this Agreement for all
work performed up to the date of termination, all reimbursable expenses, as well as other
reasonable costs and expenses incurred by Knudson related to the termination.
ACCESS TO THE SITE
Unless otherwise stated, and to the extent within Client's control, Knudson will have access to
the Project site for activities necessary for the performance of the services.
UNKNOWN CONDITIONS AND HAZARDOUS MATERIALS
Knudson shall have no responsibility for the discovery, presence, handling, removal, disposal or
exposure of persons to hazardous materials of any form. Should Hazardous materials, unknown
or hidden conditions be discovered on the site, the schedule may be affected and additional costs
may be incurred by Knudson. These costs will be reimbursed by the Client, and any necessary
adjustments in the schedule resulting therefrom will be approved by the Client.
INDEMNIFICATIONS
Each party agrees to indemnify and hold harmless the other and all of the other party's
personnel, employees and agents from and against any and all claims, damages, losses and
expenses (including reasonable attorneys fees) arising out of or from the performance of the
services, to the extent that any such claims, damage, loss or expense is caused in whole or in part
by the negligent act or omission or strict liability of the indemnifying party, anyone directly or
indirectly employed by the that party (except Knudson, in the case such party is Client) or
anyone for whose acts any of them may be liable. Knudson will perform its services in a manner
consistent with the usual and customary level of care and skill ordinarily exercised by other
professional consultants providing similar services in locations and similar circumstances at the
time the Services are performed. The above indemnification shall include any claim, damage or
losses due to the presence of hazardous materials.
LIMITS OF LIABILITY
In recognition of the relative risks, rewards, and benefits of the project to both the Client and
Knudson, the Client hereby agrees that the risks shall be allocated so that, to the fullest extent
permitted by law, Knudson's total liability to the Client, for any and all claims, losses, expenses,
damages or claim expenses arising out of this agreement, from any cause or causes, shall not
exceed the total amount of Twenty- Thousand dollars ($20,000), or the amount of the Knudson's
fee, whichever is greater. Such causes include, but are not limited to, Knudson's negligence,
errors, omissions, strict liability, breach of contract or breach of warranty.
DISPUTE RESOLUTION
The parties to this Agreement will attempt in good faith to resolve any controversy or claim
arising out of or relating to this Agreement promptly by negotiation between senior executives of
the parties who have authority to settle the controversy.
20f7
Knudson # 0080990
081125
The disputing party shall give the other party written notice of the dispute via certified mail, or
nationally recognized commercial delivery service. Within ten days after receipt of said notice, the
receiving party shall submit to the other a written response. The notice shall include (a) a statement
of each party's position and a summary of the evidence and arguments supporting its position, and
(b) the name and title of the executive who will represent that party. The executives shall meet at a
mutually acceptable time and place within twenty calendar days of the date of the disputing party's
notice and thereafter as often as they reasonably deem necessary to exchange relevant information
and to attempt to resolve the dispute.
If the controversy or claim has not been resolved within thirty days of the meeting of the senior
executives, the parties shall endeavor to settle the dispute by mediation under the Center for
Public Resources Model Procedure for Mediation of Business Disputes, or pursue amicable
termination of this Agreement.
If the matter has not been resolved pursuant to the aforesaid mediation procedure within sixty
days of the commencement of such procedure, (which period may be extended by mutual
agreement), of if either party will not participate in such procedure, the parties shall pursue
amicable termination.
FORCE MAJEURE
The term force majeure as used herein shall mean an unforeseen event, occurrence beyond the
control and without the fault or negligence of a party including, but not limited to: earthquake,
weather, flood, fire, explosion, malicious mischief, insurrection, riot, labor strike, lockouts,
boycott, acts of a public enemy, war, compliance with any order or directive of any
governmental agency. To the extent that a party's performance under this Agreement is rendered
impossible or impracticable due to force majeure, that party shall be relieved of any further
obligation under this Agreement except as to obligations incurred prior to the force majeure
event which by their nature survive termination, including payment and indemnity obligations
hereunder.
OWNERSHIP OF DOCUMENTS
All documents produced by the Knudson under this Agreement shall remain the property of
Knudson as evidence of service and may not be used by the Client for any endeavor without the
written consent of the Knudson prior to payment of all outstanding invoices. After payment of all
outstanding invoices, ownership of all documents transfers to the Client as work for hire.
Electronic documents prepared by Knudson as part of the scope of work will be supplied in a
read only format. No modification, manipulation or use of these electronic documents is allowed
without the express written approval of Knudson. Any modification, manipulation or use of these
documents by the owner, whether approved by Knudson or not, is the responsibility of the
owner. Knudson assumes no responsibility for documents modified or manipulated by anyone
other than Knudson. Knudson assumes no responsibility for the accuracy of data supplied by
others but used by Knudson in the preparation of any document required by the scope of work.
Knudson retains ownership and all copyrights of these documents in a format which can be
modified. Once all Knudson invoices are paid, ownership in a (one) read only version of each
document will be transferred to the owner, if requested. Knudson is not responsible for supplying
software, licensees or hardware which the owner made need to read the electronic version of any
30f7
Knudson # 0080990
081125
documents supplied as part of the scope of services. The owner will obtain all software, licensees
and hardware to view the documents at its own expense.
ENTIRE AGREEMENT
This Agreement and any attachments or exhibits hereto represent the entire Agreement between
Knudson and Client. There are no prior unwritten, oral, or other agreements between the parties
regarding this matter. This Agreement may be amended or modified only with the approval of
both Knudson and Client.
CLIENT CONTACT INFORMATION
The Client contact, primary business location, address of Client is:
John Joerns
Assistant City Manager
City of La Porte
604 W. Fairmont Parkway
La Porte, Texas 77571
The Client's phone number is: 281.470.5012
The Client's e-mail address is: joernsj@laportetx.gov
The Clients Project Name is: La Porte - Architectural Gateway
These shall be used by Knudson for all contract correspondence and invoices. Should any of the
Clients contact information change Client will notify Knudson of the new contact information.
KNUDSON CONTACT INFORMATION
Knudson primary business location and address is 8588 Katy Freeway, Suite 441, Houston,
Texas 77024. The Knudson Phone Number is 713-463-8200 and contact person for this contract
IS: Jad Molander, P.E - Chief Operating Officer
(CONTINUED ON FOLLOWING PAGE)
40f7
Knudson it 008()()90
081125
ACCEPTANCE
When executed by both parties this Agreement shall evidence the entire agreement between
Knudson and Client. This document is being executed in two (2) counterpart originals with
attachments, each of which has the full force and effect of an original.
AGREED AND ACCEPTED THIS r>f' DAY OF DECEMBER., 2008
CLIENT
Typed Name
Jarl W. Molander, P.E.
Chief Operating Officer
Title
CLIENT
Signatm-e
Typed Name
Title
This Agreement includes Attachments A, B-1, and C, which are hereby incorporated into this
Agreement as jfwritten directly herein.
Sof?
Knudson # 0080990
081125
ACCEPTANCE
When executed by both parties this Agreement shall evidence the entire agreement between
Knudson and Client. This document is being executed in two (2) counterpart originals with
attachments, each of which has the full force and effect of an original.
AGREED AND ACCEPTED THIS ~ DAY OF DECEMBER, 2008
l~f{~
~AT MUSToN
Typed Name
KNUDSON, LP
By:
Signature
Jar! W. Molander, P.E.
Chief Operating Officer
PRE:sJlJGA./T, J--A PO({iE Ocl/ELOfJJ-1Ftf/'.....
Title COflfof'-A,IOIll 130/11< D
CLIENT
Signature
Typed Name
Title
This Agreement includes Attachments A, B-1, and C, which are hereby incorporated into this
Agreement as if written directly herein.
50f7
Knudson # 0080990
081125
ATT ACHMENT B-1
HOURLY RATE BASIS OF COMPENSATION
LABOR COSTS
The Client agrees to pay Knudson for labor costs on an hourly basis in accordance with
Attachment C- Fee Schedule.
REIMBURSABLE EXPENSES
The Client agrees to pay Knudson for all reimbursable expenses incurred by Knudson while
providing services in accordance with Attachment A. Reimbursable expenses include, but are
not limited to: internal and commercial printing, internal and commercial plotting of drawings
and exhibits, internal and commercial copying, courier and delivery services, postage, long
distance calls, art supply fee, and vehicle mileage.
SUBCONTRACTOR AND CONSULTANT COSTS
The Client shall pay Knudson for all subcontractor and consultant costs. These costs shall be
reimbursed in accordance with Attachment C.
ADDITIONAL SERVICES
Knudson shall be reimbursed for additional services in accordance with Attachment C.
60f7
"ATTACHMENT C"
Billing Rates
December 2008
labor bv Staff Classification Billina Rate
President / COO $ 290
Senior Vice President or Deoartment Director $ 220
Vice President, Senior Proiect Manaaer or Proaram Manager $ 175
Project Manager $ 150
Proiect Administrator $ 135
Senior Financial Analvst $ 140
Financial Analyst $ 115
Development Specialist $ 80
Senior Landscape Architect $ 150
Landscape Architect III $ 125
Landscape Architect II $ 110
Landscape Architect I $ 85
Senior Planner $ 125
Planner III $ 90
Planner II $ 80
Planner I $ 70
Senior GIS Specialist $ 135
GIS Specialist $ 105
GIS Technician $ 70
Principal Environmental Specialist (aeneral consultation) $ 200
Environmental Specialist I $ 110
Environmental Specialist II $ 125
Environmental Tech $ 85
Construction Manaaer / Admin $ 175
Construction Site Representative $ 120
Senior Administrative Support / Accountina $ 135
Administrative Support / Accountina II $ 100
Administrative Suooort / Accountina I $ 70
Reimbursable EXDense Billine Rate
Subcontracted Work ( selected by KA) Cost + 10%
Subcontracted Work ( selected bv Client) Cost + 15%
Computer Usage (minimum of 17% of labor hours) $12/hour
Local Travel IRS Standard Rate
Non-Labor Expenses Cost + 15%
GPS Receiver $125/day(minimum)
All Terrain Vehicle $125/day(minimum)
In house paper copies ( Black & White) $0.50/oaae
In house paper copies ( Color) $1.50/oaae
In house plottina $14.00/SF
Art Supplies (as a percentaae of labor invoiced) 1.8%
70f7
Knudson # 0080990
081125
~.
~..j
Knudson # 0080990
"ATTACHMENT A"
KNUDSON, LP
SCOPE OF SERVICES
LA PORTE - ARCHITECTURAL GATEWAY
CITY OF LA PORTE
November 25, 2008
The following is a summary of Landscape Architectural Design services and deliverables
to be provided by Knudson, LP for the development of the La Porte - Architectural
Gateway, located in La Porte, Texas. This Scope of Services and the Basis of
Compensation are based on the attached conceptual site plan, labeled "Exhibit A-1" and
design perspective, labeled "Exhibit A-2", which includes the following:
· Landscape planting design and construction details
· Landscape irrigation design and construction details
· Site urban design and construction details:
Pedestrian paving
Outdoor furniture specification
Ornamental iron fencing
Ornamental brick columns
· Site urban design and architectural gateway lighting design
· Architectural gateway 'icon' design and construction details
· Architectural gateway 'icon' structural pier design and construction details
· Parking lot re-alignment and paving
· Parking lot drainage design and grading
· Building modifications:
Construct a higher parapet wall
Fayade improvements - doors and windows
Possible roofing improvements
Possible electrical improvements
Possible integration of Gateway Monument into building structure
Please note that the "Allevwav" behind the buildina is not within this ScoDe.
I. Project Initiation
a. Knudson will conduct an initial project design team meeting with the City
and sub-consultants to confirm the design program, project schedule and
general design requirements. This includes a tour of the project area to
familiarize all team members with key design and engineering concerns.
b. Collection and creation of project base files (base maps) from the Survey
provided by the City.
II. Site Engineering Feasibility
a. Drainage
i. Investigate existing storm drainage facilities and their capacities to
determine possibility of lowering parking lot to reduce flooding of
building from parking lot.
ii. Contact and meet with TxDOT officials to see what requirements
they have for connecting to their drainage system along SH 146.
Page 1 of 4 November 25, 2008
Knudson # 0080990
b. Water & Sewer
i. Investigate existing water and sanitary sewer systems to confirm
that both water and sanitary sewer systems have capacity for a
restaurant operation.
c. Rights of Way and Easements
i. Confirm limits and stipulations of existing rights-of-way and
easements, if applicable.
d. Engineering Feasibility Report
i. Provide a brief narrative, with exhibits as found appropriate,
identifying key site design and development issues that may affect
the Scope of work.
III. Building Engineering Feasibility
a. Structural
i. Investigate existing building wall and roof system to determine if
existing structure can support addition to parapet wall.
ii. Investigate existing building wall and roof system to determine if
new monument can be integrated into existing structure, or if the
new monument must be free standing.
b. Electrical
i. Investigate existing building wall to see if there are circuits that will
be affected by modifications to the wall structure.
ii. Determine if exterior improvements will cause Electrical Code
upgrades.
c. Engineering Feasibility Report
i. Provide a brief narrative, with exhibits as appropriate, identifying
key building condition and construction issues that may affect the
Scope of Work.
IV. Construction Document Phase - 30%, 60% and 90% Submittals
a. Based on the approved Conceptual Design that was presented to the
Economic Alliance and City of La Porte officials on 08.18.08, Knudson will
prepare Construction Documents consisting of Drawings and
Specifications setting forth in detail the requirements for construction of
the project and will show the location, configuration and characteristics of
the proposed site features as follows:
i. Site Improvements
1. Demolition Plan
2. Site Plan
3. Storm Water Protection Plan
4. Planting Plan: showing planting locations, quantities and
recommended plant species
5. Irrigation plan: showing main line routing, head layout,
valves, pipe size and irrigation controller location
6. Paving plan for pedestrian and vehicular areas, including
paving layout and material selection
7. Parking lot grading and drainage design
8. Architectural gateway design, accent material selection
and construction detailing
Page 2 of 4 November 25, 2008
Knudson # 0080990
9. Landscape and architectural gateway lighting layout and
fixture selection
10. Specifications - CSI format
11. Estimate of Probable Construction Cost
12. Design and Engineering Fee Budget Status
ii. Building Modifications
1. Demolition Plan
2. Structural Modifications
3. Fayade Improvements
4. Roof Improvements
5. Specifications
6. Estimate of Probable Construction Cost
7. Design and Engineering Fee Budget Status
b. Knudson will participate in coordination meetings with the Civil Engineer,
Architect, Structural Engineer and Electrical Engineer to coordinate
parking lot grading and drainage, structural pier design, as well as
improvements to the building.
c. Knudson will attend the following Construction Document progress review
meetings with the City of La Porte:
i. 30% Completion - 1 meeting
ii. 60% Completion - 1 meeting
iii. 90% Completion - 1 meeting
V. Bidding and Contract Phase
a. Knudson will provide the following Professional Services during the
Bidding and Contract Phase:
i. If required, assist with pre-qualification of bidders
ii. Assist City with processing of bidder inquiries and issuing
addenda
iii. Assist City with evaluation of bids
b. Attend pre-bid and bid opening meetings
c. Provide recommendation for award of construction contract.
VI. Construction Administration Phase Services
a. Attend the Pre-Construction Meeting
b. Review and approve or take other appropriate action upon Contractor's
submittals such as Shop Drawings, Product Data, Samples, and Request
for Information, but only for the limited purpose of checking for
conformance expressed in the Construction Documents.
c. Attend one Construction Progress Meeting per month to observe
construction for general conformance with the Construction Documents
and to assist the City in review of the Contractor's pay application.
VII. Basis of Compensation
a. Knudson, LP will provide the Project Initiation and Engineering
Investigations described above on an Hourly Rate Basis, with "Not To
Exceed" limits as follows:
i. Project Initiation
ii. Site Engineering Feasibility
iii. Building Engineering Feasibilitv
Subtotal
$ 2,500.00
$ 7,500.00
$ 3,500.00
$12,500.00
Page 3 of4
November 25, 2008
Knudson # 0080990
b. Knudson will provide Construction Document Phase, Bid Phase and
Construction Phase Services on an hourly rate basis, not to exceed
$58,434.00 without additional authorization by Client. This fee basis
assumes a single construction contract for all site and building
improvements and a construction schedule of four (4) months.
c. Invoices will be issued monthly to reflect work performed to date
VIII. Reimbursable Expenses
a. Reimbursable Expenses include vehicle mileage to and from meetings,
plotting, printing, courier and delivery services and are estimated to be
$3,000.00.
b. Reimbursable Expenses also includes the geotechnical investigation
which is currently budgeted at $5,600.00
c. City of La Porte will provide a topographic and site survey for use by
Knudson, in an electronic format that is compatible with AutoCAD 2006,
and in levels acceptable to Knudson. If Knudson provides the
topographic survey, it will be provided as a Reimbursable Expense with a
budget allowance of $8,500.00
d. Reimbursable Expenses are not included in the professional design fees.
e. Reimbursable Expenses will be paid for at cost times a 1.10 multiplier.
IX. Clarifications and Exclusions
a. Meetings/presentations with City of La Porte, or with others than those
described in the above, will be provided as additional services on an
hourly rate basis.
b. The design and engineering of off-site water, sanitary sewer, storm
drainage or electrical systems is not included in this Scope and will be
provided upon request as an Additional Service.
c. The irrigation system will operate and use water from the City of La Porte
municipal water system.
d. Application and preparation of documents for variances is not included in
this Scope of Services.
e. A traffic control plan and implementation will be provided as an Additional
Service
f. The drainage design for the proposed parking lot is to be determined
based on the results of the engineering investigation
g. All construction drawings will be prepared in AutoCAD 2006.
h. Revisions to the approved 100% Construction Drawings, will be provided
as an Additional Service.
X.
Proposed Schedule
a. Project Initiation and Engineering Feasibility
b. Construction Documents
c. Bid and Contracting Phase
d. Construction Phase
TOTAL
6 Weeks
10 Weeks
8 Weeks
16 Weeks
40 Weeks
Page 4 of 4
November 25, 2008
~
N
,
4.
~
..J
10
.,.I
:r
j
~